Material cost estimate report development

Hi All,
Customer need a report with belwo inputs
1.Plant
2. Material
3. MRP Controller
4. Costing Variant
5. Valid On
with M09 MRP controller with the output as -
where M09 is there it should not display the sub-materilas in it,for the remaining it is required.
all the data is coming from BOM( Bill of Material) and conversion cost is from routing.
please let me know how to caliculate the Conversion cost for materials ?
Base is ck13n &they r generating the report in ZCOSHT t.code
Can anyone tell me whether it is PP report or Costing report ?
please advice me asap.
Edited by: jahnaviprasad on Aug 16, 2011 12:15 PM
Edited by: jahnaviprasad on Aug 18, 2011 9:31 AM

Hi
Use the tables
COST
COSP
COEP
AFVV (activity)
Reward points if useful
Regards
Anji

Similar Messages

  • What are the tables to be used in a material cost estimate report????

    Hi..
    i am creating a product costing report...(similar to ck11n n ck13n)
    it has two selection screen parameters( matnr and plant)...
    i need to display
    1. cost center
    2.total hours per cost center
    3.total labor per cost center
    4.total overhead per cos center
    How do i proceed??
    where do i fetch the data from??
    how do i do all the calculations???
    plz help me..

    Hi
    Use the tables
    COST
    COSP
    COEP
    AFVV (activity)
    Reward points if useful
    Regards
    Anji

  • Report for Material Cost Estimate

    Hi Everyone,
    Is there any way that I could download a report from the SAP showing all the material cost estimates? Hope someone could help me. When I try using CK11n, there is no tab there for report downloads and it only shows one material.
    Thank you in advance
    Jahziel

    Dear Jahziel,
    In standard SAP the following reports are available:
    T Code : CK84_99 : COST_ELEMENT - Cost Elements
                 CK80_99 - Cost Components
                 CK84_99 - Itemization
    These reports will provide you the information at individual material level.
    Regards,
    Pavan Kumar Arvapally

  • Re: create material cost estimate with ck11n without

    hi gurus,
    i need to do create material cost estimate with ck11n without cost result but before i need to check the BOM with material component 11111, and also instruct me how to correct maintain BOM list to get the standard cost
    if anybody do the same scenoria giveme your golden inputs
    thanks in advance,
    kumar.b

    Hi,
    As note 351835 explains, calculation needs an inforecord to calculate prices from purchasing. Prices from outline agreements are generally not taken into account. According to note 499699, the system may consider entries in the source but it will ignore entered agreements (before this correction, any source list entries with agreement were ignored).
    Prices from agreements could only be considered either via a modification or by using the user exit for material valuation (COPCP005).
    This unfortuntely is a restriction resulting as a side-effect from note 499699. As soon as an agreement is entered in the source list, the fixed indicator will not be considered anymore.
    You therefore have two options to overcome this.
    1) You create a second source list entry without an agreement; then the fix indicator will be reflected; report Z_CREATE_EORD from note  409960 could be used to do this automatically
    2) You are using user-exit EXIT_SAPLMEQR_001 in order to 'overrule'   the standard search for source of supply (enhancement LMEQR001)
    regards
    Waman

  • Material cost estimate with quantity struchture : problem

    while running the costing transaction CK11N , the word u201Croutingu201D is not appearing under the explanation facilities.
    rate routing is already available
    what will be the reason and solution.

    Hi,
    There is a standard report you can use - S_P99_41000111 - Analyze/Compare Material Cost Estimates .
    With this report, you can report the standard cost estimates for a range of materials.
    Good Luck!!!  Assign points if this was a useful input to you.
    Thanks and Regards,
    Bhuvaneswari.S

  • Material Cost Estimate with Quantity Structure (How to download)

    Is there a standard report or feature available in SAP to download the material cost estimate with quantity structure?
    Currently we have to print screen and it is very tedious and can't do analysis with those screenshots.
    Please advice.

    Hi,
    There is a standard report you can use - S_P99_41000111 - Analyze/Compare Material Cost Estimates .
    With this report, you can report the standard cost estimates for a range of materials.
    Good Luck!!!  Assign points if this was a useful input to you.
    Thanks and Regards,
    Bhuvaneswari.S

  • Split Valuation Material Cost Estimate into COPA

    Hi all,
    Is there any way how we can transfer the split valuation material cost estimate into COPA?
    I checked the actual line items, there is no "valuation type / batch" characteristics there.
    Is this the main cause?
    Please kindly suggest on the best way to solve this issue
    Thank you very much
    Regards, Erwin

    Hi, Ajay
    Does this mean that, even though i manage to create the valuation type as characteristic in COPA, i won't be able to get 2 different cost estimate based on valuation type into COPA?
    Hm, then, are there any solutions which can be done to solve this issue?
    The client needs a COPA report which can show the breakdown of the sold materials cost estimates
    As usual, thank you very much for your help
    Regards, Erwin

  • Raw material cost estimates

    HI experts,
    Currently we have the following scenario:
    There are some raw materials which are procured externally, and these materials are maintained with price control S
    Well, the problem is that the standard cost for the material consists of a few more components, for example:
    The standard price for the material X is 20 USD which consists of:
    - the price of the material itself : 15 USD
    - the import duty : 5 USD
    let's say if the actual import duty happened during IR is 6 USD, how can we get the variance from the difference between the import duty? I am unfamiliar with raw material cost estimate, but seeing that the import duty will be captured using condition type in PO, i assumed that we can use raw material cost estimates with this, and use the COPA report with record type B for this case.
    Could anyone give any suggestions regarding this case? It is better if it comes with step to step guide.
    Thank you very much in advance
    Regards,
    Erwin

    Hi Erwin
    1. The ideal design would have been Price Control V if the material is outright purchased... There by not leaving any scope for variances... You would agree that it is best to valuate inventory @ actuals as far as possible
    2. If you want to retain S, then release your Std cost as many times as the Base Price of 15 or Import duty of 5 usd changes... This will also avoid variances during MIGO.. However, it will throw up inventory revaluation figure each time u release new cost estimate
    Else, the variances will be updated to CO or COPA as per your choice in OKB9.... The record type will be B
    Are you not able to update variance to COPA?
    br, Ajay M

  • Material Cost Estimates

    HI GURUS
    Product A Details
    Material type = ZXXX ( customized ) ,  Plant = 1500
    Bom Componet =  G & H     ( where product G is non - valuated  , no costing view maintained with material type = Z111, while H is valuated product )
    Production type =   PP-PI
    Product B Details
    Material type = ZYYY ( customized ) ,  Plant = 2000
    Bom Componet =   k & s     ( where product k is non - valuated , no costing view maintained , with material type = Z111 while S is valuated product )
    Production type =   Repetitive Manufacturing
    we are already Creating  material cost estimates for material  A. through  ( Ck11N ) successfully . with a Costing varient = ZC11 .
    also while creating cost estimates , in costing structure ( explorer ) ,  Non-valuated material G is not being shown there.
    But when we create cost estimate for for material B throgh CK11N . with costing varient ZC11. it gives error
    " No price could be determined for material \ batch  K / plant 2000.   Non-valuated material K is shown in costing structure.
    How we can restrict the Non-valuated material not being showing in costing structure in case of  B material. as it is being happen in case of material A.
    thanks \ thomas

    Check the BOM for material A   -   product G on status/long text tab shows as "not relevant to cost"  (this is why it doesn't show in the CK11n cost report
    Check the BOM for material B - product K - is it checked "on" for relevant to cost? - if so remeove the check
    Althea

  • Additive Cost Estimate Report

    Hi Gurus ,
    We need a additive cost estimate Report that would show the Material,Plant, additive cost (in dollars NOT "x" as shown in KEKO or KEPH table).
    for the above I tried a simple Querry with MARC-KEKO-KEPH (didn't conside MBEW-MARA) , in SQ01 But the end resul is same as KEKO table Just Showing the "x" mark,
    Users can not go for individual validation after doing a Mass upload of CK76N using LSMW  so would like to see a detailed report with Dollar amount and comare it with their Books.
    I searched SDN for this kind of report But no useful information,
    Your Help Greately Appreciated,
    Note: please don't say Use, KEKO, KEPH tables,Thank you ,
    Sandhya

    You can look at Functional Modules in SE37. You can as well execute them in test in the tcode to provide the input values, it would show the out put values as well.
    You need to provide your requirements by explaining what you are achieving in CK76n and how they are stored in Tables KEKO, etc... and ask him to build a program using the above functional modules.
    Infact if the above functional modules doesnot work, you can ask the ABAPer to use the same function modules used in CK76n to get the information and make the requirement changes to meet your requirements.
    Edited by: Suraj Ramamurthy on Dec 9, 2008 2:33 PM

  • Error reading material cost estimate for sales order (KE292)

    Dear All,
    I have an issue with billing. we are posting july month transactions, the material cost is maintained through MR21. When releasing billing document for accounting we are getting error message like"Error reading the material cost estimate for sales order "11"
    Message no. KE292
    Diagnosis
    In Profitability Analysis (CO-PA), the system tried to valuate item 000010 of sales order 11 by reading the corresponding product cost estimate.
    However, no product cost estimate could be found for this sales order item.
    The system accessed product costing for product AMLFP011011XX00P using costing key YB3 as defined in the
    CO-PA Customizing settings.
    System Response
    The system cannot process the document any further.
    Procedure
    Check your Customizing settings."
    We cross checked with other client as a current date and we ran cost estimate through CK40N with same material. and we posted entries. Here it is working fine. but in above process it is not working. Can you pls guide me where i missed.
    Regards,
    Nagaraju,

    Hi,
    When the Costing Key is assigned to the material types in the COPA customizing, then system expects Cost estimation when billing is released to Accounts.
    If you dont run cost estimation but update the material master through MR21, system will not accept as in the Costing key configuration you must have selected the Current Standard price field for the valuation.
    Hence, try to run cost estimation and then do releasing.
    Thanks & Regards
    Ravi Kumar

  • Error while creating material cost estimate

    Hello All
    I am creating material cost estimate of FG whose components are SF & ROH-2. While creating cost estimate system gives an error message which states: :
    *No cost element segment exists for 40103110 on 01.09.2009
    Message no. CK048
    Diagnosis
    The consumption account found by automatic account determination for material STD-PRICE-SF does not exist for the date 01.09.2009 specified.
    Procedure
    Check the cost element segment's validity period
    Check cost element
    Or, if you have authorization, create a cost element which did not exist previously.
    Create primary cost element*
    Please provide your valuable inputs regarding this error message. Looking forward to your inputs & feedback.
    Regards,
    J K Tharwani

    Dear Jitendra,
    Its Seem primary cost element you mentioned is not defined for 09 period.For this go to KA06,gIve that cost element number and the Valid from  date as 01.09.2009 and valid to date as 30.09.2009, press enter it will take u inside the T.C,feed the relevant data and save.
    Now again take the costing run.This time system should not throw the error.
    Check and Revert back.
    Thanks and Regards,
    Jitendra DIlip Chauhan.

  • Valuation with material cost estimate: error with product

    Hi Experts,
    Message no. KE350, Valuation with material cost estimate: error with product "2286940000". Please suggest me to resolve this issue.
    Points will be provided for good solution.
    Regards,
    Jay

    Hi Jaya
    This means that your customization is wrong then...
    In KE4J or KEPC you have assigned costing keys to your material types or some other combination... You should have done this config in a way that costing key is not called  for in the case of non valuated materials...
    In Ke40 you have defined costing key where in you have specified "Issue error msg if no cost estimate found".. This costing key is assigned in KE4J or KEPC in a way that it is getting called even in case of non valuated materials...
    Do you have a separate mat type for non valuated material? If yes, remove this mat type from KE4J/KEPC..
    If you dont have separate mat type i.e. in the same mat type if you have both valuated and non valuated, then you have a problem.. You would get stuck in that case
    Regards
    Ajay M

  • Valuation using material cost estimate

    Ciao a tutti,
    We have create a material cost
    estimate without standard structure(unit costing) not FOR ALL MATERIALS, but only for ONE
    VARIANT of generic material (retail solution) (because the other variant have the same price, and because we have to reproduced 5000 BOM in unit cost for just
    one variant with transaction KKPA LSMW)
    So, now we have to valuated the material cost estimate when the customer create the billing document and put the split of the cost estimate in co-pa
    Our prolem is : we have calculate standard cost estimate for 5000
    variant not for all variant (because our customer crete the BOM in unit
    costing with transaction KKPA and LSMW, and they refuced the idea to
    calculate 30000 cost estimate with lsmw) so when we crete a billing
    document with a variant that haven't cost estimate created the system doesn't
    valuated the cost estimate (the system works well), but how I can change the variant in the valuation and put the variant that have the cost
    estimate calculate?
    Wiht the transaction "Assign Costing Keys to Any Characteristics" I think
    is not possible.
    I must to use enhance COPA0002?
    Thank you very much
    Paolo Artini
    tel: +393299223804

    Hi All,
    I am also facing the problem for Sales Order Cost Estimate. and the Costing Status is VO(Marked without errors).
    I have done the following
    created the Costing Key (sales order cost estimate)
    assigned costing key to the material type.
    assigned to the respective value fields
    sales order cost estimate,
    Run the RA
    Settlement done.
    But in COPA, cost estimates are not being split up based on the cost component (like Material, Labour and Over head) and it is getting posted to COGS only.
    Do we need to change the costing status to FR, if yes, but how to do ?
    Regards
    Ramesh KR
    +91 9884020411

  • Confuguarable Material Cost Estimate

    Hi All.,
    It is an urgent requirement.......
    My client having both configuarable & non configuarable materials.....
    with regarding to the configuarable material cost estimate i don't have good grip on this.
    Can anybody please share some guidlines for how to create the cost estimate.....
    Thanks one and all.,
    Raja

    Configurable materials can only have a cost estimate when there is a sales order bom to define the build.
    We use configurable material and the cost estimate is configured in the same manner as standard material (Costing variant,costing dates, transfer control, etc. but some of the details differ), but it is only Saved within a Sales order. You can use CU50 for a trial cost - the configuration will have to be created in CU50 before it will cost.
    When costing configurable materials in sales orders or for sales orders the valuation variant is different from standard cost variant in these points:
    1 - The costing type is different. 18 - Sales order costing vs. 01 - Standard cost est. (mat.)
    The Costing type for Sales order does not allow updating of the standard price in the Mat Mstr
    The Costing type for Sales order also controls the use of Labor overhead for the costing variant.
    2 - Valuation Variant can be different - Valuation for Prod Costing specifies the rules to build a cost estimate. For Sales order, you may want it to use ONLY the standard price for a material/component, and NOT build a cost estimate.
    3 - Date control - The default “from” date for the Config Mat in a Sales order is “Today” while for product costing it is “first of next month”
    Our Prod Cost Est. is valid until the end of the Fiscal year when a new cost estimate is released. Our Config Material on a Sales order is valid until the end of time.
    I cannot explain “why” we chose one over the other, most of the decisions were made before I arrived. But the Costing Type Difference is very important to us, because there is no chance that the cost estimate will interfere with setting of standards and it allows “searching” for a Sales Order Cost estimate.
    You have to analyze how each part of the costing variant could impact the business and decide how to set it. If circumstances change, you can review the settings later. (I fully intend to review some of ours directly after this conversation.)
    Sales Order Costing Variants are on OKY9 while product costing is at OKKN
    Sales Order Costing Variants are assigned under SD “Maintain Requirements Classes for Costing/Account Assignment (table T459K)
    Hope this helps.
    Althea

Maybe you are looking for

  • How to fix an error  (related to work schedule rule) in Time evaluation ?

    Hi experts, I am getting an error while running time evaluation - PT60. Find the log Log:TimeEvaluation                                                                                General data                                                       

  • Itunes 10.6.1

    I cant download itunes 10.6.1?? It goes through the wizard then i get a error message saying it hasnt finished installation?? Help!! i want to update my ipod touch4 to the latest software... but i need itunes 10.6.1 :-(

  • "No Internet Connection" = I can't download Illustrator... but I have internet working fine.

    I've been trying to download Illustrator through the CC App on my Mac and it keeps saying I have no internet connection. I've managed to download and install Photoshop, InDesign and Lightroom but I've been trying to download Illustrator for two weeks

  • How to change the column text of an ALV in WD?

    Hiya, I have an ALV and it displays this in the column headings: I'd like to change 'Name 1' to 'Name' and 'Boolean' to 'Selection', but I can't seem to figure out how to do this in the maze of all the classes and methods... Could someone give me a f

  • Checkout error

    Hi guys, When I'm trying to re-import the model in NWDS, I hit this error: Checkout is not possible. => problem: DTR workspace is not modifiable. Has anyone hit tis error before? Could you kindly share your solution pls? THanks!