WM material staging for PM work order

Hi,
Please let me know whether I can use the staging area for transfer requirement creating against PM work orders.
Thanks in advance.
Jash

Not needed.Once the order is created,u can create the pick list thro MB26

Similar Messages

  • Material Staging for manufactoring order

    Dear experts,
    I have following scenario:
    The Source - Storage and the Production Supply Area are assigned to the same Storage Location.
    When performing material staging  for an manufacturing order, how can I AVOID that the stoch in the PSA will be considered as availible stock?
    Thank you very much in advance.
    BR
    Denis

    Dear Freddy,
    It is the standard SAP behaviour,if already reservation exists for the same material and same storage location the system will
    not propose anything to stage,instead I would suggest you to mention some other differents torage location for the second
    production order for the same component and then check what is the result in MF60.
    Either you clear the existing stock transfer reservation or else meniton a different storage location for the second order and
    check.
    Check and revert back with your findings.
    Regards
    Mangalraj.S

  • Automate WM material staging for release order parts.

    Hi all,
    We use LP12 for monitoring WM Material Staging of Release Order parts.Is there a way to automate the process of WM Material Staging for Release Order parts?
    Is there is any Standard SAP Program which can be run in the background or user exit to achieve this?
    Pl suggest
    Regards
    SB

    Hi Arunachalam,
    You can configure WM staging settings in Production Scheduling Profile (OPKP)
    You need to update WM Request field and the available options are:
         No creation of transfer requirements on order release
    X   Only creation of transfer requirements on release
    1   Transfer requirement and transfer order on release
    Hope this will solve your problem.
    Please check and Revert.
    Regards
    Suri

  • Material staging for process order

    Dear All,
    Can we use material staging for process orders.
    If possible pls brief the procedure.
    Subbu.

    Using warehouse management /WM) :
    - Create a control cycle for the component, using LPK1. Here you define if the supply will be specific for the order (when weighing takes place in the warehouse) or for released orders (normallu full packages of components and weighing is done at plant level). Reference to a supply area.
    - The resource used in the operation has a reference to the supply area.
    - Components have material master views in WM for the selected storage type
    Then, when releasing the orders run LP10 - LP12 to generate the Transfer requirements for the raw materials. These TR will be converted to Transfer Orders and Confirmed, so the stock will be moved to your supply area.
    Using Inventory Management, none of the above is required. You can use MF60 to move materials from General Storage Location to Shop Floor SLoc.
    Regards

  • WM Material Staging  for Production Order

    Hi,
    In the process order txn Cor3, Go to > List > WM pick list>  the initial screen is  Display WM Material Staging  for Production Order. In the All parts tab, could you please help me on how to be able to populate the fields in the  BSI, Category and Storage Bin. Your help is greatly appreciated.
    Thanks

    Dear Ellen,
    If you set the cursor on 'BSI' field and push F1 you'll get an explanation about the meaning of each category.
    '"<i>1" pick list item
    This materials are picked according to the required quantity specified in the production order.
    '2': Crate or kanban parts
    These materials are always removed from the warehouse in full cases. These can be ordered, for example, as soon as a case of needed parts is emptied in production.
    '3': Release order parts
    Release order parts are scheduled individually and the quantities are supplied manually to replenishment storage bins based on the requirements of production orders and the stock levels in the scheduled production supply areas.
    "0" not relevant to WM-PP
    These materials are not relevant for WM production supply and cannot be requested using the WM system.</i>'
    For instance:
    You can set raw materials / SFG as pick parts if warehouse workers have to collect those parts from high racks (from different places) and they have to provide an exact qty for the PrdOrd.
    We use '4' (manual staging) for huge alu rolls that are near the machine and WH workers have nothing to do with it - the operators, who deal with the machine, have to put the new rolls on it.
    When we issue the PrdOrd the requirements of this material won't appear in LB10 since WH has nothing to do with them.
    'Storage bin' filed will contain a value automatically, if your settings are proper.
    E.g. you have to define the default 'stock removal' & 'stock placement' storage type on WM view of material master.
    Additionally you have to define control cycles for materials you use for your production. (LPK1)
    The control cycle says from which storage type & bin you want to consume the components.
    BR
    Csaba

  • Intercompny billing for maintenance work orders

    All,
    I have two scenarios dealing with intercompany activities for maintenance work orders. The first scenario involves a maintenance work order in Company B doing work on equipment also in Company B. The work order requires labor services and material from Company A. What is the most efficient way to consume the labor and material into the Company B work order? My client requires intercompany billing anytime labor services and/or material crosses into another company. So for this scenario, should I execute a cross-company labor confirmation and material consumption and then, create intercompany invoicing from this activity? Or, should Company B provide a purchase order to Company A for the labor and material and then, Company A executes intercompany billing to facilitate the correct intercompany financial postings?
    The second scenario requires a maintenance work order settlement from Company A to Company B. How should the intercompany billing be done for this? Should I settle to the cost object in company B and then do the intercompany billing? Or, should I settle to a sales document (i.e., debit memo) and then execute the intercompany billing?
    Pleases advise.
    Thanks!

    Alex,
      You should be able to use the List edit transaction iw38 to select and print Multiple Orders simultaneosuly. Once you have selected the orders in the Output screen, use the menu path ORDER > PRINT ORDER.
    Regards
    Narasimhan

  • Material Staging for Pick part from MF60

    Hi,
    I would like to do material staging for a Pick part from MF60.
    During staging I get the error as
    WM material staging for production order reservation not possible
    Message no. RMPU311
    Kindly can you tell me how is it possible to perform tthis action using MF60.
    Using LP10 I am able to perform this staging for pick part. But Business requires to perform if from MF60.
    Thank You

    HI,
    It is possible to do staging for pick parts using MF60.
    I am setting up this for a plant, and the existing plants are able to do staging with MF60 for Pick Parts.
    Do you know the configuration that are required for doing staging using Pull List..

  • BADI for Updating work order component data

    Hi,
    I need to update the field special stock indicator for the work order component data when it is saved. I am using the BADI WORKORDER_UPDATE for the same, but when I implemented the ZWORKORDER_UPDATE_IM using the standard defenition  WORKORDER_UPDATE , the code does not allow me to change the it_component internal table belonging to the BEFORE_UPDATE method. Could you please help me in this.
    Basically if we are implementing a standard defenition how to change the parameters of the methods in it.
    Regards,
    Prabaharan.G

    Hi ,
    It is giving the below dump. The parameter is importing parameter and it does not allow to change even using field symbol. Is there any other way. Is there an user exit which will be called when pressing enter button in component screen. The exit EXIT_SAPLCOBT_001 did not work for this.
    Error analysis                                                                     
        The program tried to assign a new value to the field "<F_FS1>" even though     
        it is protected against changes.                                                                               
    The following objects are protected:                                           
        - Character or numeric literals                                                
        - Constants (CONSTANTS)                                                        
        - Parameters of the category IMPORTING REFERENCE for functions                 
          and methods                                                                  
        - Untyped field symbols to which a field has not yet been assigned             
          using ASSIGN                                                                 
        - TABLES parameters if the corresponding actual parameter is protected         
          against changes                                                              
        - USING reference parameters and CHANGING parameters for FORMs if              
          the actual parameter for this is protected against changes    
    Regards,
    Prabaharan.G

  • How to change material component for a Purchase Order?

    How to change material component for a Purchase Order?
    I need FM .
    PLEASE help

    Dear ,
    Create PO with item category L....There in Item detail you will get tab for material.
    There click in component Button, it will take you to the component screen there you can assign and deassign components.
    Hope this helps.
    Regards
    Utsav

  • Purchase Info Record for Frame work Order

    Hi Friends,
    Do we have Purchase info record for Frame work Order(FO) ?. If yes, Please tell me which info category should i need to select to create a Purchase Info Record.
    Thanks

    Hi
    Is that means, Framework  PO will also use the same standard Purchase info record ?
    Thanks

  • Purchase and release order not allowed for TECO work orders

    Hi
    We are typically setting maintenance work orders to TECO once the physical work as been performed as that sets the reference date for showing the history of when the maintenance was performed, and when the maintenance call was completed. However, we have invoices that may come in significantly later than when the  physical work was performed.
    Once the order is in TECO a purchase or release order (for services against a contract) cannot be created for the work order. Additionally it appears that even if we have a release order,or purchase order, if it is not for the exact amount of the invoice the release or purchase order cannot be ammended - we get the sameerror mssage (BS007) as when creating a new purchase order for the TECO order.
    I had wondered about using BS22 to change TECO to continue to allow purchase  and release orders when the order is in TECO status.
    Any input on pros/cons or other approachs appreciated.
    Philip

    Thanks
    That was what I initially thought. However I was informed that if the invoice is not for the originally determined amount that to post the invoice means having to change the PO, and changing the PO appears to hit the same business transaction as creating a PO, and so we get the error mssage.
    The issue is that we may know we need to have services estimated at, say, $5.000. But we do not know what the actual final invoice will be. So the actual amount may end up being $4,500 or $5,500 as an example, and it may come ni late from the vendor. The Purchse Order side is not my expertize, but I am being informed that the invoice must match the PO amount, otherwise the PO must be ammended to match. As the order is in TECO, the user cannot amend the PO.
    I would be happy to know of other options, or at least good questions to ask. I want the end user to be able to post the invoice against the PO, after the order is in TECO, even it the invoice amount is not exactly the same as what was originally anticipated.
    regards
    Philip

  • Internal Order report for PM work order

    Hi There Experts,
                  My question is related to Plant Maintainance (PM) & Internal orders. Is there any standard report in SAP controlling or anywhere else which provides for each Internal Order number the list of Work Orders which have been charged to the Internal order and also if the Work Orders have PO's then a list of POs for each Work order.
    A rough picture of the report is as below:
    Internal Order                  Work Order/s              PO's
    11112222                             5673910                     4567890
                                               6789155                     1122445
    22555111                            77889933                                                                               
    If anybody could answer this it would really really help me.
    Thanks in Advance
    John

    Hi,
    Thanks for your quick replies.
    Can we get the report as follows.
    1. Total Po's value for the internal Order (through Table EKKN)                                                      xxx
    Less: Value already posted to Internal order after creation of cost elements (S_alr_87013019)  xxx
    Less: Total Value to be invoiced (Tcode -ME2N)                                                                             xxx
    Net amount to be posted to Internal Order manually                                                                        xxx
    Is it correct?
    Regards
    Madhusekhar Gupta G
    Edited by: gms gupta on Feb 20, 2012 4:33 PM

  • Automating the services for object for a work order

    Hi All,
    Can anyone post an ABAP code using which we can automate the process of creating a note for a Work order at the time of saving the work order. I need to create a note with the work order at the time of saving it. This note needs to be attached automatically. Can anyone help me with the code to do this?

    Uhm... If you want us to do your job, how much are you willing to pay?
    How is the note "attached"? If it's an attachment using GOS then the code has already been posted on SDN - look it up. You'll need to add it to the work order creation (I'm guessing there should be some kind of BAPI or FM).

  • FM for Uploading Delivery address for Components for PM Work Order (IW31)

    Can any one please help me out in finding any Function module or any other method for uploading the Delivery address for Components to SAP system in transaction IW31 for PM Work Order.

    Hi
    I am using text items (T Text item).Therefore, there will be no checking for those items form a MM prespective.
    There is no error appear. The only thing is that i have status MANC (Mat.availability not checked) on my WO
    I'm just trying to figure out if status should be removed some how, or if this is the normal behaviour.
    Many thanks
    Joana

  • Settlemnt Required For Bulk Work Orders

    Hi All,
    How to create settlement rule for Bulk Work Orders?
    Is there Any T-code is there    
    or   using Lsmw

    Settlement rule can be created during Order release or TECO. By defining Settlement Profile, Allocation Structure with Default Object, appropriate details in Equipment / Functional Location Master data, will do the trick.
    Order release or TECO can be done in mass in IW38.
    If you have any other settlement rule different than these settings, then you should use LSMW.