Make to stock, make to order issue,

Hi
   can any body help me out, what are the configuration required in order to activate make to stok, and make to order,where exactly it reflects.
Thanks

then you can only ask your customer if he wants to wait or if he wants only 20 and cancel the 5

Similar Messages

  • Make to order issue

    Hi all,
    <b>I am trying make to order scenario</b> but i am not getting the desired result. I created a sales order, run the MRP and when in MD04, i want to convert the planned order into production order then at that time the system in the <b>"additional Data for MRP element"</b> screen - in the field <b>besides planned order no. shows me "make to stock"</b>. I am working for <b>MTO</b> scenario. <b>The following are the settings i have maintained:</b>
    1. In MMR item category group is "0001"
    2. In MRP3 screen the strategy group is "20"
    3. VOV4 item category determination i have used item category as "TAN" only.
    4. In IMG - sales & distribution - basic functions - AVC & TOR - Transfer of requirements - define requirments class. Here I have selected "040"
    5. In define requiremen type i have used "KE -
    040"
    6. Determination Of Requirement Types Using Transaction - here for item category "TAN" & MRP type "PD" i have selected as 0 - i.e strategy group will come into picture.
    <b>I want clarification on the following issues:</b>
    1. Which requirements class to be used and what are the settings in the "requirements class". I want field wise entry.
    2. Which is the requirement type to be used and where else this requirement type is to be assigned. I want for both SD & PP assignments.
    3. Is there any setting to be done in AVC?
    4. Is the item category determination correct? i.e i have used TAN for item category group "0001". Is it correct or do i have to assign any other item category.
    5. Is the strategy group correct.
    6. What are the settings to be done from the PP point of view.
    7. In MTO say sales order is created for 20 pc and while generating the production order is it possible to create for 25 pc keeping in mind that 5 may be scrapped.
    8. When the planned order is converted to production order and if there is shortage of raw material then does the system ask for the sales order no. while creating the <b>"PR"</b> and the <b>"PO"</b>?
    <b>I want the following results out of MTO:</b>
    1. when i convert the planned order into a production order the system should show the sales order no. so that the production order can be traced back to the sales order.
    2. Suppose today I create sales order for item "A" 10 pc. 5 are anyhow in stock, so i confirm those 5 pc for that sales order and production order will be created for 5 only. Say after 10 days when the remaining 5 pc come to stcok then the system shoud automatically confirm those 5 pc for the original sales order only against which the production order was created.
    3. I want to evaluate the fin. goods stock as per the sales order. Is it possible.
    Efective answers will be highly appreciated.
    Regards,
    Allabaqsh G. Patil
    Message was edited by:
            allabaqsh patil

    dear patil
    please gothrough this
    Make to order Scenario
    1. Make-to-order production is a process in which a product is individually manufactured for a particular customer. In contrast to mass production for an unspecified market where a material is manufactured many times, in make-to-order production a material is created only once though the same or a similar production process might be repeated at a later time.
    2. You can use make-to-order production: (a) For branches of industry or products where a small quantity of products with a large number of different characteristics are manufactured (b) When a product has to be assembled particularly for a sales order.
    3. Stock keeping is not usually carried out for products that are made to order. In companies using make-to-order production, the demand program only determines the production area, in which various variant types are produced. Depending on how you track the costs associated with make-to-order production, there are two ways to process make-to-order items during sales order processing.
    (a) Make to order using sales order
    (b) Make to order using project system (not relevant for SD application)
    4. for make to order production using the sales order, all costs and revenues involved for an order item are held collectively at that item. A particular rule is used that can be changed manually to transfer costs to profitability analysis.
    5. make to order production is largely a production planning configuration. It is also controlled by the requirements type, which is determined by three things
    the strategy group (MRP 3) in MMR
    the MRP group (MRP1) in MMR
    the item category and MRP type (MRP 1)
    6. Make-to-order production is controlled by the requirements type. The requirements type is determined on the basis of the MRP group (MRP1) and the strategy group (MRP3) in the material master record. In addition, a plant must be assigned for make-to-order items in the sales order.
    MAKE TO ORDER PRODUCTION (PROCESS FLOW )
    First Create a material with MM
    Basic data1:
    Give Material name : Cycle
    Material group : 010
    Division : MA
    Net Weight : 10 Kg's
    Gross Weight : 10Kgs.
    Sales: Sales org.1 :
    Base Unit of Measure : EA
    Delivering Plant : RAMA
    Output Tax : 1 ( Full tax)
    Sales: General/Plant :
    Availability Check : 01 ( Daily Requirements)
    Trans.,group : 001
    Loading Group : 0003
    MRP 1:
    Mrp Group : 020 ( Make to Order Production)
    Mrp type : PD (MRP)
    Mrp controller : 000
    Lot size : EX ( Lot-for-Lot order quantity)
    MRP 2:
    Inhouse Production : 1
    Schedule Margin Key : 000
    Forecasting:
    Forecast Model : D (Constant Model)
    Accounting 1:
    Price control : V ( Variable Price)
    Variable Price : 4000
    Price Unit : 1
    Then enter & Save.
    Material 769 created.
    Create a Sales order with VA;
    Order type : OR
    Sales Organization : RAMA
    Distribution Channel : RA
    Division : MA
    Sales Office : RAMA
    Sales Group : RAM, .............. Enter
    Sold to Party : 6000000000
    PO number : 55 , PO Date : 04.06.2007.
    Item Overview Tab:
    Material 769, Quantity : 100
    Enter & Save the Document.
    Sales Order 8212 Created
    Create Production Order with CO:
    Enter Sales order number: 8212, Item No. 10
    Order type : PP, Enter
    Click on FLAG,
    Select Generate Operation and enter NO,
    save the Document.
    Production Order Created : 60002725
    Confirm the Production Order with CO15.
    Enter Production Order No. 600075 and save the Document.
    Now the confirmation Order will be saved.
    Create Goods Receipts with MB31.
    Movement type : 101
    Order : 6002725
    Plant : RAMA
    Storage Location : RAMA
    Enter and Save, you will get Document Posted : 50000068931posted.
    Check the Stock Position with MMBE
    Material : 769
    Plant : RAMA
    Storage Location : RAMA
    Execute (F8), Here we can see the stock at Sales Order Stock.
    Create Delivery with VL01N, Billing with VF01 and Post to Accounts
    rewards if it helps
    siva

  • PPDS Make to order issue

    hi Gurus,
    we are creating make to order sale order and material is Configurable.
    my is that, report  is missing some SALES order in the report against the Production order or purchase order
    as we have created all sales order as MTO.
    When I created any purchase order for 1000 quantity against that Sales order and we did GR for for 900.
    system is automaticaly creating Make to stock order and sending requirement to APO to generate plan order.
    Due to this what ever plan order generated as a Make to stock system is not showing any Sales order infront if that plan order.
    My client doesn't want to create MTS plan order for any material as it is all MTO and configurable
    Please suggest the way
    thanks in advance..!
    Best regards,
    Nilesh I

    Hi Nilesh,
    Your requirement is not so clear.
    When I created any purchase order for 1000 quantity against that Sales order and we did GR for  900.
    system is automatically creating Make to stock order and sending requirement to APO to generate plan order.
    What do you mean by this? When you post the GR for the PO on sales order stock, using movement type 101 E, it should be in sales order stock only. Then why again there is a requirement.
    Could you please clearly give your requirement with simple example? Like Created sales order in ECC > Sales order displayed in MTO segment in Product view> and so on...
    Regards,
    Manimaran M.

  • Make to order stock delivery issue

    hi sap guys
    i m creating delivery for make to order stock, when after creating order i try to do vl01n it gives error that * No deliveryrelated items ,no shedule lines due for given date
    and  in sales order when i check shedule line  it shows confirm quanty 0 .
    so plse help- wht could be the reason for this
    is there any settings or different item category
    points will be rewarded

    First create an order and save. As it is an Make-to-order item, a Assembly order is generated from the Sales order, which you can find in the Schedule line of item > "Procurement" .
    Click on the" procurement" button below the screen, there you will find a Assembly order no.
    Presently ,you do not have stock of the MTO material. Once it is assembled, you will receive into your stock against this assembly order.
    So, receive the stock in your plant.
    Now if you will check the availability, you will find stock is available under "Sales order stock".
    You can go for Picking & then PGI.
    After PGI, the MTO stock (Sales order stock) is finished, beacuse we do not produce extra as it can not be supplied to other customer.

  • Make To Order - Commitment qty is 0 even if material on stock

    Folks,
    We are using Make to order with strategy group 82 (Assembly processing) requirement type is KMFA and class is 201. The availability check in material master is set to '02' individual requirements.
    The KMAT has about 100 components. Of 100 components about 10 are set to 'KP' - no check. the rest are set to '02' - individual requirements in the MRP3 view.
    On creating the sales order,the components with no availability check have the right committed qty whereas the rest shows 0 .(Eventhough there are enough stock) and are shown as missing parts. (the commitment date deaults to 12/31/9999)
    I tried using Movement type 412 E to post the components in to sales order stock. It worked. But there are 100s of components and 100s of orders. We cannot afford to issue the components manually for each and every order.
    Is there any way we could achieve this at one step? (like either posting to the order or reservation?)  Am I missing something in the set up? 
    Helpful answers will be rewarded.

    MRP 4 view "2" was missing in individual/Collective reqmts.

  • You cannot make an assignment to make-to-order stock - Message no. CO684

    Hi,
    During conversion of planned order to production order in variant configuration scenario I am getting following error message....
    You cannot make an assignment to make-to-order stock
    Message no. CO684
    Diagnosis
    The component cannot be allocated to an individual stock because make-to-order production and engineer-to-order production cannot be executed with this order.
    A possible cause is that you are trying to create an order with reference to a sales-order/project, where an account assignment to a sales order/project is not allowed in the settlement profile that is assigned to the chosen order type. This is inconsistent.
    System response
    The following responses are possible:
    Order processing is canceled.
    The system resets the special stock indicator back to the original value.
    Procedure
    Choose another order type.
    Any ideas or suggestions to correct this issue..
    Pavan

    Hi Pavan,
    This is one of the most common problem comes during MTO execution.And the real problem is massage no itself because you will get the same massage no. for many reason and that's it becomes more difficult to find out root cause.
    Check below threads and settings,
    - Order type for MTO is not maintain in Production scheduling Profile.Go OPKP or CORY and maintain Order type for MTO to it.
    - [Thread 1|Error Message while cretaing a Process Order;
    - [Thread 2|Error in Variant Configuration CO684;
    - [Thread 3|error information when covert plan order to production order;
    - [Thread 4|You cannot make an assignment to make-to-order stock;
    Regards,
    Dhaval

  • MTO: You Can not make assignment to make to order stock.

    Dear All,
    I am facing an issue during production order creation. The following error message persisting while creation of production order for setuping Make to order scenario.
    Details:
    I have created a sales order with configurable material (Not BOM).
    Item category: TAC, Stratergy Group: 20, Requirement Type: KE, Requirement Class: 040. (Contains, Acc *** Cat: 'E' and Special Stock Indicator 'E'.)
    Sale Order successfully saved and Requirements passed to MD04. I have run the MRP, System created Planned Order successfully.
    From MD04, When I am transferring Planned Order to Production Order The below error is persisting.
    Error Message: You Cannot make an assignment to Make to Order Stock. Message No: CO 684.
    I am using a custom production order type (Say ZP01) with settlement profile SD1 assigned to it.
    I have also activated the sales orders in TC: OKKP.
    I am using ECC 6.0. and Implemented OSS note: 723180 Still the above error Message is persisting.
    Since the development is in middle of the stage and deadline is very near I need your valuable suggestions to get the clues.
    Thanks & Regards

    Hi Ugameshk,
    First go to OMS2 ang do quantity value upadting tick.....for KMAT material type.
    I am sure you will get your problem solved.
    regards
    tara
    Edited by: tara  bhapkar on Oct 1, 2009 11:37 AM
    Edited by: tara  bhapkar on Oct 1, 2009 11:38 AM

  • Make to order and stock both in one material with consignment

    Hi Seniors
    FERT Material = XYZ which is being used for Make to Order and Make to stock both.
    In case of make to stock  scenario from GR u2013 101 and PGI made @ std price. At the time of Consignment 631 mvt. No accounting document is generated. As per my knowledge its fine. No issue.
    In case of Make to order scenario for above material.
    Q.1   At the time of goods receipt (101 Mvt) from production order,  accounting document is generated at the rate of Per unit target cost of production order and no variance shown on production order. Why not accounting document is created at Std price of Material?
    Q.2 At the the time of consignment an accounting document generated with following entry.
        Finished Goods Inventory      Dr
        Price difference                   Dr             
                        Finish Goods Inventory Cr
    Why accounting document is generated at the time of consignment in case of make to order scenario?  Pls confirm is this a sap standard behavour or anything wrong with me. As I told earlier that in case of make to stock when we make 631 mvt there is no accounting document generated.
    Note: My standard price is on the base of mix costing using two production versions.  Every time we create production order in each version.
    Regards
    Imdad

    Hi Imdad
    Q1: Why not accounting document is created at Std price of Material?
    Check your req class... There is a Field called "Valuation"... your valuation depends on whether you select M or A there... You can decide to valuate based on CK11N std cost estimate or based on Sales order cost estimate / Prod order cost estimate
    So, in a nut shell, you can configure the system to generate acc doc at CK11N Std cost also
    Q2. Why accounting document is generated at the time of consignment in case of make to order scenario?
    In my opinion, your MTO stock is maintained in Table EBEW.. Pls check that... WHen you do GR from Prod order, it resides in EBEW table..
    However, when you send it as a cons stock, the link to sales order is lost and your stock is no longer a MTO stock.. Hence, it is valuated at CK11N Std Cost.... If there is a diff between CK11N cost and GR Price, then PRD is generated... Thats why you are seeing PRD in your case
    BR, Ajay M

  • Availability check for Make to stock and Make to Order

    Dear All,
    Client is selling   Make to stock and make to Order material.
    How and what settings need to do for Avaialbility check.or we can use standard one.
    I hope in case of Make to Order availability check may not happen.
    Please correct me.
    Thanks in advance.
    Regards,
    Shrikant

    hi,
    yes for make to order we dont have AvChk.  for make to stock items u need to follow the
    below configuration.
    Availability check
    1. Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    2. Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
    3. Rescheduling: is a proposal of how u2013 confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
    4. Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) u2013 planned issues (outgoing stock). to examine stock on hand (CO09) proceed to logistics u2013 sales & distribution u2013 sales u2013 environment u2013 availability overview.
    5. Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP 2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
    6. RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
    7. There are three types of availability checks u2013
    Check on basis of ATP quantities.
    Check against product allocation.
    Check against planning.
    Configuring Availability check through Checking Groups u2013
    1. The checking group + checking rule determine how the availability check is to be performed.
    2. The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
    3. The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
    4. The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
    5. Briefly explaining the above u2013 checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
    6. Advantages of individual processing over summarized processing u2013
    Backorder processing is possible.
    You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
    The system automatically uses individual requirements in case of special stock items.
    7. Required data for the Availability check to be carried out u2013
    The Availability check must be switched on at the requirement class level.
    The Availability check must be set at the schedule line level.
    A requirements type must exist by which the requirements class can be found.
    A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
    A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
    8. Configuring Availability check and defining Checking Groups u2013
    Checking groups are introduced into the sales order based on the setting in the material master record.
    SAP standard checking groups are 01 u2013 summarized requirements and 02 u2013 individual requirements or you can create your own by copying the standard ones.
    Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
    Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
    The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
    9. Defining material block for other users u2013 the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
    10. Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
    However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
    This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
    If an entry exists, this default value is over written by MMR.
    11. Controlling Availability Check u2013 in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
    12. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
    13. These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
    14. It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
    15. It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
    16. Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
    17. Defining the elements in the availability check entirely depends on the business needs, but a few tips are given under u2013
    When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
    A shipping notification on the other hand - a confirmed purchase order u2013 is a good indicator of receiving stock on a specified date.
    It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.
    regards
    anand

  • Re Sales order stock in make-to-order scenario

    Hi
        While doing make-to-order scenario after doing production order confirmation for the raw material the reserved stock is reduced but sales order stock is not reduced. how to solve this.
    Thanks
    Antony

    Dear,
    If you are using strategy 20 then please note,
    You also must maintain the following master data settings for the finished product:
    Strategy group 20 on the MRP screen
    Item category group (such as NORM) on the Sales Organization screen
    Sales Order -> MRP -> Customer Stock Finished Product -> Delivery -
    +
       ^                                                                                |
       |                                                                                |                                                --      Reduction--
    Goods Issue for Delivery and Reduction of Planned Independent Requirements
    After goods issue for the delivery (choose Logistics -- Sales and distribution -- Shipping --Delivery --Create), the stock/requirements list is reset
    Regards,
    R.Brahmankar

  • Make to order(MTO) and make to stock(MTS)

    Hi friends
    Please Send the details about Make to order(MTO) and make to stock(MTS) process and configuration .if u have any documents pls send to my mail ID : [email protected]
    Regards
    Balu

    dear balu
    MAKE TO ORDER AND MAKE TO STOCK notes
    Make to order Scenario
    1. Make-to-order production is a process in which a product is individually manufactured for a particular customer. In contrast to mass production for an unspecified market where a material is manufactured many times, in make-to-order production a material is created only once though the same or a similar production process might be repeated at a later time.
    2. You can use make-to-order production: (a) For branches of industry or products where a small quantity of products with a large number of different characteristics are manufactured (b) When a product has to be assembled particularly for a sales order.
    3. Stock keeping is not usually carried out for products that are made to order. In companies using make-to-order production, the demand program only determines the production area, in which various variant types are produced. Depending on how you track the costs associated with make-to-order production, there are two ways to process make-to-order items during sales order processing.
    (a) Make to order using sales order
    (b) Make to order using project system (not relevant for SD application)
    4. for make to order production using the sales order, all costs and revenues involved for an order item are held collectively at that item. A particular rule is used that can be changed manually to transfer costs to profitability analysis.
    5. make to order production is largely a production planning configuration. It is also controlled by the requirements type, which is determined by three things
    the strategy group (MRP 3) in MMR
    the MRP group (MRP1) in MMR
    the item category and MRP type (MRP 1)
    6. Make-to-order production is controlled by the requirements type. The requirements type is determined on the basis of the MRP group (MRP1) and the strategy group (MRP3) in the material master record. In addition, a plant must be assigned for make-to-order items in the sales order.
    MAKE TO ORDER PRODUCTION (PROCESS FLOW)
    First Create a material with MM
    Basic data1:
    Give Material name : Cycle
    Material group : 010
    Division : MA
    Net Weight : 10 Kg's
    Gross Weight : 10Kgs.
    Sales: Sales org.1 :
    Base Unit of Measure : EA
    Delivering Plant : RAMA
    Output Tax : 1 ( Full tax)
    Sales: General/Plant :
    Availability Check : 01 ( Daily Requirements)
    Trans.,group : 001
    Loading Group : 0003
    MRP 1:
    MRP Group : 020 ( Make to Order Production)
    MRP type : PD (MRP)
    MRP controller : 000
    Lot size : EX ( Lot-for-Lot order quantity)
    MRP 2:
    In-house Production : 1
    Schedule Margin Key : 000
    Forecasting:
    Forecast Model : D (Constant Model)
    Accounting 1:
    Price control : V ( Variable Price)
    Variable Price : 4000
    Price Unit : 1
    Then enter & Save.
    Material 769 created.
    Create a Sales order with VA;
    Order type : OR
    Sales Organization : RAMA
    Distribution Channel : RA
    Division : MA
    Sales Office : RAMA
    Sales Group : RAM, .............. Enter
    Sold to Party: 6000000000
    PO number : 55 , PO Date : 04.06.2007.
    Item Overview Tab:
    Material 769, Quantity : 100
    Enter & Save the Document.
    Sales Order 8212 Created
    Create Production Order with CO:
    Enter Sales order number: 8212, Item No. 10
    Order type: PP, Enter
    Click on FLAG,
    Select Generate Operation and enter NO,
    save the Document.
    Production Order Created: 60002725
    Confirm the Production Order with CO15.
    Enter Production Order No. 600075 and save the Document.
    Now the confirmation Order will be saved.
    Create Goods Receipts with MB31.
    Movement type: 101
    Order: 6002725
    Plant: RAMA
    Storage Location: RAMA
    Enter and Save, you will get Document Posted: 50000068931posted.
    Check the Stock Position with MMBE
    Material: 769
    Plant: RAMA
    Storage Location: RAMA
    Execute (F8), here we can see the stock at Sales Order Stock.
    Create Delivery with VL01N, Billing with VF01 and Post to Accounts.
    Make-To-Stock Production:
    Purpose
    we describe the planning of a product for make-to-stock production. After requirements planning, you analyze the stock situation and convert a planned order into a production order. You also enter a sales order that is not relevant to the planning. The production order is then released and saved. After the material withdrawals and confirmation of the operations, you analyze the production variances. The sales order is delivered and settled.
    Process Flow
    1. Planning a Product
    T.code: MD61
    &#61614;Logistics Create&#61614; Production &#61614; Production Planning &#61614;Demand Management&#61614;Planned Independent Requirements
    2. Creating a Sales Order
    T.code: VA01
    Logistics&#61614; Sales and Distribution &#61614; Sales &#61614; Order &#61614; Create
    3. Executing Multi-Level Requirements Planning
    T.code: MD02
    From the MRP node, choose Planning&#61614;Single Item - Multi-Level
    4. Converting the Planned Order into a Production Order
    Tcode: MD04
    From the MRP node, choose
    Evaluations&#61614;Stock/Reqmts list
    5. Withdrawing the Material for the Production Order
    T.code: MB1A
    Logistics Goods&#61614;Materials Management&#61614; Inventory Management &#61614; Goods Movement &#61614;Issue
    6. Confirming the Production Order
    T.code: CO11N
    &#61614;Logistics Time Ticket&#61614; Production &#61614; Production Control&#61614; Confirmation &#61614; Enter &#61614;For Operation 
    7. Creating a Delivery
    T.code: VL01N
    Single&#61614;Logistics &#61614; Sales and Distribution &#61614; Shipping and Transportation With&#61614; Outbound Delivery &#61614; Create &#61614;Document  Reference to Sales Order
    8. Creating a Billing Document
    T.code: VF01
    &#61614; Logistics Create&#61614; Sales &#61614; Billing &#61614;Billing document
    rewards if it helps
    siva

  • Re : Sales order stock (make-to-order)

    Hi
        In make-order scenario after production order confirmation the sales order stock for raw material is not cleared. How to clear this stock.
    Thanks.
    Antony

    Dear,
    Reservation create against prod order. So this raw material to be issued to prod order. After doing GI by MB1A 261 mvt, reservation will remove from system
    Check in Order.
    Go to Material screen and check whether Final Issue Indicator is set or not.
    If it is not set that means still Goods issue is still not over.So Complete the goods issue or Tick that Final Issue indicator or make the order TECO then check the stock in MMBE.
    Regards,
    R.Brahmankar

  • Message " You cannot make an assignment to make-to-order stock"

    Hi,
    i'm trying to create a production order for a specific material, but I get this error message:
    "The component cannot be allocated to an individual stock because make-to-order production and engineer-to-order production cannot be executed with this order.
    A possible cause is that you are trying to create an order with reference to a sales-order/project, where an account assignment to a sales order/project is not allowed in the settlement profile that is assigned to the chosen order type. This is inconsistant."
    I have checked the settlement profile and valid receivers: "G/L account" and "sales order" are set to 1 "Settlement Optional".
    Which can be the problem?
    Thanks in advance,
    Luis.

    Hi,
    in the allocation structure assigned in the settlement rule, is there an assignment for receiver category "SDI" (Sales Order Item) maintained? If not  thats the reason.
    best regards, Christian

  • Make-to-order: COPS for  KMAT materials (Non-valuated sales stock)

    Hello,
    We are working with KMAT configurable material (i.e. non valuated sales order stock).
    The client is requiring that inventory of these KMAT material should be shown in the financial accounting;however as we work with KMAT, this seems not possible.
    The whole process is:
    - taking of the sales order with the configuration
    - MRP and Production order Execution
    - Settlement of the PO to the sales order
    - Settlement of the Sales orden to a given account in FI (just like "stock for customer order") - inventory.
    The problem we are facing now is how to make the compensation of this account once the product is delivered.
    It seems the sales order's default settlement receiver is only the PSG. can we have to use the result analysis key to calculate the cost of sales, and which valuation method can we use if I only want to settle the actual cost that settled from the production order.
    By the way, I have search for the notes:Note 26459  it seems we have to run the sales cost estimate first for the KMAT.
    Summary
    Symptom
    It is not possible to perform results analysis on sales order items with materials of material type KMAT.
    Additional key words
    Transactions KKA3, KKAK
    Cause and prerequisites
    In make-to-order production, the inventory and the cost of sales are not posted through goods movements because the materials are managed in a non-valuated sales order stock. The only way to create postings in FI is to use results analysis (see Note 26456). If the sales order item consists of a material of material type KMAT, results analysis is not possible because no cost estimate exists for this material.
    Solution
    Results analysis must be performed with a valuation method that uses profit basis C. With this profit basis, the system uses the planned costs of the production orders for the sales order instead of a cost estimate for the KMAT material.
    In Release 2.2 a modification is needed for this which is described in Note 25772. In Release 3.0 this function is provided as standard.
    From 3.0C onwards the planned costs of the sales order can also be calculated in a product cost estimate for the sales order. You should use profit basis E in this case.
    However, if you are using assembly processing with production orders, you can only use profit basis C.
    Hope the scenario is clear. Perhaps you have a different approach to work with KMAT materials.
    Regards

    Hi Friends,
    Can you please provide the solution for my problem and its slight urgent.
    Regards
    Goutham

  • Consignment stock, make to order scenario

    Hi
    We have a material which produce make to stock and make to order also.
    In case of make to stock its fine. But when we are testing make to order then following is system behavour.
    Action     Mvt Type     Accounting Document               
    GR     101     No Accounting Document               
    Consignment     631     Finish Inventory     Dr      at Standard Price     
                        Consignment Inventory Change (VKA)     Cr
    PGI     633     COGS     Dr      at Standard Price     
                        Finish Inventory     Cr
    My question is why not accounting document is generated at the time of GR 101 in case of make to order scenario.

    Hi
    MTO has 3 scenarios in it. (I think you either fall in Scenario 1 or 2)
    1. Where the Qty of Prod order is tagged to sales order upon GR from prod order....
    The valuation in this case happens at the std cost (CK11N).... Every thiing remains same as in MTS... You get variance as well
    2. Where Qty & Value both are tagged to the sales order (Sales order is Cost Object & Stock is Valuated stock)
    This is not recommended by SAP and should be chosen only in rare cases...
    This scenario pertains to Complex MTO, means totally manufactured based on customer demand.. Like Cars, Boeing Air Crafts, etc
    Sale order is a cost object...
    Sales order cost estimate is done when sales order is created...
    GR is valuated at sales order cost estimate... Variances are calculated based on this cost and actual cost incurred..
    PGI and Revenue post to the sales order because SO is the CO object
    Finally Sales order is settled to COPA
    3. Where Qty & Value both are tagged to the sales order (Sales order is Cost Object & Stock is Non Valuated stock)
    This is recommended by SAP
    This scenario pertains to Complex MTO, means totally manufactured based on customer demand.. Like Cars, Boeing Air Crafts, etc
    Sale order is a cost object...
    Sales order cost estimate can be done when sales order is created...
    GR is Non valuated... No Variances are calculated because GR is non valuated
    Production Order settles upon sales order.. hence, actual cost goes to sales order...
    PGI does not generate accounting doc because stock is Non Valuated
    Revenue post to the sales order because SO is the CO object
    Finally Sales order is settled to COPA
    These are the 3 possible scenarios in MTO... There might be a slight variation in Consignment scenario.... I am nt sure if the "No Accounting doc" situation at GR is OK or not
    Regards
    Ajay M

Maybe you are looking for

  • How to refer the parent class object from an inner class

    Hi, I have a class X, which contains an inner private class Y. Class X has a method getY which returns an object of class Y. Class Y has a method getParent. I want to return the object of parent class from this. The code is like this: public inerface

  • Getting GET variables out of outer frame

    Hi I currently have a jsp page inside an iframe. When that inner jsp page loads, I would like to get a variable attached to the url of the OUTER frame. Is this possible? If so, how would I go about it?

  • Work center change during MFBF

    Hi, In REM scenario, During backflush, i am replacing workcenter while posting actual activities. In which report can I check quantities confirmed with new work center. Regards, Wadajkar

  • NEW USER!!! THIS IS POSTED IN ITUNES BOARD!!! NEED HELP!!!

    I posted a message similar to this in the itunes board -- but i figured I'd post it here too since this is specificly for Ipod mini's I just bought an IPod mini 4gb off of ebay, but I have no clue how to use it...and I know this question is going to

  • IDVD 5 takes approximate 5 to 6 hours to burn 1hr 55min video

    I downloaded 1hr 55min video from my miniDV. I added titles, transitions, etc. When I finally burn it on DVD using the iDVD 5 program it takes somewhere around 5 to 6 hours. Is that normal? Is there any place you can select the speed you would like t