I have created measuring point for energy meter reading ...the problem is that each energy meter has a different multiplication factor how can I Map the process as the final reading will be energy meter reading multiply by multiplication factor. Is there any other field where I can define the multiplication factor so that the actual reading that will come will be after the reading gets multiplied by some factor.
The user wants to enter only the counter reading and the system should multiply the multiplication factor to the reading...

You can map indifferent way.
Crate an Ztable with front end to enter the multiplication factor for energy meter one time later if changed.
Create a separate Zreport and calculate the the reading as per the ztable multiplication factor and display to user.
In this way the energy meter measuring value will be same the user entered the value , the Reading display will be based upon multiplication factor.
Regards
Lav Mishra

Similar Messages

  • Meas point & counter

    How Meas point & counter is utilized for equipments?

    Hi,
    Measuring Points & Counters are used to measure different characteristics of the equipment.
    Measuring Point: For example, there are "N" no. of equipments in the plant. There would be some critical parameters to be measured on periodical basis.
    In case of Boiler, pressure, temperature, etc,. are the critical parameters. On daily basis or some periodical basis, these parameters should be measured so that we can avoid complex situations like breakdowns or componenets damage.
    Measuring points will have range as upper limit & lower limit. The parameter value should be within that range. If it nears to that values, some care should be taken to avoid the problems.
    These measuring points will be created in IK01. For those measuring points, measurement documents will be created on periodical basis.
    Counter: This is also type of measuring point which will either increase or decrease to certain limit.
    For example, ODO meter reading (KM readings in Vehicles) will be created as Counter. Transaction code for Measuring point creation is also IK01. But there would one check box as "Measuring point is Counter" in the screen.
    ODO meter reading will start from 1 to 99999 for motor vehicles & again that will be reset to 0. So counter overflow reading would be 100000. Annual estimate is on an average, how much KM that vehicle will run per year. Based on that, performance based maintenance can be done.
    [Measuring Points & Counters|http://help.sap.com/saphelp_erp60_sp/helpdata/en/9b/446863454711d189430000e829fbbd/frameset.htm]
    Regards,
    Maheswaran.

  • Problem with Meas Point and Documents

    Hi Friends,
    I have created a measuring point for and equipment.
    then I am posting first meas document with reading difference 2.
    then my total reading becomes 2.
    while posting 2nd meas document with reading difference 5
    then my totalCtrRading becomes "280" and counter reading becomes "280".
    If I enter the Counter reading as 7 then the difference value becomes " -268 "
    and totalCtrReading becomes "7".
    But  i dont know why system is behaving in this way.Can you please help
    Regards
    AM

    Hi Thayagrajan ,
    max reading that can be displayed is 5000.
    and the counter min reading is 0.
    Regards
    Achal Mehra
    Edited by: Amehra on Jun 14, 2011 6:54 AM

  • Propose Measuring point automatically in IW42

    Hi,
    I have assigned a measuring point as PRT to the operation of an Order. During confirmation in IW42, after entering the order number system proposes the operation details and I need to click button meas.points Inspn planning to display the measuring point assigned to the operation. But now my requirement is, system should propose the measuring point automatically, along with operation details, when I enter the order number in IW42 as user will forget to click button meas.points Inspn planning.
    Could anybody suggest how this requirement can be met?
    Thanks and regards,
    Basavaraj

    Hi James,
    Thanks for your reply.
    Yes, I have configured confirmation profile and same has been selected in IW42. I can see screen area for measurement document in IW42. Now my requirement is, I want the system to display the measuring point automatically, which is assigned to operation as PRT, when I enter the order number in IW42 ans press enter.
    Thanks and regards,
    Basavaraj.

  • CS module - Measuring Point

    Dear All,
    How to delete Measuring point of an equipment for which already measuring document is created?
    Regards,
    Samir

    Dear Samir,
    You can inactive the measuring point so that further measuring document creation is not possible. And it be available in equipment for history.
    Follow the steps:
    1) Run the transaction IK02.
    2) Enter the measuring point number.
    3) Select the following path: Measuring Point (Menu Bar) ->   Functions->    Active<-->Inactive-> Inactive
    4) Try for creating meas. doc., it will not be possible for this meas. point.
    Regards,
    Sundar Desai

  • Measuring points & counters......................,

    hi everyone,
    could you tell me indetail about measuring points and counters....
    what is difference b/w measuring point and counter ....?
    and what is the use with the measuring position and target value...
    and what is the effect if we select the measpoint is counter text box at initial screen..(t.code: ik01)
    plz share any information which u have..... if u dont mind
    thanks in advance.....
    regards,
    gunnu

    Hi,
    Measuring Point & Counters are used to capture the Important Parameters which should be captured on periodical basis.
    Measuring Position => This is Number or Description which is used to describe the Measuring Point.
    Target Value => Ideal or recommended Value for that measuring point
    Measuring Point is Counter => If you want to define ODO meter reading, that kind will be counter.
    Please go through some of the links.
    reg: measuring point creation and measuring point counter creation
    Re: Counters ans measuring points
    Re: Meas point & counter
    Regards,
    Maheswaran.
    Edited by: Maheswaran.K on May 5, 2011 10:41 AM

  • Measurement Point Synchronisation

    I am not getting Measurement Points on the Mobile Device.
    I have read several of the threads related to the replication of Measurement Points but have been unable to find the answer to my problem:
    I have run the Function MAM30_041 in the backend R/3 where it selects 157 Measurement Points.
    I have created a Variant in SPRO ALM_ME_GENERAL for the Measurement Points and executed RALM_ME_MEASP_FULL_DOWNLOAD_SD.
    On checking table MEREP_207 in the MI there are 35 records. However, after synchronising the mobile device, I am not getting any measurement points for the technical objects to which they are assigned.
    The technical object are available on the mobile device but no measurement points.
    The configuration for the Scenario assigned to the user has the following settings:
    Defects Recording: Defects Recording Active
    Notification Type:  Z1 (our own)
    Meas. Recording:  Measurement Recording Activated
    Help please!
    John Woodland

    Hi John,
    from your description you have two problems:
    1. Not all measurement points that are configured for replication are being replicated
    2. Equipment which is expected to have measurement points downloaded to the device does not have them.
    Problem  1 - meas. point is configured for replication but does not come to MEREP_207 table..
    The best way to understand how many meas.points are configure for replication are:
    1. Put a breakpoint in RALM_ME_MEASP_FULL_DOWNLOAD_SD before the RFC call to the middleware system and check how many meas.point keys are going to be transferred.
    2. Right after executing RALM_ME_MEASP_FULL_DOWNLOAD_SD  check how many keys are transferred in MEREP_DELTABO.
    If you see that more keys are transferred in MEREP_DELTABO that eventually make it way to MEREP_207 - that is real problem that have to be investigated and fixed. That is what I would do to investigate the reason:
    1. transaction se22 to see if there any errors
    2. figure out which meas. points were not replicated in MEREP_207 and execute BAPI MAMXX_041_getdetail on the backend for these meas.points.  Fails/error of this BAPI is the reason why meas.point was not replicated.
    Problem 2 - equipment is downloaded to the device without meas.points it references.
    There can be 2 reasons why it is being downloaded without meas.points:
    1. meas. point that this equipment references is not replicated in MEREP_207 because of the problem that was discussed before. Once you fixed the issue and all 137 meas.points are replicated, the problem with equipment will be solved as well.
    2. equipment is referencing meas.point that is not configured for replication (variant for meas.points that you configured in MAM excluded this meas. point). To figure this out: execute MAMXX_031_getdetail for the equipment in question, check that all meas. points in table "Equipment meas. points" are within meas.point variant. If not - fix the variant and fix problem 1 to ensure that all meas.points are replicated.
    Regards,
    Larissa Limarova

  • Call transaction in abap server proxy

    Hallo
    We have a problem with one of our server proxys.
    Scenario: SAP - backend system
    The functionality implemented is the creation of a service notification
    (IW51). The creation is made using batch input/call transaction and is
    capsuled in an function module. In case of error by creation, the
    message table will be read and a application error will be raise.
    In the implementation of the proxy class the function module will be called
    and the exceptions will be read and put in the response.
    In case of success by the creation of the notification, everything is working ok.
    In case of error in the call transaction, we will receive a "server
    error" in XI, even if the error is catched and treated. In the trace we can see the error message from the call transaction, even if we do not send these messages in our response anymore.
    <?xml version="1.0" encoding="UTF-8" standalone="yes" ?>
    - <!--  Call Adapter
      -->
    - <SAP:Error xmlns:SAP="http://sap.com/xi/XI/Message/30" xmlns:SOAP="http://schemas.xmlsoap.org/soap/envelope/" SOAP:mustUnderstand="1">
      <SAP:Category>XIServer</SAP:Category>
      <SAP:Code area="INTERNAL">HTTP_RESP_STATUS_CODE_NOT_OK</SAP:Code>
      <SAP:P1>500</SAP:P1>
      <SAP:P2>Internal Server Error</SAP:P2>
      <SAP:P3 />
      <SAP:P4 />
      <SAP:AdditionalText><html> <body> <H1> 500 SAP Internal Server Error </H1> <B> Error message: </B> Counter reading smaller than in previous document 10000009340 ( <B> type of termination: </B> ERROR_MESSAGE_STATE ) <BR /> </body> </html></SAP:AdditionalText>
      <SAP:ApplicationFaultMessage namespace="" />
      <SAP:Stack>HTTP response contains status code 500 with the description Internal Server Error XML element Envelope missing in SOAP message header (SAP XI Extension)</SAP:Stack>
      <SAP:Retry>N</SAP:Retry>
      </SAP:Error>
    Ex: if by call transaction we have at the end 2 messages ( first W and second E) , we will see in the tracing in XI the second message ( so the error one ).
    In the backend system (SAP), under sxmb_moni the message in question has the status : "green flag".
    We used the same way of implemenation for all our interfaces. The only difference is that we are now using a batch and not a bapi or SAP function module for objects creation.
    Has someone any idea? . Any suggestion will be really helpful.
    Thanks.
    Anca

    Hi Udo
    My response has the following structure:
    notification nr
    + 3 fields: message type (E,W,I,S,A)
                message nr
                message text
    In case of error I should receive this filled structure and not a internal service error.
    When I am testing the class in SAP is working very good.
    Proxy Class implementation:
    CALL FUNCTION 'Z_B2_CREATENOTIFICATION1'
      EXPORTING
        P_SERNR              = i_sernr
        P_MATNR              = i_matnr
        P_CDGRP              = i_cdgrp
        P_CODE               = i_code
        P_KUNAG              = i_kunag
        P_DATE               = i_data
        P_COUNT              = i_counter
      P_NTYPE              = 'Z7'
      P_VKORG              = '2730'
      P_VTWEG              = '20'
      P_SPART              = '10'
      P_PARVW              = 'AG'
      P_NAME               =
        P_EMAIL              = i_email
    IMPORTING
       E_QMNUM              = e_qmnum
       e_return             = e_error
      TABLES
        T_SPARES             = t_spares
    EXCEPTIONS
       EQUI_NOT_FOUND       = 1
       ERROR_EMAIL          = 2
       MEAS_POINT           = 3
       ERROR_NOTIF          = 4
       OTHERS               = 5
    output-MT_CREATE_NOTIFICATION1RESPON-returncode = sy-subrc.
    case SY-SUBRC.
    when 1.
    output-MT_CREATE_NOTIFICATION1RESPON-rctxt = 'equi'.
    when 2.
    output-MT_CREATE_NOTIFICATION1RESPON-rctxt = 'error email'.
    when 3.
    output-MT_CREATE_NOTIFICATION1RESPON-rctxt = 'meas point'.
    when 4.
    output-MT_CREATE_NOTIFICATION1RESPON-rctxt = 'notification'.
    when 5.
    data mess type ZB2_EXCHANGE_FAULT_DATA22.
          mess-fault_text = 'others'.
          raise exception type ZB2_CX_FM_CREATE_NOTIFICATION1
                 exporting standard = mess.
    endcase.
    output-MT_CREATE_NOTIFICATION1RESPON-qmnum = e_qmnum.
    data out_return type ZB2_DT_RETURN2.
    IF e_error-type is not initial.
    out_return-type = e_error-type.
    out_return-number = e_error-number.
    out_return-message = e_error-message.
    append out_return to output-MT_CREATE_NOTIFICATION1RESPON-DT_RETURNS.
    endif.
    Regards,
    Anca

  • Queries related to MAM enhancements

    Hi,
    We require more fields than what is offered by standard MAM application.
    Please let me know the procedure to do so.
    My understanding is
    Step 1 : Add the fields in BADIs so that it can be pulled using standard BAPI wrappers.
    Step 2 :Regenerate the syncbo after modifying the BAPI wrappers and edit the sync bos to download the fields to the mobile device. We would need license key for SAP to do this
    Step 3 : Add set and get functions for the newly added fields in the java files.
    I have few queries
    1. Please let me know if the above understanding is correct.
    2. After modifying the syncbos, can I add get and set functions in the impl java files without importing the xml file from syncbos?
    I am using standard MAM 2.5 app, in which the app form belongs to that of non generic syncbo access code.
    3. In the order management module, when I click on the order management link,it displays the list of orders..
    Can I change this functionality to introduce another jsp to scan the equipment.Is such a customization possible
    Regards
    Raja Sekhar

    Hi Raja,
    Question 1: Two possible reasons for I-Waiting - breakpoint in backend BAPI and it waits for action. Or one of the SyncBOs is not activated (very common reason, check merep_pd).
    Question 2: "Master data selection" is for replication. Technical objects on the device are coming from three sourses - when they are referenced on order and notif header level, when they are in order object list (and this is activated on the backend), standalone TOs configured in "user-dependent data".
    Normally, if order references FL, FL should come to the device, if this FL references Meas. Point it should come to the deice as well. If you check logs for FL you will probably see "cascading error" for the meas. point. Few things to check - this meas. point is returned by the BAPI MAM041_getlist so it is suposed to be replicated. If it is in the list - check BAPI MAM041_getdetail to see that it does not return error. No error - check DB on the middleware to see that it is indeed replicated.
    Regards,
    Larissa Limarova

  • Queries related to MAM configuration and MI synchronization

    Hi,
    I have queries as to the synchronization in MI & MAM
    1. When I am synchronizing with MI Server, the requests are going in I-Waiting work lists in  work list monitor..  What could be the reason for it.
    2. I require clarification as to exact purpose of the variants used in Master data selections of the MAM configuration. Is it to reduce the replicator database or to reduce the handheld database.
    I have created one variant for each FL, equipment and measurement points
    A. The FL variant downloads all the necessary FL to the MI server. We havent assigned the variant to the user so as download the ony the FLs related to work orders.
    B. The Equipment variant doesnt download any equipments because we are not using any equipments
    C. The measurement point variant downloads the measurement points related to the FLs mentioned in the FL variant.
    In the above scenario, we are able to download Work orders, Functional locations but not able download measurement points. In our scenario, we dont have equipments and measurement points are related to FL directly. The work list monitor displays "No data from R/3 downloaded".
    Is it due to the MAM configuration ?
    Can I debug the synchronization process in MI server so as to simulate the events happening when a synchronization is requested from MI client.
    Thanks
    Raj

    Hi Raja,
    Question 1: Two possible reasons for I-Waiting - breakpoint in backend BAPI and it waits for action. Or one of the SyncBOs is not activated (very common reason, check merep_pd).
    Question 2: "Master data selection" is for replication. Technical objects on the device are coming from three sourses - when they are referenced on order and notif header level, when they are in order object list (and this is activated on the backend), standalone TOs configured in "user-dependent data".
    Normally, if order references FL, FL should come to the device, if this FL references Meas. Point it should come to the deice as well. If you check logs for FL you will probably see "cascading error" for the meas. point. Few things to check - this meas. point is returned by the BAPI MAM041_getlist so it is suposed to be replicated. If it is in the list - check BAPI MAM041_getdetail to see that it does not return error. No error - check DB on the middleware to see that it is indeed replicated.
    Regards,
    Larissa Limarova

  • Single cycle plan with counter in plant maintenance

    Dear Experts,
    I am creating single cycle plant with performance based with couter reading.
    1 I have crated a measuring point with counter in running hrs
    2 Created a single cycle plan and given the couter no. there
    3 Since i hv given 4000 hrs in plan, as soon as i update the document there should be a notification but it is not happening
    Can any one clarify the issue
    Thanks&Regards
    N.Chandrasekhar

    Dear thyagarajan,
    1 I hv created meas point with counter with specified equip
    2 made document for that of 10 hrs
    3 Created a  single cycle plan giving reference same equip Cycly given 250 hrs, Entered the counter no there, call horizon 100, schedule 365 days.... while saving given no to save.....while scheduling IP10,
    taken the counter ducument which i 1st saved 10 hrs... thn called 1st call and released and saved.
    4. here with out entering that 250 hrs in ducument i am getting the notification............?
    5. I have to get the notification after entering 250 only..
    Why is happening like that
    Hope you have under the issue
    Regards
    N.Chandraasekhar

  • Replacing a active counter in a maintenance plan

    Hopefully someone can help....
    I have a strategy plan that schedules off a counter. Now this same counter is used in various other plans so I don't want to replace it. I just want to pull it from the current plan, and replace it with a new counter I created. Any ideas?
    Thanks
    Josh

    Dear thyagarajan,
    1 I hv created meas point with counter with specified equip
    2 made document for that of 10 hrs
    3 Created a  single cycle plan giving reference same equip Cycly given 250 hrs, Entered the counter no there, call horizon 100, schedule 365 days.... while saving given no to save.....while scheduling IP10,
    taken the counter ducument which i 1st saved 10 hrs... thn called 1st call and released and saved.
    4. here with out entering that 250 hrs in ducument i am getting the notification............?
    5. I have to get the notification after entering 250 only..
    Why is happening like that
    Hope you have under the issue
    Regards
    N.Chandraasekhar

  • Querry regarding PM material

    hi
    If oil sample in the transformer to be tested, how this scenario will be dealt in SAP PM, whether by calibration order or any thing else please give the details. while creating equipment i have created transformer oil as material.
    regards
    pushpa

    Dear kola
    U can go for oil analyis 3 ways is possible. u sud decide which is better accord 2 client req.
    Oil analyis also one of condition monitoring like vibration analysis.
    1. Prev Mtc- Thro Staratagy u can go
    2. Calibration - Decide the MIC and go for inspection point testing
    3. Condition monitoring Mtc-- Maintain the range at Meas point. If not in limit set the configuration as mtc order creation.
    Go for analyse with ur self and do it.
    thenna

  • Missing Orders on Client

    Hi! everyone
    We did applyy SP21. We are working with MAM25 SR5 .
    We are missing ORDERS on the client.
    We aregetting Notification, equipments, Meas. points and Functional Location.
    After We run SE37 for MAM25_001_GETLIST  We can see 3 ORDERS but we can not get any on the client.
    Could you please give me ideas about how to get orders on the client ?
    Thank you for your help

    Hi! guys
    1. Before we applied the SP21 we did a homogenoues copy from production backend system to quality Backend system.
    We did apply SP21 only on Quality environment. As soon as everything works fine we will do that on production.
    W did run MAM25_GETDETAIL for those ORDERS that do no go to the Client and are shown by MAM25_and the GETDETAIL works fine I did not see any error.
    On Quality envionment we did check the MEREP_LOG and  we did not see Error type E, all of them are type I, and some are type W.
    Z_MEREP_GEN_T02_____MAM25_090 Begining for the execution number 0000131796 and the time execution is 67 
    Does not exist data to download from R/3 on the downloader                                                            
    Downloader finished ok.(ID Mobile: 0000003937, SyncBO: MAM25_090)                                  
    Z_MEREP_GEN_T02_____MAM25_090 finished for the execution number 0000131796 and the time execution is 67  
    Z_MEREP_GEN_S01_____MAM25_001 Begining for the execution number 0000131796 and the time execution is 70 
    MAM25_001_GETLIST Begining for the execution number 0000131796 and the time execution is 71             
    MAM25_001_GETLIST finished for the execution number 0000131796 and the time execution is 71              
    Códe of call return BAPI RFC: No objects were selected                                           
    Objects en R/3=0, filter took=0, filter loaded=0                                                       
    Objects: added=0, modifiied=0, deleted=0, no modified=0                                              
    ID móvil=0000003937: Total registers=0, total PT=0, conflicts identified=0                               
    ID móvil=0000003937: Added=0, modified=0, deleted=0                                                   
    Does not exist data to download from R/3 on the downloader                                                            
    Downloader finished correct.(ID Mobile: 0000003937, SyncBO: MAM25_001)                                  
    Z_MEREP_GEN_S01_____MAM25_001 finished for the execution number 0000131796 and the time execution is 70  
    With MEREPE_MON We did see the same Type of errors as we saw on the MEREP_LOG
    As you can see the MAM25_090 said that it does not have data so,.... I think I should be focus on it. But my questions are:
    1. If I did a homogenous copy from production why I have problem with MAM25_090 ?
    2. Why are we getting some information on the client Like notifications, Meas. Point, Equipments, Func. Locations ??
    Thank you for your cooperation
    Xiomara

  • Chapters menu button loop duration

    I've created multiple iDVD projects, each with multiple movies on the Chapters page. Some projects will allow me, via the Inspector Window, to set loop duration for an individual movie's button-thumbnail within the menu. Other projects' Inspector Window will not allow me to even view loop duration.
    How do I create an iDVD project that always allows me to set Chapters menu button loop duration?

    My mistake... When it says "pointer over the menu" it's misleading because of the accompanying picture. I thought it meant "pointer over the menu button" because thats what the picture shows.
    When you simply put your pointer over that whole screen or "menu", you get the loop duration slider which is global to all clips on that screen.

Maybe you are looking for