KANBAN External Supplier with MRP

We have a requirement to use KANBAN for external vendors and also do forecasting for same materials using MRP.
Does standard SAP support this?
We are using replenishment strategy 02 ( with SA's ) but it is not working.
Any ideas ??

Hi Prashanth,
It makes no sense to have both KANBAN and MRP for he same material in a plant. KANBAN is an alternative method to material requirements planning! That's why also SAP will not allow that.
The only exception is when the material is in-house manufactured, and you want to pass dependent requirements to it's sons in the BOM via MRP planning and explosion of BOM.
If you only need to pass to your supplier some info on future requirements, but still work operatively via KANBAN, you can try using LTP MRP for that (if planning is demand based), or just material forecast (without MRP) if planning is consumption based.
Regards,
Mario

Similar Messages

  • Kanban - External procurement with multiple vendor

    Hi Gurus,
    We are working on implementation of Kanban for external procurement (Scheduling agreement) in my organisation. As per the business requirement, some of the components are supplied by more than one vendor. As per the standard process, Kanban supports automated processfor single vendor only & not multiple vendors
    Has anybody come across this issue? Could you plese share your experiene & any possible workaround or solution to this isuue
    Thanks
    Kariya

    Hi,
    This is how KANBAN works. Since sourcing is automatic.
    You could do a couple of things; first, have more than one control cycle, one for each vendor. Drawback is that you also need to have separate kanban containers for each cycle/vendor. But in the case where you have more that one supply area for a material this is not so bad.
    Another way could be working with internal demand area, in such a way that Kanban creates a stock transfer reservation. Then you need to process the requirements with MRP, and issue orders to multiple vendors (maybe using quota arrangement).
    To ilustrate the solution: your supply area is geting replenishment from the main warehouse, not directly from the vendor. These are two different storage location or plants...
    Regards,
    Mario

  • External Procurement with MRP based on sales demand w/o Production unit.

    Dear Friends,
    Plant AAAA is a central warehouse (Distribution center),from where materials are dispatched to other storage locations.
    AAAA is non manufacturing unit and is dealing only with FG's.
    Sales demand will come from different storage locations,based on which external procurement of FG's will be started.
    1.,how the sales demand can be turned into external procurement through MRP?.
    2.Please provide the customization settings to achieve the same.
    Regards,
    Venkatesh

    Hi Venkat,
    Try to use the functinality SOP, where you can maintain the demand in the system by T-code MD61 after getting all the sales demand from various locations,
    When you run the MRP, this demand will be considered & accordingly procurement proposal will be generated by the MRP run.
    Also you can go through below links sublinks for understanding about SOP,
    SOP basics

  • Kanban With MRP and with External vendors

    We are implementing SAP 4.7 for one of clients and here is the requirement:
    They want to use Kanban with external vendors where  once  KANBAN is empty, it should create a schedule line for the defined scheduling agreement. Problem is , we have to exclude the material  from MRP in order to work with "External Purchase Orders" or "Scheduling Agreement" replenishryment category.
    They   do not want to exclude the KANBAN materials from MRP but want to use KANBAN for procurement with vendors.
    Is this possible?
    Because when we try replenishment strategy " Working with MRP" , SAP does not create any PO or Schedule line desite of maintaining all the data. Instead, SAP allows replenishment elements created in MRP run to flow thru and create PO/ Schedule lines.
    Is it possible to include the material in plant MRP and still use external procurement kanban?

    Hi Vikas
    Ia m not familiar with  asynchronous MRP.  Can you elaborate on that? What specific settings  we need to make for that?
    Thanks for your help.
    Regards.
    Mankai

  • Replenishment between Storage Location with MRP Planning

    Dear PP Gurus,
    I need you expertise on the below question.
    I have a plant with multiple Storage Locations. One Storage Location is Main Warehouse and another ilocation s External Warehouse (3PL) where excess stock are kept due to storage capacity in the Main Warehouse.
    Now the requirement is replenish the stock to Main Warehouse from the External Warehouse with Stock Transfer using MRP trigger the Stock Transfer.
    I know the setting in MRP 4 View in the material master, the Indicator to set to 2, maintain a reoder point in the Sloc: 1200 and Replenishment Qty: 1500 and Special Procurement Type: (what should be the setting)
    My question is where to set the target Sloc and source Sloc, then only system will trigger the replenishment Stock Transfer?
    The storage location which is plan separately, will have a different segment. Therefore, in terms of the availability check for the Sales Order it will consider as normal based on the scope of check.
    Appreciate the reply
    Thanks & Regards
    Pooja

    Dear ,
    1.You need  to set up the MRP for Plant with group of storage location  and run MRP-MD01 .You can try SCOPE of planning -OM0E.
    As an information : In standard MRP I, f you have several storage location for your plant, you cannot plan for them separately unless you assign them to a separate MRP area.If a storage location (alone) is assigned to an MRP area, it means you wan to plan for it separately. If several storage locations are assigned to an MRP area (or let's say to a plant), it means you want to plan using all of them - and you cannot choose only one and plan for it (you can exclude a SLoc from planning w/o assigning it to MRP area).
    2.Find steps for config for activating Sloc to Sloc transfer within plant using STO : -
    follow path: SPRO--> Materials Management -->Purchasing -->Purchase Order -->Set up Stock Transport Order -->Set Up Stock Transfer Between Storage Locations
    1. Activate Stock Transfer Between Storage Locations
    2. Assign Delivery Type and Checking Rule According to Storage Location
    purchase document category 'F' , here use PO type UB, supplying plant, issue sloc and delivery type , (prefer to create new delivery type by copying delivery type 'NL' replenish delivery
    3. Define Shipping Data for Stock Transfers Between Storage Locations
    for plant defind sales org and distribution chenal and devision
    select the pline and go to sloc
    assign there customer (created for sloc)
    4. Define Rule for Determination of Shipping Point
    for newly created delivery type set L storage location specific shiping poing determination
    5. Assign Shipping Points According to Storage Location, assign her sloc based shiping poing determination
    at last when you will create PO put issue storage location, system will determine shiping data based on config done.
    after this process will be same as STO plant to plant using shiping.
    You will need to mention the issuing storage location during posting the delivery,
    ie, ME21N - Create STO
    VL10B - Create Delivery
    VL02N - Post Goods issue - here you will need to mention the issuing storage location
    Refer : STO process -Std in SAP
    Hope it is clear to you .
    Regards
    JH
    Edited by: Jiaul Haque on Jul 7, 2010 10:23 AM

  • Purchase Order is generated after MRP for Material with MRP Type ND

    Hi Everyone,
    Material type := HAWA
    My material procurement type = F i.e. External Procurement.
    MRP Type = ND in Production server , and VB in Quality
    Lot Size = EX
    Material Status :- 15 Pre-release both for Quality and production server
    The Material is bulk material and bulk material indicator is set.
    Purchasing View is also maintained for the same.
    Planning Strat = Z5 Company specific
    Special procurement key:- Z7 Company specific
    I am running MD02 with following parameters.
    Create Pur Req =1, PR
    Create MRP List = 1, MRP List
    Delivery Schedule = 3, Schedule Lines
    Planning Mode = 2 Re- Explode BOM & Routing
    Scheduling = 1
    Issue:
    After MRP run, system is  generating PR, Though with MRP type ND purchase requisition should not be generated.
    Observation:- Looks like there is inconsistency of material date in Quality and production server.
    When I tried to run the planning , The Error message was generated"Material status is set to pre- release.
    After changing the material status to 20 (Active ) , when we run the MRP , The error message is generated "Material is not planned automatically "
    We havent been able to locate the root cause so far
    Please guide us
    Thanks in Advance,
    Ayaz
    Edited by: Ayaz Alam Khan on Feb 16, 2011 2:41 PM

    IF the material is ND, system won't Run MRP for the material
    Observation:- Looks like there is inconsistency of material date in Quality and production server.
    There is no link
    When I tried to run the planning , The Error message was generated"Material status is set to pre- release.After changing the material status to 20 (Active ) , when we run the MRP , The error message is generated "Material is not planned automatically "
    system will read the X plant  material status or plant specific material status first and then only system will read MRP type

  • External Procurement with a Valuated Sales Order Stock

    Hi Experts,
    I read the following in SAP Help,
    For external procurement with a Valuated Sales Order Stock, system generates a purchase requisition from the sales order.
    If you are using a valuated sales order stock, the externally procured material is assigned to inventory at the time of the goods receipt. If the sales order item is flagged as carrying costs and revenues, then when the goods issue for delivery to the customer takes place, the sales order item is debited with the costs of the externally procured material.
    My question is - it says costs of external procurement is debited to sales order item when " goods issue for delivery to the customer takes place"
           - but in my case, when I made the GR for purchase order (created automatically by sales order), system directly posted the procurement cost as actual costs to the sales order item. There is no delivery for sales order done still.
    So actually, when should the external procurement cost be debited to sales order item -- when GR for purchase order is done (or) when  goods issue for delivery to the customer takes place?
    Thanks,
    GAN

    Hi Rafi,
    Thanks for your reply. I understand the problem now.
    Material which comes from prod order is posted statistically (value type 11) to sales order when GR for prod order is done.
    Here, the issue is about a GR for purchase order (assigned to sales order). This material purchased is not used in any production process. Its a material which is supplied to customer along with main material produced in house.
    In purchase order, I have given the consumption account (which is cost element 1). Entry was Consumption Dr and GR/IR Cr. So, this posted as actual cost to sales order.
    I should have given inventory account in purchase order (with cost element 90).
    Its a mistake of using consumption account in purchase order.
    Thanks.
    GAN.

  • R/3 HTTP GET to external supplier - what are the options

    Hello all
    Our scenario is that we have to connect to an external supplier using HTTP GET to get our order responses in the return structure. I was wondering what the best/easiest way is to do this.
    We cannot use the HTTP adapter since that only supports HTTP-POST. Additionally the RFC that lies behind it does not allow query strings in the definition, something we need to use.
    we could make use of the HTTP_GET function module in the SFTP function group but how to do it then?
    -we cannot create an abap proxy for this since the outbound WSDL contains invalid keywords (choice keyword not supported)
    -we probably could use BPM that calls the HTTP_GET.
    -we could write an ABAP that calls the HTTP_GET and puts the output into a directory where XI can pick it up.
    -I also read that you could write a small java function that does the HTTP_GET . But i have no experience with this.
    So what is the best option to accomplish this?
    thanks
    Tom

    From SP15 you may use Adapter-Specific Message Attributes.
    To evaluate adapter attributes in the message header of the XI message, set the Use Adapter-Specific Message Attributes indicator.
    œ     If you want missing message attributes to trigger an error message, set the Fail If Adapter-Specific Message Attributes Missing indicator. If the indicator is set and the header for adapter-specific message attributes or one of the set attributes is missing from the message, this leads to a system error (red flag).
    If you do not set the indicator, and message attributes are missing, the adapter accesses information from the adapter configuration.
    œ     If you want to use an HTTP destination or URL set by the mapping, set the URL or HTTP Destination indicator. (The indicator displayed depends on the Addressing Type you selected above). If you set the indicator, the URL or HTTP destination set dynamically is called by HTTP.
    If the message header does not contain the URL or the HTTP destination, and you have set the Fail If Adapter-Specific Message Attributes Missing indicator, the XI message is set to status System Error. If you do not set the indicator, the URL or HTTP destination defined statically in the communication channel is used.
    œ     If you want to use HTTP Header Fields, set the indicator and enter the fields in Field 1 to Field 6. The fields are embedded in the HTTP request under the names you enter here.
    The technical names of the fields are HeaderFieldOne, .... HeaderFieldSix.
    œ     If you want to use URL Parameters, set the indicator and enter the parameters in the fields Parameter 1 to Parameter 6. The parameters are embedded in the HTTP request under the names you enter here.
    The technical names of the fields are URLParamOne, c, URLParamSix.
    The attribute namespace for the adapter is http://sap.com/xi/XI/System/HTTP.
    http://help.sap.com/saphelp_nw04/helpdata/en/43/64dbb0af9f30b4e10000000a11466f/content.htm
    /Otto

  • Add External Supplier from a Vendor List

    Hi;
    Iu2019m trying to create a vendor list.
    The list should appear in SRM portal in u201CStrategic Purchasingu201D u2013 u201CBusiness Partneru201D u2013 u201CCreate business partner: Supplieru201D u2013 u201CAdd external Supplier fromu201D.
    My u201CList of Vendorsu2019u201D data is:
    Technical Type of Service: HTML
    Logical system: SRM;
    Path for Symbol for Service: http://.../sap/bc/bsp/sap/ros_prescreen?sap-client=010
    In Standard call structure we have:
    1                            http://.../sap/bc/bsp/sap/ros_prescreen?sap-client=010     0 URL
    2     username                     projecto                          2 Fixed Value
    3     password          projecto                                     2 Fixed Value
    4     HOOK_URL                                    4 Return URL
    5     ~OkCode                     ADDI                          2 Fixed Value
    6     ~target     _     top                          2 Fixed Value
    7     ~caller          CTLG                          2 Fixed Value
    Do you have any idea what is missing or wrong?
    Thanks;
    Marta Marques.

    Hi Martna
    please see the below link Parab's check list on ROS.Thanks parab it was a good expalnation on ROS with ros grammer syntax.
    you may use client also a different parameter in call structure.
    Re: Error installing CE Evaluation April 2007
    Web Service ID : ROS
    Description: External Web Service in EBP
    Bus Type of a Web service : List of Vendors
    Display Partner Data again in Vendor List : X
    Vendor Root Node : 50000620 (this is Vensor Root node in EBP client)
    Use Error Log : X
    Use HTTP GET to call Web Service : <blank>
    Codepage of Service: <blank>
    Techinical type of Service : <Blank>
    Logical system : SRDCLNT310 (this is ROs client from there supplier will be transfered)
    Path for symbol for service : <blank>
    Standard Call Structure Parameter setting as follows
    1. <blank> http://....ros_prescreen/main.do URL
    2. sap-client 310 fixed_value
    3. sap-username dineshp fixed_value
    4. sap-password GAJANAN fixed_value
    5. HOOK_URL <blank> Return_URL
    6. ~OkCode ADDI fixed_value
    7. ~target top fixedvalue
    8. ~caller CTLG fixed_value
    Also defined ROS external web service as default CAT attribute in the organization setting.
    BBP_MARKETP_INFO table entry in EBP client.
    Hope it helps to configure ROS in define webservices.
    regards
    Muthu

  • Validate (check) after PReq assign source of supply with ME57

    Hi,
      I want to know if it is possible to control or check the PReq after assign source of supply with ME57. My explanation, I have a release strategy on the u201CSource of supplyu201D if it is null. When I create a PReq with the MRP by default the release strategy appear because there is no Source of supply. If I go with ME52N and put a Source of supply my release strategy disappear but if I use ME57 to assign the release stay there until I use the transaction ME52N to control(check) it. Do you know if it possible to force the control(check) with ME57?
    Regards.

    Hi Duang,
    When you create the PR manually , guess that you are not selcting the source list check box ( tick
    in the ME51N screen ),hope this should be the reason for the difference in behavior.
    Please select the tick box when you create PR in ME51N, then the manual PR also will not auto select
    the Vendor. Please test & confirm the behavior after check box selected.

  • 1 requisition to be sourced by first internally else external supplier

    Hi,
    I have a typical requirement wherein an employe raises a requisition for 5 items, so the system should look for availability in warehouse, if say 2 items found then Internal issue should be made and balance 3 number should be obtained from external supplier.
    I am only using OM and INV and PO modules. No MRP/ASCP.
    Is this functionality possible by automation?
    Need your feedback ASAP.
    Thanks
    Supriya

    There is no out of the box functionality in OM/INV for this.
    I can suggest following personalization as a work around.
    1) Create a when-validate-record personalization on the PO Req lines
    2) The personalization fires if the req. type = purchase
    3) The personalization checks if onhand exists in other orgs and displays a the onhand quantity and the name of the other org as a message of type = show.
    4) The user changes the req. type to Internal if appropriate.
    Hope this helps,
    Sandeep Gandhi

  • Theparameter jce_policy_zip in externally supplied configuration is invalid

    hi
    We are in the process of upgrading EA-PS from 600 to 604, but we are
    facing an issue in running the script
    "./STARTUP jce_policy_zip=<change
    directory><jce_policy-1_5_0.zip>
    under EHPI directory stating that
    "The
    parameter jce_policy_zip in externally supplied configuration is
    invalid"
    . please suggest on this and waiting for your solution.
    Edited by:Sravan  on Oct 26, 2010 11:37 AM

    Hello Kumar,
    Please start the EHPI only with the STARTUP.BAT without any specification of jce_policy.                                                             
    Here is an example:                                                          
    /<installation directory>/STARTUP                                            
    Regards,
    Paul

  • Firewire External HD with Clone won't boot

    I just installed an OWC Mercury Elite-AL Pro 250GB external Firewire 400 HD to supplement storage on my eMac. I used the supplied Prosoft DataBackup 3 software (supplied with the OWC drive) to Clone my internal drive to the external drive, following instructions to make the Clone bootable.
    The software indicated a successful backup, and Disk Utility shows the volume as "Bootable".
    But, when I choose the external drive as the boot drive in the Startup prefs, it gets to the Apple Gray screen, and the little clock/fan thingy just spins and spins (I've waited as long as 10 minutes).
    If I use the Option key on startup, the Startup Manager shows both drives as available (with the little "X" on the corner of both the internal and external drives), but choosing the external drive at this point doesn't work either.
    Any suggestions as to what I may have done wrong, or what else I should try.
    Thanks
    PowerMac G4 Dual 1.25 & G4 17 Powerbook   Mac OS X (10.4.9)   1.0 eMac, D-Link DSL Router & Switch, D-Link USB Hub

    Download either Carbon Copy Cloner or SuperDuper. Both are good cloning programs and are both free to try (CCC all the time, SD is shareware). SD is a bit easier to get going and use, but CCC works fine and I use it because it is donationware. SD locks you out of certain functions in the free version.
    Anyway... Try cloning your drive with one of those and see if you can then boot off it. If you can, then the software that came with the drive is either crud, or you just happened to get a bad clone that time. If the drive still doesn't boot, then that particular model may not fully be bootable compatible (it happens sometimes).
    Patrick

  • How do i use an external display with my macbook pro?

    How do I use an external display with a macbook pro?

    Just buy the proper adapter cord, such as MiniDisplay port to HDMI for example.  Plug it in and it will be automatically recognized.  Use System Preferences > Displays to set options.
    The display can Mirror your primary desktop or Extend the Desktop.
    Regards,
    Captfred

  • Getting error while creating a new web app saying "The password supplied with the username domainname\username was not correct. Verify that it was entered correctly and try again"

    Hi ,
    I am trying to create a new web app using Central Administration in Sharepoint 2010 and getting an error "The password supplied with the username  was not correct. Verify that it was entered correctly and try again".
    I tried running this command also "stsadm -o updatefarmcredentials -userlogin <domain\username> -password <newpassword>" but when it got executed it showed me "Access Denied".
    What should i do ??
    Thanks in advance.
    Regards, Anurag

    HI,
    right click on command icon and click run as administrator then use above stsadm commend to update credential. If still you face same issue then try with powershell as mention in below link: (make sure that you open sharepoint powershell as run as administrator)
    http://smartrider.wordpress.com/2010/07/15/powershell-script-to-create-web-application-and-site-collection-in-sharepoint-2010/
    let us know your result
    Hemendra: "Yesterday is just a memory,Tomorrow we may never see"
    Whenever you see a reply and if you think is helpful, click "Vote As Helpful"! And whenever
    you see a reply being an answer to the question of the thread, click "Mark As Answer

Maybe you are looking for