Production Overhead Rates

Hi,
What procedures are required for entering both material and production overhead rates? I will need to establish production OH rates for the 3 stages which are in cement manufacturing Raw Mix, Clinker, and Cement Production.For each stage we will execute Costing Run.
Note: We are using Costing Sheet for Material Overheads.
Requirement Is -
1.Now if i want to add Production overheads what should i do?
2.How can i provide the Material and Production Overheads for all 3 stages separately as we need to execute the Costing Run separately for each stage.
3.If we want to provide the different Material and Production Overhead rates for different stage how can i proceed?
4.My doubt is -We are maintaining only one costing sheet but wanted to maintain differant overhead rates for 3 stages.How can i proceed?
Thanks
Supriya

Define over head groups and over head keys in order to assign different rates based on your requirmenet. Assign over head groups in material masters.
Suppose you want to apply an overhead rate of 10% to one group of materials and an overhead rate of 20% to another group of materials. To do this, you create two overhead groups and two overhead keys:
Overhead group       Overhead key         Percentage
    Mat 10               Mat10                   10%
Mat20                Mat20                       20%
You enter overhead group Mat10 in the master records of the materials in the first group, and overhead group Mat20 in the master records of all materials in the second group.
The costing sheet for overhead calculation is selected through the valuation variant. You create two lines in this costing sheet. In the first line, you link the percentage 10% to the overhead key Mat10. In
the second line you link the percentage 20% to the overhead key Mat20.
regs,
ramesh b

Similar Messages

  • Complex Product Costing Scenario- Separate overhead rates to same material

    Hello- I have a strangely complex scenario at my current client.
    They wish to apply different overhead rates to the same raw material (one material number in SAP) which is a part of two different BOMs to the same Semi-Finished product (one material number in SAP). This semi-finished product needs to be costed 2 different ways with 2 different BOMs, routings and overhead rates and then i need to use mixed costing to come up with a blended rolled-up cost to update in the material master of the semi-finished product. I am able to get past all challenges but the only open item is to be able to apply different overhead rates to the same material.
    Limitations:
    1- We have to use Standard price, not moving average.
    2- Split valuation idea thrown out the window.
    3- Using 2 different material numbers for the raw materials thrown out of the window.
    4- Business area idea thrown out of the window.
    basically, coming back to the original issue at hand, the challenge is to be able to apply different overhead rates to one material number in SAP.

    Hi
    There are available,, But you have thrown them out of the window already
    I believe you need to rampup your overhead absorption mechanism... if ovh is dependant on the component, then it should remain fixed/.. however, if it is getting changed bsaed on the parent material, then driver is not the component, but the Parent material
    hence, your overhead should be based on Parent material... Assign an overhead group to the Parent material say, 100 and 110 to the 2 Parent materials.... Now you maintain separate % of overhead per overhead group.... BASE would be the raw material consumption cost element
    @ Subodh: Do you think above suggestion will work?? I think exit need not be used if I have understood his requirement clear
    br, Ajay M

  • Maintain overhead rates in production system

    Hi experts,
    i want to maintain percentage overhead rates in production system, but system has status not modifiable. I found t-code S_ALR_87008275, choose Status, double click on transaction, i found IMG activity SIMG_ORKK_WERK_KZZ2 and area menu KKSM, than i triggered SE16 table CUSAMEN and create new class and object, all i transport to product system. But i can change or create overhead in production system only, but not in details concrete Percentage.
    What shall i do to change in details percentage?
    Thanks for advice.
    Gustavo

    Hi,
    check SAPNET note 301665 maybe 310768.
    best regards, Christian

  • How to Close Planned Overhead Rates after production order/ CK40N

    Hi,
    While creating production order,it will pick planned overheads from Costing Sheet.After closing the production Oder,how will we close the planned overheads?
    For example: We have maintained the planned overheads as 3% in the costing sheet.Over a period of time we have observed the actual overheads is only 2%.How to deal with this in the system.In this case how to close the planned overheads which we got from costing sheet?
    Kindly advice me
    thanks
    Sunitha

    Hi,
    If i understand you correctly,currently your planned overhead rate is 3% and you wants to change to 2%.
    if this is the case goto your Overhead rate in configuration and copy overhead rate key which is with plan overhead type(2). and change 3% end as of today and copied one with new rate (e.g 2%) as of tomorrow and till end of life(12/31/9999)....
    hope this helps you.
    Thanks,
    Rau

  • Actual Overhead rates on Production Orders

    There is a function that let you recalculate overhead rate for actual?
    I mean for example, when you use activity types in production orders, during confirmations planned price is posted to orders, then at the period end closing you can calulate actual price (KSII) and then revaluate production orders with this new price (CON2)
    Is there something like this for overhead rates? p.j. if your actual rate is $3.00 by produced unit. Then at the end of the month is there any transaction that compare actual expenses and actual production and determine new rate? example $3.5. In order to revaluate production orders?
    Thanks

    Hi Espinosa
    Welcome to SDN!
    I guess your question is to check if there is a mechanism to auto calculate the overhead rate in the system....
    Sorry, there is no such mechanism.. You need to manually calculate and maintain it in KZM2 or KZZ2... Then revaluate the prod orders with new rate using CO43....
    However, I find it painful and boring.. Hence, I have developed a workaround which I prefer to use always...
    You need to decide on what basis you would like to absorb your overhead... Say, Machine hrs, lab Hrs or Output.... Lets assume you choose Output (KG) to absorb the overhead
    1. You need to create an Activity Type called PRDOVH and assign it in the PP Work center... Assign the cost element of this act type to a separate cost component in OKTZ
    2. While creating the Routing, the Activity Qty = Operation Qty for this Act Type... i.e. If you are creating routing for 100 Units, specify the Act Qty for PRDOVH as 100...
    3. The Formula in the work center will be fully variable for this Act Type.. i.e. the Act Qty should change in proportion to the Qty Confirmed....
    4. The PP Guys will confirm the operation in PP... This Act Type will also get confirmed along with it
    5. Now calculate Act Price KSII as usual and run revaluation... From this point onwards, follow the normla procedure which you follow in month end
    br, Ajay M

  • Overhead rate maintained sales order aswellas production order

    Hi Guru,s
    My Client using overhead rates in a particular costsheet for SD and PP.The overhead rate maintained a particular profit center.these particular profit center maintained sales order aswellas production order.In this case we need to calculate costing for sales order only for this profit center not production order.Any setting required to ovecome this problem.Could you plz help on this regards,
    Thanks&Regards,
    Prakash.

    Hi,
    There is no specific setting is reqd. If u want to calculate the overheads for production, then u need to define the base % and the overhead key. But in sales order you need to maintain the condition type. This will take care of your reqmt.
    Regards,
    V. Suresh

  • Percentage Overhead Rates are not capture with Transport request

    Hi,
    I have defined Percentage Overheads rate in KZZ2 and assigned the same  into Costing Sheet.But while saving the transport reqest in to QAS client,It is throwing the below error.Kindly help me in solving this issue.
    Individual entries cannot be put into the change request
    Individual entries cannot be put into the change request
    Message no. SV141
    Diagnosis
    For technical reasons, the entries cannot be fully specified in the change request. There are two possible reasons for this:
    1. The key of an entry is longer than 120 characters. All entries whose keys match up to character 119, are then copied into the change request, rather than an individual entry.
    2. The key of an entry contains fields of special data types, for example, packed numbers. The key can only be specified in the change request up to the first such field from the left.
    all entries whose keys match up to character 238 are copied into the change request, rather than a single entry.
    System response
    The selected entry is copied into the change request correctly, but other entries may be copied as well.
    Please advice me.
    Thanks
    Sunitha

    Hi Sunita,
    I am also facing the same problem while transporting the overhead rates in quality and production.
    Can you give the elaborative steps of how you resolved your issue.
    The steps mention as under i tried but it is not working
    1) Go to SA38 or SE38
    2) Run the program RKAZUTR1
    3) You need to specify the number of your request with the costing sheet changes
    Thanks in advance
    Sayed

  • How to maintain overheads? Either through KP26 or KZZ2-Overhead Rates?

    Hi,
    We have one client with business cement manufacturing.The manufacturing follows 3 stages.Such as...
    1 Stage is Raw mix
    2 Stage is Clinker
    3 Stage is Cement
    So far they dont have the production.They are supposed to start the production.In this case,what we can suggest for the overheads either KP26 or KZZ2 overheads rate through Costing Sheet.
    What are the differant overheads that are to be considered in this process? Kindly advice me..
    Thanks
    Sunitha

    Another thing to consider would be that you could use either a Costing Sheet or you an Activity Type for Overhead.  Although your client has a fairly straightforward manufacturing process they will still need to apply Overhead in some manner.  As an example, the Overhead at your client may contain costs arising from Purchasing salaries, Production Control office supplies, Production Equipment depreciation expenses, etc., etc.   It also depends on how they 'apply' the Overhead.  Are they applying it based on Labor Hours, Material Consumed, or a Per Unit Basis, etc., etc.  You will need to make sure that you apply the Overhead at the appropriate 'spot' in the manufacturing process.  In other words, you will need to make sure that you are applying the Overhead that's associated with a particular labor operation at that point in the manufacturing process and not earlier or later in the process.
    Edited by: Hilary Hagblom on Nov 30, 2008 6:49 PM

  • Planned & Actual Overhead Rates

    Hello friends..
    In the costing sheet, under the percentage overhead rates..
    Can someone please tell me what is the basic difference between the Planned Overhead rate (Overhead type 2) and actual overhead rate (overhead type 1)?
    Please explain..
    Regards
    Shiv

    Well, usually we maintain the same percentage for both plan and actual. Just for appreciating the difference, I indicated to try with a different %. This could be having an use too, where the planning is done at beginning of the year and later in the year, you land up in under absorption, you may want to absorb more on production order, you could resort to.
    In cases of activity pricing, you can run an actual activity pricing, that can re-calculate the activities. But for indirect overheads, where costing sheets are used you can only change the actual (type 1) percentages.
    Well the purpose of standard costing is to set a standard and monitor the variances as we produce. Whatever changes to actuals are made, anyway will be disclosed during the variance calculation.

  • Can we do poduct costing with out using cost sheet  and overhead rates

    Hi,
    can we do product costing with out using cost sheets and overhead rates.
    In that cast , how the cost estimation happens ?

    Hi,
    a costing sheet is used to calculate (on a base) overhead values. If you dont need / want to use this functionality just create/use a costing variant where not costing sheet is assigned.
    Use this costing variant in CK11N or KKPAN, depending if ou have a quantity structure or not.
    best regards, Christian

  • Costing Sheet Overhead Rate Change Mid Month

    Does SAP Support a mid month overhead rate change in a costing sheet?  I have an overhead rate change effective 5/12/2007, but my PM Order is not recognizing the change unless the Basic Start Date of the order is 6/1/2007.

    hi
    it will not support mid month overhead. it should be either period basis or yearly basis.
    regards,
    siva

  • Tables for overhead rates

    Hi experts,
    i want to know all tables for maintain overhead rates. I know only TKZU1, TKZU2, TKZU3, TKZU4, T685, TKZU9 and TKZUTR, but i don´t know others tables primarily for percentage overhead rates. I need this for migration between SAP systems. Can You advise me?
    Thank You
    Gustavo

    Hi Christian,
    i don´t find in TKZUTR the same records as in customizing - define percentage overhead rates. In TKZUTR are less records. Therfore i think that are others tables. I don´t know way are diferent ? 
    best regards
    Gustavo

  • Maintain overhead rates for cost centers

    hello
    could some one tell me when i should i maintain overhead rates for the cost centers.
    thanks
    ram

    Hi,
    If I do not misunderstand your question on "WHEN", to take the overhead calculation on cost center effective, you need to setup the costing sheet and assign the costing sheet to the receiving cost centers to collect overhead before you take overhead calculation for them.

  • Overhead Rates Maintenance in DEV,QAS & PRD Systems

    Hello All,
    I need your expert advice on this topic. "What is the best practice to maintain OH rates in SAP Systems across the landscape". Any link to document, whitepaper or knowledge link is very welcome.
    I am aware that it can be maintained after making the system modifiable. But being a basis guy, i am against this method and am on the look out for the best process to do it.
    Points will be awarded for sure for worthy answers.
    Best Regards,
    Sri

    Hi,
    To define the overhead method, choose:
    Period-end closing->Single functions->Accrual calculation->Extras ® Settings->Percentage method, or
    Planning->Planning aids->Accrual calculation->Extras->Settings->Percentage method
    Using the overhead structure display for the given controlling area, you can maintain, create, or call up information on accrual calculations for selected objects.
    To do so, choose one of the following objects either by double-clicking on it or by choosing Goto from the menu:
    Base (basis for calculation): You specify the base cost elements that are to be assigned overhead per controlling area. Choose Where-used list->Overhead structure or Controlling area to display whether and where the base cost element assignments exist.
    O/H rate (overhead rates): Determines plan and actual overhead rate percentages for each controlling area applying to a particular validity period. On the overhead list screen, the Assignments indicator shows whether individual overhead rates exist.
    To check the assignment of the current object (calculation base, overhead rate, or credit) and to display the assignments per controlling area, per overhead structure and the structures not used, when maintaining the above-mentioned accrual data, choose Where-used list-> Overhead structures or Controlling area (see: Where-Used List for Accrual Calculations).
    Controlling->Cost Center Accounting-> Planning->Planning Aids->Accrual Calculation-> Percentage Method->Maintain Overhead Structure.
    - Actual Postings->Period-End Closing->Accrual Calculation->Percentage Method-> Maintain Overhead Structure.
    Save your entries.
    Hope this helps you.
    Rgds
    Manish

  • Which of these statements about overhead rates are true?...

    Hello SAP-team!
    Which of these statements about overhead rates are true and which are false?
    - The costing sheet is entered in the master record of the order
    - Costing sheets consists of base, overhead rate, and credit
    - Overhead cost elements of type 41 are entered in the rate
    - The costing sheet is assigned at controlling area level and is determined automatically by the system
    - Only percentage rates are possible for overhead rates
    ps: thanks to SAP-community!
    Eugene

    Hi,
    Which of these statements about overhead rates are true and which are false?
    - The costing sheet is entered in the master record of the order- True
    - Costing sheets consists of base, overhead rate, and credit-True
    - Overhead cost elements of type 41 are entered in the rate-True
    - The costing sheet is assigned at controlling area level and is determined automatically by the system- I think false. Generally cost sheet is defined independently and assigned either thru costing variant or thru orders.
    - Only percentage rates are possible for overhead rates- False. Qty based is also possible
    Regards
    Sudhakar Reddy
    Edited by: Sudhakar Reddy K.V. on Sep 15, 2009 11:27 AM

Maybe you are looking for

  • Inline options are greyed out

    The Inline options are greyed out. I can't imagine why this wouldn't work like it does in Pages. Is there a work-around?

  • Menu bar does NOT appear in FULLSCREEN APPS

    Hey everyone, I recently updated to Mountain Lion from Snow Leopard on release day. Although I am relatively unfamiliar with the full screen apps Lion + ML have started enabling I seem to be having an issue. I started using fullscreen mode with Safar

  • Formatting Color of Header/Footer in Pages

    I'm using Pages 5.5.1; I'd like to format the color of the header/footer cell in a file that was sent to me (screenshot of said header below). However, when I double click the cell, there is no option for me to change the background color of the actu

  • How to make sure all the apex pages open up in new tab (or) new windows ?

    - Lets say I create an Apex application in 4.0.2 with 10 pages. - Now I wanted to check if there is some property in the Apex Admin or some settings which control this: 1) anything you click on application, either a page,field- it needs to open in a

  • Adding a node in ABAP Mapping

    Hello All, I need to create the follwoing structure using ABAP mapping <IDocFlatFile>    <FlatFile>       <FlatFileString/>    </FlatFile> </IDocFlatFile> With the follwoing code data irc type i. data: odocument type ref to if_ixml_document. odocumen