Material Staging for Pick part from MF60

Hi,
I would like to do material staging for a Pick part from MF60.
During staging I get the error as
WM material staging for production order reservation not possible
Message no. RMPU311
Kindly can you tell me how is it possible to perform tthis action using MF60.
Using LP10 I am able to perform this staging for pick part. But Business requires to perform if from MF60.
Thank You

HI,
It is possible to do staging for pick parts using MF60.
I am setting up this for a plant, and the existing plants are able to do staging with MF60 for Pick Parts.
Do you know the configuration that are required for doing staging using Pull List..

Similar Messages

  • Automate WM material staging for release order parts.

    Hi all,
    We use LP12 for monitoring WM Material Staging of Release Order parts.Is there a way to automate the process of WM Material Staging for Release Order parts?
    Is there is any Standard SAP Program which can be run in the background or user exit to achieve this?
    Pl suggest
    Regards
    SB

    Hi Arunachalam,
    You can configure WM staging settings in Production Scheduling Profile (OPKP)
    You need to update WM Request field and the available options are:
         No creation of transfer requirements on order release
    X   Only creation of transfer requirements on release
    1   Transfer requirement and transfer order on release
    Hope this will solve your problem.
    Please check and Revert.
    Regards
    Suri

  • WM Material Staging  for Production Order

    Hi,
    In the process order txn Cor3, Go to > List > WM pick list>  the initial screen is  Display WM Material Staging  for Production Order. In the All parts tab, could you please help me on how to be able to populate the fields in the  BSI, Category and Storage Bin. Your help is greatly appreciated.
    Thanks

    Dear Ellen,
    If you set the cursor on 'BSI' field and push F1 you'll get an explanation about the meaning of each category.
    '"<i>1" pick list item
    This materials are picked according to the required quantity specified in the production order.
    '2': Crate or kanban parts
    These materials are always removed from the warehouse in full cases. These can be ordered, for example, as soon as a case of needed parts is emptied in production.
    '3': Release order parts
    Release order parts are scheduled individually and the quantities are supplied manually to replenishment storage bins based on the requirements of production orders and the stock levels in the scheduled production supply areas.
    "0" not relevant to WM-PP
    These materials are not relevant for WM production supply and cannot be requested using the WM system.</i>'
    For instance:
    You can set raw materials / SFG as pick parts if warehouse workers have to collect those parts from high racks (from different places) and they have to provide an exact qty for the PrdOrd.
    We use '4' (manual staging) for huge alu rolls that are near the machine and WH workers have nothing to do with it - the operators, who deal with the machine, have to put the new rolls on it.
    When we issue the PrdOrd the requirements of this material won't appear in LB10 since WH has nothing to do with them.
    'Storage bin' filed will contain a value automatically, if your settings are proper.
    E.g. you have to define the default 'stock removal' & 'stock placement' storage type on WM view of material master.
    Additionally you have to define control cycles for materials you use for your production. (LPK1)
    The control cycle says from which storage type & bin you want to consume the components.
    BR
    Csaba

  • Material staging for process order

    Dear All,
    Can we use material staging for process orders.
    If possible pls brief the procedure.
    Subbu.

    Using warehouse management /WM) :
    - Create a control cycle for the component, using LPK1. Here you define if the supply will be specific for the order (when weighing takes place in the warehouse) or for released orders (normallu full packages of components and weighing is done at plant level). Reference to a supply area.
    - The resource used in the operation has a reference to the supply area.
    - Components have material master views in WM for the selected storage type
    Then, when releasing the orders run LP10 - LP12 to generate the Transfer requirements for the raw materials. These TR will be converted to Transfer Orders and Confirmed, so the stock will be moved to your supply area.
    Using Inventory Management, none of the above is required. You can use MF60 to move materials from General Storage Location to Shop Floor SLoc.
    Regards

  • Staging of PICK parts ....

    Hi Friends ....
    I am doing staging of pick parts against a Process order.As per my undrstanding for pick parts, system only stage material qty what is reqd for a Process Order.While for Crate it picks in the entire qty availale in Case.
    Here i have a queries, would appreciate if u could help me out.
    1) I have created a Process order qty for 1 in which 1 pc of the Component (child item) is required. I have 1000 pcs of inventory available in warehouse.
    As soon as I released my process order , TR gets created for 1 pcs but when I conveted it to Transfer Order , it picks all inventory available for child material (i.e 1000 pcs) for staging.
    Therefore wondering why it is picking the entire qty , I checked by Source Storage type settings for FULL STOCK REMOVAL but is not set.
    I am using Batch mgmt and entire inventory 1000 pcs lying in single batch , is it because of that ??
    Regards
    shrey

    Hi,
    When PrdOrd is released it generates TR for pick parts (generally, it is based on your settings - LP10 can also be used).
    I don't think the TO would be generated for 'whole inventory', maybe it is generated for the whole bin-qty, SU. Is your storage type SU managed? Maybe SAP wants to remove the whole SU. If partial picking is not allowed it will remove the whole SU.
    Another thing: Are you using pick-point in this process?
    Is your problem this?
    Csaba

  • Material Staging for manufactoring order

    Dear experts,
    I have following scenario:
    The Source - Storage and the Production Supply Area are assigned to the same Storage Location.
    When performing material staging  for an manufacturing order, how can I AVOID that the stoch in the PSA will be considered as availible stock?
    Thank you very much in advance.
    BR
    Denis

    Dear Freddy,
    It is the standard SAP behaviour,if already reservation exists for the same material and same storage location the system will
    not propose anything to stage,instead I would suggest you to mention some other differents torage location for the second
    production order for the same component and then check what is the result in MF60.
    Either you clear the existing stock transfer reservation or else meniton a different storage location for the second order and
    check.
    Check and revert back with your findings.
    Regards
    Mangalraj.S

  • Material Staging for Production

    Hi,
    When WM is implemented, is it really necessary to use Production supply area and Control Cycle? or only Interim storage area 100 is sufficient? We are not using any KANBAN features,,
    Regards
    Shrinivas

    When WM is implemented, is it really necessary to use Production supply area and Control Cycle? or only Interim storage area 100 is sufficient? We are not using any KANBAN features,,
    1.
    If you use WM/PP interface, you use interim storage type 100 for material staging. In this case production supply area is a must.
    In this scenario you move the pick parts to the interim storage type (100) by processing the TR that is created at the time of PrdOrd release (e.g.).
    Please notice that no IM movement is posted at that time. When you get the parts in interim storage type you post IM-mvt 261 and consume the components (so, first WM movements and after that comes IM movmement). Storage type 100 behaves like an interim storage type.
    2.
    If you don't use WM/PP interface you use interim storage type 914. First you post IM-mvt 261 and after that processing the TR (that is created as a consequence of IM booking) you will get the TO and move the parts from normal storage type to 914.
    So, in this case WM movements come after IM movement.
    Regards,
    Csaba

  • Best practice - material staging for production order

    Hi Experts,
    could any of You pls, support me with some hints of best practice how to handle material staging WM-PP interface in a certain case?
    Up till now we had a system, where production had no separate location in IM, but one location existed including raw material wh and production. In the same time in WM we had separate storage types for production and raw materials u2013 hence we did material staging transferring goods only inside one IM location between different WM storage types. The material staging should be done based on separate prd. orders.
    Now this need to be changed and separate location need to be handled in IM for production u2013 which means the staging should be done between different IM locations and WM administration also need to be handled.
    Up till now we used LP10 for staging, then LB13 for TO creation etc. We can keep going like that, but if do so, there is another step required in IM u2013 movement 311, where material numbers and qty need to be added manually to finish the whole procedure. I would like to avoid this u2013 which makes the administrational procedure quite long.
    I have been checking the following possibilities:
    1.     Set released order parts-staging at control cycle and use MF60 for staging u2013 but I can not select requirements based on pro ordders here (only able to find demand if component including into selection)
    2.     Two step transfer 313/315 u2013 but this not a supported procedure u2013 313 TI /TO / 315
    3.     Try to find solution how to create 311 movement based on TO or based on WM stock at certain storage type / dynamic bin.
    I have failed.
    So, could any of You pls, support me with some useful ideas, how to handle material staging where 311 included and definetly the last step of procedure, but administrator does not need to enter items manually one by one in MIGO.
    All answers will be appreciated

    Hi,
    Storage location control should be able to take care of your problem.
    If you want to stage the material to a different IM location then the WM location then make the following settings
    If location xxxx is your WM location and location yyyy is your Production location.
    You have defined Production storage type ZZZ for production storage location YYYY and have maintained the supply area for the same
    In WM configuration - For interfaces - IM interface-Control of Assignment "Plant / Stor.Loc. - Whse Number"
    Assign location XXXX as the Standard Location. Maintain entry donot copy sloc in TR for location YYYY
    In WM configuration - For interfaces - IM interface-  Storage Location control for WH
    This entry ensures that there will be a WM tarnsfer Posting between your WM and Production storage Location automatically when you confirm your TO. You can have this done via a btach job also if you want cumulative posting. (schedule job RLLQ0100)

  • Material Staging for Production Order

    Hi,
    I am doing Material Staging against production Order using T Code MF60. We don't have WM setup in the enterprise structure so the Staging is done via IM Mvmt. Type 311. My problem is that the material document created using MF60 does not have a reference of Production order or vise versa. Can anyone suggest a configuration or a user exit that can be used to make a reference link between the Production Order and the Staging Document?
    Thanks
    Arvind

    Hi!,
    Though whatever you are asking for is not possible with standard SAP but you can try this work around solution:
    Click on replenishment element.
    Now in MF60  Menu > View > Table column > Select " All Column" (after clicking ).
    Now system will show some open fields (like Goods recipient, unloading point etc) on replen. element.
    There in one of the field like unloading point (which you are not using elsewhere) you can enter the production order number so when you stage the same that order number will be saved in that document and you can get it from RESB table against the reservation number.
    To automate the same you can use some enhancement with above logic.
    I hope this helps in resolving your problem.
    regards,
    Uday
    Edited by: Uday Parchure on Jul 29, 2009 12:50 PM

  • How do I copy a GarageBand for iPad part from one song to another?

    Surely this must be an obvious thing, but I see no way to do it.
    I am working on 2 versions of song on my iPad. I want to copy a part from one song to the other.
    I know I can duplicate the entire song, but that is not the same.
    I really need help on this one and I'll be most disappointed if it's a basic feature Apple have not provided - I'm writing a soundtrack and at the moment and bought the app and to some extent the iPad especially to write on the road, but this will mean we have to abandon GarageBand for iPad entirely if its not possible.
    The other secondary question is why can't you copy parts (using Sonoma copy/paste or similar) OUT of GarageBand into other apps? Another basic function Apple should not have skimped on. This is necessary to, say, apply an effect externally and bring it back to GarageBand for mixdown. I'll raise this separately too.
    Thanks!

    Hi  Here is a guide I wrote about bouncing tracks in GarageBand for iPad.  You could use the methods in here to bounce the track you want to open in another app in to Hokusai , into your other app, and then back into GarageBand.  I hope this helps!   Cheers
    http://ipad.slapWagon.co.uk

  • How to CIF product locations for many parts from R/3  to SCM SPP

    We are trying to CIF product locations of 2500 parts. We are able to take only 10 parts
    in one transfer. Can anyone help us with this. How do we transfer all these parts in a single attempt.

    Thanks for your answer.
    In the product selection screen in CFM1, there are limited no of rows that can be copied in one go. The next set of rows have to be added by scrolling down.This becomes very manual if we have to do it for 2500 parts.
    Can u suggest a better way of doing this activity?

  • Config Steps for Pick process from warehouse number

    Dear Gurus,
    Need the config. steps for picking process with warehouse number assignments
    Thanks

    Hi,
    You only need to assign a Warehouse number for the combination of Plant and Storage location in SPRO in assignment of organisational structures in Warehouse Mngt. If this is done, then picking will become mandatory and you can do picking either manually or automatically through LT03 or other transactions.
    If this warehouse assignment is not done, then you can put the picking quantity directly in delivery and do PGI. If this assignment is done, then you will be able to do picking only through transactions like LT03, either in foreground or background. In this case, u will not be able to manually update the picking quantity in delivery.
    Hope this helps.

  • WM material staging for PM work order

    Hi,
    Please let me know whether I can use the staging area for transfer requirement creating against PM work orders.
    Thanks in advance.
    Jash

    Not needed.Once the order is created,u can create the pick list thro MB26

  • Handling Material Variance for 3rd Part PO with No Invoice

    How can material variances be handled for 3rd party purchase orders with no invoice?

    Hi Annie,
    if the configuration doesn't help you enough, you would have to add some custom logic after the invoice has been created.
    Technically speaking, I believe there exists a business add-in (BAdI) where you could enter a piece of code which would after the invoice creation check the GR and block it if appropriate. Another implementation option would be a mini-workflow - there you would have a step which checks the GR existence and blocks the invoice.
    Hope this helps, I suggest talking to your local abap consultant for more details,
    -Mikko

  • Material staging for production orders- NO TR

    Dear Experts,
    I have created a Planned Order for which Component materials are to be supllied.
    I am not able to see the Transfer request for the same.
    Kindly help.
    Please also let me know if there are any configurations for this?
    regards,
    Shetty

    Any suggestions pls?

Maybe you are looking for

  • What adapter/converter do I use for my USA mac book pro in NEW ZEALAND?

    I'm studying abroad in New Zealand for 2 months and was wondering what type of adapter/converter do I use? I'm actually already here in New Zealand but buy a converter/adapter before I left. What should I look for on the box? I have a mac book pro 13

  • Best Practice for SCVMM2012 setup in 3 data centers

    We are currently setting up SCVMM for our 2012 Hyper-V clusters. We have 3 data center each with one 2012 Hyper-V two node cluster. The data center are separated by a 10MB up and 50MB down pipe. There are three campuses. We plan to use SQL 2012 to ho

  • Audio out from FCE HD to USB audio iMic

    I use my Sys Prefs to set my audio out to a USB audio device (iMic), and all of my audio goes there EXCEPT for FCE HD 3.0 which insists on using the Mac Line Out... Any way to change this?

  • On iPhoto 08 - File Directories, Events and Gallery Support

    For sometime now, I have been meaning to better organize my digital photos and share them with my friends and family on the web. I have finally done so, and now I am having a bit of a problem implementing my organization into the new iPhoto, but I am

  • Registered name

    I screwed up when I activated my phone and did not put my name in the registered area and it comes up with administrators iphone is there a way to enter my name now after the fact???