Lines are not generated for holidays and sundays

Hi
creating a sale order shcedule lines are not generated for sunday for a particular plant .
Schedule lines are generated for subsequent monday only.
the plant calander  is also  correct
with regards
partha

Hi
I would really double check the factory calendar ans the  of the plant and sales organisation
regards,
Sidi

Similar Messages

  • Outbound Idocs are not generated for some material number MATNR

    Hi all,
    We are using a custom program to process the IDOCS to some other thirdparty systems.
    but the problem is the IDOCS are not generated and also we can't find the IDocs in TRFC also.
    But it is working for the other matnr.
    I have already debug the custom program, and it is taking all the inputs correctly.
    plz guide me guys

    Hi Praveen,
    This is the code I am using
    LOOP AT GS-MATNR_WERKS ASSIGNING <MATNR_WERKS>
    GS-COUNT = GS-COUNT + 1.
        GS-TEXT  = 'IDOC for Material & & (& of &) is just being created'(001).
        REPLACE '&' WITH <MATNR_WERKS>-MATNR INTO GS-TEXT.
        REPLACE '&' WITH <MATNR_WERKS>-WERKS INTO GS-TEXT.
        REPLACE '&' WITH GS-COUNT            INTO GS-TEXT.
        REPLACE '&' WITH GS-LINES            INTO GS-TEXT.
        CONDENSE GS-TEXT.
        CALL FUNCTION 'SAPGUI_PROGRESS_INDICATOR'
             EXPORTING
                  TEXT = GS-TEXT
    validation code for the MATNR & WEKRS
    CALL FUNCTION 'Z_MASTERIDOC_DISTRIB_ZCOPEBOM'
             EXPORTING
                  MATNR        = <MATNR_WERKS>-MATNR
                  WERKS        = <MATNR_WERKS>-WERKS
                  MESSAGE_TYPE = P_MESTYP
    GS-CREATED = GS-CREATED + 1.
        GS-COMMIT  = GS-COMMIT + 1.
        IF GS-COMMIT >= 100.
          GS-COMMIT = 0.
          COMMIT WORK.
        ENDIF

  • Schedule lines are not coming for HALB after MRP run

    Dear All,
    I am not getting schedule line after mrp run, inspite of all required setting only purchase requisitions are coming.
    Material type is HALB and involve a subcontracting process (30). For raw material I am getting the schedule line but in the case of HALB, it is not coming.
    Pls let me know if I am missing something and guide me further on this.
    Thanks & Regards
    Kundan Kumar

    Hi,
    In transaction OMDT you have to enable the indicator create schedule lines
    In MD02 MRP control Prameter here select the Delivery schedules -3- Schedule line. Processing Key as NETCH and Planning Mode - 3 delted and recreated.
    Maintain source list ME01, in that put MRP indicator as '2' i.e. schedule lines via MRP.Put your agreement no in that.
    If u run MRP properly u will get schedule lines automatically in ME38.
    Make the schedule agreement, make it source relevent in the source list make is FIX and MRP indicator as 3.

  • Schedule lines are not generating properly in MD04

    Hello All,
    I have a issue in MD04, in which schedule line for Schedule agreement is not getting generated on the same day as sales order is created (09.05.2014). But Schedule line is getting created in different date. Because of which i am creating schedule lines manually at required dates. 
    Note: I have attached screen shot of MD04
    Kindly help me to overcome this issue.
    Regards,
    Manoj  

    Hello Manoj
    Please observe that there are rescheduling exception messages and rescheduling dates for your scheduling agreements. It generally happens when you have sales orders in the past and you don't allow "start in the past" for replenishment proposals generated by MRP.
    Go to the customizing transaction OPPQ and change the customizing "start in the past". After that, run MRP again for your material and the schedule line dates should match the sales order. Please observe that firmed schedule lines wont't be changed.
    BR
    Caetano

  • When we run the MRP schedule lines are not generated automatically.

    Hi,
    In MD04 requirement date is on 5.12.2009.My source list validity starts from 1.12.2008 onwards.When i run the MRP for the material system generates the Purchase requisition instead of the schedlue lines.When i change the source list validity as 25.11.2008 now i run the MRP system generates the schedule lines.
    My question is why the system couldn't able to generate the schedule lines when the validity starts on 1.12.2008.In the source list we maintained the scheduling agreement and maintaine the MRP setting as 2.

    hi,
    Let me know your purchasing processing time defined in the SPRO settings for CBP?? It may be due to this also...
    Regards
    Priyanka.P

  • Miro line item not generated

    Dear All,
    I have facing one issue at the time posting in MIRO.
    I post one of migo doc in date 03/01/2010 , the entry is:( with same material )
    Post key   description  amt                               curr.( USD)
    89              Stk.RM -IMP                                     32100.00
    96              PL.VND.RM.IMP GR/IR                     32100.00
    40              Purchase RM-IMP                            32100.00
    50              Purchase offset.                             32100.00
    And Miro Posting on date 23/03/2010
    Post key   description  amt                               curr.( USD)
    31           xyz Vendor                                    32100.00
    86           PL.VND.RM.IMP GR/IR                    32100.oo
    89           Stk.RM -IMP                                    -
    40           Purchase RM-IMP                          -
    50           Purchase offset.                           -
    But when I post for another po in migo on date 03/01/2010
    Post key   description  amt                               curr.( USD)
    89              Stk.RM -IMP                                     76800.00
    96              PL.VND.RM.IMP GR/IR                     76800.00
    40              Purchase RM-IMP                            76800.00
    50              Purchase offset.                             76800.00
    and miro posting on date 19/02/2010
    Post key   description  amt                               curr.( USD)
    32            yz Vendor                                       76800.00
    86           PL.VND.RM.IMP GR/IR                      76800.00
    89           Stk.RM -IMP                                      Line item not generated
    40           Purchase RM-IMP                             Line item not generated
    50           Purchase offset.                              Line item not generated
    Can any one tell why line item not generated for miro posting .
    Regards
    Milind

    Hi,
    The extra line items will be generated when there are any exchange rate diffrences are there then only shows.
    Other wise it wont show those extra line items
    Please check group currency , global currency etc. for  your extra line items

  • Schedule lines are not getting generated during MRP Run

    Schedule lines are not getting generated during MRP Run. I have maiantained source list for the material with proper validity date and also maintained scheduling agreement . MRP relevvant Indicator , I have marked - 2 which means -Record relevant to MRP. Sched. lines generated automatically.
    Still I am not able to get schedule lines and instead of that *Purchase Requisitions* are getting generated.
    Can any one help me and suggest me what to be done in this case .
    Thanks & Regards ,
    Nirmalya

    Dear,
    Welcome to SDN,
    In transaction OMDT you have to enable the indicator create schedule lines
    In MD02 MRP control Prameter here select the Delivery schedules -3- Schedule line. Processing Key as NETCH and Planning Mode - 3 delted and recreated.
    Maintain source list ME01, in that put MRP indicator as '2' i.e. schedule lines via MRP.Put your agreement no in that.
    If u run MRP properly u will get schedule lines automatically in ME38.
    Make the schedule agreement, make it source relevent in the source list make is FIX and MRP indicator as 3.
    Regards,
    R.Brahmankar

  • Mails are not generated in background Jobs and not shown in SOST.

    Dear All,
    I have facing issue regarding to system mails. I want to send mails the various reports automatically from SAP System to different recipients. So I scheduled that reports at background and in their spool list recipient I have added distribution list.
    But that mails are not generated, it is not shown in transaction SOST also. When I send mails manually it goes successfully to only our company domain recipients. But not other domains. How should I resolve this problem?
    Please help me out.
    Thanks in advance.
    Amit

    Hi Srihari,
    I have checked the background jobs they showed it finished. Following logs are shown in job logs. Is problem is due to 3rd log??
    18.03.2012 14:23:34 Job started    00           516          S
    18.03.2012 14:23:34 Step 001 started (program RFITEMAP, variant PDC FARMAR, user ID DEVELOPER1)      00           550          S
    18.03.2012 14:23:37 No items selected (see long text)                                              MSITEM         033          I
    18.03.2012 14:23:42 Spool request (number 0000026302) created without immediate output               SY           355          S
    18.03.2012 14:23:46 Job finished                                                                     00           517          S
    When I saw further details of 3rd log it following message.
    No items selected (see long text)
        Message no. MSITEM033
    Diagnosis
        No line items meeting your selection criteria could
        be for the following reasons:
        1.) No corresponding items have been posted.
        2.) You are not authorized to display this data.
        3.) The items have already been archived.
    Please help me out.
    Thanks
    Amit

  • Line items are not appearing for some users

    Hi
    In one module pool program some line items are not appering for specific users. For Ex: Out of 5 line items user1 is able to see only 3 and user2 able to see all the line items. what might be the reason.
    Regards
    John.

    Hi,
    What do you mean by line items? Are you talking about screen fields in your module pool program or output of the program?
    Please clarify your issue.
    Regards,
    RS

  • Schedule Lines are not getting generated after MRP run.

    Hi,
    I have an issue where a SA exists for the parent material with item category L (subcontracting). The parent material has a valid BOM and some sub components as well. I see in CS03 that BOM is fine with validity dates for the parent material. A valid source list also exists for the parent material where SA is present as the source of supply with MRP indicator as 2. Now when i run MRP for the parent material using MD02 (NETCH), with indicators as below:
    Create pur.req.  2
    Schedule lines   3
    Create MRP list  1
    Planning mode   1
    i don't see any schedule lines in MD04. Instead it creates a PR that too without any source of supply.
    In master data for the parent material MRP type is PD with Procurement type F and special procurement key 30. I have checked and every thing seems to be fine still MRP run doesn't create schedule lines.
    Any help is appreciated. I can give more info if required.
    Thanks.

    Dear Rakesh,
    Scheduling agreement:An outline agreement against which materials are procured at a series of
    predefined points in time over a certain period.
    1.For this you have to first use ME31L for creating scheduling agreement and then ME38 for maintaining scheduling agreemnet
    schedule.
    2.Ensure in the source list after maintaining the material,vendor combination the setting for MRP relevancy is set to 2 - Record
    relevant to MRP,Schedule line generated automatically.
    Moreover you have to use value 3 for delivery schedule line which is one of the MRP control parameter while taking MRP run.
    So for the materials for which scheduling agreement exists,schedule lines will be generated.
    Check and revert back.
    Regards
    Mangalraj.S

  • Business area not determined for line item?

    Hello All,
    I am trying to create a sales order. When I enter a line item and enter plant for the item, it gives me an error "Business area not determined for the line item #" and it does not accept the item.
    I have already checked in the enterprise structure in IMG that the business area is defined and assigned for this plant.
    Is there anything else need to be done? Do we have to define or assign the business area in material master?
    I would appreciate  if somebody can answer.
    Thanks.

    There are three rules for determining a business area:
    o   Rule 1: plant and division 
    o   Rule 2: for each sales area          
    o   Rule 3: for each plant and item division
    See what you are missing

  • Date fields for info structure S032 are not generated

    Hi Experts,
    I am trying to update set up tables for '02'  using OLI2BW. I excluded some plants from selection and executed the set up. But the job run for few mins and completed with the message "Date fields for info structure S032 are not generated".
    I couldn't see any records in RSA3.
    Please through some light on this issue.
    Points reward for usefull help.
    Please no wild guess.
    Regards,
    -N-

    Did you find out why. I am getting same message.
    Thanks
    Shalini

  • Every movie purchase through iTunes fails to transfer to my iPhone or iPad and the message I get is this: some of the items in the itunes library, including were not copied to the ipad because you are not authorized for them on this computer... help?

    For a couple months now, every movie purchase through iTunes fails to transfer to my iPhone or iPad giving me the error: "some of the items in the iTunes library, including were not copied to the iPad because you are not authorized for them on this computer". I have read many forums about deleting, reinstalling, de-authorizing and authorizing my iMac through the iTunes store. Many suggestions don't work except to rename the movie to *.MP4 in Finder under the iTunes movie directory. I imagine this is a setting or a bug somewhere... any suggestions on how to bypass having to rename the files in Finder? My research into Google suggests this problem dates back to 2007 or so but it is now more prevalent than ever.
    Thanks.

    Try:
    iTunes repeatedly prompts to authorize computer to play iTunes Store purchases

  • Schedule lines are not in sink for PO

    Hello Everyone,
    We are using ECS.
    So we create PO in SRM with some schedule lines and transfer it to the ECC system.
    But sometimes the schedule lines are not in sink on both the sides because buyer update the schedule lines on SRM side.
    So we need to check that is schedule lines in SRM and Basic quantity in SRM are same or not?
    So is there any OSS note to check this?
    Regards,
    Khushbu.

    Hi,
    In transaction OMDT you have to enable the indicator create schedule lines
    In MD02 MRP control Prameter here select the Delivery schedules -3- Schedule line. Processing Key as NETCH and Planning Mode - 3 delted and recreated.
    Maintain source list ME01, in that put MRP indicator as '2' i.e. schedule lines via MRP.Put your agreement no in that.
    If u run MRP properly u will get schedule lines automatically in ME38.
    Make the schedule agreement, make it source relevent in the source list make is FIX and MRP indicator as 3.

  • I recently bought an iphone 4s from people who are not in the know and restore my iphone .. Now do not be in use for not having ID and password ... Owner apple owner just gave me a serial number how do I want to continue to use this ... Their telephone he

    I recently bought an iphone 4s from people who are not in the know
    and restore my iphone .. Now do not be in use for not having ID and password ... Owner apple owner just gave me a serial number how do I want to continue to use this ... Their telephone help me: (

    I am having same problem . i can not use the phone. my Carrier ROGERS checked the phone its not stolen or lost phone but after restoring always ask for apple ID of previous owner and seller is not responding to any mails or phone if some one can help me out than it will be great.
    thank you

Maybe you are looking for

  • Can I enter the 'wait' character in a phone number in Contacts?

    I am accustomed to being able to enter a 'pause' character and a 'wait' character when entering phone numbers in my phone's address book. 'pause' causes the phone to pause a certain number of seconds (typically 2 or 4) before sending the characters w

  • I downloaded  free app.  Now I can't find it on my homescreen.  How do I locate it

    I downloaded an app from the app store.  The app store indicates it was installed.  I can't locate it on my screen.  How do I find it.

  • Identify Trading Partner EDI X12 over File Protocol

    Hi I am working on EDI X12 (835) over File Protocol. The EDI payloads I will be getting will hold same EDI InterchangeIds, Group, or Exchange. oracle.tip.adapter.b2b.edi.identifyFromTP = ANY and I have given oracle.tip.adapter.b2b.allTPInOneDirectory

  • Safari do not release applet instance correctly!

    [Safari 1.3 and 2.0] when I open web page with applet and swith between different pages, the applet instances will increase continusly, until the system runs out of memory! IE and firefox no such problem, when switch between pages, the applet instanc