Machines with different Capacities in a production order

i am have the  Machines of Different Capacities( Ex Machine A :2pcs/hr &  Machine B:4 Pcs Hr).
i have Maintained the Work centers as Same Name.
In actaual Production i want to use both the Machines.
How to maintain in the  Routing .This is only one Operation and i want to use both the Machine.
Ex :Prod Order Qty :100
I want to use Machine A to manufacture the 60 Qty and use the Machine B for 40 Qty.
Please give me the Solution

Dear laks,
I think this will help.  If you have maintained individual capacity as 2 for eg, for machine oriented capacity category then pl maintain the individual capacity details for  those 2 nos. You can give the individual capacities what ever name u like for eg Punch press 10ton, Punch Press 20 ton etc. 
Note: you can access the individual capacities in the menu bar "goto - Individual capacities" of the relevant capacity category.
Once you have maintained this, you can assign these individual capacities  in your production order.  You have to enter into the production order operations, double clik on the operation number which has got this WC, then enter into Cap. req assignement tab.  There u can enter the individual capacities detail and assign the quantities for the individual capacities as well.  Also, the capacites will be split and despatched as well.
During the confirmation process, in CO11n, you have to mention the split number as well other than your confirmation / order number.  The system will validate this quantities with the production order capacities split qty.
Regarding parallel routing, i think this will only work if you have two different work centers. 
If the scenarios  is always like this, i think it would be preferable to create two diff work centres and like the other members of the forum have suggested, a parallel routing would be ideal.
reg
kiki
Award points if this info is useful and solves ur problem

Similar Messages

  • Restarting a failed admin server on another machine with different IP

    Hi,
    I'm trying to restart a failed admin server on another machine with different IP on Weblogic Server 10gR3. After copying the domain config to another server, the admin server can be started without any problem, but it cannot contact the managed server until the managed server is rebooted.
    The behavior contradicts the documentation, http://download.oracle.com/docs/cd/E12840_01/wls/docs103/server_start/failures.html#wp1064112, that says Running MSs will learn the new AS address when they are contacted by the AS after it has been started. It does not mention the managed servers need to be rebooted.
    did I do anything wrong? Your help would be much appreciated.
    Thanks a lot,
    Andreas

    Hi,
    What ever you said is true. If the IP Address of Admin Server is changed, then Managed Server must connect to Admin Server after "ReconnectIntervalSecs" . If the IP address is not moved then Admin Server Should contact Managed Server automatically.
    Can you provide details steps you had performed, so that we can identify the root cause of the issue.
    Thanks.
    Vijay Bheemineni.

  • Restore Rman hotback in different machine with different Database name

    Hi All,
    I have oracle 11.2.0.3.0 in Windows 2003 R2 server 64 bit version,i have my production database "Proddb" in archivelog mode , I have taken RMAN hot backup at 9 AM and i want to restore this RMAN backup into new Machine with new Db Name "Testdb" at 1 PM ,in between 9 AM to 1 PM lots of transactions happened , lots of archivelogs got generated ..
    Can anyone tell me how to restore RMAN Backup in different machine with new Db name and also how to apply those archive logs which got generated between 9 AM to 1 PM.
    Thanks & Regards,
    Vikash Jain

    http://docs.oracle.com/cd/B19306_01/backup.102/b14191/rcmrecov.htm#i1007814Yes you will have to apply all those archivelog after yours last backup 9:00 AM to 1:00 PM , someone give you good link to restore the RMAN backup from one machine ot another machine but it is missing one thing which you require is to restore database at new machine with new DB_NAME , for that you can do it in two ways after restoring and recovering the database.
    1)After restoring with original name "Proddb" do not recover database ,Create contorlfile in control.txt format using alter database backup controlfile to trace,Shutdown restored database ,delete/rename contorolfile ,recreate controlfile from control.txt which by setting its first line as
    Create controlfile set database "Testdb" resetlogs noarchivelogStartup mount with new created controlfile after defining new controlfile in pfile ,recover database at sql using backup controlfile "recover database using backup controlfile untill cancel" supply log till 1:00 PM ,Open database with resetlogs,run at comand prompt
    sqlplus "/ as sysdba" @aduplib.sql so2)Or better approach is http://docs.oracle.com/cd/B28359_01/server.111/b28319/dbnewid.htm.
    Khurram

  • Problem with prod. ver. explosion to production order

    Hi
    I have problem with production versions. I have FERT with 3 production versions. Additionaly we have Z-program (on Z-table) which control parameter sold to party (from sale order) with production version. So after MRP I see in planned order right production version for example 3 - field PLAF-VERID; in master data in planned order I see right alternative BOM and routing; but when I make a conversion to production order I see that system always explode 1st version; additionaly in planned order in components (button)  I see 1st pr.ver (1st alternative BOM) and in Bill of Material (it seems like to manually expolding BOM) I see right version??? But it couldn't be like this that to have right data I need to go to transaction MD12, explode BOM manully, save and after that make a prod. ord.
    I would like to system explode BOM according to production version (field VERID) already in planned order; so after that it should be that when I will converted it to production order I should have right BOM and right routing from production version signed in planned order.
    I know it sounds complicated Add. in configuration all parameters are set right to explode BOM etc. etc. system version: 4.7
    Thanks and regards. Joanna
    Additional info: I cancel this question cause problem is in Z-program; becuase when according to Z-table system change input in field VERID for system it is only "digital" not parameter for which system should explode right BOM; sorry for disturbing, we need to change Z-programm; I do not know how but maybe any function module can help - we will think. Regards
    Edited by: Kostkaj on Aug 17, 2010 10:25 AM

    HI
    Check this link and find valuable suggestion by Mr Mangalraj regarding selection of PVs
    Produciton version selection in MRP
    Regards
    Anupam Sharma

  • Invoking java methods from C/C++ on the machine with different JREs

    I implemented Windows NT Service instantiating JVM and invoking several java methods. Everything works but I have an issue with running the service on the machine where multiple different versions of JRE have been installed. The service is calling java methods that require JRE 1.3 or later so I wrote the code that is setting system PATH from within the service based on the configuration stored in the external file. The problem is that the service requires jvm.dll to be in the PATH prior lunching it since this library is instantiated through the implicit linking. When I put jvm.dll in the same path as the service binary I can lunch it but JNI_CreateJavaVM fails and returns -1. This happens even if JRE 1.3 is in the system PATH prior lunching the service.
    Everything works if the system PATH contains references to JRE 1.3 and jvm.dll is removed from the service's directory.
    I am looking for an advice on what is the proper way to deal with invoking java methods from the C/C++ executable in the environment with different versions of JRE.
    Thanks, Kris.

    Here's a way I have done what you are asking about:
    What you want to do is make all of your linking happen at runtime, rather than at compile time. This way, you can edit the PATH variable before the jvm.dll gets loaded.
    Following is some code that I used to handle a dll of my own in this manner. You can decide if you want to write a "wrapper" dll, or if you find it simpler to approach the jvm.dll in this way.
    // Define pointer type for DLL entry point.
         typedef void JREPDLL_API (*EXECUTEREQUEST)(char*, Arguments&);
    // Set up path, load dll, and pass everything off to it.
    HINSTANCE javaServer = javaServer = LoadLibrary("jrepdll.dll");
    if (javaServer != NULL) {
    EXECUTEREQUEST executeRequest = (EXECUTEREQUEST)GetProcAddress(javaServer, "ExecuteRequest");
    if (executeRequest != NULL) {
    if (argc == 1)
         // Execute the request.
         executeRequest("-run", args);
    else
         // Execute the request.
         executeRequest("-console", args);
    Here's some code for how to edit the PATH:
              // Edit the PATH environment variable so that we use our private java.
    char *appendPt;
    char *newPath;
    char *path;
              char tmp[_MAX_PATH];
              // Get the current PATH variable setting.
    path = getenv("PATH");
              // Allocate space for an edited path setting.
              if (path != NULL)
                   newPath = (char*)malloc((_MAX_PATH * 2) + strlen(path));
              else
                   newPath = (char*)malloc((_MAX_PATH * 2));
              // Get upper part of path to desired directories.
              strcpy(tmp, filepath);
              appendPt = strstr(tmp, "dbin\\jreplicator");
              appendPt[0] = '\0';
    sprintf(newPath, "PATH=%sjava\\jre1.2.2\\bin;%sjava\\jre1.2.2\\bin\\classic", tmp, tmp);
    // Append the value of the existing PATH environment variable.
    // If there is anything, append it.
    if (path != NULL) {
         strcat(newPath, ";");
         strncat(newPath, path, (sizeof(newPath) - strlen(newPath) - 2));
    // Set new PATH value.
    _putenv(newPath);
              free(newPath);

  • Capacitity leveling - Dispatching production order considering PM block

    Dear friends,
    I am trying to dispatch a production order of large Qty by using transaction CM21.
    The order will take 15 days to complete.
    Two days are blocked by plant maintenance order on that work center in future. They are shown as black in CM21.
    When I try to dispatch, system is automatically dispatching the order in such a way that its end date is before PM block date or start date is after PM block date.
    e.g. Order will run from 10th August to 25th august.
    PM has blocked dates 20 & 21st August.
    Hence the expected result is start the order on 10th and will end on 27th.
    But when I dispatch the order on 10th, system automatically takes it to 22nd (First day after PM block).
    Can we not plan orders with PM block period in between?
    Best Regards,
    Avinash

    You need to enable splits in the operation (routing definition).

  • Automatic batch determination with fixed batch number for production order

    Hello all,
    I want to create a production order where the batc number can be assigned for one component as Batch fixed value once the order is released.
    1.- I have created the characteristic (CT04) assigned to the table MCHA and field CHARG (Batch number) and one value: LINER.
    2.- I have created the class (CL02) and assign to this the characteristic.
    3.- I have created the sort ZSORT and the batch (MSC1N).
    4.- I have checked the classification in the material and it has assigned correctly the class and characteristic and the MRP2 view has the backflush = 1, batch entry = 3 and the prod. stor. location = COIL.
    5.- I have created the strategy (COB1, strategy type CO02) and assigned the selection criteria and sort.
    6.- I have created the order (CO01).
    7.- I was releasing the order and the batch number was assigned but, with numbers!! and I need assign this with fixed value = LINER.
    Could you help me please? How can I do it?
    Kind regards,
    SP
    Edited by: SANDRA PALOMO on Mar 15, 2011 11:28 AM

    Hi Vishwas.K
    Thank you for your respone, but, doing more researching, let me explain you with more detail:
    1.- I am going to the transaction CO02 in order to release the order, but, before it, I am checking the component by Go to > Overviews > Components.
    2.- Then, I am selecting my component and making a click in "Batch determ. " button.
    3.- The system is showing me many batch numbers and I select the "Selection criteria" button and the system said: "Selection class "LINERBATCH" does not contain any selection criteria". But, it has a characteristic that I have created before.
    4.- Then, I select in the new screen "Selection criteria: Origin..." the"create" button.
    5.- The system selection my class from the material classification and when I go back to the last screen, finally the system is showing me my batch: LINER.
    Do you know why my selection criteria with my selection class is not working in automatic?
    Thank you for your time and support.
    Kind regards,
    Sandra Palomo

  • Delivery is pulling items with different delivery dates from sales order

    hi all,
    i have a sales order with two line items with different delivery dates(eg 1st and 21st). material availability date for them is different. when i tried to create the delivery on 1st it is pulling the 2nd item whose delivery date is on 21st.
    where can i control this.
    thanks in advance
    harini

    Hi,
    let us take one example>materials A and B,
    A delivery date is 22.01.2008(maintained in schedule lines in SO)
    B delivery date is 30.01.2008(maintained in schedule lines in SO)
    now i want to deliver material A on 22.01.2008
    by default system will give you only material A in the item line
    material B will not be displaced in the second line item
    now i want to deliver material B on 30.01.2008
    by default system will show me material B in delivery line item
    if in case material A is not delivered then delivery will show you two line items
    i.e., Material A and B
    i think you have understood the difference
    regards,
    US

  • Possible to clone BO XI server to another machine with different ip

    Hi,
    Is it possible to clone BO XI (Windows) to another wintel server (different config), with different hostname and IP address ?
    Assuming, we will use the same database repository (only the destination machine has different hostname and IP).

    It will use names of the servers it created during installation. What version of BOE are we talking about here ?
    If it's R1/R2 - in CMC after repointing, you will see new servers and old ones, you delete old ones and you're good to go.
    With Xi3.1 it's a little more complicated (see many threads on this forum) but same in principal. On new install you create new SIA pointed to the original CMS DB etc...
    Import Wizard aproach is actualy even more safe, but little slower.

  • Can we give 2 materials existing with different plants in 1 Sales order

    can we give 2 materials with different plants in 1 Sales order

    Hi dear,
    In that Case : u can create a single delivery...... AS the ccriteria for delivery split as per standard are
    1. ship-to-party
    2. shpping point
    3. route
    4. incoterms
    5. transportation zone
    Thanks,
    Raja

  • Report for material with sloc,qty available, and production order

    hi friends, i need advice on getting this report for material with qty and specific sloc with the corresponding Prodn order numbers. in mb51 i could get all these details except the prodn order no. could you advice me please?

    to make sure you know how to do this.
    In the material document list, hit "Ctrl+F8" on your keyboard.
    A window will pop up. Click on the button position and look for "order" in the list of available fields. That should do it.
    Rgds.

  • Invoice showing up with different pricing compare to Sales order.

    Hi SD Gurus,
    I have just copied the standard doc types OR/LF/F2 for ZSOR/ZSLF/ZSF2.Once i created the transactions for all 3 doc types & invoice is showing up with differnt pricing procedure.
    As per SAP standard what ever pricing procedure is showing up for sales order should be the same for invoice.
    Note: i hav't changed any config setup for the doc type just copied,kindly suggest why the invoice is picking diff pricing procedure.,
    Thanks,

    Hi Dora sahadev
    As you have copied the sales document, delivery document and billing documents . so go to VOV8 and and select the ZSOR document type and change the delivery document and billing documents to ZSLF and ZSF2.Now create the sales order and do delivery and billing ZSOR->ZSLF->ZSF2.
    Also check in the SPRO->SHIPPING FUNCTIONS->PRICING procedure determination check if any other pricing procedure has been assigned to your sales area at delivery level  .If it has been assigned there then when you create delivery , system will pick up the other pricing procedure which has been assigned for shipping functionality.and that will be getting copied to the billing also . But if it is not assigned then check in VOV8 only and change delivery and billing document types
    Regards
    Srinath

  • Can I restore with time machine with different OS?

    My internal hard drive went kaput, but managed to backup to external with Time Machine.  I was running Mountain Lion.  I replaced the drive today, and rebooted to install Snow Leopard (have the disks), but it won't properly restore.  Do I need to upgrade to Mountain Lion for it to properly restore?  If so, how do I best do that without repurchasing from the App Store.  Many Thanks in advance!-Stan

    Time Machine - Frequently Asked Questions 19. How do I set up a new Mac from an old one, its backups, or a PC? (via Setup Assistant or Migration Assistant)

  • I have various devices with different capacities, but my iphone 5 won't sync as it says i'm overcapacity? it there any way to store onto the icloud and not the device?

    I have an ipad and iphone 3gs 32gb, an iphone 5 and nano 16gb and also purchased 15gb on icloud. My iphone 5 won't sync as it says it is over capacity. Is there any way to store on icloud and not my device? Is having the various capacities on each device is pointless?

    Just select less to sync with the iphone 5.
    Each device will only sync what you select.

  • Do iPhones with different capacities have different specs?

    This might be a silly question. Are the new iPhone 6 plus models equal? what I mean by that is do the different capacity models on the 6 plus have the exact same specs? For example, in the past with the iPod Touches the lower memory models have had slower processors and the new 5th gen 16 gb doesn’t have a camera (thats a drastic example). My main question is this. I want to buy a 16gb iPhone 6 plus, but in doing so will i get cheated out for specs? Do I have to get the larger capacity one if i want the best specs? Is the true only difference between the models just the amount of storage they have?
    I hope that makes some sense.
    Thanks!

    See for yourself:
    http://www.apple.com/iphone/compare/
    Processors are the same in the 6 and 6+
    Same for camera, etc.
    Only difference would be the screen and the battery capacity, which is bigger in the 6+
    But no difference of built in components, if you compare the 16GB, 64 or 128GB model of the 6+

Maybe you are looking for