Maintain overhead rates in production system

Hi experts,
i want to maintain percentage overhead rates in production system, but system has status not modifiable. I found t-code S_ALR_87008275, choose Status, double click on transaction, i found IMG activity SIMG_ORKK_WERK_KZZ2 and area menu KKSM, than i triggered SE16 table CUSAMEN and create new class and object, all i transport to product system. But i can change or create overhead in production system only, but not in details concrete Percentage.
What shall i do to change in details percentage?
Thanks for advice.
Gustavo

Hi,
check SAPNET note 301665 maybe 310768.
best regards, Christian

Similar Messages

  • Actual Overhead rates on Production Orders

    There is a function that let you recalculate overhead rate for actual?
    I mean for example, when you use activity types in production orders, during confirmations planned price is posted to orders, then at the period end closing you can calulate actual price (KSII) and then revaluate production orders with this new price (CON2)
    Is there something like this for overhead rates? p.j. if your actual rate is $3.00 by produced unit. Then at the end of the month is there any transaction that compare actual expenses and actual production and determine new rate? example $3.5. In order to revaluate production orders?
    Thanks

    Hi Espinosa
    Welcome to SDN!
    I guess your question is to check if there is a mechanism to auto calculate the overhead rate in the system....
    Sorry, there is no such mechanism.. You need to manually calculate and maintain it in KZM2 or KZZ2... Then revaluate the prod orders with new rate using CO43....
    However, I find it painful and boring.. Hence, I have developed a workaround which I prefer to use always...
    You need to decide on what basis you would like to absorb your overhead... Say, Machine hrs, lab Hrs or Output.... Lets assume you choose Output (KG) to absorb the overhead
    1. You need to create an Activity Type called PRDOVH and assign it in the PP Work center... Assign the cost element of this act type to a separate cost component in OKTZ
    2. While creating the Routing, the Activity Qty = Operation Qty for this Act Type... i.e. If you are creating routing for 100 Units, specify the Act Qty for PRDOVH as 100...
    3. The Formula in the work center will be fully variable for this Act Type.. i.e. the Act Qty should change in proportion to the Qty Confirmed....
    4. The PP Guys will confirm the operation in PP... This Act Type will also get confirmed along with it
    5. Now calculate Act Price KSII as usual and run revaluation... From this point onwards, follow the normla procedure which you follow in month end
    br, Ajay M

  • Maintain overhead rates for cost centers

    hello
    could some one tell me when i should i maintain overhead rates for the cost centers.
    thanks
    ram

    Hi,
    If I do not misunderstand your question on "WHEN", to take the overhead calculation on cost center effective, you need to setup the costing sheet and assign the costing sheet to the receiving cost centers to collect overhead before you take overhead calculation for them.

  • How to Close Planned Overhead Rates after production order/ CK40N

    Hi,
    While creating production order,it will pick planned overheads from Costing Sheet.After closing the production Oder,how will we close the planned overheads?
    For example: We have maintained the planned overheads as 3% in the costing sheet.Over a period of time we have observed the actual overheads is only 2%.How to deal with this in the system.In this case how to close the planned overheads which we got from costing sheet?
    Kindly advice me
    thanks
    Sunitha

    Hi,
    If i understand you correctly,currently your planned overhead rate is 3% and you wants to change to 2%.
    if this is the case goto your Overhead rate in configuration and copy overhead rate key which is with plan overhead type(2). and change 3% end as of today and copied one with new rate (e.g 2%) as of tomorrow and till end of life(12/31/9999)....
    hope this helps you.
    Thanks,
    Rau

  • Maintain (SMARTFORMS) objects in production system

    Hi,
    I need to maintain special objects directly on the production system although the system is declared as non-changeable. Is there a chance to customize this without a modification? I need it to be able to maintain smartforms text-modules.
    any help is highly appreciated
    thanks in advance and regards
    Gabriel

    Hi Gabriel,
    No it is not possible.
    Regards.
    Ruchit.

  • Overhead Rates Maintenance in DEV,QAS & PRD Systems

    Hello All,
    I need your expert advice on this topic. "What is the best practice to maintain OH rates in SAP Systems across the landscape". Any link to document, whitepaper or knowledge link is very welcome.
    I am aware that it can be maintained after making the system modifiable. But being a basis guy, i am against this method and am on the look out for the best process to do it.
    Points will be awarded for sure for worthy answers.
    Best Regards,
    Sri

    Hi,
    To define the overhead method, choose:
    Period-end closing->Single functions->Accrual calculation->Extras ® Settings->Percentage method, or
    Planning->Planning aids->Accrual calculation->Extras->Settings->Percentage method
    Using the overhead structure display for the given controlling area, you can maintain, create, or call up information on accrual calculations for selected objects.
    To do so, choose one of the following objects either by double-clicking on it or by choosing Goto from the menu:
    Base (basis for calculation): You specify the base cost elements that are to be assigned overhead per controlling area. Choose Where-used list->Overhead structure or Controlling area to display whether and where the base cost element assignments exist.
    O/H rate (overhead rates): Determines plan and actual overhead rate percentages for each controlling area applying to a particular validity period. On the overhead list screen, the Assignments indicator shows whether individual overhead rates exist.
    To check the assignment of the current object (calculation base, overhead rate, or credit) and to display the assignments per controlling area, per overhead structure and the structures not used, when maintaining the above-mentioned accrual data, choose Where-used list-> Overhead structures or Controlling area (see: Where-Used List for Accrual Calculations).
    Controlling->Cost Center Accounting-> Planning->Planning Aids->Accrual Calculation-> Percentage Method->Maintain Overhead Structure.
    - Actual Postings->Period-End Closing->Accrual Calculation->Percentage Method-> Maintain Overhead Structure.
    Save your entries.
    Hope this helps you.
    Rgds
    Manish

  • How to Enhance SPRO so that Config can be maintained in Production System

    I have a requirement to Enhance the configuration nodes within SPRO so that the Client can directly edit specific configurations that would pose a risk to the business if they have to wait for the production release.
    I have to enhance the following Node :
    u2022     Advanced Planning & Optimization --> Supply Chain Planning --> Service Parts Planning (SPP) --> Monitoring --> Shortage Analysis -->Make General Settings for Shortage Analysis
    u2022     Supply Network Collaboration --> Basic Settings --> Notes --> Define Reason Codes for Notes
    The check box for "Current Setting" is input disabled for the above nodes in SPRO.
    Please let me know if there is a SAP Note available to Enable "Current Settings" which will allow the Client to maintain settings directly in Production System.
    If not , Please suggest any alternative solutions.
    Thanks in Advance,
    Vinit

    Hi,
    Your basis team should be able to help you to make changes directly in the production system.
    Regards
    Datta

  • Tables for overhead rates

    Hi experts,
    i want to know all tables for maintain overhead rates. I know only TKZU1, TKZU2, TKZU3, TKZU4, T685, TKZU9 and TKZUTR, but i don´t know others tables primarily for percentage overhead rates. I need this for migration between SAP systems. Can You advise me?
    Thank You
    Gustavo

    Hi Christian,
    i don´t find in TKZUTR the same records as in customizing - define percentage overhead rates. In TKZUTR are less records. Therfore i think that are others tables. I don´t know way are diferent ? 
    best regards
    Gustavo

  • Maintain Exchange rates

    Hi,
    I want to maintain exchaneg rates in the system on daily basis.What is the eay out ?
    i mean when we go live do we need to maintain it in Production system everyday ?
    regards,
    manOO

    Hi Prabhu,
    Thx for feedback.My question is that if it is to be maintained daily then directly one has to do it in production system via OB08.Correct ?
    Regards,
    manOO

  • Reg: Maintenace of ZTable in Production System

    Dear Experts,
    There was a ztable created in Development with Delivery Class as 'C' and Data Class as 'USER'. The maintenance generator is created for this ztable. Then the table is transported to Production system.
    In production system, I'm not able to maintain entries.
    I thought this could be a problem of Delivery Class, so i changed to 'A'. Still i'm not able to maintain any entries in Production system, where as i can maintain entries in Quality and Development systems.
    Do any one have solution for this.
    Kindly help me.
    Regards,
    Abdur Rafique

    NO need to create Table maintenance for each time.    
        suppose you made the changes in any fields ( e.g. like increase or decrese the size in the domain) you should modify the Table maintenance.
        suppose you made change in the table (e.g.like the delivery type or some thing related to the table) first you delete Table maintenance and create the Table maintenance.
       all change will be stored in to the Transport Request what are all the changes done in the DEV server it will stored into the TR. so you just release the TR to Quality server.
       if you want to transport the table content just select the table content click table entry-> transport entries. they ask the TR number.
    Regards,
    Dhina..

  • Overhead rate maintained sales order aswellas production order

    Hi Guru,s
    My Client using overhead rates in a particular costsheet for SD and PP.The overhead rate maintained a particular profit center.these particular profit center maintained sales order aswellas production order.In this case we need to calculate costing for sales order only for this profit center not production order.Any setting required to ovecome this problem.Could you plz help on this regards,
    Thanks&Regards,
    Prakash.

    Hi,
    There is no specific setting is reqd. If u want to calculate the overheads for production, then u need to define the base % and the overhead key. But in sales order you need to maintain the condition type. This will take care of your reqmt.
    Regards,
    V. Suresh

  • Complex Product Costing Scenario- Separate overhead rates to same material

    Hello- I have a strangely complex scenario at my current client.
    They wish to apply different overhead rates to the same raw material (one material number in SAP) which is a part of two different BOMs to the same Semi-Finished product (one material number in SAP). This semi-finished product needs to be costed 2 different ways with 2 different BOMs, routings and overhead rates and then i need to use mixed costing to come up with a blended rolled-up cost to update in the material master of the semi-finished product. I am able to get past all challenges but the only open item is to be able to apply different overhead rates to the same material.
    Limitations:
    1- We have to use Standard price, not moving average.
    2- Split valuation idea thrown out the window.
    3- Using 2 different material numbers for the raw materials thrown out of the window.
    4- Business area idea thrown out of the window.
    basically, coming back to the original issue at hand, the challenge is to be able to apply different overhead rates to one material number in SAP.

    Hi
    There are available,, But you have thrown them out of the window already
    I believe you need to rampup your overhead absorption mechanism... if ovh is dependant on the component, then it should remain fixed/.. however, if it is getting changed bsaed on the parent material, then driver is not the component, but the Parent material
    hence, your overhead should be based on Parent material... Assign an overhead group to the Parent material say, 100 and 110 to the 2 Parent materials.... Now you maintain separate % of overhead per overhead group.... BASE would be the raw material consumption cost element
    @ Subodh: Do you think above suggestion will work?? I think exit need not be used if I have understood his requirement clear
    br, Ajay M

  • Production Overhead Rates

    Hi,
    What procedures are required for entering both material and production overhead rates? I will need to establish production OH rates for the 3 stages which are in cement manufacturing Raw Mix, Clinker, and Cement Production.For each stage we will execute Costing Run.
    Note: We are using Costing Sheet for Material Overheads.
    Requirement Is -
    1.Now if i want to add Production overheads what should i do?
    2.How can i provide the Material and Production Overheads for all 3 stages separately as we need to execute the Costing Run separately for each stage.
    3.If we want to provide the different Material and Production Overhead rates for different stage how can i proceed?
    4.My doubt is -We are maintaining only one costing sheet but wanted to maintain differant overhead rates for 3 stages.How can i proceed?
    Thanks
    Supriya

    Define over head groups and over head keys in order to assign different rates based on your requirmenet. Assign over head groups in material masters.
    Suppose you want to apply an overhead rate of 10% to one group of materials and an overhead rate of 20% to another group of materials. To do this, you create two overhead groups and two overhead keys:
    Overhead group       Overhead key         Percentage
        Mat 10               Mat10                   10%
    Mat20                Mat20                       20%
    You enter overhead group Mat10 in the master records of the materials in the first group, and overhead group Mat20 in the master records of all materials in the second group.
    The costing sheet for overhead calculation is selected through the valuation variant. You create two lines in this costing sheet. In the first line, you link the percentage 10% to the overhead key Mat10. In
    the second line you link the percentage 20% to the overhead key Mat20.
    regs,
    ramesh b

  • Production system editing of overhead percentage calculation

    Hi,
    We want to maintain the overhead percentage calculation in the live
    production system through the T.code S_ALR_87008275.when we want to
    change the percentage the following message appers "Client has status
    not modifiable". Without changing the client status we want to change
    the percentage in the live production server. Kindly guide us in this
    regards....
    Regards
    Syamkrishnan

    Hi
    Refer to SAP notes 372620,374609,356483, 135028 and 77430
    This will help you in achieving the same.
    Good Luck
    Hari

  • How to maintain overheads? Either through KP26 or KZZ2-Overhead Rates?

    Hi,
    We have one client with business cement manufacturing.The manufacturing follows 3 stages.Such as...
    1 Stage is Raw mix
    2 Stage is Clinker
    3 Stage is Cement
    So far they dont have the production.They are supposed to start the production.In this case,what we can suggest for the overheads either KP26 or KZZ2 overheads rate through Costing Sheet.
    What are the differant overheads that are to be considered in this process? Kindly advice me..
    Thanks
    Sunitha

    Another thing to consider would be that you could use either a Costing Sheet or you an Activity Type for Overhead.  Although your client has a fairly straightforward manufacturing process they will still need to apply Overhead in some manner.  As an example, the Overhead at your client may contain costs arising from Purchasing salaries, Production Control office supplies, Production Equipment depreciation expenses, etc., etc.   It also depends on how they 'apply' the Overhead.  Are they applying it based on Labor Hours, Material Consumed, or a Per Unit Basis, etc., etc.  You will need to make sure that you apply the Overhead at the appropriate 'spot' in the manufacturing process.  In other words, you will need to make sure that you are applying the Overhead that's associated with a particular labor operation at that point in the manufacturing process and not earlier or later in the process.
    Edited by: Hilary Hagblom on Nov 30, 2008 6:49 PM