Locate Materials with Future Planned Price

Hi All,
I have a user who did costing run in between of the month to change the Standard price from next month and Marked the prices for next month but forgot to note down the Material numbers.
Now, the problem is in the month of July'14 when CK24 is executed for release no materials are coming up. It is possible that the Costing entered is for the month of June'14.
Is there any report by which we can locate materials which Future Planned price and period and Current Planned Price and Period.
Regards

Hi,
It is  very simple,
You will get all price results in the table MBEW:
For your query relevant field is : ZPLPR.
Go to SE16: MBEW table and provide the input of your plant and execute.
Check whether there are any entries in ZPLPR,
If you find entries in that filed means materials marked for the estimate but it was yet to be released.
you will get the total list of materials.
Please find the relevant tables and fields to get the prices in the material master:
Let me know if you find any difficulty to get the values in the table
Regards,
Pavan Kumar Arvapally

Similar Messages

  • Material valuation with respect planned price 1 in material master

    Dear All,
         The costing variant PPC1 has been used for released cost estimate. In my scenario I want to create one more variant say ZPC1 where to calculate the value of the material from the planned price 1. In this case
    1.     What should be the validity date mentioned in the material master for valuation
    2.     The variant has been configured as
    a.     Costing Type – 12 Mod Std cost Est
    i.     Price Update – No Update
    ii.     Save Parameter – With Start of Period
    iii.     Misc – Cost Sheet
    b.     Valuation Variant – 001 Planned Valuation
    i.     Material Valuation - Planned Price
    ii.     Standard Price
    c.     Date control
    i.     From Date : Start of Current Posting Period
    ii.     To Date : End of Current Posting Period
    iii.     Qty Struc Date : Current Date
    iv.     Val Date : Current Date
    d.     Qty Structure Control (As PPC1)
    3.     When I run the standard cost estimate with variant ZPC1 the system calculates the standard price of the material even when the price is mentioned in the planned price1. 
    How the variant should be created to capture the planned price for calculation when using the variant ZPC1.
    Kindly help me in this regards
    Regards
    Vasantha

    HI,
    The requirement is to execute the cost estimate quaterly for planned price 1.
    So we are planning to create separate costing variant to pick the planned price 1 of RM.
    Clinet has the Excel file with the details of RM and Price combination but the prices are not available in SAP.
    We are looking for the Mass transaction to upload the prices in Planned price 1.
    Kindly help.
    Thanks,

  • Materials with moving average price that have goods receipt without PO

    We want to have materials on moving average price, but they are not purchased but are leftovers from production process that can be used again. As such we want to put them in inventory according to internally determined price but to use V price control in order to avoid reavluation of existing inventory when price changes. How this can be done as we don't have PO where to put the price. Maybe is possible to have dummy PO without vendor?

    Hi there,
    so there is never a "regular" GR or invoice? And the material will be put back to stock using movement Type 262, for example?
    There is a way... Consider to activate the "External GA Amount" for the relevant movement type(s). You can do this by customizing the movement type's field selection, category "Materials management". Set this field to "optional". After this you can enter a value in the detail dynpro of the movement. Watch out, it is the value for the posted quantity, not a price... The valution price will be recalculated, the moving everage price will change, but there is no revaluation.
    Does this help?
    Kind regards from Germany,
    Bernd

  • Materials with quality plan

    Hi
    I want to see the list of materials for which quality plan is available.
    Can anyone help me in finding out.
    Thanks&
    Regards
    Janardhanan

    Hi,
    Go to SE16N
    By using the following tables you can see
    Inspection Plan PLKO Inspection plan Header
    Inspection Plan MAPL Material Assignment   ( This table will have Material code, Task list type- Q and Group and counters)
    Inspection Plan PLPO Operation Details
    Regards
    Hari

  • How to view materials with selected moving average price

    Dear Gurus,
    How to view materials with moving average price greater than some selected value?  ie..Is there any report which takes moving average price as input?
    Thanks in advance,
    Sastry

    HI
    While checking any table or report u cannot give conditions (more than this value).
    If it mabe the case, down load the data from table MBEW - Field Name VERPR  to excel file. then u apply conditions, like greater than this value.
    U'll get the desired out put.
    Thanks
    Raman

  • Production Order GR with Planned Price

    Dear All,
    We are using following steps for production order=
    1) Create BOM, for Semifinished material with Price control = "S"
    2) Create Roting, with all Keys PP01, PP02 and PP03 with Material allocation to respective steps
    3) Standard Cost Estimation using CK11N and CK24
    4) Create Production order using CO10 with Material and WBS Element.
    5) Material issue against Reservation. But the material may be changed after releasing prodction order first time. And Actual issue for the BOM material may be more or less in qty.
    6) Final confirmation with completion of last phase confirmation of production order.
    7) Production Order TECO
    8) Prodction Order Settlement using KO88
    Now my problem is while I am doing final confirmation the GR done is with Planned price (Based on BOM) + Subcontracting charges which it is set with production order while releasing it for the first time.
    Kindly tell me is the system behaviour is correct or wrong?
    We are expecting that GR should happen with the actual material issue price + Subcontracting charges only.
    Please reply.
    Thanks & Regards,
    Vishal Kadia

    Vishal,
    This is for your information.
    If you have production order of 1 EA- Starnadar Price =10 rs
    Raw material cost=5
    Activity Cost=2
    Overhead Cost=2
    So COM=9 rs
    Suppose after production order creation plan cost is 9 rs, hence after confirmation there is no varience (plan vs actual) so actual cost is also the same 9 rs.
    Now as you said if system will go for GR against actual cost, that will post in cost of good mfg account at the time of GR.
    As per std SAP after GR also you can issue the material to that order, hence if you will go for more goods issue of new material against that order (unplanned issue) of rs 5 for the same order then the actual cost will again change (recalculated), but for that oredr material is allready GR with actual cost, then you will not able settle the cost of newwly issued material on that order.
    So whatever the plan and acual cost GR will be done against std price maintioned in material master ( 10 rs)
    This is my understanding.
    Hopes that will clear your dought.
    Tara

  • How to send Materials with Prices in IDOC

    Hy SAPExperts,
    I've following use case, I want to send materials with material price with an IDOC to a external system. How can I proceed this?
    I found the IDOC PRICAT01, but to use this IDOC i must create a pricebook, is this a good way to proceed my use case? Does companys work with Pricebooks? Or is there another way to proceed my use case without craeting a pricebook?
    Thanks,
    Frederic

    Hi Alec,
    this Keys are Toggled with SendVKey
    for example 
    {enter} means -> sendVKey 0
    There is a Listing in the Scripting Help which shows all V-Keys
    hope it helps
    greetings
    Thomas Br

  • Multilevel routing report (with planned price data)

    Hi Experts,
    Could any of You pls support me with a basic idea how to build a multilevel routing report?
    I am not happy with the existing / standard reports related to routings, I actually need one with all subassemblies and also planned price included from CO.
    So I have found out the following way:
    1.     I build a report, using standard FM CS_BOM_EXPL_MAT_V2, to get a hierarchical BOM all components,
    2.     only select top level and components which has subassemblies
    3.     run my own written FM to get routing data for subassemblies (using mapl, plas, plko, plpo, crhd, crco)  already created
    4.     add planned price data (using CO-tables cssl, cost) 
    It is rather a by-pass; so does a better / nicer solution could be used for the purpose, possibly with some existing FMs (which I have not found up till now)?
    Answers will be appreciated

    Well it all depends on what this Z report which you're building should output at the end of it. Also the format in which it should be displayed.
    Since there is no info on that in your query or what is the exact issue faced, just putting across some FM/Bapi which might be of interest
    For routing you can use -
    CARO_ROUTING_READ
    Some BAPI's which are relevant for costing:
    BAPI_COSTESTIMATE_GETEXPLOSION
    BAPI_COSTESTIMATE_GETDETAIL
    BAPI_COSTESTIMATE_ITEMIZATION

  • Planning of subcontracting materials with scrap percentage

    Hi All,
    Need your help for below mention scenario,
    For planning, where my planning is start with subcontracting materials.
    To clarify more, strategy group is defined in subcontracting materials. Now when I entering Assembly scrap or Component scrap in material master or BOM, system is not considering this scrap percentage for planning.
    when i defining scrap percentage with procurement type, E (Inhouse Production) or X ( Both) system is considering scrap percentage. But for external like F or X with special procurement 30 (Subcontracting) its not considering the scrap percentage.
    Please suggest, how I can plan subcontracting materials with scrap percentage.
    Regards,
    Rajesh
    Edited by: Rajesh Sawant on Feb 18, 2009 4:54 AM

    Hi Jejesh,
    Thanx for reply.
    This scrap is required for subcontracting materials.
    Setting in material master,
    In MRP 1 and MRP 4 view- Define scrap as Assembly and Component scrap as per the requirement.
    Procurement key - F or X
    Special Procurement key - 30 (Subcontracting)
    Strategy group- 40 (Planning with final assy) in MRP 4 view.
    Bill of Material setting,
    Component scrap and Operation Scrap in Bill of material.
    Based on above master data, Plan Independent Requirement (PIR)  cration for above materials and MRP Run.
    Here after mrp run based on above setting, scrap percentage is not considered. Plz suggest the solution.
    Regds,
    Rajesh

  • Is it required to cost the materials with Price control "V" ?

    Dear All,
    Would like to know if we have to consider the items with Price control "V" during the cost run in CK40N..?
    Since the system automatically updates the price of the item for price control "V", do we also require to update through cost run?
    Please help me understand.
    Best regards,
    Praveen

    Hi,
    Materials with price control "V" is dynamically updated with value whenever there is a receipts.  The system will calculate average rate by dividing total value by total stock.  Hence, cost the materials for this price control is not relevant.  It is recommended to have price control "V" for all externally procured materials.
    Best Regards,
    Madhu

  • Whether i will able to avail call facilities with my ipad(Cellular) by not jailbreaking it? If not now, whether apple has any future plans to implement the same?

    Whether i will able to avail call facilities with my ipad(Cellular) by not jailbreaking it? If not now, whether apple has any future plans to implement the same?

    An iPad is a tablet, not a phone, they do have plans, it's called an iPhone....
    While it has celluar data this isn't hte same as a celluar line or ability to make phones, can you imagine how stupid you'd look with a tablet against your ear?
    Skype, Google +, Facetime, all wonderful ways to have calls

  • Thinking about Moves with my Plan and Future, Help Appreciated

    OK so this was the deal with my plan currently, is that right now im looking to save money on my phone bill every month and im being given the big run around with my Talk/Text/Data Promotion where i keep being told my data discount of 9.99 would come off and so far this month too it did not come off. The woman in Promotions department apparently fixed my account which not sure if she did and the problem with the whole thing is that different reps keep telling me i can only get my employee discount on my voice or the data discount which of course is wrong because the promo woman over the phone told me i can receive both and the loyalty reps over the phone keep giving me different stories and im tired of it. This was the reason i extended my contract for a bit to get this discount and its getting very frustrated about it!!
    The other thing was i was thinking about switching carriers when my contract is up because my bill has been pretty high the past couple of months and it makes no sense to early terminate my 2nd line because my ex gf upgraded to a smartphone and jacked up the fee. My mom hardly uses the 2nd line and i would like to cancel it but because its too high it makes no point to do that since both our contracts are up in a year. I was thinking about going to a basic phone to cut my data plan prices because the only cheapest verizon has is the 30 dollar plan. I don't use my data plan too much but i heard if i go to a basic phone and within 14 days i go back to a smartphone i can get my unlimited data back. So idk if this is true or not. But its gotten to the point that these smartphone plans and contracts are a bit much now. So if there is a Verizon rep that can chime in and see what can be done or discuss with me about options, that would be greatly appreciated. Otherwise i just had to vent about the issue with my current bill at this moment. So just was saying.

    To answer SuzyQ, my ex gf is off my account because of problems with her being on it (being late all the time, messing up my credit) and she wasn't choosing to fix her problems by doing and AOL because of her credit which Verizon wanted 400 and she didn't want to do it. Long story short, she lied to me about her AOL deposit amount just to stay on my account for a few more years (hence the early upgrade). So thats why shes no longer with my account.
    To answer AZS, your right my mom HAS a basic phone now and does not have data. My problem is that i have data on my plan which im trying to cut back on the cost of the plan and so far, i really wish Verizon would let me have that Talk/Text/Data promotion where it was 9.99 for the unlimited data and it would really help my bill alot. Of course i had a hard time getting it and one of the reps who i dealt with about getting it was very rude with me and she didn't care about satisfying the problem or the plan with me.
    But both lines have less than a year left so when the time comes, its time to move to something cheaper and better for me no contract wise. Unless anyone has something else to throw in their opinion of.

  • Invoice price is not equal to po price with invoice plan

    Hi experts,
    I have one po with invoice plan like below,1st item was closeed.
    Start Date : 2007/11/29
    InvDate         Description                         %                  Invoice value   Currency                        T                    R                   DC
    2007/11/30     Down payment-     5.00     44,000.00         USD          1     C     W1
    2007/11/30     Down payment-     30.00     264,000.00         USD          1     A     W1
    2010/11/30     Prior to ship                          50.00     440,000.00         USD          1     A     W1
    2010/11/30     After Accepta     15.00     132,000.00         USD          1     A     W1
    In mir7, I put the po item in screen po reference and system give me 836,040.87 USD. I think the correct amount is 836,000, how the system logic to calculate invoice amount when po with invoice plan?

    Hi,
    please read from FAQ note 499523 the questions and answers 16, 23 and 25.
    Regards,
    Edit

  • Finished Goods valued at Future Standard price at the time of Delivery .

    Hi,
    My client requires the Finished Goods to be valued at Future Standard price at the time of delivery from Production order. This is required because in case there are frequent changes in the material prices, i can mark my material several times.. and change the future standard price.
    I have checked and found that it is always valued at Current standard price only.. and not at the future standard price.
    1) i have tested by changing the costing variant in OPL1 ( Planned costing variant for Production orders).. such that the valuation variant picks up the Future price... it seems it will work only for the Raw materials and SFG's consumed in the Production order and not for the Finished goods.
    2. Define valuation variant for Goods received option in the IMG - It seems it is relevant only when your FG is valued at Moving average price only.. so not relevant for my case.
    My question :
    Can i value my Finished goods at future standard price ( i.e Marked standard cost estimate ) at the time of receiving goods from Production order ? If yes how ?
    Thanks in advance for your answers.
    Njoy
    Siva

    Hi Siva
    It is very much possible, but you need to use exit... I think exit COPCP002 should be the relevant....
    Usually, this is used to valuate the GR in case of Valuated sales order stock... I guess this should work in MTS also...
    The reason why I feel it should be possble, is that if you read SAP text for the IMG Step Define Goods Received Valuation for Order Delivery, it says at the end
    For materials with price control S, on the other hand, the credit posting is always made at standard price.
    If you deliver to stock at a price that is not the standard price, the system will report an output price variance in variance calculation
    Hence, it should be very much possible to achieve what you want.. Only thing is it will hit a PPV and that you need to find relevant exit if the one abov does not work
    Regards
    Ajay M

  • Material ledger:Dynamic Release of Planned Prices

    Dear all,
    Would anyone tell me how to test the 'Dynamic Release of Planned Prices '  in material  ledger step by step? SAP said that system can change the price during the first goods movment in next period, but I did not know how to test it.
    rgds,
    Ben

    If the 'dynamic price release' is active for the corresponding plant   
    in Material Ledger (you may check that in transaction CKM9), the system
    releases planed future price at first goods movement at beginning of the
    period (materials movements transactions).                                                                
    The standard price can be released by different ways. It can be changed
    with transactions CK24, CK40N, CKME and with a dynamic price release   
    with the first posting in the new period.                              
    There are the following prerequisites for the successful release of     
    standard prices:
    1.  The current MM period has to correspond to the current FI period. If
        the MM period is already moved before attaining the FI period, no   
        prices can be released for the new period until the first date of   
        the new FI period is reached. However, Modification note 551956     
        permits a dynamic price release in such cases.                                                                               
    *According to the fiscal year variant from the system or user date  
    2.  The period for which the cost estimate was created and flagged has  
        to correspond to the current MM period or the valid-from date of    
        future prices from the accounting must have been reached.                                                                               
    3.  In the release period, a release of a running cost estimate cannot  
        yet occur.       
    4.  Provided that a future price is supposed to be released from the    
        accounting, but a flagged, released or passed cost estimate is      
        anchored on the cost estimate view of the material master, you      
        either have to undo these anchors (REDO or delete in Transaction    
        CKR1) or you have to override message CKPRCH025 or M8155. When you  
        override the message the program might issue incorrect values in the
        variance calculation and in the CO-PA since the standard price may  
        no longer correspond to the current planned price.                                                                               
    5.  Provided that the Material Ledger (ML) is active, the period status 
        has to permit the release. In this case, note that a release cannot 
        occur after the end of the prior period (Exception: Late release by 
        means of MR21).                                                                               
    6.   Provided that you want to use the dynamic release, note     that it
        is only possible in connection with goods movements, but NOT with   
        invoice receipts (Error message M8394) or by means of direct posting
        to the material or by means of the CLOSING ENTRY of the Material    
        Ledger (no message).

Maybe you are looking for