Limit SC: value limit lower then expected value

Hello,
When I request a Limit item shopping cart and I, for example, set the valluelimit on u20AC400,- and the expected value on u20AC1200,-, the approval takes place on the amount entered in value limit (u20AC400,-), but the p-order inherts the amount in expected value (u20AC1200,-).
In confirmation it is only possible to confirm u20AC400,-.
This is not a desirable behaviour because the approval can be avoided and it could lead to "confirmation problems" when the values are entered wrong by mistake.
Is there a solution that solves the problem?
Thanks in advance!
Regards,
Jorgen

Hi Jorgen ,
The system uses the "Value limit" for any approval process and this
value will be displayed on the PO. The "Expected Value" is used for
controlling and represents the total commitment being made by the
document. If your commitment ("Expected Value") is greater than your
"Value Limit", then the purchaser can increase the "Value Limit" on
the purchase order to allow the commitment to be met. For example,
you have a purchase order that will be in effect for a while and you
only want a limited amount released each month. You would enter the
total amount in the "Expected Value" and each month you would increase
the "Value Limit". This may be, for example, $12,000 for a year.
However, you may not want the full $12,000 posted against the order all
at once if it is a 12 month order for something recurring. You would
put the "Value limit" at $1000, for example, because that controls the
total that can be posted against the service entry sheet.
Using BAdI BBP_DOC_CHECK_BADI, you could implement your own error
message to be raised if you would prefer that the user cannot enter
an "Expected Value" greater than the "Value Limit".
I hope this information helps you.
Best regards
Summer

Similar Messages

  • Schema version is lower than expected value

    While configuring the database at Step 3 of 9, it threw me an exception: INST-6177 OIM Schema version is lower than expected value.
    Create OIM 11g schema using repository creation utility and proceed with configuration.
    Now, Please help me...

    For the exception, the trace says that:
    [2011-05-19T14:29:10.511+01:00] [as] [NOTIFICATION] [] [oracle.as.install.engine.modules.validation.oracle.as.install.engine.modules.validation.handler.oimQueriesHandler.checkForUpgrade] [tid: 11] [ecid: 0000J08SN_J6UOYFLrvH8A1DpHfc000002,0] [[
    [OIM_CONFIG_INTERVIEW] MDS Schema Version is correct
    [2011-05-19T14:29:10.527+01:00] [as] [NOTIFICATION] [] [oracle.as.install.engine.modules.validation.oracle.as.install.engine.modules.validation.handler.oimQueriesHandler.checkForUpgrade] [tid: 11] [ecid: 0000J08SN_J6UOYFLrvH8A1DpHfc000002,0] Exiting method executeHandler
    [2011-05-19T14:29:10.527+01:00] [as] [NOTIFICATION] [] [oracle.as.install.engine.modules.validation.oracle.as.install.engine.modules.validation.handler.oimQueriesHandler.checkForUpgrade] [tid: 11] [ecid: 0000J08SN_J6UOYFLrvH8A1DpHfc000002,0] [[
    [OIM_CONFIG_INTERVIEW] Database is not encryped. This is not an upgrade flow.
    [2011-05-19T14:29:10.527+01:00] [as] [NOTIFICATION] [] [oracle.as.install.engine.modules.validation.oracle.as.install.engine.modules.validation.handler.oimQueriesHandler.checkForUpgrade] [tid: 11] [ecid: 0000J08SN_J6UOYFLrvH8A1DpHfc000002,0] Could not fetch the schema version from the database
    [2011-05-19T14:29:10.527+01:00] [as] [NOTIFICATION] [] [oracle.as.install.engine.modules.validation.oracle.as.install.engine.modules.validation.handler.oimQueriesHandler.checkForUpgrade] [tid: 11] [ecid: 0000J08SN_J6UOYFLrvH8A1DpHfc000002,0] [[
    ERROR ====>>>>:INST-6177
    [2011-05-19T14:29:10.527+01:00] [as] [NOTIFICATION] [] [oracle.as.install.engine.modules.validation.oracle.as.install.engine.modules.validation.handler.oimQueriesHandler.checkForUpgrade] [tid: 11] [ecid: 0000J08SN_J6UOYFLrvH8A1DpHfc000002,0] [[
    Cause:OIM Schema version is lower than the expected value
    [2011-05-19T14:29:10.527+01:00] [as] [NOTIFICATION] [] [oracle.as.install.engine.modules.validation.oracle.as.install.engine.modules.validation.handler.oimQueriesHandler.checkForUpgrade] [tid: 11] [ecid: 0000J08SN_J6UOYFLrvH8A1DpHfc000002,0] [[
    Action:Create OIM 11g schema using Repository Creation Utility and proceed with configuration.
    [2011-05-19T14:29:10.527+01:00] [as] [NOTIFICATION] [] [oracle.as.install.engine.modules.validation.oracle.as.install.engine.modules.validation.handler.oimQueriesHandler.checkForUpgrade] [tid: 11] [ecid: 0000J08SN_J6UOYFLrvH8A1DpHfc000002,0] [[
    [OIM_CONFIG_INTERVIEW] Retrieving default locale set in the machine.
    [2011-05-19T14:29:10.527+01:00] [as] [NOTIFICATION] [] [oracle.as.install.engine.modules.validation.oracle.as.install.engine.modules.validation.handler.oimQueriesHandler.checkForUpgrade] [tid: 11] [ecid: 0000J08SN_J6UOYFLrvH8A1DpHfc000002,0] Exiting method executeHandler
    [2011-05-19T14:29:10.527+01:00] [as] [NOTIFICATION] [] [oracle.as.install.engine.modules.validation] [tid: 11] [ecid: 0000J08SN_J6UOYFLrvH8A1DpHfc000002,0] Handler launch end: oimQueriesHandler.checkForUpgrade
    [2011-05-19T14:29:10.527+01:00] [as] [NOTIFICATION] [] [oracle.as.install.engine.modules.validation] [tid: 11] [ecid: 0000J08SN_J6UOYFLrvH8A1DpHfc000002,0] Handler returned status: FAILED
    [2011-05-19T14:29:10.527+01:00] [as] [NOTIFICATION] [] [oracle.as.install.engine.modules.validation] [tid: 11] [ecid: 0000J08SN_J6UOYFLrvH8A1DpHfc000002,0] Error in validating schema details

  • Expected Value and Overall limit value usage.

    Hi Sap Gurus,
    if the frame work order we have these 2 field Expected value and overall limit field value to be filled,
    and the system allows Invoice (or GR) up to the maximum of the overall limit value. and only if the value entered crosses the overall limit value the system issues a Error Message ( which is agreeable)
    but the logical requirement is that, if the value crosses the Expected value limit the system should display a warning message, indicating that the value has crossed the expected value.
    is there any config or note to be applied to get this funtionality.
    Thanks and regards
    Priya S

    Hi,
    Please refer to the Online documentation:                                      
             Material Management                                                   
             -> External Services Management                                       
                -> Procurement of Services: Processes                              
                   -> Accelerated and Simplified Processes                         
                      -> Use of Value Limits (for Unplanned Services)                                                                               
    Inside this documentation, it is stated that there is a variety of             
    limits (combinations) to be used:-                                                                               
    - Overall limit only                                                         
      - Overall limit and limit on services covered by contract item(s)            
      - Overall limit, limit on services covered by contract item(s),              
      - and other limit                                                            
      - Overall limit and other limit                                              
      - Overall limit on services from model specifications or standard            
        service catalog                                                            
      - Expected value                                                             
    The expected value is used in the update of the               
    PO item value and this is the value used in the release strategy.                   
    Here is the f1 help:                                                                               
    Expected value - ESUH-COMMITMENT                                                    
    Value that the unplanned services (or the materials) covered by this                
    item are not expected to exceed.                                                                               
    Use                                                                               
    If you are working with the release (approval) procedure for purchasing             
    documents, this value serves as the basis for a release strategy applied            
    to this document.                                                                               
    If you tick 'No limit',you don't need to enter 'Overall limit',but must             
    enter 'Expected value'.Because 'Expected value' will affect the release             
    strategy. Please read the note 440601 connected to this.     
    Concerning the variability of actual cost of a purchase order,                   
    expected value means that the unplanned services (or materials)                  
    covered by this item are not EXPECTED to exceed.                                 
    It is not mandatory that it has the same value like total limit value.           
    Expected value can exceed, it is used for comparison with total limit            
    value in cost control.                                                           
    Expected value can also be combined with unlimited total limit in a              
    purchasing document.                                                                               
    Regards,
    Edit

  • The validity interval has the initial value as lower limit

    Hi Friends,
    When i was executing a query on Multiprovider,
    got an error like
    "The validity interval has the initial value as lower limit"
                 Actually The multiprovder has been built on two infocubes 0CFM_C10 & 0CFM_C11, in those 0CFM_C10 contains the non-cumulative values.
                Even i've checked the query also in query designere it is saying like the query is correct, in that query we are using Key Date...
    please help me onthis, awaiting for your answers
    thanks in advance

    Hi you can try using inial at the update rules

  • User Exit / BAdI to validate Overall Limit and Expected Value

    Hi SAP Gurus,
    I have a requirement that needs to check if Overall Limit exceeds the Expected Value (This is in tcode ME21N). Is there any user-exit or badi I can use?
    Thanks,
    Eo

    Hi Sid,
    In SE80, input MLSL in Function Group. Expand Screen folder-> open screen 115.
    You can see the Module ROW_IN.  I created an enhancement in the subroutine ROW_IN that checks if ESUH-COMMITMENT (Expected value) is greater than ESUH-SUMLIMIT (Overall Limit). Hope this also solves your issue._
    Thanks,
    Eo

  • Value of service item exceeds allowed value limit

    Hi Friends,
    This is regarding a service PO or Contract . I want a create a Value/quantity Contract of more than 100 crores value.When the service line item value is more than 99.99 crores system is issuing a error message (Message number SE371) displaying the text under the subject from which I am unable to proceed further. I even tried to delete  the message from attributes of system message under Purchasing as well as in external service management.but still the problem continues .Is there any system setting where value of more than 11 digits are not allowed. But in target value in header what ever value i am putting is no problem. How to solve this.It is also observed that the field Total value PLANVALUE has length of 11 characters for which this is not happening.Should I change the length to more than 11 in the structure RM11P.
    Dhruba
    Edited by: Dhruba Charan Behera on Mar 11, 2009 3:27 PM

    I'm with the same problem in my client and that "just technical limit" is "just" the big issue that I'm facing here.
    I don't think we have to accept the limit but force SAP to change it, once I know a few more cases like this. How can I say to the client that he has to change his way of doing business, because SAP refuses to change a field?
    In African countries, for instance, the currencies have a low power, so this limitation is easily reached.
    So, is there real solution?
    Thanks

  • How can I restrict a vendor with certain value limit?

    Hi Gururs,
    How can I restrict a vendor with certain value limit?.
    Scenario is like this
    If my company was decided to purchase goods from a particular vendor upto Rs.1000, if cross the rs.1000 limit don't allow the Posting the PO and get the Message as warning/error.
    Give the configuration setting's and T.codes
    Thanks and regards
    G.N.Rao

    Hi
    Go to T.Code oms4 and then select the material status BP (Blocked for purchasing)
    Click on Details
    In that under Purchasing select the option A= Warning or B=Error
    Click on Save
    Thus by doing this no further purchasing function for that material can be done. So the PO can not be issued
    So as and when the value limit reaches see that purchasing option is blocked
    So no further PO are generated in the future
    I hope this helps you out
    If found useful reward accordingly
    Thanks
    pavan

  • Workflow issue in SC (WS10000276) - Value limit 1 step approval

    Dear Experts,
    We are configuring 1 step value limit approval in SRM 7.0 for SC.
    We have maintained the attribute SLAPPROVAL for the employee who raises the shopping cart with the manager.
    For the roles assigned to Manager and employee we have specified the spendding limit and approval limit.
    Activated the WF WS10000276.
    When I create the SC it is not determining the approver based on value.
    We have even tried out by assigning agents for the WF WS10000276.
    Can any one help me in this regard.
    Is there any attribue SLAPPROVERLIST where we need to maintain the approvers.
    Please give me the steps to configure.
    Thanks,
    B.N.Karthikeyan.

    Hello BN,
    I tested the WF in SRM 5.0 and had to set the SLAPPROVER attribute to "USMANAGER01" if the approver/manager was the User Id MANAGER01. Meaning with US in front of the User Id of the Approver.
    But you might have already done this.
    Franz

  • Increase Value limit in MIRO

    Dear all gurus,
    How to increase the value limit in MIRO?
    Upesh

    Thanks for reply ,
    actually it is tolarance limit config sir,  I am facing problem in to value limit in MIRO doc. prcently I can post MIRO doc in my client more than 100 CR. (INR).
    Upesh

  • Value Limit in Service Line

    Hi All,
    While doing a service order and entering the item in service line with a total value of more than 100 crores  I am getting a error message no.SE370 that Value of line exceed allowed value limit.But I did not find the message SE370 in the attributes of System Message neither in PO environment data nor in Service environment data.Where this value limit is mantained .Or how to get rid of this message which I am getting .From the message in SE area although I am getting the message number deleting the same what will be the repurcussion .
    Dhruba

    Hi,
    IN overall llimit field also it is not taking more than 100 crores and same message appears.Even while creating MK contract with K+D in service line when the value becomes 100 croes the same message appears.I think there may be some table where the value limit gets defined.
    Has any one experienced such problem ,please answer .
    Dhruba
    Edited by: Dhruba Charan Behera on Feb 8, 2008 9:22 AM

  • Transfer PO value limit from HR system to SRM system

    Hi All,
    Kindly provide some inputs about how could I transfer the PO value limit from HR system to SRM system.
    It would be good if you please explain in brief.
    Regards,
    KM

    Done

  • Value limit in graphs 2147483?

    When making graphs in illustrator CS3, I often get the error message when changing the figures in the Value Axis that the maximum value is 2147483 -- which does me no good since I am working in larger numbers.
    Anybody know how to get around this problem?
    Thanks,
    Kevin

    I do not see this problem, what system are you on? this was from a Mac
    What type of Chart/Graph?
    Did you try resetting the preferences?

  • BAPI_PO_CHANGE - changing overall limits and expected value to 0.

    Hi,
    I created a normal purchase order with a service item is srm (the overall
    limit and the expected value are filled). In R/3 system the corresponding
    PO got created.
    After that, in SRM we change the overall limit and the expected value to zero.
    In R/3 system the net price is updated, but the overall limit and
    the expected value are not updated. Could you please help me witht this?
    Thanks in Advance,
    Best Regards,
    Vidya
    Edited by: Vidya K Moorthy on Mar 18, 2009 3:06 PM

    Finally found the answer.
    BAPI_PO_CHNAGE does not support this functionality to delete limits.

  • How to Select More then 1000 values in Multi-Select prompt!!!

    Hello Users,
    I have Scenario where i have to pass all the values from prompt to report and the values in the prompt are coming from session variable, so whatever value access user has the report will run with that only...
    Now the question is that Multi-Select Prompt is not able to take more then certain values, so is there any way that we can increase the limit for selected values??
    in-short how to increase the limit for selected values in multi-select prompt??
    Thanks In Advance!!!

    Hey David,
    The Scenario is like, we have data level security on "Unit" attribute. now based on the user selection when user logs in he should able to see the report only for those units which he/she has access.
    in total we have 1800 units available, now for 5-10 units access is fine, but the question will arise when user will not have only some units access from 1800 units.
    because report will not take those values from the multi-select prompt reason is that multi-select prompt is not able to take more then certain values in selected side.
    now in multi-select until-unless u have data coming in selected side those values will not pass. so i have kept the sql in default for that prompt.
    so when user logs in he will able to see those values in selected side for the multi-select prompt, but when values increase from some level it's going automatically in un-selected side.
    i want everything on selected side of multi-select prompt.
    Let me know if you need any further details.

  • Expected value in a service PO

    I have a PO (doc type frame work).
    Is there any way by which we can prevent the expected value from exceeding the overall limit.
    Currently the system is allowing the expected limit to be greater than the overall limit.
    Is my current setting a standard SAP behaviour?
    Iam under the impression that the Expected value is always lesser than the overall limit.
    Thanks
    Syed

    Hi
    Pl.check Unlimited check box is not set under delivery tab for po line item

Maybe you are looking for

  • How to store data in KM from a JSP file

    Hi In our portal we have a JSP file with a text view where the user can add notes/things to remember etc. I need somewhere to store that information. I don't want to store it directly on the portalserver or the backendsystem. Is there a way to store

  • PR funds check report

    Dears, I need to develop 1 report to find out before raising new Purchase requisition whether funds check limitation available or not. GL natural account :: Budget value :: PO requisition made on account :: PO req status e.g Expense account :: alloca

  • 2 Boot Camp Questions

    Good Evening Folks, Two quick questions for a newbie to both mac and the boot camp program. 1) I am using a apple brand external modem for my dial-up connection (Yes, I know I am still in the stone age). When I use XP in boot camp it of course does n

  • Translation Problem – Region Disappearing

    Translation Problem – Region Disappearing I recently started working on translating my application to German. When I apply my xlif file I have a problem with the contents of all my report regions using Vertical Report Look 2 disappear. The report reg

  • MB Combo drive reads no original DVDs but burned ones

    hello, i need advice: my macbook 1.83 with combo drive reads only self burned dvds, it rejects all original dvds; no mac os reinstall possible, no movies nothing... help.... what is the problem here ? thanks michael