KKS2 ran for future periods; Target costs double the actual costs

Hi
Variance calculation was accidentally run for period 011/2012 and it affected several orders in that the target costs are showing double the actual costs (period 01 + period 11) of year 2012.
Is there some report in SAp that would give us a list of orders for which KKS2 (variance calc) was run for period 11 2012.
Best wishes
Raj.

hi
Thanks for your responses. But nothing has answered my question
Is there a report in SAp that could give me a list of all orders for which variance calculation was run for period 11 2012?
I used several reports including KOB3 and s_alr_87013140 but nothing gives me that list.
Thanks in advance for your replies.

Similar Messages

  • Updating Unit Cost by using Actual Cost Adjustments

    Hi,
    How can we adjust Unit Cost by using Actual Cost Adjustments Window?
    By giving Cost Adjustment without giving Adjustment Qty, the amount was adjusted to total quantity (transacted during the period). But I want to increase unit cost by a fixed amount. Is there any option?
    Thanks in advance.
    Regards,
    Ram

    Hi Ram,
    there are some patches released by oracle 5-6 months back(5003789 and 4735489) having this feature.
    There is also a meatalink note is available,expalins this cost adjustment type called Unit Cost Adjustment.This is the way it works.....
    The Actual Cost process now supports this new adjustment type where you adjust
    the actual unit cost of the item with the specified cost. The Actual Cost process
    calculates the cost of the item per the current logic and then applies this unit cost
    adjustment to calculate the new adjusted cost. This adjusted cost becomes the new actual cost of the item.First the New Unit Cost (without the Unit Cost Adjustment) is calculated.The Unit Cost Adjustment is included only after the Actual Cost is calculated based on the existing Adjustment types. Then, the New Unit Cost (with the Unit CostAdjustment) is calculated.
    Hope this helps...
    Rgds
    Shajahan

  • Can't Run AFAB - Posting run requested for future period

    Hi,
    While taking depreciation run for company code in AFAB system is generating the error message "Posting run for future period requested (check entry)" SAP error AA697
    Diagnosis
    There was a check of your entries in the company code and posting period fields for the current system date. The result of this check is that you requested a posting run for company code xxxx for a future fiscal period.
    Please help me, cause I must close the period.
    Thanks

    Hi
    Check Table TABA, whats your last posted period for depreciation
    If you are executing depreciation for last period + 1, then this error is not justified
    If you are doing it for last period + 2, then its justified
    Br, Ajay M

  • Depreciation error - Unplanned posting run allow for future period

    Dear ,
    Need urgent advice for depreciation error happen in our production system.
    FYI, our fiscal year variant 2013 = Feb 2012 - Jan 2013 ( We are now at month-end close for Pr 1 2013 ).And fiscal year close 2012 AJAB and Carry forward ARJW have successfully run for new FY 2013.
    In short, in our asset accounting user was accidentally run unplannned depreciation for future period 12/2013 of one particular asset, while we are now in Pr 1/2013. And, Pr12/2013 is open for asset posting.However, no FI posting posted into the system.
    Just a curiosity as to why system allow user to run unplanned depreciation for future posting without giving an error message to follow the posting cycle.
    The impact/error of above unplanned depreciation run:
    User is not allowed to execute AFAB depreciation run for Pr 1/2013. Even worst, in the AFAB program shows from Pr 1/2013 - 12/2013 is already posted when we do depreciation test run. We can't perform any planned,repeat,restart  for Pr1/2013.
    Because of only one asset had accidentally run for Pr12/2013, all of our asset (96,773 asset) cannot proceed with depreciation run for Pr 1/2013 in the new fiscal year.
    This is high priority as it will impact the entire depreciation run for 12 month of our company.
    Your early reply on this issue is greatly appreciated.
    Thank you,
    Regards,
    Latifah

    Thank you for the response.
    FYI, the asset posting actually has been executed but no document was posted as there's no value.
    I've check the 2 tables below:
    ANLC - No numbers of run for any period in FY2013
    ANLP - No depreciation run was posted in FY13 (all periods).
    Is there anyway for us to do normal planned run for Pr 1/2013? As i understand SAP has no function to perform reversal depreciation run in AFAB. How
    With regard to the posting period 12/2013 that is open for user, I already highlighted this to the respective custodian.
    Thanks.

  • Posting run for future period requested (check entry)

    Hi,
    While taking depreciation run for company code in AFAB system is generating the error message "Posting run for future period requested (check entry)" SAP error AA697
    I checked in OB52 postings periods are open for 2009(all periods)
    SAP note 1150235 (all corrections) and 1153718 are completely implemented.
    Still the problem is not resolved.
    Regards,
    Sankar

    Hi Sankar,
    I would like to refer you to the already implemented note 1153718 which states :
    After you implement the changes, the system issues error message AA 697      
    "Posting run for future period requested (check entry)" immediately when     
    you use a fiscal year that is in the future.  In principle, you can          
    customize this message. However, in this case, no settings are taken         
    into account; the system always issues an error message.                     
    Regards Bernhard

  • Posting run for future period requested

    Dear Team,
    While taking depreciation run for company code in AFAB system is generating the error message "Posting run for future period requested (check entry)" SAP error AA697
    please help to reslove the issue.
    Regards,
    MAhendra

    Hi,
    look into the Threads,
    Can't Run AFAB - Posting run requested for future period
    Regards
    Andi

  • Posting run request for future period; check your entry message no.AA697

    Hello Guru's,
    I have below error while Depreciation run in T.Code AFAB
    "Posting run requested for future period; check your entry" message no.AA697
    Request help
    thanks in advance
    Regards
    Chintamani

    Hello Chintamani,
    Why you want to post the depreciation for future period?
    Is the future fiscal year in open or is the posting period open for that? If no, please open that period with AJRW T code if you want to post the depreciation for future period but it is not recommendable.
    Check the posting period once again because the given posting period belongs to future year? So please do re-chk and give correct period according to your current fiscal year.
    You can get your fiscal year details and assignment of fiscal year variant to the co,code details in OB29 and OB37 t codes respectfully.
    Check the OSS Note: 1150235 - Preventing depreciation posting run for future
    I hope it helps else revert us with your query.
    Thanks & Regards,
    Lakshmi S

  • Depreciation for future period

    Hi Guru's,
             Could anyone tell me how we can get dep report for future period is there any standard report in sap or what is the option.
    Thanks
    Ravi

    Hi Ravi,
    You can use the below Standard Report Provided by SAP for Depreciation Simulation for future period.
    S_ALR_87012936 - Depreciation on Capitalized Assets (Depreciation Simulation)
    While executing the report specify the future report date to view the deprecaition amount of future periods.
    Hope the above helps.
    Regards
    Nitin

  • Time Card entry for future period

    Hi ,
    We want to enter time cards for future period ,like now we're in jun and we want to enter time cards till sep 2012 but the self service screen allowing me to enter till aug 2012 only. Can any one explain me what could be the reason. anything we need to enable for this? please advise. Thanks
    Regs
    RG

    Yes it is possible , but it is not advisable in production system.
    Open ur time schema using PE01 and comment the line
    ACTIO TD10                      End if daily WS still active
    Then the sys will allow u to run time eval for future period

  • Production Order wise List for  Target cost v/s Actual cost

    Dear Sir,
    We have make to order scenario . We want to have a list giving Production Order wise "Target Cost" and "Actual Cost" . The purpose of list is to analyze the Variances Production Order wise .
    I request to kindly guide us , how can the above list be generated please .
    Regards
    B Mittal

    KKBC_HOE - With Defined Summarization Hierarchy
    S_ALR_87013104 - Sales Order Selection
    KKAC - For Sales Order with Assigned Orders
    KVBI - Actual Costs
    KOB3 - Variances

  • Viewing Data Usage For A Period Of Time With The WRT1900AC

    Is there a way to view the overall data usage for a period of time with the WRT1900AC? For example, I would like to see how much data I've used (up and/or down) for this month.

    Hi. The Linksys firmware does not have that feature.

  • Excise duty value on sales invoice not reflecting in the actual cost

    Hi,
    we are paying excise duty, when we are removing material from plant for the particular project. Now excise duty paid is reflecting properly in the actual cost colunn of the the report s_alr_87013558. Secondly when we are rasing commercial invoice to the customer & excise duty paid earlier is recovered from the customer, now excise duty recovered from the customer is not being reduced from the actual cost.
    Cost elment for excise duty paid - 6101100, with category 1 - primary cos/ cost reducing revenue.
    Cost elment for excise duty recovered -  3801090, with category 11 -  Revenue.
    Kindly guide how to update(reduced) excise duty revocvered in the acutal cost.
    regards
    Sanjay

    Hi Mohan,
    Please use the formatting options to format ur question...!!
    Thanks,
    Tatvagna.

  • Sales order costing - tracking of actual costs at sales order item level

    Hi
    We are going with sales order costing for services
    Service material is non-valuated hence the scenario is non-valuated sales order stock
    PP module is not implemented.
    I am having following questions
    1. How to track the actual costs at sales order item level? Is Internal order/CO production order is required to be created for the same?
    2. Can I do activity confirmations directly from cost center to sales order item.
    3. Can Raw material is issued directly against sales order item.
    4. Is Sales order is a real or statistical account assignment object?

    dear friend,
    please look here:
    http://help.sap.com/saphelp_47x200/helpdata/EN/42/d7248ab27111d19e9a080009b0db33/frameset.htm
    http://help.sap.com/saphelp_47x200/helpdata/EN/90/ba6cfb446711d189420000e829fbbd/frameset.htm
    reagrds,

  • When the labor cost of timesheet  go to the Actual Cost Line Items report ?

    Hi ,
    when the user book the time in timesheet on Network / Activity, when this record reflect the actual cost of project ?
    After Timesheet Approve via CATS_APPR_LITE
    Or after Confirmation
    Or after transfer via CATA
    Who can tell me the relationship among these three steps ?
    Thanks and Regards
    Shubin

    Hi,
    The flow is like this ( if u r using timesheets for confirmation):
    CAT2 : Timesheet: Enter Times : User enters the time.
    CATS_APPR_LITE  : Approval of timesheet
    CAT5  : Transfer to Projects.
    This will post cost to Projects.
    Another way of getting the Actual cost is Confirmation using CN25 or CN29.
    Regards,

  • In which table we can find service entry sheet no to find the actual cost

    In which table we can find service entry sheet no to find the actual cost of External service
    Service code,     Service description      Quantity     UOM,     Vendor,     Cost

    Hi,
    Total Actual Material Cost - Sum up the total cost ENWRT against the AUFNR in the table RESB and display in the report
    Total Actual External Service Cost - Provide the field AUFNR in the table EKKN and get the Purchasing document field EBELN & apply this field data in table EKPO get field NETPR and display in the out put
    For link between operation & order - Selection criterion is the order number (Field AUFNR table AUFK). The content of field AUFPL has to be used afterwards as selection criterion in the table AFVC. The selection field in this table is again AUFPL and display the field LTXA1..
    Kuber

Maybe you are looking for

  • Can not send SMS text message.

    Hi, I'm a BlackBerry user for 4 years now and this is the first time that I have a problem with SMS text messaging. My precious BB is a Q10. The problem is that I can receive SMS messages but I can not answer and I can not send messages. When I tap t

  • Time machine backup on NAS using WebDav?

    Hi, I regularly use Time Machine to backup my mac on a NAS using my home network (Synology instructions are for configuration using the afp protocol). I have been travelling a lot lately and Time Machine backups on my NAS are not a choice. I'm using

  • About converting a text member to a list

    Hi there everyone! I'm trying to convert a prepared text member to a property list. the text cast member: [#boxes:[#b0: [#rect: rect(61, 392, 695, 465)],#b1:[#rect:rect(501,358,688,460)],#b3:[#rect:rect(99,415,199,493)]],#points:[#p0:[# loc:point(677

  • How to add columns for wad in web apllication designer

    hi, can any one tell me how to add new columns for analysis item in wad. i found an option of adding new rows but not able to find a option of new columns in analysis item. please suggest me. i will assign points

  • Formatting multiple values in ADF tree node

    JDeveloper 11.1.2.2.0 -- WinXP I have an ADF tree component that is bound to a table with two values per node level. The results look like: Fruit 1234     -- VineGrown 5678        -- Grapes 4567            -- Red 1234            -- Green 56 Veggie 45