Lines are not generated for holidays and sundays
Hi
creating a sale order shcedule lines are not generated for sunday for a particular plant .
Schedule lines are generated for subsequent monday only.
the plant calander is also correct
with regards
partha
Hi
I would really double check the factory calendar ans the of the plant and sales organisation
regards,
Sidi
Similar Messages
-
Outbound Idocs are not generated for some material number MATNR
Hi all,
We are using a custom program to process the IDOCS to some other thirdparty systems.
but the problem is the IDOCS are not generated and also we can't find the IDocs in TRFC also.
But it is working for the other matnr.
I have already debug the custom program, and it is taking all the inputs correctly.
plz guide me guysHi Praveen,
This is the code I am using
LOOP AT GS-MATNR_WERKS ASSIGNING <MATNR_WERKS>
GS-COUNT = GS-COUNT + 1.
GS-TEXT = 'IDOC for Material & & (& of &) is just being created'(001).
REPLACE '&' WITH <MATNR_WERKS>-MATNR INTO GS-TEXT.
REPLACE '&' WITH <MATNR_WERKS>-WERKS INTO GS-TEXT.
REPLACE '&' WITH GS-COUNT INTO GS-TEXT.
REPLACE '&' WITH GS-LINES INTO GS-TEXT.
CONDENSE GS-TEXT.
CALL FUNCTION 'SAPGUI_PROGRESS_INDICATOR'
EXPORTING
TEXT = GS-TEXT
validation code for the MATNR & WEKRS
CALL FUNCTION 'Z_MASTERIDOC_DISTRIB_ZCOPEBOM'
EXPORTING
MATNR = <MATNR_WERKS>-MATNR
WERKS = <MATNR_WERKS>-WERKS
MESSAGE_TYPE = P_MESTYP
GS-CREATED = GS-CREATED + 1.
GS-COMMIT = GS-COMMIT + 1.
IF GS-COMMIT >= 100.
GS-COMMIT = 0.
COMMIT WORK.
ENDIF -
Schedule lines are not coming for HALB after MRP run
Dear All,
I am not getting schedule line after mrp run, inspite of all required setting only purchase requisitions are coming.
Material type is HALB and involve a subcontracting process (30). For raw material I am getting the schedule line but in the case of HALB, it is not coming.
Pls let me know if I am missing something and guide me further on this.
Thanks & Regards
Kundan KumarHi,
In transaction OMDT you have to enable the indicator create schedule lines
In MD02 MRP control Prameter here select the Delivery schedules -3- Schedule line. Processing Key as NETCH and Planning Mode - 3 delted and recreated.
Maintain source list ME01, in that put MRP indicator as '2' i.e. schedule lines via MRP.Put your agreement no in that.
If u run MRP properly u will get schedule lines automatically in ME38.
Make the schedule agreement, make it source relevent in the source list make is FIX and MRP indicator as 3. -
Schedule lines are not generating properly in MD04
Hello All,
I have a issue in MD04, in which schedule line for Schedule agreement is not getting generated on the same day as sales order is created (09.05.2014). But Schedule line is getting created in different date. Because of which i am creating schedule lines manually at required dates.
Note: I have attached screen shot of MD04
Kindly help me to overcome this issue.
Regards,
ManojHello Manoj
Please observe that there are rescheduling exception messages and rescheduling dates for your scheduling agreements. It generally happens when you have sales orders in the past and you don't allow "start in the past" for replenishment proposals generated by MRP.
Go to the customizing transaction OPPQ and change the customizing "start in the past". After that, run MRP again for your material and the schedule line dates should match the sales order. Please observe that firmed schedule lines wont't be changed.
BR
Caetano -
When we run the MRP schedule lines are not generated automatically.
Hi,
In MD04 requirement date is on 5.12.2009.My source list validity starts from 1.12.2008 onwards.When i run the MRP for the material system generates the Purchase requisition instead of the schedlue lines.When i change the source list validity as 25.11.2008 now i run the MRP system generates the schedule lines.
My question is why the system couldn't able to generate the schedule lines when the validity starts on 1.12.2008.In the source list we maintained the scheduling agreement and maintaine the MRP setting as 2.hi,
Let me know your purchasing processing time defined in the SPRO settings for CBP?? It may be due to this also...
Regards
Priyanka.P -
Dear All,
I have facing one issue at the time posting in MIRO.
I post one of migo doc in date 03/01/2010 , the entry is:( with same material )
Post key description amt curr.( USD)
89 Stk.RM -IMP 32100.00
96 PL.VND.RM.IMP GR/IR 32100.00
40 Purchase RM-IMP 32100.00
50 Purchase offset. 32100.00
And Miro Posting on date 23/03/2010
Post key description amt curr.( USD)
31 xyz Vendor 32100.00
86 PL.VND.RM.IMP GR/IR 32100.oo
89 Stk.RM -IMP -
40 Purchase RM-IMP -
50 Purchase offset. -
But when I post for another po in migo on date 03/01/2010
Post key description amt curr.( USD)
89 Stk.RM -IMP 76800.00
96 PL.VND.RM.IMP GR/IR 76800.00
40 Purchase RM-IMP 76800.00
50 Purchase offset. 76800.00
and miro posting on date 19/02/2010
Post key description amt curr.( USD)
32 yz Vendor 76800.00
86 PL.VND.RM.IMP GR/IR 76800.00
89 Stk.RM -IMP Line item not generated
40 Purchase RM-IMP Line item not generated
50 Purchase offset. Line item not generated
Can any one tell why line item not generated for miro posting .
Regards
MilindHi,
The extra line items will be generated when there are any exchange rate diffrences are there then only shows.
Other wise it wont show those extra line items
Please check group currency , global currency etc. for your extra line items -
Schedule lines are not getting generated during MRP Run
Schedule lines are not getting generated during MRP Run. I have maiantained source list for the material with proper validity date and also maintained scheduling agreement . MRP relevvant Indicator , I have marked - 2 which means -Record relevant to MRP. Sched. lines generated automatically.
Still I am not able to get schedule lines and instead of that *Purchase Requisitions* are getting generated.
Can any one help me and suggest me what to be done in this case .
Thanks & Regards ,
NirmalyaDear,
Welcome to SDN,
In transaction OMDT you have to enable the indicator create schedule lines
In MD02 MRP control Prameter here select the Delivery schedules -3- Schedule line. Processing Key as NETCH and Planning Mode - 3 delted and recreated.
Maintain source list ME01, in that put MRP indicator as '2' i.e. schedule lines via MRP.Put your agreement no in that.
If u run MRP properly u will get schedule lines automatically in ME38.
Make the schedule agreement, make it source relevent in the source list make is FIX and MRP indicator as 3.
Regards,
R.Brahmankar -
Mails are not generated in background Jobs and not shown in SOST.
Dear All,
I have facing issue regarding to system mails. I want to send mails the various reports automatically from SAP System to different recipients. So I scheduled that reports at background and in their spool list recipient I have added distribution list.
But that mails are not generated, it is not shown in transaction SOST also. When I send mails manually it goes successfully to only our company domain recipients. But not other domains. How should I resolve this problem?
Please help me out.
Thanks in advance.
AmitHi Srihari,
I have checked the background jobs they showed it finished. Following logs are shown in job logs. Is problem is due to 3rd log??
18.03.2012 14:23:34 Job started 00 516 S
18.03.2012 14:23:34 Step 001 started (program RFITEMAP, variant PDC FARMAR, user ID DEVELOPER1) 00 550 S
18.03.2012 14:23:37 No items selected (see long text) MSITEM 033 I
18.03.2012 14:23:42 Spool request (number 0000026302) created without immediate output SY 355 S
18.03.2012 14:23:46 Job finished 00 517 S
When I saw further details of 3rd log it following message.
No items selected (see long text)
Message no. MSITEM033
Diagnosis
No line items meeting your selection criteria could
be for the following reasons:
1.) No corresponding items have been posted.
2.) You are not authorized to display this data.
3.) The items have already been archived.
Please help me out.
Thanks
Amit -
Line items are not appearing for some users
Hi
In one module pool program some line items are not appering for specific users. For Ex: Out of 5 line items user1 is able to see only 3 and user2 able to see all the line items. what might be the reason.
Regards
John.Hi,
What do you mean by line items? Are you talking about screen fields in your module pool program or output of the program?
Please clarify your issue.
Regards,
RS -
Schedule Lines are not getting generated after MRP run.
Hi,
I have an issue where a SA exists for the parent material with item category L (subcontracting). The parent material has a valid BOM and some sub components as well. I see in CS03 that BOM is fine with validity dates for the parent material. A valid source list also exists for the parent material where SA is present as the source of supply with MRP indicator as 2. Now when i run MRP for the parent material using MD02 (NETCH), with indicators as below:
Create pur.req. 2
Schedule lines 3
Create MRP list 1
Planning mode 1
i don't see any schedule lines in MD04. Instead it creates a PR that too without any source of supply.
In master data for the parent material MRP type is PD with Procurement type F and special procurement key 30. I have checked and every thing seems to be fine still MRP run doesn't create schedule lines.
Any help is appreciated. I can give more info if required.
Thanks.Dear Rakesh,
Scheduling agreement:An outline agreement against which materials are procured at a series of
predefined points in time over a certain period.
1.For this you have to first use ME31L for creating scheduling agreement and then ME38 for maintaining scheduling agreemnet
schedule.
2.Ensure in the source list after maintaining the material,vendor combination the setting for MRP relevancy is set to 2 - Record
relevant to MRP,Schedule line generated automatically.
Moreover you have to use value 3 for delivery schedule line which is one of the MRP control parameter while taking MRP run.
So for the materials for which scheduling agreement exists,schedule lines will be generated.
Check and revert back.
Regards
Mangalraj.S -
Business area not determined for line item?
Hello All,
I am trying to create a sales order. When I enter a line item and enter plant for the item, it gives me an error "Business area not determined for the line item #" and it does not accept the item.
I have already checked in the enterprise structure in IMG that the business area is defined and assigned for this plant.
Is there anything else need to be done? Do we have to define or assign the business area in material master?
I would appreciate if somebody can answer.
Thanks.There are three rules for determining a business area:
o Rule 1: plant and division
o Rule 2: for each sales area
o Rule 3: for each plant and item division
See what you are missing -
Date fields for info structure S032 are not generated
Hi Experts,
I am trying to update set up tables for '02' using OLI2BW. I excluded some plants from selection and executed the set up. But the job run for few mins and completed with the message "Date fields for info structure S032 are not generated".
I couldn't see any records in RSA3.
Please through some light on this issue.
Points reward for usefull help.
Please no wild guess.
Regards,
-N-Did you find out why. I am getting same message.
Thanks
Shalini -
For a couple months now, every movie purchase through iTunes fails to transfer to my iPhone or iPad giving me the error: "some of the items in the iTunes library, including were not copied to the iPad because you are not authorized for them on this computer". I have read many forums about deleting, reinstalling, de-authorizing and authorizing my iMac through the iTunes store. Many suggestions don't work except to rename the movie to *.MP4 in Finder under the iTunes movie directory. I imagine this is a setting or a bug somewhere... any suggestions on how to bypass having to rename the files in Finder? My research into Google suggests this problem dates back to 2007 or so but it is now more prevalent than ever.
Thanks.Try:
iTunes repeatedly prompts to authorize computer to play iTunes Store purchases -
Schedule lines are not in sink for PO
Hello Everyone,
We are using ECS.
So we create PO in SRM with some schedule lines and transfer it to the ECC system.
But sometimes the schedule lines are not in sink on both the sides because buyer update the schedule lines on SRM side.
So we need to check that is schedule lines in SRM and Basic quantity in SRM are same or not?
So is there any OSS note to check this?
Regards,
Khushbu.Hi,
In transaction OMDT you have to enable the indicator create schedule lines
In MD02 MRP control Prameter here select the Delivery schedules -3- Schedule line. Processing Key as NETCH and Planning Mode - 3 delted and recreated.
Maintain source list ME01, in that put MRP indicator as '2' i.e. schedule lines via MRP.Put your agreement no in that.
If u run MRP properly u will get schedule lines automatically in ME38.
Make the schedule agreement, make it source relevent in the source list make is FIX and MRP indicator as 3. -
I recently bought an iphone 4s from people who are not in the know
and restore my iphone .. Now do not be in use for not having ID and password ... Owner apple owner just gave me a serial number how do I want to continue to use this ... Their telephone help me: (I am having same problem . i can not use the phone. my Carrier ROGERS checked the phone its not stolen or lost phone but after restoring always ask for apple ID of previous owner and seller is not responding to any mails or phone if some one can help me out than it will be great.
thank you
Maybe you are looking for
-
Can I enter the 'wait' character in a phone number in Contacts?
I am accustomed to being able to enter a 'pause' character and a 'wait' character when entering phone numbers in my phone's address book. 'pause' causes the phone to pause a certain number of seconds (typically 2 or 4) before sending the characters w
-
I downloaded free app. Now I can't find it on my homescreen. How do I locate it
I downloaded an app from the app store. The app store indicates it was installed. I can't locate it on my screen. How do I find it.
-
Identify Trading Partner EDI X12 over File Protocol
Hi I am working on EDI X12 (835) over File Protocol. The EDI payloads I will be getting will hold same EDI InterchangeIds, Group, or Exchange. oracle.tip.adapter.b2b.edi.identifyFromTP = ANY and I have given oracle.tip.adapter.b2b.allTPInOneDirectory
-
Safari do not release applet instance correctly!
[Safari 1.3 and 2.0] when I open web page with applet and swith between different pages, the applet instances will increase continusly, until the system runs out of memory! IE and firefox no such problem, when switch between pages, the applet instanc
-
Hi, My european phone was stolen by some kids on the beach in Cambodia. It is a shame, but I would still like to have a a phone for the rest of my travels, and hopefully be able to use the same phone when I get home. The problem is: I live in Sweden