Material loan before PO creation

Hi,
we have a scenario.
Minimum PO value should be there to raise a PO.
our client receives material on loan basis from the  vendor.
when the requirement reaches minimum order value, then PO will be raised for the total quantity.
Vendor supplies the material  after deducting the loan quantity from the ordered quantity.
Vendor sends Invoice for the total po quantity.
How do we map this scenario in SAP ?
Plz explain.
Edited by: kanakarao.G on Sep 8, 2009 9:52 AM

Dear,
At the time of po creation you can see material master with help of double click on material code. But as per my knowladge you can't change material master at the time of purchase order creation.
If i correct please revert back.
Sorry but due to word problem i repeat it.
Regards,
Mahesh Wagh

Similar Messages

  • User exit before TO creation to chage MAKTX field or FM to change it after

    Hi all,
         I need some WM Expertise help.
         When I create a Sales Order from program (with bapicreatefromdata2) , the system automatically create a delivery, and then, a transfer order with no immediate confirmation. The TO is manual confirmed. In bapicreatefromdata2 I completed on each item line the field ARKTX with a description (Example: red - material description ). This field is automatically completed in delivery( same field ARKTX). But I need this description also in transfer order for each line (field MAKTX). The TO is created automatically and  the field MAKTX is completed with the description from the material master.
         So, I need an user exit before TO creation to change the field MAKTX. I have tried user exit: MWMTO001 and is not working I think because the TO is created with no immediate confirmation. Also I putted break-point everywhere in program SAPML03T (standard program for TO creation)  and  I changed the settings in debugger mode. I checked System Debugging and Update Debugging. Nothing happened. I cannot find the place before TO is created.
         An alternative to this is to update LTAP (item table for TO) after TO immediate creation in include MV45AF0B_BELEG_SICHERN but I can't find a function module to update the table before TO manual confirmation. I tried L_TO_UPDATE_PREPARE but this I think is for confirmed TO.
         Any one who worked on this kind of things, Please help.
         Thanks in advice,
         Bogdan

    check these exits....                  
    EXIT_SAPMM06E_012 
    <b>EXIT_SAPMM06E_013</b>
    EXIT_SAPMM06E_014 
    EXIT_SAPMM06E_006 
    EXIT_SAPMM06E_007 
    EXIT_SAPMM06E_018 
    EXIT_SAPMM06E_016 
    EXIT_SAPMM06E_017 
    vijay

  • Reverse the material document before cancelling the excise invoice.

    Dear Experts,
    While cancelling the exice invoice thru J1iex , system is giving me an error message "Reverse the material document before cancelling the excise invoice" .......I checked PO history where all the material documents are already cancelled with MIGO cancellation (movement 106 )
    But in J1iex , if I select the cancel option and put this invoice number , it is showing me one document with status "IN PROCESS" and if I select that doc and try to save it. System prompted me the message "Reverse the material document before cancelling the excise invoice ,but if I am trying to post this document system is issuing me a message "All Part I entries have been canceled for excise invoice ...........xx.Exicse table J_1IGRXREF and J_1IPART1 alrady update with both documents.kindly any one suggest me positive.
    MINI

    Hello
    follow the below steps
    1. MIGO:Cancel the material document (movement type 102) & during cancellation update part1 only. This changes the excise invoice document status to In process
    2. J1IEX:Post the excise invoice referring the material document (of movement type 102). Creates an accounting document to reverse the CENVAT postings. Creates a corresponding entry in Part II of the appropriate excise register
    Thus the excise postings are reversed.
    3.J1IEX: Cancel the excise invoice (Do this if your plant does not allow multiple goods receipts per excise invoice).Now the system will allow you to cancel the vendor excise invoice
    above the procedure right. you will get this updation excise registers also
    Laxman

  • Change Purchase Order type ,price before auto creation of PO through MIGO?

    Hi ,
    I have reuirement  infront of me.
    We are creating return Purchase order through MIGO for Non-ordered items.
    Purchase Order is created automatically by SAP.
    I need to change its Purchase Order type  , Net Price , Order Price Unit .
    Is it possible to modify the content before the creation of this PO.
    Please help me .
    Regards,
    Amit

    We are not using BPA ; is there any solution involving ASL and/or Sourcing Rule which can be used to meet the User requirement.There certainly is. It involves using either Blanket Purchase Aggreement (which you don't have) or using Quotes.
    Once you have created either of those, simply create an ASL entry for the item(s), attach the Quote or BPA to the ASL entry; create a sourcing rule.
    Once these setups are done, when a requisition is created and approved, it will get converted into a PO automatically.
    And depending upon the value you enter in the "Release method" field on the ASL screen (and your PO workflow attributes), the PO will be created in incomplete status or it can be automatically submitted for approval.
    Hope this answers your question,
    Sandeep Gandhi
    Independent Techno-functional consultant

  • Purchase Requisition Date before SC Creation Date

    Hi
    We have a odd situation with a shopping Cart where Purchase Requisition Date (REL_DATE = March 11 2009) before SC Creation Date (March 31 2009).
    Any comments/suggestions?
    Nikhil

    HI
    I think this is an backend PO, the shopping cart created with reference to this PO.  Becase of that this may happen.
    tell me one think it is a production order.
    Regards
    Satish

  • While working in Material Master, Before exporting to Excel need to know the count of listed items in SQVI Reporting

    While working in Material Master, Before exporting to Excel need to know the count of listed items in SQVI Reporting

    Major documentation is at https://service.sap.com/installmdm.
    In the "Installation" section, you can find information about predefined object models (e.g. Product, Business Partner). For "Vendor" information, please check under "Previous Releases (ZIP Files) > MDM 5.5 (SP03) Installation Guides > SAP ERP-MDM Field Mapping and Check Tables.xls.

  • Raw Material Inspection before Goods Receipt

    Hi Gurus,
                  My Client wants to carry out Raw material Inspection before doing GRN.How it can be mapped in SAP.Please tell me the steps .
    Thanks in advance,
    Soumyendu

    Dear,
    Kindly activate QM view in material master and activate inspection type 02( Goods issue inspection) for the materials you required
    Go to tcode mm02 >selcet the purchasing view and mark the quality inspecton check box.
    You can inspect & clear the stock before issuing to either costcenter or production etc.
    Regards,
    R.Brahmankar

  • Blocking of deleted material in Return Order creation

    Hi everyone,
    Can somebody please teach me how to block a particular deleted material in Return Order creation.  I have already blocked it in Sales Order creation using OVSU.
    Thanks in advance.

    hi,
    same t.code - OVSU
    Block f.returns - sales order return
    Block for order - sales order
    regards
    senya

  • DQM before party creation

    Hi,
    We have a requirement to do DQM and check for duplicate customers before creating them in the TCA base tables using the HZ APIs. The creation of customers is done in batch using a custom concurrent program. So, we want to introduce the duplicate check before the creation and log any duplicates into the log file along with the duplicate customer information present in the TCA tables. Has anyone done this and which APIs have you used. Would appreciate if you could share the information.
    Thanks.

    Please do not post duplicate threads -- DQM before party creation

  • J1iex cancellation -Reverse the material document before cancelling the exc

    Hi ,
    I am facing problem in reversing J1iex excise invoice .
    OUR CASE is like
    We have a purchase order of 100 pcs , against which a delivery of 10 pcs was made by the vendor.
    1) At the time of J1iex Capture , user has entered 100 pcs (by mistake) as excise invoice Qty.
    2) MIGO with Mtype 103 and 105 were prepared for 10 pcs only
    3) J1iex was also posted for 100 pcs
    Since there was a mistake while entering excise invoice qty in J1iex ,therefore we decided to reverse the entire process.The step followed were ...
    1) Reversed the Material document (using 106 movement type)
    2) Re-Posted the same excise invoice thru J1iex to reverse the Part-11 enteries
    and now when I am trying to cancel the J1iex - excise invoice , system is prompting me an error message
    "Reverse the material document before cancelling the excise invoice"
    I hope,  I am following the correct process.
    Since the material document is already reversed therefore wondering why system is prompting this ERROR message.
    Need your help
    Regards
    Shrey

    thx

  • Material Master check before PO creation.

    Hi,
    I have a requirement where some procured materials need to be checked before the purchase requisition is converted into a PO.
    The client wants the system to pop up a message saying "Check Material" when they are creating a PO, so they can back out and check material, make the corrections that they need and then go back in to convert the purchase requisition into PO.
    Is this possible in SAP? How? I do not want to flag the material for deletion.
    Thanks in advance.

    Dear,
    At the time of po creation you can see material master with help of double click on material code. But as per my knowladge you can't change material master at the time of purchase order creation.
    If i correct please revert back.
    Sorry but due to word problem i repeat it.
    Regards,
    Mahesh Wagh

  • Read Material Classification during MM01 creation

    hello all,
    my requirement is to send Idocs to different system when a material is created or changed.   change pointers have been created and badi BDCP_BEFORE_WRITE is being used to filter out the records that don't need to be sent.
    the process works perfectly with one exception.   one of the filter criteria is a material classification we named COMMODITYTYPE.   at the moment my code looks like this:
        SELECT SINGLE ATWRT INTO l_CHAR_VALUE FROM AUSP
                                 WHERE OBJEK = l_matnr
                                 AND   ATINN = '0000000023'
                                 AND   KLART = '001'.
    this works very well for changed materials (MM02) but it looks like AUSP is being updated in a separate update task and it hasn't been triggered at the time BDCP_BEFORE_WRITE gets triggered so there is nothing in the table.
    i am looking for a function module (or whatever) that can read the classification when BDCP_BEFORE_WRITE is triggered. 
    has anyone come across this before?   any ideas?   thanks much.
    (running ECC 6.0)

    tutun,
    thanks for your reply.   however, i may not have been clear.   i am not actually sending the classification in the material idoc (and we are using MATMAS as the basic type).   in fact, the idoc gets created with everything we want.   the issue is filtering the change pointers at the time of creation.    we only want tocreate idocs for certain materials and one of the filter criteria is the classification COMMODITYTYPE.
    so as i go through the MM01 views i can see the correct value in the COMMODITYTYPE field but when i look in AUSP during the BADI BDCP_BEFORE_WRITE it is not there - it gets updated in a secondary update task.    so this value is sitting in memory somewhere and i am trying to find it.  
    i hope that helps explain things.
    james

  • ATP check before delivery creation

    Gurus,
    Is there any way of confirming stock in sales order or scheduling agreement by some user exit before we create the delivery.
    For example i have one sales order with quantity of 10. I have 10 pieces in stock but not confirmed in sales order yet so before batch job runs and creates delivey what should be done to confirm that stock in sales order.
    Any help would be appriciated.
    Thanks
    Aman

    Hi Amandeep,
    You need to go for Rescheduling of sales order which is the standard functionality and you dont have to use user exit for the same.
    Lets say your orders are created with 0 confirmed quantity and now you have stock in the system.
    Execute the transaction v_v2 and check out the below mentioned step and result for the same.
    During the rescheduling the open sales order items release their confirmed quantities. The items are sorted according to delivery priority, creation date, document numberand item number and are then transfered to the availability check. Both sales orders are checked in the order of their creation date, because they have the same delivery priority.
    If the Unconfirmed documents required parameter is selected, at least one document of the material must be unconfirmed to assure that all documents of the material are transfered to the availability check.
    The delivery date of the sales order can be set as sorting criterion for the availability check, via the sorting criterion delivery date parameter (which you didn't choose). In this case every sales order is sorted according to the delivery date within the priority.
    Sales order items with the marks date and fixed quantity aren't rescheduled.
    # Choose .
    The system displays a list of the rescheduling results.
    In the rescheduling log you can see, that sales order  has got a new confirmed quantity (column confirmed new).
    # In the dialog box, choose Yes.
    # Choose until the overview tree appears.
    Hope this will resolve your query.
    REgards,
    Krishna O

  • SD-how to process material packing before sales order entry?

    Hi,Guys,
    If materials are packed before sales order is created, like:
    materia A,  10 batches was put in one bag,
    how to model it in R/3? Handling Unit Management can still be used?
    Best regards,
    Cherie

    Maybe I should tell the scenario more clearly.
    Following is the physical process in a High-tech company:
    10 finished goods:  A , were produced.Batch is 001.
    In the plant, they are packed into one bag. And this bag has a packing lable number:100
    now comes the sales order for one bag of material A. Stock worker go to the warehouse to get the packing number:100 to deliver this sales order.
    This scenario is different from the standard one using HUM. Because the standard scenario packing the materials when doing order entry,but this one is before order entry.

  • Regarding material wise purchase order creation with reference to pr

    Dear sir
    I have a scenario depending on the  material wise pos creation
    I have two type of material
    1) raw material
    2) consumables
    When user will create purchase order for raw material, system should ask purchase requisition. ( i.e with out purchase requisition for raw material , system should not allow to create the purchase order)
    Where as for all consumables materials system should allow to create the purchase order
    Without purchase requisition also, for user.
    Regards
    Jrp.

    You have to create two different document type for purchase order.
    1) Raw Material Purchase
    2) Consumables Purchase
    You can create two different document type for purchase order with below mention path: -
    SPRO >> Materials Management >> Purchasing >> Purchase Order >> Define Document Types.
    After define two different document type, You can change field status for two different document type with below mention path.
    SPRO >> Materials Management >> Purchasing >> Purchase Order >> Define Screen Layout at Document Level.
    Select document type and change field status of purchase requisition.
    Regards,
    Mahesh Wagh

Maybe you are looking for

  • External hard drive disappeared and doesn't mount

    Hi all, we're using a MacMini Server at work. As backup we use an external drive and Time Machine. It has been working nicely so far. However, two days ago the external drive just disappeared. It neither shows up on the desktop nor in finder or - and

  • Materialized View and I_SNAP$ Indexes

    Hello Everybody, At the time of doing REFRESH of the Materialized View, we are getting error like - SQL> EXECUTE DBMS_MVIEW.REFRESH('MV_TEST.MY_VIEW,'CF'); BEGIN DBMS_MVIEW.REFRESH('MV_TEST.MY_VIEW,'CF'); END; ERROR at line 1: ORA-12008: error in mat

  • E7 Symbian Anna music player vs N8 PR1.2 music pla...

    Does anyone here happen to have both the E7 (with Symbian Anna), as well as an N8 9with PR1.2)? If so, can you do a comparison of the Anna music player compared to the poor default player of the N8? Are there any noticeable UI differences at all, or

  • The procedure entry point _StopSpyin​g@0 coule not be located in the dynamic link library NiSpyLog.d​ll

    When I try to use Ni Spy I receive the error: The procedure entry point _StopSpying@0 coule not be located in the dynamic link library NiSpyLog.dll Ni VISA 4.0 Ni Spy 2.0.0.16 Windows 2000

  • No trace files in udump and bdump.

    Dear all, I have oracle 10g on linux. There are no files in folder bdump and udump.What could be the reason. Is there any parameter that need to be set. Please advice. Regards, Amit.