List of BOM usage types

Hi ,
Here is the requirement .
1. Select material,Plant,Usage type from table MAST based on the selection criteria .
2. For a given material and plant combination, with what usage types the material bom is created .
<b>Sample output :
Material   Plant     Usage_one Usage_three Usage _five
Mat-123   P-123      X                 X                    X
Mat-123   P-234      X                                      X</b>
The above output says that for mat-123 and p-123 combination bom with usage type 1,3, and 5 have been created but for mat-123 and p-234 combo only 1 and  5 have been maintained .
Can anyone please let me know how the logic should be developed to generate output in this format ?
Thanks ,
Daniel .

Thanks for the quick response Michelle even if it gave me an answer I didn't want ;-( Oh well. Onwards and upwards.
Read the RoboColum(n) for a tips, tricks and musings on the Technical Communication Suite products.
Follow the RoboColum(n) on Twitter

Similar Messages

  • BOM with usage type "Z"

    Hello Guys,
    I need to replicate strucutred products between R3 and CRM with usage Type "Z". I was able to replicate the structured types between R3 and CRM with usage Type "5", the standard usage type. For the business concerns I need to use a BOM usage type "Z", so there are any workaround for this?
    In the several tests that I have made I could see that it is possible to replicate structured products that belong only a plant or structrured products that not belong a any plant, that belong a group bom, instead in my scenario I need to create a structured products for various plants.
    It is that possible?
    Best Regards,
    Mary

    Hello Jürgen,
    I have already created the version in the material master with the correcponding BOM asociated but, where can I find the version field in the info record? I have been cheking these data but I can not find the field to include the version number:
    General data
    Purchase organization data
    Purchase organization data 2
    conditions
    Texts
    Where can I find it?
    Thanks again
    Laura

  • Problem with BOM usage

    Hi,
    Due to client requirements, i have created a new BOM usage type "X".
    At OS21, i have set the default as "relevant to production".
    Defined order of priority in OS31, and assigned to plant parameters through OPPQ.
    In OS30, created new application & assigned to production order types.
    The Problem is iam able to make use of this BOM in a production order, and iam not able to explode it through transaction CS12.
    When i explode it through CS12, the message i got is mentioned below.
    E: to XCPPEDLJ31-DEMO4/IN10/ZP01 no BOM is available
    Message no. 29514
    Regards,
    K.Kumar.

    In OS31
    Are you maintained the selid, selpr, BOM usage(newly created)?
    while creating a BOM application are you maintained the same selid (selection ID) ?
    and also check your BOm application have  any indicator relevant to explosion of MRP, rel Costing, rel for work scheduling,pland order, Rel order, collwith, sale order,

  • Combining BOM Usage

    Hi,
    Weu2019re investigating the possibility of combining BOM Usage P to BOM Usage 1.
    Thereu2019s slightly different between P and 1 in SD Relevant.
    In 1 SD Relevant is u2013 (No entry).
    In P SD Relevant is . (Optional entry)
    We plan to change BOM Usage 1u2019s SD Relevant from u2013 (No entry) to . (Optional entry).
    Please advise if this is feasible and what're the affects?
    Thanks,
    Joe

    Hi,
    I would not recommend to make changes to SAP std BOM usage type.
    In BOM usage - 1, the Sales indicator is set to - as you know, this will result in the Relevant to Sales field being greyed out at item level. If you change it to optional, then this field will become editable.
    It would be better if you continue to use BOM usage P instead of modifying 1.
    Regards,
    Vivek

  • Usage types and installed software list

    Tell me please is it the way to see what usage types are installed in system?
    Thanks,
    Olga

    If you have the Java Stack in your system, you could use
    http://<host>:<http_port>/utl/UsageTypesInfo
    For example:
    http://10.1.1.198:50000/utl/UsageTypesInfo
    use the user J2EE_ADMIN, and you will see the information...
    Active Usage Types 
    Product Name  UT Code  Short Name  Description  Activation Date  Configured 
    SAP NetWeaver 2004s  PI  PI  Process Integration  Mon Nov 10 00:00:00 CST 2008  YES 
    SAP NetWeaver 2004s  AS  AS Java  Application Server Java  Mon Nov 10 00:00:00 CST 2008  YES 
    SAP NetWeaver 2004s  EPC  EP Core  Enterprise Portal Core Components  Mon Nov 10 00:00:00 CST 2008  YES 
    SAP NetWeaver 2004s  EP  EP  Enterprise Portal  Mon Nov 10 00:00:00 CST 2008  NO 
    SAP NetWeaver 2004s  AAS  AS ABAP  Application Server ABAP  Mon Nov 10 00:00:00 CST 2008  YES 
    SAP ERP 2005  ECC  ECC  Central Component  Mon Nov 10 00:00:00 CST 2008  YES 
    SAP ERP 2005  BP-ERP  BP ERP  Business Packages (Portal Content)  Mon Nov 10 00:00:00 CST 2008  YES

  • Standard tcode for list of BOM & routing

    Dear Friends,
    Is there any standard report in sap to view entire list of BOM and Routing apart from viewing thru tables MAST,STKO for BOM and POKL for routing
    Gvrrus

    Dear GVR,
    1.You can use CEWB to list down all the BOM and routing available,to execute CEWB,you have to
    configure the individual working area in OP77.
    2.Check CA51 to list down the routing details of all the materials for specifying the task list type.
    3.For finding out all the materials that has a BOM is just goto CS03,press F4 in the field for material
    selection,now in the search method serach using material by bill of material,eneter the plant,BOM
    usage and remove the maximum no of hits and enter,now you can download this by right clicking and
    selecting download.
    In my understanding use the step no 3 for a rough checking purpose,but for exact details always use
    the tables.
    Check and revert back.
    Regards
    Mangalraj.S

  • Service BOM - Usage

    Dear SAP Gurus,
    I have created Service BOM for several Materials in the system but when I am trying to use this BOM in the Structural List in Service order I get the error saying "Enter Valid object carrrying structural List".
    Eg:- For the Pump I am repairing the BOM contains : 1. O-Ring Seal 2. Shaft Seal 3.Rotary Kit
    Now when I create a service Order for Pump , I would like to pick Sub-items 1 and 3 as the spares consumables for the order.
    But actually, in SAP Order am not able to do so..........
    Please let me know if any setting w.r.t BOM is needed at the background.
    Thanks
    Prasad Subramanya

    For Universal Usage type PM is not marked.
    I just tried with same BOM but with Usage 4 i.e., for PM and now it is picked up and looks normal.
    Thanks a lot for your help.
    But general question for you,
    For Service Materials like Pumps, motors, drives we don't create any Equipments as such. We just use the material itself without assignment to any Equipment.
    In this case, I just create a Material BOM and do you think I can use the same in Order for the List structure??
    Regards
    Prasad
    Edited by: Prasad Subramanya on Apr 4, 2009 4:25 PM

  • Selection of usage type for EHP7 SPS02 ERP 6.0 Upgrade

    Hi Experts,
    We are planning to upgrade our SAP ECC 6.0 to EHP7 SP02 ERP 6.0, But during MOPZ configuration to generate the side effect report, its prompting to choose at least one technical usage type. I am not able to judge which is the right usage type to our environment. I have checked with functional team and they said our business type is Logistics but in the list logistics not found.
    Here i have attached this list of components installed in our system and list of usage types which is showing in MOPZ. Please suggest me with correct usage type to proceed.
    Thanks in advance,
    Regards,
    Suresh Babu
    Component
    Release
    SP Level
    Support Package
    Description of the component
    SAP_BASIS
    700
    21
    SAPKB70021
    SAP Basis Component
    SAP_ABA
    700
    21
    SAPKA70021
    Cross-Application Component
    PI_BASIS
    2006_1_700
    11
    SAPKIPYM11
    Basis Plug-In (PI_BASIS) 2006_1_700
    ST-PI
    2008_1_700
    8
    SAPKITLRD8
    SAP Solution Tools Plug-In
    SAP_BW
    700
    23
    SAPKW70023
    SAP NetWeaver BI 7.0
    SAP_AP
    700
    20
    SAPKNA7020
    SAP Application Platform
    SAP_APPL
    600
    17
    SAPKH60017
    Logistics and Accounting
    SAP_HR
    600
    59
    SAPKE60059
    Human Resources
    SAP_HRCAR
    600
    59
    SAPK-60059INSAPHRCAR
    Sub component SAP_HRCAR of SAP_HR
    SAP_HRCAT
    600
    59
    SAPK-60059INSAPHRCAT
    Sub component SAP_HRCAT of SAP_HR
    SAP_HRCAU
    600
    59
    SAPK-60059INSAPHRCAU
    Sub component SAP_HRCAU of SAP_HR
    SAP_HRCBE
    600
    59
    SAPK-60059INSAPHRCBE
    Sub component SAP_HRCBE of SAP_HR
    SAP_HRCBR
    600
    59
    SAPK-60059INSAPHRCBR
    Sub component SAP_HRCBR of SAP_HR
    SAP_HRCCA
    600
    59
    SAPK-60059INSAPHRCCA
    Sub component SAP_HRCCA of SAP_HR
    SAP_HRCCH
    600
    59
    SAPK-60059INSAPHRCCH
    Sub component SAP_HRCCH of SAP_HR
    SAP_HRCCN
    600
    59
    SAPK-60059INSAPHRCCN
    Sub component SAP_HRCCN of SAP_HR
    SAP_HRCDE
    600
    59
    SAPK-60059INSAPHRCDE
    Sub component SAP_HRCDE of SAP_HR
    SAP_HRCDK
    600
    59
    SAPK-60059INSAPHRCDK
    Sub component SAP_HRCDK of SAP_HR
    SAP_HRCES
    600
    59
    SAPK-60059INSAPHRCES
    Sub component SAP_HRCES of SAP_HR
    SAP_HRCFI
    600
    59
    SAPK-60059INSAPHRCFI
    Sub component SAP_HRCFI of SAP_HR
    SAP_HRCFR
    600
    59
    SAPK-60059INSAPHRCFR
    Sub component SAP_HRCFR of SAP_HR
    SAP_HRCGB
    600
    59
    SAPK-60059INSAPHRCGB
    Sub component SAP_HRCGB of SAP_HR
    SAP_HRCHK
    600
    59
    SAPK-60059INSAPHRCHK
    Sub component SAP_HRCHK of SAP_HR
    SAP_HRCID
    600
    59
    SAPK-60059INSAPHRCID
    Sub component SAP_HRCID of SAP_HR
    SAP_HRCIE
    600
    59
    SAPK-60059INSAPHRCIE
    Sub component SAP_HRCIE of SAP_HR
    SAP_HRCIN
    600
    59
    SAPK-60059INSAPHRCIN
    Sub component SAP_HRCIN of SAP_HR
    SAP_HRCIT
    600
    59
    SAPK-60059INSAPHRCIT
    Sub component SAP_HRCIT of SAP_HR
    SAP_HRCJP
    600
    59
    SAPK-60059INSAPHRCJP
    Sub component SAP_HRCJP of SAP_HR
    SAP_HRCKR
    600
    59
    SAPK-60059INSAPHRCKR
    Sub component SAP_HRCKR of SAP_HR
    SAP_HRCMX
    600
    59
    SAPK-60059INSAPHRCMX
    Sub component SAP_HRCMX of SAP_HR
    SAP_HRCMY
    600
    59
    SAPK-60059INSAPHRCMY
    Sub component SAP_HRCMY of SAP_HR
    SAP_HRCNL
    600
    59
    SAPK-60059INSAPHRCNL
    Sub component SAP_HRCNL of SAP_HR
    SAP_HRCNO
    600
    59
    SAPK-60059INSAPHRCNO
    Sub component SAP_HRCNO of SAP_HR
    SAP_HRCNZ
    600
    59
    SAPK-60059INSAPHRCNZ
    Sub component SAP_HRCNZ of SAP_HR
    SAP_HRCPH
    600
    59
    SAPK-60059INSAPHRCPH
    Sub component SAP_HRCPH of SAP_HR
    SAP_HRCPT
    600
    59
    SAPK-60059INSAPHRCPT
    Sub component SAP_HRCPT of SAP_HR
    SAP_HRCRU
    600
    59
    SAPK-60059INSAPHRCRU
    Sub component SAP_HRCRU of SAP_HR
    SAP_HRCSE
    600
    59
    SAPK-60059INSAPHRCSE
    Sub component SAP_HRCSE of SAP_HR
    SAP_HRCSG
    600
    59
    SAPK-60059INSAPHRCSG
    Sub component SAP_HRCSG of SAP_HR
    SAP_HRCTH
    600
    59
    SAPK-60059INSAPHRCTH
    Sub component SAP_HRCTH of SAP_HR
    SAP_HRCTW
    600
    59
    SAPK-60059INSAPHRCTW
    Sub component SAP_HRCTW of SAP_HR
    SAP_HRCUN
    600
    59
    SAPK-60059INSAPHRCUN
    Sub component SAP_HRCUN of SAP_HR
    SAP_HRCUS
    600
    59
    SAPK-60059INSAPHRCUS
    Sub component SAP_HRCUS of SAP_HR
    SAP_HRCVE
    600
    59
    SAPK-60059INSAPHRCVE
    Sub component SAP_HRCVE of SAP_HR
    SAP_HRCZA
    600
    59
    SAPK-60059INSAPHRCZA
    Sub component SAP_HRCZA of SAP_HR
    SAP_HRGXX
    600
    59
    SAPK-60059INSAPHRGXX
    Sub component SAP_HRGXX of SAP_HR
    SAP_HRRXX
    600
    59
    SAPK-60059INSAPHRRXX
    Sub component SAP_HRRXX of SAP_HR
    EA-IPPE
    400
    17
    SAPKGPID17
    SAP iPPE
    EA-APPL
    600
    17
    SAPKGPAD17
    SAP Enterprise Extension PLM, SCM, Financials
    EA-DFPS
    600
    17
    SAPKGPDD17
    SAP Enterprise Extension Defense Forces & Public Security
    EA-FINSERV
    600
    17
    SAPKGPFD17
    SAP Enterprise Extension Financial Services
    EA-GLTRADE
    600
    17
    SAPKGPGD17
    SAP Enterprise Extension Global Trade
    EA-HR
    600
    58
    SAPKGPHD58
    SAP Enterprise Extension HR
    EA-HRCAR
    600
    58
    SAPK-60058INEAHRCAR
    Sub component EA-HRCAR of EA-HR
    EA-HRCAT
    600
    58
    SAPK-60058INEAHRCAT
    Sub component EA-HRCAT of EA-HR
    EA-HRCAU
    600
    58
    SAPK-60058INEAHRCAU
    Sub component EA-HRCAU of EA-HR
    EA-HRCBE
    600
    58
    SAPK-60058INEAHRCBE
    Sub component EA-HRCBE of EA-HR
    EA-HRCBR
    600
    58
    SAPK-60058INEAHRCBR
    Sub component EA-HRCBR of EA-HR
    EA-HRCCA
    600
    58
    SAPK-60058INEAHRCCA
    Sub component EA-HRCCA of EA-HR
    EA-HRCCH
    600
    58
    SAPK-60058INEAHRCCH
    Sub component EA-HRCCH of EA-HR
    EA-HRCCN
    600
    58
    SAPK-60058INEAHRCCN
    Sub component EA-HRCCN of EA-HR
    EA-HRCDE
    600
    58
    SAPK-60058INEAHRCDE
    Sub component EA-HRCDE of EA-HR
    EA-HRCDK
    600
    58
    SAPK-60058INEAHRCDK
    Sub component EA-HRCDK of EA-HR
    EA-HRCES
    600
    58
    SAPK-60058INEAHRCES
    Sub component EA-HRCES of EA-HR
    EA-HRCFI
    600
    58
    SAPK-60058INEAHRCFI
    Sub component EA-HRCFI of EA-HR
    EA-HRCFR
    600
    58
    SAPK-60058INEAHRCFR
    Sub component EA-HRCFR of EA-HR
    EA-HRCGB
    600
    58
    SAPK-60058INEAHRCGB
    Sub component EA-HRCGB of EA-HR
    EA-HRCHK
    600
    58
    SAPK-60058INEAHRCHK
    Sub component EA-HRCHK of EA-HR
    EA-HRCID
    600
    58
    SAPK-60058INEAHRCID
    Sub component EA-HRCID of EA-HR
    EA-HRCIE
    600
    58
    SAPK-60058INEAHRCIE
    Sub component EA-HRCIE of EA-HR
    EA-HRCIN
    600
    58
    SAPK-60058INEAHRCIN
    Sub component EA-HRCIN of EA-HR
    EA-HRCIT
    600
    58
    SAPK-60058INEAHRCIT
    Sub component EA-HRCIT of EA-HR
    EA-HRCJP
    600
    58
    SAPK-60058INEAHRCJP
    Sub component EA-HRCJP of EA-HR
    EA-HRCKR
    600
    58
    SAPK-60058INEAHRCKR
    Sub component EA-HRCKR of EA-HR
    EA-HRCMX
    600
    58
    SAPK-60058INEAHRCMX
    Sub component EA-HRCMX of EA-HR
    EA-HRCMY
    600
    58
    SAPK-60058INEAHRCMY
    Sub component EA-HRCMY of EA-HR
    EA-HRCNL
    600
    58
    SAPK-60058INEAHRCNL
    Sub component EA-HRCNL of EA-HR
    EA-HRCNO
    600
    58
    SAPK-60058INEAHRCNO
    Sub component EA-HRCNO of EA-HR
    EA-HRCNZ
    600
    58
    SAPK-60058INEAHRCNZ
    Sub component EA-HRCNZ of EA-HR
    EA-HRCPH
    600
    58
    SAPK-60058INEAHRCPH
    Sub component EA-HRCPH of EA-HR
    EA-HRCPT
    600
    58
    SAPK-60058INEAHRCPT
    Sub component EA-HRCPT of EA-HR
    EA-HRCRU
    600
    58
    SAPK-60058INEAHRCRU
    Sub component EA-HRCRU of EA-HR
    EA-HRCSE
    600
    58
    SAPK-60058INEAHRCSE
    Sub component EA-HRCSE of EA-HR
    EA-HRCSG
    600
    58
    SAPK-60058INEAHRCSG
    Sub component EA-HRCSG of EA-HR
    EA-HRCTH
    600
    58
    SAPK-60058INEAHRCTH
    Sub component EA-HRCTH of EA-HR
    EA-HRCTW
    600
    58
    SAPK-60058INEAHRCTW
    Sub component EA-HRCTW of EA-HR
    EA-HRCUN
    600
    0
    Sub component EA-HRCUN of EA-HR
    EA-HRCUS
    600
    58
    SAPK-60058INEAHRCUS
    Sub component EA-HRCUS of EA-HR
    EA-HRCVE
    600
    58
    SAPK-60058INEAHRCVE
    Sub component EA-HRCVE of EA-HR
    EA-HRCZA
    600
    58
    SAPK-60058INEAHRCZA
    Sub component EA-HRCZA of EA-HR
    EA-HRGXX
    600
    58
    SAPK-60058INEAHRGXX
    Sub component EA-HRGXX of EA-HR
    EA-HRRXX
    600
    58
    SAPK-60058INEAHRRXX
    Sub component EA-HRRXX of EA-HR
    EA-PS
    600
    17
    SAPKGPPD17
    SAP Enterprise Extension Public Services
    EA-RETAIL
    600
    17
    SAPKGPRD17
    SAP Enterprise Extension Retail
    FINBASIS
    600
    17
    SAPK-60017INFINBASIS
    Fin. Basis
    C-CEE
    110_600
    23
    SAPK-11023INCCEE
    ECC Core Country Versions for EEM Countr
    ECC-DIMP
    600
    17
    SAPK-60017INECCDIMP
    DIMP
    ERECRUIT
    600
    17
    SAPK-60017INERECRUIT
    E-Recruiting
    FI-CA
    600
    17
    SAPK-60017INFICA
    FI-CA
    FI-CAX
    600
    17
    SAPK-60017INFICAX
    FI-CA Extended
    INSURANCE
    600
    17
    SAPK-60017ININSURANC
    SAP Insurance
    IS-CWM
    600
    17
    SAPK-60017INISCWM
    Industry Solution Catch Weight Management
    IS-H
    600
    22
    SAPK-60022INISH
    SAP Healthcare
    IS-M
    600
    17
    SAPK-60017INISM
    SAP MEDIA
    IS-OIL
    600
    17
    SAPK-60017INISOIL
    IS-OIL
    IS-PS-CA
    600
    17
    SAPK-60017INISPSCA
    IS-PUBLIC SECTOR CONTRACT ACCOUNTING
    IS-UT
    600
    17
    SAPK-60017INISUT
    SAP Utilities/Telecommunication
    LSOFE
    600
    17
    SAPK-60017INLSOFE
    SAP Learning Solution Front-End
    SEM-BW
    600
    17
    SAPKGS6017
    SEM-BW: Strategic Enterprise Management
    ST-A/PI
    01Q_700
    2
    SAPKITAB7L
    Servicetools for other App./Netweaver 04

    Hi Reagan,
    I have already checked in SPAM &  same status has been copied in the initial message.
    Thanks,
    Suresh Babu

  • SAP NW 7.3 - add usage type

    SAP Netweaver 7.3 AS java on RHEL 6.
    Database db2 LUW 9.7.
    How would one add a usage type?
    For example I install usage types:
    AS Java
    NW Product Description
    Application Server Java Extentions
    Enterprise Portal
    EP Core
    Then the boss comes by and asks for
    Business Process Management
    In the past I've used OSS support package download stack application
    to generate a stack xml and a list of support packages,
    then used JSPM option add usage type.
    With SAP NW 7.3, OSS has no stack application.
    I haven't seen a "add usage type" within SOLMAN MOPZ...
    Ken

    Hi,
    Check SAP note 1466288 and 1625087.
    Thanks
    Sunny

  • High-Level items (item category LUMF, Sales BOM Usage 5) in PO's

    One of our plants supplies High-Level Items to their customers. The GenItemCatGroup MARA-MTPOS_MARA and the Item category group MVKE-MTPOS for these items is =  LUMF.  These are essentially Phantom items, which they do not stock.
    Weu2019ve created BOMu2019s for these items with BOM Usage 5
    The components for these BOMu2019s are GenItemCatGroup MARA-MTPOS_MARA and the Item category group MVKE-MTPOS = NORM
    In our sales orders, the high-level (LUMF) item comes in with Item Category TAQ, and all sub-items come into the order as TAE.
    The TAQ items are relevant for pricing.  The TAE items are not.
    The requirements in MD04 are as follows:  No requirement for the LUMF item (phantom item).  Requirements DO appear for the sib-items.
    Everything seems to be working fine as far as Sales Orders are concerned.
    Our problem is that this same plant will also sell the same LUMF high-level items to other plants within our organization via Purchase Order (Type NB).
    When an NB purchase order is processed, the MD04 only shows requirement for the LUMF Phantom Material.  There are no requirements generated for the sub-items.
    What do we need to do so that the NB Purchase Orders with LUMF items react the same way that sales orders do, as far as demand in stock requirements, pricing, etc?

    Ashish,
    Suppose the material is completed then the value is shown against final product. In that case we use Item vategory Group ERLA. The maina item category will be shown as TAQ. The Subitem will take item category TAE (text item)
    If the material is still not complete then the value is ascertaind through sub items in that case LUMF item category is used and item category for the main item is TAP and for sub items it is TAN.
    In any case we will change the item category group as (ERLA or LUMF) in the material master of the final material "Computer". Where as the subitems item category will be "Norm".
    Note: If you use standarad Order = OR, and standard item category group ERLA in the Finished MAterial Conmputer, then system will automatically assign item categories for Main item = TAQ and SUb Items = TAE.
    Standard process and ORder = OR
    Then  Execute MM02 for finished material or Main materialo alone i.e., "Computer",  Assign Item Category Group = ERLA and save. Then create BOM CS01, CS11 Single level the output will be
    COMPUTER = TAQ
    SCREEn = TAE
    HERdisk = TAE
    Key board= TAE.
    Similarly if you proceed process by changing Item category group = LUMF for main material i.e., Finished goods "Computer" then
    COMPUTER = TAP
    SCREEn = TAN
    HERdisk = TAN
    Key board= TAN
    If you are changing the document type prefixed with Z , then you need to proceed with "Assign tem Catgeory"
    Regards
    Sathya

  • Consume PIR from Sales Order when PIR's are not in BOM Usage 1

    I need help determining which combinations of Strategy groups I need at the header level (Variant Config KMAT) and item level Phantoms (HALB)  The Phantoms are just used to drive forecast, I have no need to issue or stock these items... just need them to be reduced when I use them in a Sales Order.
    Please help me understand the planning strategy groups or the requirement type combinations on the header material and the item materials.
    Standard SAP will consume the PIR if they exist in the production BOM (Usage 1).   However, due to Usage 1 having the object dependencies placed at lower levels and parameter effective, I am not able to add the foretasted assemblies to the usage 1 BOM.  I have created the PIR's for these HALBu2019s using Simulative Long Term Planning.
    I need a way to consume/reserve the foretasted PIR's from the sales order... without the use of the Production Order or Planned Order.  I think it can be done at the time of the sales order PGI... but have not been able to figure out the configuration.  Below are the main steps if the PGI is the vehicle for consumption.
    Sales Order uses Configuration Profile SD01, KMAT and BOM Usage 5 items are in the found in the Sales Order.
    KMAT is inactive in Demand Management (MD62).
    BOM Usage 5 items have PIRu2019s, they are created from Simulative Long Term Planning.
    1.     During Sales Order creation, the BOM Items are selected from VC.
    2.     During Sales Order PGI, the BOM Items are consumed and show as withdrawn in MD623/MD73.
         Sales Order Reservation and/or Consumption of Item Level Planned Independent Requirements     
         ***PIR's are not found in the Production BOM, only the Sales BOM.               
         ***Production BOM and Sales BOM have same KMAT, and same Object Dependencies          
         Step 1:     Create Sales order for KMAT 10000008                    
              a. Sales Order will have KMAT at line item 10               
              b. Sales Order will have BOM Usage 5 materials as items (see BOM's Below)          
              VC will pick the specific materials that are relevant to order          
         Step 2.     Sales Order is Saved/Confirmed.                         
              a. A reservation will be created against the Planned Independent Requirements for Sale BOM Items.
              MD73 for the HALB will show the Planned Independent Requirement, and the Reservation.     
              b. A Planned Order is created using BOM Usage 1.               
              VC will pick the specific materials that are relevant to order          
         Step 3.     Production Order is completed and issued to Sales Order.               
         Step 4.     Sales Order Delivered with PGI                    
              a. The HALB PIRu2019s in the Sales Order will be withdrawn (reservation goes away, PIR qty reduced by 1 PC).
    Client 100     BOM Usage 5                              
         Material Type     BOM Item     Material Number     Planning Strategy Group     Planning Independent Requirements     VC ObjDep          
         KMAT     Header     10000008     25     00-Inactive     KMAT          
         HALB     01     10000023     70     00-Active     Yes, At this level          
         HALB     10     10000025     70     00-Active     Yes, At this level          
         HALB     20     10000024     70     00-Active     Yes, At this level          
         HALB     30     10000026     70     00-Active     Yes, At this level          
         HALB     40     10000027     70     00-Active     Yes, At this level          
    Client 100     BOM Usage 1                              
         Material Type     BOM Item     Material Number     Planning Strategy Group     Planning Independent Requirements     VC ObjDep          
         KMAT     Header     10000008     25     00-Inactive     KMAT          
         KMAT     10     KA_350_FA_P4
    (Parameter Effective)     Null     Null     Yes, but at lower levels          
         KMAT     20     KA_350_FA_P4 (Parameter Effective)     Null     Null     Yes, but at lower levels          
         KMAT     30     KA_350_INT
    (Parameter Effective)     Null     Null     Yes, but at lower levels          
         KMAT     40     KA_350_INT
    (Parameter Effective)     Null     Null     Yes, but at lower levels

    You can manage copying data from the sales order to the production order by some FMS.
    For data not in the production order you can define UDF-s on the production order.
    E.g.copying the item code you can use this FMS:
    SELECT T0.ItemCode
    FROM RDR1 T0  INNER JOIN ORDR T1 ON T0.DocEntry = T1.DocEntry
    WHERE T1.DocNum =$[$32.1]
          and T0.VisOrder=0
    connecting this to the Product No. field setting autorefresh when Production Order Origin Number changes.
    Or copying the Item details you can use this FMS
    SELECT T0.Text
    FROM RDR1 T0  INNER JOIN ORDR T1 ON T0.DocEntry = T1.DocEntry
    WHERE T1.DocNum =$[$32.1]
          and T0.VisOrder=0
    connected to an UDF setting autorefresh when Production Order Origin Number changes.
    (And similar other FMS-s can be connected to other fields you want to copy.)

  • Costing BOM usage

    Hi Experts,
    Please explain me with some examples what is the use of " BOM usage (6)costing BOM".
    I have the following scenario where i was trying to use the Costing BOM concept.
    To produce material 'A',  I need component 'B' and 10 other consumable materials.
    For the cost estimation purpose, the client wants to put the consumables in the BOM.
    The production of A is happening like this, Prod. Order qty of A is 100000 Meter.
    The confirmation of A will be taken place partially like 500 m, 700m, 900m...etc.
    When i do the confirmation, Auto GR for material A and consumption of components by 261 movement type will be taken place.
    Here i can monitor what is the actual consumption of component B and i will enter during confirmation. So that i can get the Plan Vs Actual quantity.
    But for consumables i can not monitor what is the actual consumption since it is very less quantity and it will be filled in the tank as a bulk quantity.
    Please thro' some light on the following 2 queries,
    1.In the costing BOM i will put all the consumables and in Production BOM i will put only the prime material, how to avoid the Variance during every confirmation?
    2.If i don't put the consumables in the BOM, i added it in the Costing sheet, and i am issuing all to Cost center by 201 movement type. In this case how to take the Plan Vs Actual variance?
    Thanks in Advance.
    Bala

    Dear Balamurugan,
    Check out this,
    Generally the Production BOM will be used for production as well as costing.Production in the sense which
    will be used for running MRP or for creating a planned order or else a production order.
    If you want to create a BOM for a material just for doing the cost calculation or if your company wants to
    know the cost split up alone means then you can create a BOM using the usage 6,where the same will not
    be considered for production that's in particular for running MRP.In case if you want to restrict that one
    should not run MRP for a material which has a BOM (which has only Costing BOM) then in this case it will
    be helpful.
    Regards
    Mangalraj.S

  • Assembly indicator in BOM doesnu2019t consider BOM Usage

    In a business scenario we are using two types of BOM 1. Production BOM & 2. Engineering BOM.
    Letu2019s say for Material 'A' there is an engineering BOM & it consists of two components say 'B' & 'C'.
    Material 'C' has its own BOM but with usage "Production".
    Still in transaction CS03, when we display Engineering BOM (Usage: 2) for Material A.
    Assembly indicator for material 'C' is active though there is no engineering BOM for material 'C'.
    Is there is any condition for checking BOM usage for assembly indicator? Or what can be the solution to take into consider BOM usage.
    PP gurus please help.
    Many thanks in advance.

    Hi Sumedha
    BOM usage defines the area (such as engineering/design or production) where a BOM can be used.
    when ur material A is having C as component and C is having its own bom so it will show that in the system. bom usage is only for using the bom in diffrent area
    if u have an engineering/design BOM and if u want to use that in production that time it will give an error
    or massage that BOM usage is not as per requriement
    hope u got it
    regards
    Sachin

  • Sales Order BOM(Usage 5)-Manual re order point VB-No BOM Explode-MD02

    Hi Guru's,
    I have typical requirement from my client.
    Requirement is as follows.
    1)There is no Production in the Plant, so NO PP module.
    2)All parts are like Kit, Purchase will be Component wise and at the time of Sales, Sales will assemble(Sales BOM)
    3)Requirement should trigger from Manual re order point-VB
    4)Am using Material type HAWA-Trading Material
    5)I have changed Usage type 5 as Production and sales, because system should Explode the BOM at MD02 and as well it should use in Sales order.
    Problem is
    1)If i Set MRP type PD, Strategy 10, and Demand from MD61 then system is exploding BOM and giving PLanned order and PR
    2)If i set MRP type VB or V1, No strategy and Requirement should arrise from Safety stock and re order point, system wont Exploding in MD02 for Component level(child part)
    Please give me advise on this issue.
    Thanks,
    VR

    Hi Karthi,
    Currently Stock is Zero and my reorder point is 10 and safety stock 5 for Parent and same this is applicable for child part.
    Yes , For Parent material system generating Requirements but not exploding BOM(Child part)
    Thanks,
    VR

  • Is it possible to switch between two BOM usages in the order?

    Hello Experts,
    We have created two maintenance BOM's say Structural BOM - Usage Plant maintenance & Spares BOM - Usage Spares for a technical object.When I am creating an order,in the components list I can only list the BOM with Usage plant maintenance.Is it possible to switch between the usages?I need both the usages for selecting materials in the components tab.
    Thanks,
    Ashraf

    We are on ECC 6.0
    Regards,
    ashraf

Maybe you are looking for