Material cost charge to Production Order from Cost Center / Work Center.

In Production Order Environment, is it possible that goods are issued from Storage location to Cost Center / Work Center, and in turn charged to Production Orders.
Scenario. Transformer Manufacturing.
Production Order size : 100 Units
Steel (Kgs) per Transformer : 3 Kgs
Total Steel required for Production Order: 300 Kgs (100x3)
In the process of manufacturing of a Transformer Steel or Core winding is the first process step.
Even though the Steel required for above said Production Order is 300 Kgs, the minimum issuable lot size from stores is 2000 Kgs.
Is it possible in SAP ECC 6.0 that the Steel of 2000 Kgs is issued to a Cost Center / Work Center, and later charged to production order based on actual Consumption in the said Cost Center / Work Center.
Regards, Replies and Sugestions shall be appreciated
Madhu

Thank you for the reply,
However, the scenario that i had in mind was a bit different from what you had conceptualized.
Scenario - These transformers are basically for loading on to Inverters & UPS, The max weight of the transformer range from 15-30 Kgs. and they dont have an external casing of steel as seen on Indian Electricity Board transformers. Multiple production orders are processed at a single time in the Plant as per Customer specifications.
The general process followed for manufacture is as follows:
1. Core Winding u2013 This process takes place in the core winding department. Steel reels are loaded on to Winders and individual cores of approx 5 u2013 30 Cm Diameter are produced. (Multiple reels of Steel are stacked one on top of the other onto a pallet.) Usually issue of steel from stores happens pallet wise. The pallets of steel generally weigh in excess of 2 tons.
In the present situation (Non SAP Environment) the entire pallet of Steel is issued to the Core winding department and later the Output is charged to multiple Production Orders, based on the records of the Core winding dept. Since in general the steel content in the FG ranges from 3- 25 Kgs multiple Production Orders can be catered to from one Pallet of Steel.
2. Core Laithing. The wound cores are laithed so as to make the sides smooth.
3. Core Annealing u2013 Heat treatment process.
4. Core Insulation. u2013 Insulation of the annealed cores with insulating material.
5. Primary Winding. u2013 Copper is wound as per the BOM Specification. The issue like that of Steel also arises in the Copper winding process. Here also the Cooper comes in Spools which far exceed the requirement for any Production Order. The minimum issueable lot for Copper from Stores is one Spool. The current practice followed is that the Cooper is taken in the name of the Copper winding department and later charged to individual Production Orders.
6. Primary Soldering.
7. Mid Insulation.
8. Secondary Winding
9. Secondary Soldering
10. Shielding
11. Final Insulation u2013 Same issue with insulation too, since the insulating material comes in rolls.
12. Testing.
13. Potting & Drilling - Process of pouring a chemical compound in the center of the transformer, which helps the transformer to later be loaded on an Inverter. The same issue with like of Steel, Copper & Insulation arises here too, since the chemical compound comes in big containers capable of meeting production requirement for a week.
14. Packing
15. Transfer to FG Inventory.
One of the suggestions was to issue the entire 2000 Kgs to the Production Order and then return 1700 kgs after completion of the Production Order based on actual usage. However, in my opinion this option might not be practicable because, assuming that I get another / multiple Production orders in between the issue of 2000 Kgs and return of 1700 Kgs, issue to the new Production order will not be possible if the stock in stores was only 2000 Kgs initially. In case assuming that the material is available in stores for the next production order, the situation could worsen in case of receipt of multiple production orders.
Hope, I have explained the scenario & issue being faced.
Regards
Madhu

Similar Messages

  • Table for Material-Cost center-Settlement Rule_REM product cost collecter

    I want to generate a report to see for particular material which cost center and which settlement rule is available.
    If we go in Product cost collecter (PCC) there we have an option to see settlement rule under header tab, I want to fetch that data for material as selection parameter, can anyone suggest how to get the data as,
    Material        Cost Center        Settlement Rule
    Thank you.
    Regards,
    Deven

    Hi,
    pleasefind tables related with cost.
                          TKA01               Controlling areas
                         TKA02               Controlling area assignment
                         KEKO               Product-costing header
         KEPH               Cost components for cost of goods manuf.
         KALO               Costing objects
         KANZ               Sales order items - costing objects
         Cost center master data
                        CSKS               Cost Center Master Data
                        CSKT               Cost center texts
                        CRCO               Assignment of Work Center to Cost Center
                        COSP               CO Object: Cost Totals for External Postings
                        COEP               CO Object: Line Items (by Period)
    .     COBK               CO Object: Document header
         COST               CO Object: Price Totals
    Regards
    SANIL

  • Can we restrict the partially confirmed production order from getting delet

    Dear all,
    Can we restrict the partially confirmed production order from getting deleted?
    I.e. if the production order is having status PCNF then the deletion flag indicator (status DLFL) should not be allowed to set
    SmanS
    Edited by: SAP PP Consultant on Feb 4, 2009 6:12 AM

    Hi,
    Then must be there is change in BS22.Check allowed transaction setting for Status PCNF/CNF .For reference purpose compare it with other client IDES or sand box.
    For your reference I have pasted Error log on the same.
    Balance of ORD 1000000702 is not zero
    Message no. KO115
    Diagnosis
    The balance on object ORD 1000000702 is not zero. That is, there are still costs on the object.
    System Response
    The object cannot be closed and the deletion flag must not be set.
    regards,
    Dhaval

  • Production order from sales order

    Hi experts,
    I have created production order from sales order through t-code co07, there it shows error "Sales order has no CO object" like this.. how to resolve this.
    Thanks

    Hi,
    KA01 configuration is must for CO object And OKB9 config where we configured the Cost Element to Cost Center basing on the profit center as we have the Automatic Acct Assignment.
    Please try and come back.
    Regards,
    R.Brahmankar

  • Exclude stock reserved for production order from availability check

    Hi Experts,
    We have a problem in the availability check.
    There is a material used as selling product and components in the same time.
    When the material has been reserved completely for a production order, the new sales order still get confirmed despite there is no physical stock at all!
    Please advise how to exclude the stock reserved for production order from the availability check in sales order? Many thanks!
    Regards,
    Qiang

    Go to MM02 and check what availability check is maintained for that material.  Next go to OVZ9, select that available check with the combination "A" and maintain "X"  or  "F"  in the field  "Incl.production orders".
    thanks
    G. Lakshmipathi

  • Restricting a production order from releasing

    Hi,
    How can i restrict a production order from releasing if material is not available?
    Regards,
    samir
    Edited by: wadajkar on Jun 2, 2010 2:51 PM
    Edited by: wadajkar on Jun 2, 2010 2:51 PM

    Hi,
    In t code OPJK at material avialibility check section maintain '3' i.e. do not release if components are not avialable.
    Regards,
    Vishal

  • Error while generating Production Order from Recommondation Report

    Hi..
    I have got few production orders to be created through Recommendation Report. 
    After getting them 'Checked' when i try to create production order, following error message appears :
    No matching records found 'Product Tree' (OITT) (ODBC - 2028) [message 131-183]
    Please let me know what went wrong ?
    Regards
    Rakhi

    Hi.......
    I think you are trying to make production orders who has no BOM. First prepare BOM and then Create Production Order from Recomemdation Report. Because it supports only Standard Production Order and not Special......
    Regards,
    Rahul

  • Print out of production order from co02

    Hi All,
      How do I take a print out of production order from co02. If I go to co02- Functions-Print- I get an error that after the next update the order will be printed. Since the production order is already in the released state how do I take the print.

    Priya,
    What system is prompting is that once you use the print function in the change mode of the order, system prints the papers to Spool or Printer once it is saved, that is the reason it is giving you a message.
    Please save the order after using the Print function in the change mode of the order, I am sure that you would get the print output either directly to the printer configured or to spool. If it was configured for spooling, use the transaction SP01/SP02 to print the spool request.
    Regards,
    Prasobh

  • Material availability  check for production order

    Hello,
    Is there any functional module to check the material availability of production order. So that it can be used in developments.
    Regards,
    Ganesh

    Hi,
    Following are the available Function Modules for avaibility checks in Production orders,
    BAPI_PRODORD_CHECK_MAT_AVAIL -  BAPI: Execute Material Availability Check for Production Orders
    And for Process Orders,
    BAPI_PROCORD_CHECK_MAT_AVAIL - BAPI: Execute Material Availability Check for Process Orders
    Regards,
    Dhaval

  • Create production order from sales orders

    Hello,
    I am looking for some detailed documentation in order to make customizing in sales module. The aim is to create production orders from sales orders..
    Thanks  for your help

    See the following link from SAP help online:
    > http://help.sap.com/saphelp_47x200/helpdata/en/70/a7853478616434e10000009b38f83b/frameset.htm
    It contains lots of useful information on Make-To-Order Production.
    I hope this helps.
    Gerard

  • Production order from sales order with multiple line item(for one material)

    Dear Gurus,
    I am working in MTO scenarios. If there is several line item in a sales order for one material, multiple production order( same as no. of sales order line item) is getting created against each of the line item.My requirement is,since the material code is same in each line item and sales order is one, one production order should be generated for all line item. please tell me how to do it.
    (Here for one material, multiple line item is required for some specific reason)
    Regards
    Rajib Pathak

    Hi,
    This is not possible.
    In Std SAP will create one production order for one sales order. The stock is also allocated to thet particular sales order only. Because each and every sales order may vary in any one of the parameters. Considering this, SAP has designed like this.
    Regards,
    V. Suresh

  • Creating Production Order from Planned Order

    Hi,
    We are trying to use the BAPI 'BAPI_PRODORD_CREATE_FROM_PLORD' to create Prod. Orders. But it is failing with the message, 'Cannot be saved. Maintain serial no.' Now, the problem is there is no input parameter in this BAPI for providing the serial numbers. Our current Z program manually generates the Serial Numbers and uses BDC for 'CO48' to create the Prod. Order but has a horrible performance and for that reason we are trying to switch to BAPI instead).
    Now, the question is how best to achieve this objective: Use the BAPI to generate Prod. Orders from Planned orders with user-given serial numbers when there is no input option in the BAPI?
    I think of couple of options but not sure how good they are:
    1) Can we create/attach the serial numbers to the equipment/material first and then create production orders?
    2) Use implicit enhancement to add another parameter to BAPI and use it instead. This one seems little technically complicated because the BAPI itself calls tons of other programs (including CO48) to create Prod. Orders so the right place to insert the numbers might be difficult.
    Any clues how to solve this problem would be appreciated..
    Thank you

    Hi,
    REM manufacturing is simpler way to book the production.
    What is needed for REM is first question.
    1) REM profile
    2) Material on REM with this profile and REM tick
    3) Have normal BOM and routings/ rate routings and work center
    4) Define Production Version
    5) Define Product Cost Collector on which all costs are booked whenever you do your confirmation thro MFBF
    Having defined these master, once you run MRP you get planned order of PE type. It was earlier also callled as RS i.e Run Schedule.
    By using MFBF, backflushing transaction can book the production. REM is period based type of production booking unlike discrete where you make a production order of particular material for some dates, it is lot based production booking.
    Hope it is clear.
    Srini

  • Document Flow to Production Orders from BOM

    Dear SAP Gurus,
    I have attached a few documents at header level of the BOM. I have also attached document at item level in the BOM. When I create a production order these documents are not flowing to Production Order. Is there any way to do that. I also want to see them in CS11 and CS12 reports.
    In OPKP I have already checked Document Links-BOM "On Creation" and "On Release" for my production scheduling profile.
    Thanks and Regards
    Geravine

    Dear Geravine,
    You can use a Production Scheduling profile to specify that in a production order or process order
    particular business transactions are carried out in parallel
    generation of document link from material master on order creation
    generation of document link from BOM on order creation
    generation of document link from material master on order release
    generation of document link from BOM on order release
    Include the check boxes for Document links for material and BOM both under order creation and order release.
    Check in T Code OPKP.
    But in my understanding only the document that are attached to the header and the items with D category alone gets
    transferred to the production order.
    Regards
    Mangalraj.S

  • Link between Material, Cost center to Work Center.

    Hi Experts,
    Can you provide me the following.
    Link between the material and work center.
    Link between Cost center and Work Center.
    Thanks in advance.
    Jyoshna.

    Extend the cost center validity from 01.01.2008, there won't be any harm. It may take from the beginning of the calendar year.

  • User-exit to update material component in a production order with a batch

    I am looking for a solution to update a production order material component with a batch number what is stored in the configuration of a sales order. The production order is defined for salesorder related production. How can I update the field RESBD-CHARG in the production order.
    Tried already the exits PPCO0001, PPCO0008, PPCO0021. Also looked for a solutions with batch search stratgegies, but I have no idea kind of possiblities I have here. Other problem is that we are stil on release 4.7.
    Hopefully some can help me with a solution.
    Regards,
    Peter Geurts

    Dear
    You have to update the batch in a production order component via RFC Call of BAPI_ALM_ORDER_MAINTAIN.You should also pass operation number to T_COMPONENT and T_COMPONENT_UP
    T_COMPONENT-ACTIVITY = Operation Number
    You need to pass the following tables
    IT_METHODS should have 2 values
    Refnum - '000002'
    Objecttype - 'COMPONENT'
    Method - 'CHANGE'
    Objectkey - 300054 (Prefix the zero's)
    Append IT_METHODS
    Method - 'SAVE'
    Append IT_METHODS
    T_COMPONENT should have the following values
    RESERV_NO - Reservation number ( you can see in production order)
    RES_ITEM - Reservation item ( you can see in production order)
    BATCH - populate the required value
    APPEND T_COMPONENT
    T_COMPONENT_UP should have the following values
    BATCH - 'X'
    APPEND T_COMPONENT_UP
    Or else look at BAPI 'BAPI_MATERIAL_GETBATCHES'. This might help you.....
    CALL FUNCTION 'BAPI_MATERIAL_GETBATCHES'
    EXPORTING
    material = MATERIAL
    BATCHNUMBER =
    plant = PLANT
    expirydatefrom = DATE
    Hope this will be useful
    Regards
    JH
    Edited by: Jiaul Haque on Sep 12, 2010 11:14 PM

Maybe you are looking for

  • How do I set up my new Macbook Pro to associate with my Apple ID so I can download purchased music?

    How do I set up my new Macbook Pro to associate with my Apple ID so I can download purchased music? Under 'Manage Devices' it only lists my iPhone and iMac. I've bought stuff on my new Macbook Pro using my Apple ID, but I can't find music I previousl

  • Entry of non-English characters into the db

    Hi We are facing a problem in inserting non-English characters into the database.For example, we have a company name field which can accept German characters. This field has been defined as of varchar2 type of size 50 in the db. When we enter 49 Engl

  • Best way to work with interlaced and progressive clips in the same timeline

    I´m shooting with Sony MC-50E camera in 1920x1080, 50i. When importing with Log & Transfer I can work with ProRes 422 files in interlaced mode. I have to mix the footage with video screencapture which is progressive (ProRes 422). The final videos are

  • Mouse losing connection

    My mouse is losing connection with my computer on a regular basis, and regaining it after around 1-2 minutes. The problem is happening every day, sometimes up to 5 times, during which time the mouse is completely unresponsive. I've tried rebooting, t

  • MB5S.

    Hi, when executing trx MB5S, system shows that: -received quantity = 67; -quantity invoiced = 67; -GR value  =2242,8; -Invoice amount 2242,8 Clicking on GR value (2242,8) shows that the column Amt.in loc.cur. for the GR is  = 2194,92 that is (32,76 (