Job jumps from Scheduled to Finished for RDA DSO

Hi,
A job in production for RDA DSO load started jumping directly from " scheduled to finished " when the job gets kicked off, instead of going to " Active " state.
The log in SM37 shows the job finished successfully and I do not find any errors anywhere.
When, I rerun the job manually, it changes from Scheduled to Active and runs fine.
I also looked under infopackage > processing tab, but, nothing odd.
What am I missing

Hello Devi,\
This is less likely to happen.., Anyway have to got the desired output from the job !
If yes, then there might be something like, job started and finishes as soon as you refreshed for the status.  And I suppose if the desired outcome from job is visible , then no need to worry on that Issue.
And as you mentioned there is nothing odd, then relax .., everything is fine !
If there is any issues/ problems, can you please share the relevant description or snapshot.
Regards
YN

Similar Messages

  • Dynamic Job Name from Scheduler

    Hi,
    I am newbie to BIP and have couple of questions about scheduling reports
    Is it possible to configure the name of the report output and email as an attachment? -- e.g. 12345_033110081010.pdf
    In bursting report, is it possible to name each busted report output file and email each burst report separately?
    Thanks in advance.
    HS

    Hi Marshal,
           You can add a extra node to your target strucutre like
    FileName- Node
    --FileName - Element.
    do the mapping from the field filename of RFC to FileName field in u r target strucure. And use this  field path at Refrence in variable subtituion.
    In the Content converison add the Name & Values as below
    FileName.fileldNames -- FileName
    FileName.fieldFixedLengths -- 0
    FileName.fixedLengthTooShortHandling -- Cut
    So the extra field in u r target structure would not populate in u r target text file.
    Cheers
    Veera

  • Oracle Grid Scheduled jobs disappear from active tab?

    Thread was posted before as a similar situation.
    Grid Control jobs disappeared from schedule
    But was never answered;
    For Grid control v10.2.0.3 Unix box.
    I was wondering if this is a bug within OGC. Some of the scheduled jobs disappear from the active tab and have to be re-submitted. Does anyone or has anyone experienced this? Agents are in synch, and the only thing that was done was a bounce of the database and possibly the box itself.
    Thanks,
    Mark S.

    Hi,
    I have upgraded Discoverer 4i EUL to 10g EUL by using auto upgrade utility which comes with the Disocverer 10.1.2 and installed the Discoverer 10g Admin Edition on my PC. And I executed the batchusr_app.sql and assigned a user DISCREP(other than APPS). We are in APPS mode EUL. The script execution completed fine and the EUL5 packages were created under the DISCREP owner. When I log into the Discoverer Admin and select Tools/Privileges and at the point of assigning the result tables to a schema which is DISCREP, I am getting a message saying that 'EUL5_BATCH_REPOSITORY' package is wrong version and batchusr.sql script needs to be run. I ran the batchusr.sql script and when tried to assign the schema to own result tables it gave me the same message.
    Any ideas. You may have gone through this during your upgrades or installation.
    Thanks,
    Sabbani

  • Enhance additional fields for RDA

    Hi
    what is process need to follow if I want enhance fields to dso which is using loading process as RDA. and what is process follow while moving to production and what is process  I need historical loads for rda dso.

    Hi,
    Whats your data flow?
    Assuming as source field might be exist at source/psa.
    at Dev system you can add required info object to DSO.
    do the proper transformations from source.
    if you at PSA/source there is no historic data then delete psa/dso data.
    Load historical data from source to psa and then dso..further.
    at prod. Stop DSO data flow process chain.delete delta pointer at data source level.
    move your changes to prod.
    load full load.
    run init info pack without data.
    set delta pointer and continue your loads.
    At DSO level data deletion not mandatory if your dso key fig are over write option. But memory wise better to delete old data and reload historic data.
    Think twice and follow your actions.
    Thanks

  • How can we schedule the finished job in SM37 ?

    Hi,
    I need to schedule all the jobs which are running in Production to a common user (Ex. BWGURU).  Presently the jobs are running on different users in SM37. My requirement is to schdule all the running / finished / scheduled /released / cancelled jobs to a common user. I am not manaage to schedule the finished / cancelled job.  How can i do that ?
    Please required ur inputs .
    thanks
    Praveen.

    Hi Praveen.....
    U can't never make a finished job to released............First a Job will be in Release state...........then it will be in Schedule.........then the Job will Start...........then either finish or Cancelled...........
    To start a job...............u hav ti to take the Released state of the Job to schedule......
    Hav u Clicked on immediate tab...........there just check the immediate box................then check and save...........
    U hav said.......i am getting extra job running with the same name............u mean that the job is is running State .............right.........Look u cannot create two jobs in same name...............may be that job is running.............hav u scheduled the job ?............may be thats why it is running..............if u want to cancel the running job.............double click on the job.............from job details copy the PID and Application server.............come out...........click on Application Server...............double click on the desired server...search the PID.and cancel the job.............
    Regards,
    Debjani..........

  • Restrict users from scheduling job

    Hi All,
       Now our users are able to schedule the job from SM37. By default I think the job is running on the main server and the performance of the system is effected badly.
      Is there any way we can restrict the users to schedule the job on a particular server and try to avoid them from scheduling the job on a particular server.
    Thanks.

    This can be done with a small work around.
    When you run a job what actually runs is the program which you set it as steps
    Now, set authorisation for that particular program so that only few users who are authorised can run the job.
    Now, while scheduling the job, in SM36 you can specify the target application server on which the job has to run..
    Hope it helps
    Thanks,
    Babu Kilari

  • Default environment for user Oracle when launched from Scheduler?

    Hi:
    This is probably pretty basic but I haven't found the answer yet. I'm trying to run an import job using imp from Scheduler. I've modified the file $ORACLE_HOME/rdbms/admin/externaljob.ora so that the jobs are running as user oracle. If I echo the result of 'whoami' in the program it indeed says I'm oracle, but ORACLE_HOME etc. are not set. Is this intentional? I would think that it runs the .bashrc etc. to get the proper environment for the user.
    Thanks.

    You can not rely on any variable set in the environment.
    Ronald
    http://ronr.blogspot.com

  • Asking for login details jumping from BW  to SS report at Portal site

    Hi Guys
    Our BW reports are avilable from protal for user's.
    Now the issue we are facing is when we jump from BW report to source system(SRM) report, it is aksing for login details for source system. where as at portal site it should not ask for login deatils. And we are facing this issue only in QA system and not PRD system.
    M not sure where things are going wrong. I have checked SSO. nothing seems to be wrong here also.
    Thanks & Regards,
    Rohini

    Hi Rohini,
    I may not be correct. But does the user id which you are using (both in QA & Prod) have same settings for User-Type (<i>SU01 -> Logon Data -> User Type</i>). ?
    Also u can check the RFC Settings (SM59).
    Hope it would help..
    Regards,
    Vikrant.

  • Read the job Z_JOB from SM37 and re-schedule dynamically

    Hi All,
    I have one requirement where I need to schedule a job in background. The job Z_JOB has 10 steps in it and each step itu2019s calling different program with a variant. Now I need write a Z program to re-schedule the Z_JOB dynamically.
    I know how to schedule the job with multiple steps through program. (JOB_OPEN, Submit Statement, JOB_CLOSE). But my question is there any other way to read the job Z_JOB from SM37 and re-schedule dynamically. So that I can avoid this 10 SUBMIT programu2026??
    Thanks in Advance,
    Raghu.

    Hello Raghu  ,
    JOB_OPEN ( Opens  a BG job )
    JOB_SUBMIT ( Insert a background Task)
    JOB_CLOSE (Closes a BG job)
    Are the 3 function module by with you can create a have  a bg job sheduled programatically...!
    Hope it helps
    Edited by: Anup Deshmukh on May 3, 2010 12:36 PM

  • How can i schedule concurrent program for every one hour from back end

    Hi ,
    I want to schedule concurrent program for every one hour from back end .
    Example
    1) xyz is the concurrent program that should run for every one hour with a parameter 111 and the SAME concurrent program that
    should run every 2 hours with a different parameter like 222.
    I mean Conc prog should run for different parametrs with a different scheduling..
    Please guide me to solve the issue.
    Thanks in advance...
    Regards
    Narender B

    Hi ,
    I have used following code for scheduling the concurrent program from backend.
    declare
    l_request_id NUMBER;
    l_return_code boolean := FALSE;
    BEGIN
    fnd_global.apps_initialize(62991,54477,20003);
    l_return_code := FND_REQUEST.SET_OPTIONS ('YES');
    l_return_code :=fnd_request.set_repeat_options('16:36:00','','DAYS','START','','Y');
    l_request_id:=fnd_request.submit_request(application => 'xbol',
    program => 'NAPP_START_GENERATE_CHART_DATA',
    description => 'Processing chart ',
    start_time => SYSDATE,
    sub_request => FALSE,
    argument1 =>4000130957231588,
    argument2 => null
    COMMIT;
    dbms_output.put_line('Program has been submited and request id is '||l_request_id);
    END;
    Here the issue was concurrent program is completing with a warning like
    Resubmission of request 75588551 has been cancelled.
    FND_RESUB_PRIVATE.PROCESS_INCREMENT EXCEPTION: ORA-01403: no data found
    Resubmission of request 75588551 has been cancelled.
    FND_RESUB_PRIVATE.PROCESS_INCREMENT EXCEPTION: ORA-01403: no data found
    so i could not find the solution for this issue,please anybody guide me to solve this issue.
    Regards
    Narender B

  • Message directly from SAP for job details from SM37 to email adress.

    Hi,
         Can any one tell me if there is any way of triggering a mail from SAP R3 for any particular job details from T code SM37.
    Thanks & Regards,
    Rohan Somji.

    Dear Rohan,
    Check this thread to explore about the settings to be doen for sending E mail to the external system,
    Re: Settings to be done for sending mail to external system
    Regards
    Mangalraj.S

  • Retrieve data from a report or database to an input schedule in BPC for exc

    Hi,
    I am using BPC for excel ( v 5.1).
    I've created an Input Schedule(Input-1) using BPC for excel and sent data to the dB.
    I need this (Input-1) data to use it in a new Input Schedule(Input-2), for further manipulation.
    I need this data to be dumped in a sheet for further calculations in (Input-2).
    How can i bring this data?
    I created an input schedule(Input-2) and tried building an evdre in an excel macro to get it as a report of the 1st Input. But i was unsuccessful. I faced an error "ERR: Invaled KeyRange Header".
    Am i thinking in the correct way? Do we 've any other options to retrieve this data?
    Need your help to proceed....
    (Pretty soon, the environment is going to be with version 7.0)

    The macro i use to run when my workbook opens is as follows:
    Private Sub Workbook_Open()
        ActiveWorkbook.Sheets.Add
        Sheets(Sheets.Count).Name = "Dump_Sheet"
        Sheets("Dump_Sheet").Range("a1") = "Application1"
        Sheets("Dump_Sheet").Range("a2") = "=EvDRE($A$1,A14:B20)"
        Application.Run ("MNU_eANALYZE_REFRESH")
    End Sub
    Also I 've tried this too:
    Private Sub Workbook_Open()
        ActiveWorkbook.Sheets.Add
        Sheets(Sheets.Count).Name = "Dump_Sheet"
        Sheets("Dump_Sheet").Range("a1") = "=EvDRE(""Application1"",A14:B20)"
        Application.Run ("MNU_eANALYZE_REFRESH")
    End Sub
    Both of these gave me the same error code :
    #ERR : Invalid KeyRange Header

  • I use BT Yahoo! but when I try and navigate to email from the home page it keeps jumping between 'connected and waiting for login' and never loads up.

    My internet service provider is BT in the UK. The home page is www.btinternet.com. After I've logged on, the home page displays fine - I can see the summary of my emails in one of the windows on the home page. The problem comes when I click on the mail application. The page then tries to load the email application. However, it never actually loads, it keeps jumping between connected and waiting for login. It never achieves it so I just have to click the 'back' button to get to the home page. I use chrome and ie but neither has this problem.

    I retraced my steps to how i got the Google app:
    App Store icon on Home Screen > Search, at bottom > entered Google
    The first Google App on the screen appears:
    Google logo small g in blue square: Google Search; Open (because it is already installed).  Below that is a picture of the iPod with the usual  Google Search screen.  I have never inserted a link into a discussion group so i hope you can open this. 
    http://https://itunes.apple.com/us/app/google-search/id284815942?mt=8
    Does this bring us any closer? 

  • How to stop a running job in 10g Scheduler?

    The following is a duplicate post. I posted the following to the general database forum before seeing that otn has a new scheduler forum:
    I am not able to find in the Admin Guide a method to stop a currently running instance of a job in the 10g scheduler.
    In 9i, I run the following script calling DBMS_JOB.broken and DBMS_JOB.remove to shut down currently running jobs:
    DECLARE
    jobid NUMBER;
    CURSOR c1
    IS
    SELECT job
    FROM dba_jobs
    WHERE priv_user = 'ME';
    BEGIN
    OPEN c1;
    LOOP
    FETCH c1
    INTO jobid;
    EXIT WHEN c1%NOTFOUND;
    DBMS_JOB.broken (jobid, TRUE);
    COMMIT;
    DBMS_JOB.remove (jobid);
    COMMIT;
    END LOOP;
    CLOSE c1;
    END;
    How may I create similar code to shut down currently running jobs using DBMS_SCHEDULER in 10g? According to the Admin Guide, disabling jobs with the force option will still allow the job to finish.
    How can I terminate a running job in 10g?

    You can stop a currently running job using the STOP_JOB api.
    STOP_JOB Procedure
    This procedure stops currently running jobs or all jobs in a job class. Any instance of the job will be stopped. After stopping the job, the state of a one-time job will be set to SUCCEEDED whereas the state of a repeating job will be set to SCHEDULED or COMPLETED depending on whether the next run of the job is scheduled.
    Syntax
    DBMS_SCHEDULER.STOP_JOB (
    job_name IN VARCHAR2
    force IN BOOLEAN DEFAULT FALSE);
    Parameters
    Table 83-44 STOP_JOB Procedure Parameters
    Parameter Description
    job_name
    The name of the job or job class. Can be a comma-delimited list. For a job class, the SYS schema should be specified.
    If the name of a job class is specified, the jobs that belong to that job class are stopped. The job class is not affected by this call.
    force
    If force is set to FALSE, the Scheduler tries to gracefully stop the job using an interrupt mechanism. This method gives control back to the slave process, which can update the status of the job in the job queue to stopped. If this fails, an error is returned.
    If force is set to TRUE, the Scheduler will immediately terminate the job slave. Oracle recommends that STOP_JOB with force set to TRUE be used only after a STOP_JOB with force set to FALSE has failed.
    Use of the force option requires the MANAGE SCHEDULER system privilege.
    Setting force to TRUE is not supported for jobs of type executable.
    Usage Notes
    STOP_JOB without the force option requires that you be the owner of the job or have ALTER privileges on that job. You can also stop a job if you have the CREATE ANY JOB or MANAGE SCHEDULER privilege.
    STOP_JOB with the force option requires that have the MANAGE SCHEDULER privilege.

  • How to schedule a workflow for recurring executions: The solution

    Scheduling a workflow for recurring execution has been long awaited in WFA, perhaps from 2.0 time. The following document shows how to get it done. I've also explained the logic behind it. It’s very simple to use, meets every requirement which one can have from a scheduler and of course highly flexible. Let's go!! The Real stuff. What is this? Is this actually a scheduler? No. This is actually a command in your workflow, but a special 'magical' command. This 'magical' command logic is built using the answers for the following questions: Can a workflow be scheduled for a delayed execution in a future time? Yes, but only one execution instance. If you want the next execution, execute the workflow again providing the same set of inputs and the execution date/time.During workflow execution, can a command inside a workflow get to know what is the  name of the workflow? YesDuring workflow execution, can the command know what is the job execution id? YesIs there any programmatic interface available to know what are the user input provided or a particular job execution? YesCan a command inside a workflow trigger another workflow? Yes.Can a command inside the same workflow trigger itself? Absolutely yes. I've ticked all boxes needed to build such a solution. The solution is to make the workflow a smart workflow, so smart that it can schedule itself for the next execution. It no longer needs any other task scheduler to tigger it. WFA provides a large set of REST APIs for other 3rd part SW integration. But I  also can make  good use of these APIs to make smart workflows. I have always believed that WFA should not only be seen as a framework for automating Storage boxes or server, but just about any task( inside a computer of course) which is done manually. WFA is an awesome product indeed.  So this is a command called "Workflow Scheduler" which  you can put in your workflow as another command. Prerequisites: You need PowerShell 3.0 on your WFA server. I certainly could have done it for PoSH2.0 as well, but life for web interfaces  using PowerShell is so much easier with Posh3.0. Posh3.0 is a big jump from 2.0. WFA is fully supported to work on Posh3.0. Its available by default in Win2012, Win2008 can be upgraded, Win2003 users can't use it. Add credentials of a WFA Admin/Architect in you WFA itself with Name/IP: localhost Match: ExactType: OtherName/IP: localhostUsername: <WFA Admin/Architect Username>Password: <User Password>   3.  Minimum WFA version 2.2. This is only needed for Importing the dar. I've provided the command code in text too. The command code is the real deal. How to use it? If you have a workflow which you want for recurring executions, just add this command "Workflow Scheduler" in it. The command takes parameters for the workflow execution intervals. For example minsInterval for executing this workflow every x minutes, or daysInterval for executing the workflow etc.Now just like a normal workflow execution execute this workflow deciding what is the trigger time. Example: Suppose you want the execution every day at 10:00 PM.So provide daysInterval = 1 And execute the workflow for a delayed execution at 10:00 PM. You can pick the day to start as you wish. The workflow will execute at 10:00 PM and when this execution reaches our magical command "workflow scheduler", this command will trigger the same workflow  with same set of inputs for the next execution at 10:00 PM tomorrow. And so on an so forth. I’ve attached a very simple example workflow here to help you understand. An Example of a workflow scheduled for recurring execution Daily at 11:30 PM starting 10-March-2015     How to stop/suspend this recurring execution? Easy. You just abort the next scheduled job execution in Execution=> Execution Status. The cycle will stop. How to resume it? Easy again. Just resume the same aborted job. The cycle restarts. Can I change the schedule execution time? Yes. After aborting the current execution, you can resume the same workflow at a new time. Execution interval can't be modified as you can't change the command parameters. But the recurring execution now can occur at a new time. Where or which position to place this “workflow scheduler” command in your workflow? At the beginning ? At the end? Or somewhere in the middle. This completely depends on your choice. See some below cases. You don't want the next job execution scheduling to happen if any of the commands in my current workflow execution fails: Put command “workflow scheduler” in the end. It will trigger the schedule of the next job execution only when all real original commands of your workflow have passed. else not.     You want continuous job executions irrespective of the workflow command failures: Put it in the beginning. It will trigger the schedule for next execution before any of the actual command begin executing.     You want an approval before the next execution job is scheduled: Add an approval point before the comamnd.           So it’s all left to you.      Can an operator decide the execution schedule? Yes, but which workflows will be available to him/her for this recurring execution will have to be decided by the designer. This is a good thing to have as it serves for access control in a way. The Architect/Admin can now restrict which workflow can be put for recurring executions. Operators can’t execute just any workflow available to him for automatic recurring execution. And the workflow designer can also choose which scheduling parameter is to be made a variable for the operator. For example the designer want the operator to schedule a given workflow only for weeks Interval and not months or days i.e. he/she can only chose to schedule for weekly, biweekly etc. executions and  nothing else. For this the designer can define a User-Input variable only for weeksInterval parameter. It’s Done. You want workflow execution to be scheduled either for daily or once in 2 days but not any other. You can restrict this. Or he/she wants to give full freedom to the operator make his/her own decision about scheduling, he defined user-input variable for all scheduling parameters. The workflow designer wants weekly schedule but the day should not be a weekday: You can even do this. Is this flexible enough for my requirements? I’ve attached the very command code. You can modify the command as per your requirements. Suppose you want daily execution of a certain workflow at 10:00 PM but skip a day of execution if the day is a Monday. Modify the code check for the day and add another day if it’s a Monday. Its posh code and highly readable. So you can see how this can be used in a  variety of ways. This is the beauty of a programmatic solution. Its highly flexible, it allows users to design solution based on their requirements. Flexibility is the heart & soul of WFA. Thats why I like it. I have a workflow but I don't want to modify it by adding a new command in it. Can I still use this solution? Yes but with WFA 3.0 on wards. WFA3.0 allows to create modular workflows. Create a parent workflow with you actual workflow as a child workflow in it. Add our “workflow scheduler” command too. So now you don't need to touch your existing workflow. I've attached a workflow example here.   Have fun!! sinhaa  

    Providing a new version 1.1.0 of the command "WFA Schedular" Changes made: Added conditional String Representation based on the Scheduling parameter provided. Provided check for the right number of parameters passed into the command.Added a new parameter "Expiry Date" to automatically stop the recurring execution upon expiry.Check for Posh3.0 version in code.Have Fun!! sinhaa Below example for:Schedule a workflow for recurring execution every alternate day i.e. once in 2 days at 10:30 PM starting 06-Jul-2015 (Today's date is 02-Jul-2015) . The recurring workflow execution  should expire on 31-Dec-2015 and stop.  

Maybe you are looking for

  • 10.6.1.7

    I have a new ipad3 and a 6th gen nano- neither are syching.    I thought the new update listed above was supposed to fix these errors.  I am still unable to synch either.  ipad running on 5.1  and nano running on 1.2.  I am on a PC platform.  iTunes

  • Lock screen closing apps - iOS8/iPad Mini

    Since the iOS8 upgrade my iPad mini closes the open app when it auto locks or when I close the cover. How do I fix this undesirable behaviors?

  • Is there any table or report that available in SAP for any PR/STR

    HI All, Is there any table or report that available in SAP for any PR/STR that are remain opened after S/O canceled. Please advice at the earliest. Thanks Chandru

  • Indexing across many documents

    I am making a 442 page book, but the process used to get this book published has required me to ship the pages in spreads. So, I have 221 documents. I wanted to Index them ASAP. Is there a way to index all as separate documents or am I forced to make

  • Write-Behind Caching and Old Values

    Is there a way to access the old value cached in the write-behind cache for the same key from the CacheStore's store() or storeAll() method?