hi,
here we are having one scenario that client is having MTO process, where HALB level components can exchanged from one sales order to another.here costs of HALB material used in the FERT production order is not picked  as the typical functionality of MTO is like that diff. levels of components will be procured for sales orderwise.
kindly suggest a solution
thanks
murali krishna.r.n

hi reddy,
our client is using MTO process, where they will exchange halb materials for the fert level production order. i.e according to MTO sales order will trigger procurement seperately at all levels of bom( as sales order stock). what is happening at the client side is they are converting plnd orders to production orders generated in the stock requirement list for HALBS, as thier wish they want to use these  randomly for fert production,
costs differences are arising.....
so kindly suggest a solution
thanks
madhu

Similar Messages

  • Customer Returns Process - Make to Order Scenario

    Dear Experts,
    In Customer Returns Process for make to Order scenario, I am using SAP Standard Documents and Item Categories.
    For standard Sales Order the Requirement type used is Customised say ZHS and Batch Numbers are to be used which are flowing from PPModule.
    While creating Returns order same Requirement Type is triggered i.e.ZHS and while creating Returns Delivery   PGR is not happening untill the Requirement is changed to SAP Standard 011 / KSL in Returns Order.
    How to solve this issue.
    Regards
    Hari

    Hi
    The requirements can be triggered on the basis of your configuration which i had replied
    like in
    MG
    Sales and Distribution
    Basic functions
    Availability check and Transfer of Requirements
    Transfer of requirements
    Determination of requirement types using transaction
    Item categoryPDReq typeRequirement class2
    I also faced the same scenario in MTO managed in batches for me what i said has solved my issue. In your case may be different if you can provide details so that the forum can help you
    regards
    Prashanth

  • Customer number not in the inspection lot for a make to order scenario

    Hi All,
    I know that standard SAP will get the Customer number into Insp. lot only for insp. types 10/11/12.  I am wondering if someone know a way to get the customer no. into insp. lot for insp. type 04 where the material is make-to-order scenario and the Production/Process order has the Sales order and customer no. without activating User-exit.  The quality users want to be able to see the customer no. in insp. lot without having them to go to process order. 
    It makes no sense to me why the customer no. is not brought into insp. lot when that is available in the Prod/process order, which can further be used to select the customer specific insp. plans for 04 insp. type Insp. lot without using Variant configuration.
    Any light on this topic is appreciated.
    Thanks.

    Hi Srikant,
    I guess.........
    Normally the inspection lot refers the triggering document that are the trigger cause for them.
    - Inspection type 01: - Purchase Order and GR material document.
    - Inspection type 03: - Pro. Order Number
    The same way...
    The inspection type 10\11\12 are purely related to the SD, and directly integrates QM and SD. Hence in the inspection lot for the inspection types directly integrated to SD, it will furnish the Sales order number \ Customer.
    But the inspection type 04 is purely have it's relation to Production process. So it will have the details related to integrations it has i.e. the "Pro. Order." Hence it integrates QM-PP, it have the data related to PP (Pro Order), not the SD's one.
    But I think one way you can achieve it,
    Assign the Customer number also to the inspection plan along with the Material. So I think at the time of assigning the inspection plan to the inspection lot, it will refer the Customer number also and will display the Customer number along with Task list Group\Group Counter, in the inspection specification screen in QA03/02
    Regards,
    Shyamal

  • Make to Order Scenario problem

    i want to configure a make-To-Order Scenario
    i have create an item category  ZTAK  (for Make to order items) ... and assigned it to my sales document type and the Material item category in sales view 2 is 0001 (Make to order)
    when creating the sales order i got the following message
    Transaction ZTAK PD  is not defined
    Message no. V1347
    Diagnosis
    This combination of item category ZTAK and MRP type for material PD is not allowed.
    System Response
    The system does not allow further processing of this item.
    could any one help

    Hi,
    Configuration steps:
     Create material by specifying item category group as 0001 = Make u2013 to u2013 order (Normal item)
    In MM01 Basic data tab, General item category field [0001] = Make u2013 to u2013 order, 0002 for configurable
    material
    Make u2013 to u2013 order checking group for availability check should be [02] = Individual requirements in Sales:
    General/Plant tab.
     Go to VA01 and raise the sales order by specifying this material that we created in the previous step
    Item category is TAK
    Schedule line category = CP
    Requirement type = KE [Sales order Header  Procurement  Requirement field]
    KE = Individual customer order without consumption
    (For standard items item category group = NORM)
    System determines requirement type 041-order/delivery requirements. This requirement type points requirement
    class where we can control whether the system has to carryout TOR, Availability check, and Product allocation
    functions.
    NOTE: Make sure that controlling area and fiscal year defined and maintained.
     Save and Exit
     Go to MB1C to initialize the stock
    Movement type [561]
    Specify special stock [E]
    E = Receipt without purchase order in unrestricted sales order stock
    Specify the sales order number [ ] and item number [10]
    Specify the material with quantity
     Save and Exit
     Go to MMBE and check the stock balance
     Go to VL01N do the delivery
     Go to VF01 and raise the invoice
    Hope this helps.
    Regards

  • Re Sales order stock in make-to-order scenario

    Hi
        While doing make-to-order scenario after doing production order confirmation for the raw material the reserved stock is reduced but sales order stock is not reduced. how to solve this.
    Thanks
    Antony

    Dear,
    If you are using strategy 20 then please note,
    You also must maintain the following master data settings for the finished product:
    Strategy group 20 on the MRP screen
    Item category group (such as NORM) on the Sales Organization screen
    Sales Order -> MRP -> Customer Stock Finished Product -> Delivery -
    +
       ^                                                                                |
       |                                                                                |                                                --      Reduction--
    Goods Issue for Delivery and Reduction of Planned Independent Requirements
    After goods issue for the delivery (choose Logistics -- Sales and distribution -- Shipping --Delivery --Create), the stock/requirements list is reset
    Regards,
    R.Brahmankar

  • ATP - Make to Order Scenarios

    Can anyone advise how ATP works for make to order scenarios?  In the first place, shd there be ATP for make to order scenarios?  Since the production order created is associated directly with that particular sales order.
    1. w/o assembly processing
    I noticed SO for this case is always confirmed based on lead time towards customer.  However, any date changes in the production order does get updated into SO schedule lines.  Why is this so?  In the event if there's any delay, material availability shd be change due to change in order completion date.  Why is different from case with assembly processing?
    Thanks
    Peter

    ATP:
    Available-to-promise is the quantity of a material or part still available to MRP which can be used for new sales orders.
    Available to Promise. It is the process of checking the available quantities of a material. The ATP quantity is equal to warehouse stock plus the planned receipts (incoming stocks). ATP takes in to account all movements into and out of the warehouse.
    If selected, it can check the stock examined for ATP that can be safety stock, stock in transfer, stock in quality inspection, & blocked stock, although the planned receipts & planned issues of the stock associated with ATP may be purchase orders, purchase requisition, planned orders, production orders, reservations, dependent reservations, dependent requirements, sales requirements & delivery requirements.
    The ATP quantity is calculated according to the following formula: ATP quantity = warehouse stock + planned receipts - planned issues.
    JP

  • Getting error while doing make to order scenario

    Hello Sap Gurus,
    While doing make to order scenario(strategy 20),when i am giving customer requirement through md81(using reqmt type KE),i am getting the following error,"Receiver category is not allowed by settlement profile SD1."
    Could you guys help me in solving this error.In settlement profile SD1  i have checked that valid receivers material,sales order are kept as optional,then also getting error.

    Hi Jitendra
    Can u confirm what setting is kept against reciever "sales order"? Is it kept as settlement required or optional? Ideally it should be "required"
    Also provide the error message number which u are getting
    Rgds

  • Individual Orders for Customer requirement and Forecast

    Hi Experts,
    We have requirement to create separate planned orders for customer demand and separate planned orders for forecast.
    I mean one planned order should not cover both the forecast and the Sales order quantity; there should be separate orders for the two.
    We are using SNP heuristic for planning.
    For Eg in a bucket :-
    Forecast = 100
    Sales Order = 40
    Lot size = Lot for Lot
    Planning Strategy = 20
    We Need:
    Planned order 1 = 40
    Planned order 2 = 60
    Regards
    Manu

    Hi Manu,
    Unfortunately, SAP itself says that one should not use 30 with SNP. Quoting from SAP Help for  "Planned Independent Requirements (PIR) Segment":
    http://help.sap.com/saphelp_scm50/helpdata/en/61/95613b3e24526fe10000000a11402f/content.htm
    "In SAP APO, the quantities for make-to-order operations are, in general, planned separately to those for make-to-stock operations. These areas are known as PIR segments.
    In general, you can only plan within a PIR segment. This means that you cannot consume planned independent requirements for a make-to-stock scenario with sales orders in a make-to-order scenario.
    However, SAP does offer a special segment to cover exactly this situation u2013 PIR segment Planning without final assembly, without individual requirements. For more information, see the input help for the PIR Segment field in the requirements strategy.
    Supply Network Planning (SNP) cannot work with the individual customer segment. For example, demand in this segment is not shown in SNP. Consequently, you should not use requirements strategies that use this segment. In the standard system, these are the strategies 30 and 40."
    I have not worked with 30 myself.
    As I mentioned earlier, it won't be easy to differentiate between the planned orders, so I am still not clear how creating separate planned orders would be beneficial for you. But best of luck anyway.
    Thanks - Pawan

  • Consignment stock, make to order scenario

    Hi
    We have a material which produce make to stock and make to order also.
    In case of make to stock its fine. But when we are testing make to order then following is system behavour.
    Action     Mvt Type     Accounting Document               
    GR     101     No Accounting Document               
    Consignment     631     Finish Inventory     Dr      at Standard Price     
                        Consignment Inventory Change (VKA)     Cr
    PGI     633     COGS     Dr      at Standard Price     
                        Finish Inventory     Cr
    My question is why not accounting document is generated at the time of GR 101 in case of make to order scenario.

    Hi
    MTO has 3 scenarios in it. (I think you either fall in Scenario 1 or 2)
    1. Where the Qty of Prod order is tagged to sales order upon GR from prod order....
    The valuation in this case happens at the std cost (CK11N).... Every thiing remains same as in MTS... You get variance as well
    2. Where Qty & Value both are tagged to the sales order (Sales order is Cost Object & Stock is Valuated stock)
    This is not recommended by SAP and should be chosen only in rare cases...
    This scenario pertains to Complex MTO, means totally manufactured based on customer demand.. Like Cars, Boeing Air Crafts, etc
    Sale order is a cost object...
    Sales order cost estimate is done when sales order is created...
    GR is valuated at sales order cost estimate... Variances are calculated based on this cost and actual cost incurred..
    PGI and Revenue post to the sales order because SO is the CO object
    Finally Sales order is settled to COPA
    3. Where Qty & Value both are tagged to the sales order (Sales order is Cost Object & Stock is Non Valuated stock)
    This is recommended by SAP
    This scenario pertains to Complex MTO, means totally manufactured based on customer demand.. Like Cars, Boeing Air Crafts, etc
    Sale order is a cost object...
    Sales order cost estimate can be done when sales order is created...
    GR is Non valuated... No Variances are calculated because GR is non valuated
    Production Order settles upon sales order.. hence, actual cost goes to sales order...
    PGI does not generate accounting doc because stock is Non Valuated
    Revenue post to the sales order because SO is the CO object
    Finally Sales order is settled to COPA
    These are the 3 possible scenarios in MTO... There might be a slight variation in Consignment scenario.... I am nt sure if the "No Accounting doc" situation at GR is OK or not
    Regards
    Ajay M

  • Make to order Scenario...

    Hi Friends,
    I have maintained all required fields for make to order scenario.....
    In MRP 3, Strategy Group- 20
    in house production time-  2 days
    But when I punched sales order , in schedule line tab of order item .....order quantity in getting confirmed before proceeding to further process in make to order ( Production order , Material Planning and before production order is getting confirmed ).
    My problem is that in make to order scenario, sales order quantity is getting confirmed before proceedings further.
    So kindly advised as to be done to get rid of this problem
    Thanks in advance
    Shailesh

    Hi Shailesh,
    Please check the configuration settings in the IMG for Availability check.
    You check have maintaining availability checking group 01 or 02 in the Material master.
    Have you assigned Checking rule AE -SD order; make-to-order stock for checking group 01 or 02 in the IMG
    Spro>sales and distribution>Basic functions>Availability check and transfer of requirements>Availability check>Availability check with ATP logic/Against planning>Carry out control for availbility check.
    I hope it will help you,
    Regards,
    Murali.

  • Which fields of material maintain in make to order scenario through bdc

    HELLO  !!!!!
    GURUS !!!
    I am working on make to order scenario.
    Here is batch management.
    I am giving data for uploading so for that which fields must be filled from
    basic data to costing .
    Could you give me some ref. on this topic.
    Regards,
    Nitin

    Hi,
    Its like I have given for the Raw Material what are all the required fields and this is as per the scenerio which we follow and i think this helps you..
    MBRSH     Industry Sector
    MTART     Material Type
    DYTXT     
    WERKS     Plant
    LGORT     Storage location
    MAKTX     Material Description
    MEINS     Base unit of measure
    MATKL     Material Group     
    SPART     Division
    BSTME     Order Unit
    EKGRP     Purchasing Group
    KAUTB     Automatic PO
    XCHPF      Batch MAnagement
    EKWSL     Purchasing valu key
    WEBAZ     GR Processing Time
    USEQU     Quota arrangement Usage
    DISMM     MRP Type
    DISPO     MRP Controller
    DISLS     Lot Size
    BESKZ     Procurement type     
    LGFSB     S.Loc for Ep
    PLIFZ     Scheduling margin key
    FHORI     Planned Delivery Time
    RWPRO     Coverage Profile
    STRGR     Strategy Group
    VRMOD     Consumption mode
    VINT1     Backward Consumption Period
    VINT2     Forward Consumption Period
    MTVFP     Availability Check
    SBDKZ     Individual/Collective     
    BKLAS     Valuation Class
    VPRSV     Price Control Indicator
    VERPR     Value/Price
    EKALR     With Qty Structure
    Hope This Helps you.. is it clear
    Regards,
    Sravanthi
    Edited by: sravanthi nemani on Dec 29, 2008 1:38 PM

  • Make to Order Scenario Process Flow

    Hi Friends -
    I am looking for simple Make to Order scenario with BOM Components with Routing.
    The process flow I want to execute -
    1. Create a Sales Order for a Finished Product (Product should have a BOM for Production)
    2. Do the product Materials Planning for the Sales Order through MD50
    3. Get all the dependent material requirements (both for products as Planned Order and also for BOM Components - all the BOM components should also be planned)
    4. Convert Planned Order for Product to Production Order
    5. Convert Planned Orders for BOM components to Purchase Requisition
    6. Confirm Production Order
    Pls correct me if I my process flow is wrong or requires modification.
    I will appreciate if you can validate the above process flow and guide me to execute the same in the system.
    Pls help me on configuring the system and setting up the materials and related master data for the same.
    Thanks in advance
    Purnendu

    Dear GSL - Pls check the following details
    1. I have created a Material Master data for Finished Product (FERT).
    2. I have assigned Item Category Group - 0004, and General Item Category group as 0004 ( Make to Order / Assembly).
    3. I have assigned MRP Type PD in MRP 1 View and Strategy Group 20 (Make to Order Production) in MRP 3 View.
    4. Now created a Universal (Type 3) BOM for the product with one material component.
    5. Now also created a Routing for the Material with two operations having PP01 a control key.
    6 When I try to create a Sales Order for the finished material it is giving message
    Configuration not possible for material 747 : Reason 3 --> Help
    Message no. V1360
    Diagnosis
    This may have been caused by one of the following:
    1. The configuration profile for the material allows or requires the bill of materials to be exploded during order processing. However, a plant has not been specified in the item.
    2. The configuration profile of the material allows or requires the bill of materials to be exploded during order processing, but the order quantity in the item must be greater than 0.
    3. A configuration profile has not been maintained
    or
    A configuration is not permitted for the material
    or
    4. The configuration profile of the material allows or requires the bill ofmaterials to be exploded during order processing. However, the system could not determine a date because important data is missing from the item (see incompletion log).
    This message is also coming in the Incompletion log f the sales order.
    I have not checked the Configurable Indicator for the material in the Basic Data 2 view of the materials master, but still the message related to Configuration is coming.
    Pls help e on this.
    Thanks and warm regards
    Purnendu

  • Configuration for Make to Order Scenario

    Hi!
    We are using make to order scenario, but we want to follow product cost by production order, not product cost by sale order.
    alway our costs should acrrue to production order.
    What are steps we need to check and do..
    In requirement class (40), we need to change any thing ?
    regs,
    ramesh

    Dear Ramesh,
    Dont remove any account modification indicator
    Just keep blank consumption posting field.
    Regarding valuation, if you keep it as M=Valuation related to particular S.O
                                                                A=Valuation not related to a particular S.O(MTS)
    So, you can keep this field as blank(i.e. Non-valuated stock)
    Rgds
    Murali. N

  • Accounting Entry getting passed in case of Make to Order Scenario

    Hi Experts,
    In Make to Order scenario, as per my knowledge, when the goods is recieved from Production Order the Accounting entry gets passed is Inventory A/c Debit and Cost of Goods Produced Credit.
    But how is Cost of Goods Produced, which is  an expense, gets crebited? I am confused, because the above entry will create a credit balance to an expense account. Can anybody clarify this please?
    Thanks and Regards,
    Sameer Joshi

    Thanks for the reply.
    Do you mean that at the time of PGI, when the entry is posted to COGS, the amount of COP will also get transferred to COGS and then the whole amount will be posted at PGI?
    Thanks and Regards,
    Sameer

  • Make to order scenario (GR Nonvaluated indicator is on by default)

    Hello Friends,
    I am working on make to order scenario. I have assigned  planning strategy 20 to the material. Against this material i created one sales order. Now with reference to this sales order i am creating the production order by transaction CO08. While doing these when i am checking under goods receipt tab, i am finding that GR Nonvaluated indicator is on by default. Because of this when i am doing the GR against these production order, system is not generating any accounting documents.
    I am unable to find how the GR Nonvaluated indicator under Goods Receipt tab in production order is on by default, in make to order scenario.
    Kindly share your valuable input on these.
    Thanks and Regards,
    Jitendra Chauhan

    Check
    Re: GR nonvaluated flagged automatically

Maybe you are looking for