Kanban - External procurement with multiple vendor

Hi Gurus,
We are working on implementation of Kanban for external procurement (Scheduling agreement) in my organisation. As per the business requirement, some of the components are supplied by more than one vendor. As per the standard process, Kanban supports automated processfor single vendor only & not multiple vendors
Has anybody come across this issue? Could you plese share your experiene & any possible workaround or solution to this isuue
Thanks
Kariya

Hi,
This is how KANBAN works. Since sourcing is automatic.
You could do a couple of things; first, have more than one control cycle, one for each vendor. Drawback is that you also need to have separate kanban containers for each cycle/vendor. But in the case where you have more that one supply area for a material this is not so bad.
Another way could be working with internal demand area, in such a way that Kanban creates a stock transfer reservation. Then you need to process the requirements with MRP, and issue orders to multiple vendors (maybe using quota arrangement).
To ilustrate the solution: your supply area is geting replenishment from the main warehouse, not directly from the vendor. These are two different storage location or plants...
Regards,
Mario

Similar Messages

  • External Procurement with a Valuated Sales Order Stock

    Hi Experts,
    I read the following in SAP Help,
    For external procurement with a Valuated Sales Order Stock, system generates a purchase requisition from the sales order.
    If you are using a valuated sales order stock, the externally procured material is assigned to inventory at the time of the goods receipt. If the sales order item is flagged as carrying costs and revenues, then when the goods issue for delivery to the customer takes place, the sales order item is debited with the costs of the externally procured material.
    My question is - it says costs of external procurement is debited to sales order item when " goods issue for delivery to the customer takes place"
           - but in my case, when I made the GR for purchase order (created automatically by sales order), system directly posted the procurement cost as actual costs to the sales order item. There is no delivery for sales order done still.
    So actually, when should the external procurement cost be debited to sales order item -- when GR for purchase order is done (or) when  goods issue for delivery to the customer takes place?
    Thanks,
    GAN

    Hi Rafi,
    Thanks for your reply. I understand the problem now.
    Material which comes from prod order is posted statistically (value type 11) to sales order when GR for prod order is done.
    Here, the issue is about a GR for purchase order (assigned to sales order). This material purchased is not used in any production process. Its a material which is supplied to customer along with main material produced in house.
    In purchase order, I have given the consumption account (which is cost element 1). Entry was Consumption Dr and GR/IR Cr. So, this posted as actual cost to sales order.
    I should have given inventory account in purchase order (with cost element 90).
    Its a mistake of using consumption account in purchase order.
    Thanks.
    GAN.

  • T&E postings with multiple vendor

    Hi gurus ,
    there is a scenario for T&E postings as Journal Entries :-
      SAP system will be recieving a file in the following format  from a thrid party tool--->
    One Journal Entry :-
    Company Code   Cost Center   GLAccount   Assignment   Text   Debit Amount    Credit Amount
       0004                   62100           60100            TEA125       Cattty     45
       0004                   62100           00103            TEA125       Catty       210
       0004                   82131           60100            TEA131       ADAM    34
       0004                   82131           60103            TEA131      ADAM     670
       0004                                        2xxxy           PostingDat   TEpayble                       200
       0004                                        2xxxz           PostingDat   CrdtCrdpayable             300
    Will it be possible to post the entries like :-
        employees are considered as vendors : so vendor account crediting and GL Account debbiting ?
    Like
    Posting key 31 (vendor)    9122345       Catty       45
                       40 (Debit Entry)60100         Catty       200
    or
    Shall we infer it as multiple vendor postings in one accounting Document ?
    Could anybody please give some suggestions on the above file format breaking down to one Journal Entry Posting ?
    Any information is helpful : since i have nevr checked file with multiple vendors at line item level or how shall we infer the debit side and the credit payable side as mentioned above
    Thanks
    Kylie

    is there some problem at the sdn , even if i rate a thread as Stop watching and discard it doesnot get discarded ????
    Thanks
    Kylie

  • Can we bind a single external table with multiple files in OWB 11g?

    Hi,
    I wanted to ask if it is possible to bind an external table with multiple source files at same or different locations? Or an external table has to be bound to a single source file and a single location.
    Thanks in advance,
    Ann.
    Edited by: Ann on Oct 8, 2010 9:38 AM

    Hi Ann,
    Can you please help me out by telling me the steps to accomplish this. Right click on the external table in project tree, from the menu choose Configure,
    then in opened Configuration Properties dialog window right clock on Data Files node and choose from menu Create -
    you will get new record for file - specify Data File Name property
    Also link from OWB user guide
    http://download.oracle.com/docs/cd/B28359_01/owb.111/b31278/ref_def_flatfiles.htm#i1126304
    Regards,
    Oleg

  • Item master Item mapping with multiple vendors

    Hi Experts,
    I need your help, I have one item like 'TV' in item master and need to enter multiple prices make wise samsung,sony,lg like.
    How can I maintain this in SAP B1 2005B.
    One Item mapping with multiple vendors with price...
    Thanks,

    Dear Aarti,
    I would recommend to have multiple items for the different brands you are selling.
    For example, you can call the item code Samsung, Sony etc and all of these item can be added to an item group called TV.
    Then you can assign a price to the items in the price lists.
    Alternatevely, if you need to have one single item called TV and different prices according to the brand, create a number of price lists called Sony, Sumsung etc and then if you know which customers buy a particular brand you can connect the price list to the customer under
    Business partner master data - Payment Terms - Price list.
    Please, if these 2 options are not helpful let us know the exact scenario and business reason behind your request.
    Kind Regards,
    Marcella Rivi
    SAP Business One Forums Team

  • How can I modify a Landed Costs with multiple vendors

    Normally, you just open a new Landed Costs, select same vendor as the original, and choose Copy From > Landed Costs, select original and modify!.
    With multiple vendors the "Copy from" lists just turns out empty.
    I have searched similar cases but the newest post i found was from 2009 and was not resolved.
    I'm using SAP B1 9.0

    Hi,
    Tested in 8.81 version PL10.
    1. If there is no landed cost for both vendors, the list of land cost is empty. Make sure vendors that selected in landed cost should have landed cost
    2. If you add multiple vendor, system will show landed cost document for second vendor not for first vendor.
    Thanks & Regards,
    Nagarajan

  • Service Procurement with Multiple Service Line items

    Dear Experts,
    We have the following Business Scenario. Request your inputs in addressing this issue.
    Business scenario : Most of the Procurement for our client is of services. So, we need to configure services with multiple service line items. This Shopping cart to create PR in ECC. PR to PO conversion to take place in ECC. Now onwards client needs Supplier integration for confirmation of services and sending invoices by Vendor.
    Guidance required in the following
    1 In Shop functionality if we select services, PR is being created in ECC with only one Service Line item. Whereas if we go for Request functionality, then always it is routing to Bidding process (which is not required for client). Can we create SC with multiple service line items with out request functionality?? Or Can we root the Request functionality with out Bidding process??
    2 If we convert the PR to PO in ECC (Classic Scenario), can we go for SUS integration. In such case which is the best way of supplier integration. Can you please guide us on basic steps on installation (can we go for different client in the same server) and configuration.
    Request your inputs in this regard
    Thank you,
    Ravi

    Hello,
    We suffered the same problem in our company.  We have found a way to work with the SRM shopping cart multiple line rollup to ECC single line purchase order.
    If the multiple shopping cart line items contain the same location code and cost assignment they will rollup into one ECC purchase order.  The system seems to 'think' it is helping you by consolidating your information.
    In the Basic Data section of the shopping cart there is a Service line item field.  If you enter something in each in that field for each line it will keep it's own line in ECC.
    Your implementation may differ slightly from ours but I recommend playing with the location code, cost assignment and Basic Data service line fields until you can see a pattern.  Basically you need to find a method to make each line a separate entity so they don't rollup.
    Good luck,
    Corinne

  • Using a seagate external drive with multiple macs

    i got a 1TB seagate external hard drive for backup and transfer purposes... it had a little program to help set it up and i set it up for use with mac and pc ( only onther option was stricty this computer.) it works on my computer and a pc but when i tried transfering files from another older mac i have it showed that i could only read on that computer...
    how can i get it to work with multiple macs...?

    I have the oldest macbook (1.83. 2 gigs ram, 60 gig internal hard drive)
    I have all my logic content on my external maxtor firewire 400 drive (usb 2.0 is actually faster than firewire 400) and everything is fine. the good thing is if your external drive has 7200rpm, but the ones with 5600rpm should do as well.
    Once you drag your apple loops to logic from your external drive, logic will remember for the next visit. And when you are opening a project which is on the external drive , just find it with logic finder and all should be fine.

  • Sharing an iPhoto Library over an external drive with multiple Macs

    I have a library of photos that is around 30 GB. All of the photos are already on an external drive, which is accessed through Xserve, and I have begun creating an iPhoto library on that same external drive. I have seen mixed opinions on whether or not an iPhoto library is able to be shared with multiple users (we have about 6 other Macs that we want to have full access to this). Unfortunately, none of us are on the same iPhoto version, so we have not been able to test this out yet, as they have been incompatible with each other so far. Is this something that is possible?

    1 - sharing in a very limited sense is possiible -  http://support.apple.com/kb/HT1198  -  IF and only if all versions of iPhoto that will access it are the same version
    2 - since you have different versions of iPhoto on different systems you can not share amoung them - only amoung ssytems using the same version of software
    3 - I have no idea what XDrive is - but note tha tthe iPhoto library must always be on a volume formatted Mac OS extended (journaled) and should be on a drive that is directly connected with a wired connection
    LN

  • Info records with multiple vendors

    Hello all,
    I have some info records defined for multiple vendors for subcontracting material numbers. How do I tell SAP to use a specific vendor by default when it creates the Purchase Requisition?
    Thanks in advance for information.

    Hi,
    If you have maintained source list(ME01) and "info record"(ME11) for the desired vendor and material combination and MRP indicator as 1 . It will default as "fixed vendor" in PR when you run MRP. Of course when you copy PR into PO, it is going to copy the same.
    if you want to create Subcontract PR ...you have to use special procurement key 30 for that material.
    Hope it helps you.
    Kuber

  • PO process with multiple vendors

    Hi All,
    Finished product-
    BOM Header-A0001
    Components---A1, A2, A3, A4.
    Vendor A will supply A4 (sheet-10ft) material to Vendor B.
    Vendor B will use the 8ft of A4 material and 2ft scrap and will sent to Vendor C.
    Vendor C will use the components A1, A2, A3, and A4 (8ft). and make the finished Product A0001 and will sent to plant.
    How to map the above process in SAP.
    Thanks
    chindam

    I think you can map this scenario in the multiple vendors 3 rd party subcontracting process.
    I will try to put some light on ur issue .........hope this will help u in some extend..
    1) Create a PO to 1st vendor.
    2. Maintain the required entries.
    3. Go to delivery address tab tick SC Vendor
    4. Maintain 2nd vendor here.
    It means that after finishing first operation 1st vendor sends a matl. to 2nd vendor.
    If u post migo for 1st PO(i.e. for 1st PO vendor) system says that matl is with 2nd vendor.
    So u need not to send the matl to 2nd vendor.
    Similarly, do it for other vendors also.
    normaly in sucontracting process,for calculating the SCRAP ,,we should maintain this in NEGATIVE quantity in BOM.so that at the time of GR,,it wont affects,the calclation of payment to be given to vendor.
    Here important thing is U have to send a PO to respective vendors for respective operations.
    For the last vendor who gives u the finished product dont tick SC vendor to him. Maintain your company delivery address.
    Regards
    Anjali
    Edited by: anjali s on May 30, 2009 7:50 AM

  • External Procurement with MRP based on sales demand w/o Production unit.

    Dear Friends,
    Plant AAAA is a central warehouse (Distribution center),from where materials are dispatched to other storage locations.
    AAAA is non manufacturing unit and is dealing only with FG's.
    Sales demand will come from different storage locations,based on which external procurement of FG's will be started.
    1.,how the sales demand can be turned into external procurement through MRP?.
    2.Please provide the customization settings to achieve the same.
    Regards,
    Venkatesh

    Hi Venkat,
    Try to use the functinality SOP, where you can maintain the demand in the system by T-code MD61 after getting all the sales demand from various locations,
    When you run the MRP, this demand will be considered & accordingly procurement proposal will be generated by the MRP run.
    Also you can go through below links sublinks for understanding about SOP,
    SOP basics

  • KANBAN External Supplier with MRP

    We have a requirement to use KANBAN for external vendors and also do forecasting for same materials using MRP.
    Does standard SAP support this?
    We are using replenishment strategy 02 ( with SA's ) but it is not working.
    Any ideas ??

    Hi Prashanth,
    It makes no sense to have both KANBAN and MRP for he same material in a plant. KANBAN is an alternative method to material requirements planning! That's why also SAP will not allow that.
    The only exception is when the material is in-house manufactured, and you want to pass dependent requirements to it's sons in the BOM via MRP planning and explosion of BOM.
    If you only need to pass to your supplier some info on future requirements, but still work operatively via KANBAN, you can try using LTP MRP for that (if planning is demand based), or just material forecast (without MRP) if planning is consumption based.
    Regards,
    Mario

  • Time Machine doesn't like external drives with multiple partitions

    I've had a problem with Time Machine on both 10.5.0 & 10.5.1 - Time Machine could not create the initial backup regardless of all the things I tried.
    I have a Powerbook with a 300Gb Maxtor connected via firewire 800. This drive had been partitioned into three partitions (which I've used with other backup tools without problem).
    Apparently the problem I had been having with Time Machine was that there were three separate partitions on the external drive. As soon as I took a chance and wiped all of those partitions and made a single partition, everything was fine.
    I had called Apple Tech Support shortly after I got Leopard and when I discovered the problem with Time Machine. I specifically asked if there would be a problem from the multiple partitions and they didn't think there would be, but they were sure. Looks like Apple was wrong.
    If you are having problems with Time Machine with a drive that has multiple partitions, trying changing your external into a single partition drive.

    You will note that I was referring to a Powerbook and the Apple Partition Scheme. There might be something different happening for Intel/GUID users.
    10.5.1 did address other issues with other partition types. Time Machine seems to have trouble with certain partition schemes. I'm not surprised that multiple partitions and GUID works because of things like bootcamp. Apple probably tested specifically for that type of config. They may not have worked all the bugs out of multiple partitions on a Apple Partition Scheme.

  • Dual sourced part with multiple vendors - one vend no inspec required but

    inspection lot still being created, what is setup incorrectly?

    Hi
    In addition to above setup remember that Quality Info record is Vendor ,Material ,plant & rev level combination.
    That means the PO created must be  of the same revision with which info record is created,.
    Also Maintain Info record for the vendor-materila combination for which you don't need inspection & maintain "No Inspection"
    This will automatically put material to unrestricted after GR is created.
    Regards
    Sujit.

Maybe you are looking for

  • Old Vendor Number and New Vendor number

    Dear Experts, In Vendor Master we have a Field ALTKN which is of 10 Character to Store the Old Vendor number, Where as my client has old vendor number is of 14 characters in his Legacy system. As this Old Vendor number is very much required in SAP. K

  • Monochrome non-animated version of the battery icon?

    So, basically my nano is experiencing this: http://docs.info.apple.com/article.html?artnum=302420 but it says about 30 mins, and I've had mine charging for a couple hours now. I still cant turn it on, and I've reset it already, and saw the apple sign

  • Macbook pro crashing after Mountain Lion

    This is the crash report I get. Any help would be appreciated. It crashes randomly throughout the day, but lately it's been crashing even more. My Mac is version 10.8.3 with 2.4 GHz Intel Core i5, 4GB 1067 MHz DDR3. Thanks. Interval Since Last Panic

  • Read-timeout-seconds

    Hi! What happens if I set <read-timeout-seconds> to some value for a read only bean, according to bea's docs the ejbLoad() is called initially when the EJB is created and afterwards, WebLogic Server calls ejbLoad() only at intervals defined by the re

  • IPhone 4 Auto-Lock

    My phone is set to Auto-lock after 1 minute, however if certain applications are open (Text Messages, e-mails) it will not lock at all, whereas other applications (games, browser, news) it will lock after 1 minute. This never happened with my 3GS. An