Hi,
I am involved in a project to reorganise storage for our VMs so that virtual disks are stored on the most appropriate RAID groups as we are seeing latency on some LUNs at present.
I would like to be able to estimate what the IOPs cost of a particular type of VM would be for future planning purposes. For example if we need to deploy a new Exchange server it would good to know the rough IOPs cost of that type of server before actually comissioning it so that we can start create its virtuals disks on the most suitable RAID groups. Obviously this would vary according to how much the server is being used but it would be good to know how an email server compares to a database server or compares to a file server. Does anyone know of any practical metric by which this can be measured.
Is there any information availble through vCenter? Does vCenter give you information on real time IOPs per VM?

I assume you are Anuj since this question is identical to the e-mail we got :-)
General answer for everybody:
Yes, we have an estimation tool that is used as part of the Forms2ADF assessment. While the tool is integrated with JHeadstart design-time clases, there is currently no option to run it through a JDeveloper wizard, or through the command line.
The estimation tool counts various types of forms elements, and applies estimating weighting factors to each form element. These estimating factors are different for each customer, and for each application!
We always migrate a set of selected forms (simple, average, complex) and based on the time spent on these forms and the characteristics of these forms, we set the estimating factors and extrapolate to a total migration effort by generating a spreadsheet using this estimating tool.
Steven Davelaar,
JHeadstart team.

Similar Messages

  • Measure IOPS

    Is there any good way to measure IOPS on a current server that is running SQL Server? It seems like that SQLIO utility is more for bench marking a potential server that may be used as a SQL Server host.
    Are there any specific counters that I can add up to come up with current average IOPS of a sql server instance? Can adding the average of Disk Read/ Sec and Disk Write/Sec give me the average of IOPS?
    please advice.
    thanks
    SQL Pro

    Hi sqlstar,
    For detailed information about how to analyze IOPS requirements from a SQL Server perspective, see:
    http://sqlcat.com/sqlcat/b/whitepapers/archive/2010/05/10/analyzing-i-o-characteristics-and-sizing-storage-systems-for-sql-server-database-applications.aspx
    And this thread described some contents which you need: 
    http://social.technet.microsoft.com/Forums/en-US/operationsmanagergeneral/thread/92ad3a22-49fb-4e60-9573-8b6f629cbbe9/
    Best Regards,
    Iric
    Please remember to mark the replies as answers if they help and unmark them if they provide no help.

  • Backflush with Prel cost estimate still considering standard cost estimate

    Hi,
    Trying to do back flush with Prel cost estimate . Flagged in REM profile " Post Activities " / Using Data from Preliminary Costing".
    However,  FG rate is considred as per standard cost estimate and not as per preliminary cost estimate.
    Kindly advise whether any other specific setting is needed.
    Regards,
    Mrinal

    HI
    check these links:
    standard / preliminary cost estimate
    Significance of Preliminary cost estimate,
    preliminary cost estimate for product cost collector
    Hope it clarifies.
    Regards
    Anupam Sharma

  • Delivery cost condition type in PO coming as display mode

    Hi Experts,
    In my Purchase order having delivery cost condition types, for ex freight.  For this PO i have done Goods receipt. PO all the delivery costs are showing in display mode. i have reversed the Good receipt.Again also all the delivery costs are showing grey mode in PO.
    I want to make as editable for this PO after reversal of GR. Kindly do the nedful.

    HI makarand  ,
    the condition type you have created is this assigend in Item Level or Header level. Plz check this in Header and item Conditions Tab. If you can assigned Delivery cost condition type in item level than it will changed by item level itself.
    In Header Level it displays in Display Mode.
    Vraj

  • VPRS Cost Condition type

    Hello,
    I have copied VPRS cost condition type & created a new cost condition type ZABC for the purpose of recognizing cost for a project.
    When i create sales order VPRS & ZABC cond types are getting populated  in sales order with correct cost but when i create Invoice , VPRS is getting copied correctly from sales order whereas ZABC is not getting copied from sales order, It shows value $0   When i double click on ZABC , it shows "Inactive via formulae of incorrect".
    Not sure if this is due to this error or some other error?
    Copy control looks fine since it is copying all other cond types correctly.
    VPRS & ZABC both are statistical.
    Can someone help.
    Thanks,
    Manny

    Hi Manny,
    SAP does not recommend have more than one condition of type 'G' in general because only the first condition obtains the goods issue value as a condition value. For additional conditions, the special logic of condition category 'G' is lost.
    Please refer to note 547570 about this.
    If you still need the 2nd cost condition appears in the billing document, please consider the possible solution provided in
    Note 15462.
    Regards,
    Alex

  • Cost Element  Type change  with balance in it

    Hi All,
    I have a P &L account created in FS00 maintained as cost element of type 1 , and now we want to change it as type 12 sales and Deductions Cost element, so when I try to change in FS00 it didn't allow me to do so as it is having some balance, so 
    What can I do now ?
    How can I change that cost element type from 1 to 12 ?
    How can I clear  the balance that  is that account now ?
    and where can I see what  balance is in that Cost element?
    Your Help greately appreciated,
    Sandhya

    Hi Eli,
    Thank you for the valueble report, But it shows I have no data in that cost element ,
    But When I try to change the CE category in FS00 it is saying the transactional data exists Message KS134 , 
    where can I see the actual dollar amount sitting in that Cost Element?
    and
    If I don't know how much in that CE how can I transfer the amount from this CE to another CE?
    Please Help me Guru s,,,
    Sandhya

  • Cost Center Assessment - cost element type 42

    Hi dear All,
    I got issues running KSU5 to allocate planned costs under cost element type 42. we were expecting that all planned costs (primary and secondary(cost element type 42)) could be allocated by credit cost center (actual). only primary costs are being allocated.
    Scenario:
    cost center planning (kp06) 1000 currencies in primary cost element in cost center A
    running planning assessment - KSUB: cycle uses assessment cost element (type 42): sender cost center A, receiver cost center B (all planned values). assessment cyles posts 1000 currencies from CC A to cost center B
    planning in cost center B (primary cost elements through kp06, 500 currencies) total planning 1000 from previous assessment  with CE type 42, and 500 from cc planning in a primari CE.
    by the period end closing, tcode KSU5 (allocation actual) is running. new cycle created, based on planned values (origini not actual, but planned amounts).
    we were expecting to allocate 1500 currencies from cost center B to cost center C (using 100% and through assessment cost element)).
    result: credit actual cost center B = 500 currencies debit actual cost center C = 500 currencies.
    1000 currencies pending on cost center B (planned).
    do you know why SAP is not allocating the 1000? even if those 1000 were planned in cost center B by assessement, a new allocation cycle should be able to post them or not?
    thank you for your outcome.

    Hi dear Ajay, thank you for your answer.
    first, I understand the difference between KSUB and KSU5, in the defined scenario, we have both. planned values, become actual with the MEC activities. business definition.
    regarding the cycle, I have setup assessment cost element so we can get all planned lines posted as 1.
    On sender tab I have only the cost center. no cost element defined.
    receiver its cost center.
    furthermore, i've not setup allocation structure, so all cost elements should be allow, there is no restriction on this.
    the only difference is: planned costs which their origin is already an assessment are not being assessed again.
    I can show you the print screens with cycles setup if it helps
    best regards
    MF

  • Change cost element type 4 to 1

    Hello,
    I want to change a cost element type "4" to "1". But SAP does not allow it because the plan data on the cost element.
    How can I change the type? Please any help.
    Thanks

    HI,
    I'm afraid if dependent data (actual and/or planning data) exist for cost element for the fiscal year, then there is no way to change the category type until the next fiscal year.  This is to prevent inconsistency in the data for a given fiscal year.  When posting the first transaction data (plan or actual posting), a year dependent entry is created in a control table for the cost element. You can only change the category if NO transaction data exist for the relevant year or if all the transaction data for this cost element/year
    is deleted.
    An option is to create a new analysis period (KA02 -> Basic Screen -> Edit -> Analysis Period) and specify the new cost element category. The new analysis period can only be specified in yearly intervals.
    For further information on this please review the attached note:
    37093 Master data: change/delete validity period
    Regards,
    Abhisek

  • Cost element type 12 "Sales Deduction"

    Hi guru
    I would understand the effective impacts in CO-PA when I use Cost Element Type 12 "Sales Deduction".
    Can you help me?
    Thanks

    Hi,
    Cost element category '12" is used for sales deduction. If u want this to flow to COPA U have to Maintain the value field of COPA with the FI G/L for that paricular account in Valuation Strategy Configuration.
    Regards,
    Sreekanth

  • Cost element type 90

    I need information about primary cost elements with cost element type 90.
    Has someone hands-on experience?
    I try to use this type of cost element linked to a reconciliation (customer) accont.

    Hello
    Cost Element Category 90
    Cost element for balance sheet accounts in Financial Accounting
    Cost elements of this category are generated automatically when you create cost elements in Controlling that have asset reconciliation accounts, that is, special balance sheet accounts, as corresponding general ledger accounts in Financial Accounting.
    You cannot change this cost element category in CO master data maintenance.
    FI does not require CO account assignments of category 90. However, if you do enter a CO account assignment, this is only updated statistically even for true CO objects.
    Cost elements of category 90 enable you to control the costs of an order or project budget during the acquisition of fixed assets that can be directly capitalized. To achieve this you enter a capital investment order or work breakdown structure (WBS) element in the appropriate field in the asset master data. The Asset Management (AM) component ensures that when the asset is acquired, the order or WBS element is automatically entered in the document.
    In Controlling, orders and WBS elements are debited statistically. This statistical debit is checked with the budget during availability control.
    The system does not support other uses of category 90 cost elements at present. You cannot plan using these cost elements.
    Reg
    *assign points if useful

  • Cost element type

    Is it possible to change the cost element type after posting some actuals?

    No, it is not possible to change the cost element type

  • Delivery cost condition types in ECC

    We are going for Ext clasic scenario where SRM POs will be transferred to backend. How to have delivery cost condition types in SRM which will also appear in ECC POs? In SRM condition types, condition category does not have delivery cost option , like ECC.
    I created the same condition type in SRM as in back end, and marked it as statistical in the 0100 pricing procedure, but it does not appear in backend PO , although the pricing procedure in backend has the same condition type as a delivery cost condition.

    Hi
    <u>You can create custom fileds in the Local SRM POs by using SAP OSS Note 672960 and 485891.</u>
    <u>Map the data from SRM system to back-end ECC system using BADIs -></u>
    BBP_ECS_PO_OUT_BADI 
    BBP_PO_INBOUND_BADI
    or some standard SAP function modules can also be used here.
    <u>Other related Information -></u>
    You can change the following credit memo data at header level:
    <b>Unplanned delivery costs</b>
    You can change the unplanned delivery costs.
    <b>Links -></b>
    http://help.sap.com/saphelp_srm50/helpdata/en/e7/72623c6b69bf70e10000000a11405a/frameset.htm
    http://help.sap.com/saphelp_srm50/helpdata/en/a4/f1db8a5422408695e1d5265477ecd7/frameset.htm
    <b>Condition types in SRM</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/72/f40f3c98ddaa4ce10000000a11402f/frameset.htm
    <b>Condition Categories in SRM</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/76/d90c3cb8d19347e10000000a114084/frameset.htm
    http://help.sap.com/saphelp_srm50/helpdata/en/ee/d9df3bbcce4b37e10000000a114084/frameset.htm
    Hope this will help.
    Do let me know.
    Regards
    - Atul

  • Raw Material Cost Estimate - No split between cost component

    Dears,
    I need to execute a material cost estimate considering the Purchasing Info Record (PIR) where 3 different conditions are present:
    1) PB00
    2) FRB1
    3) RUC1
    The scope is:
    - linking PB00 to cost component 1
    - linking FRB1 to cost component 2
    - linking RUC1 to cost component 3
    Cost components are already created.
    I did following steps:
    - creation PIR with these 3 conditions (transaction ME11)
    PB00  10,00 EUR @ 1 KG
    FRB1   2,00 EUR @ 1 KG
    RUC1   3,00 EUR @ 1 KG
    - link condition types to origin groups (transaction OKYO)
    FRB1 linked to FRB1
    RUC1 linked to RUC1
    - link origin groups to cost component (transaction OKTZ)
    PB00, is linked to cost component 1 without origin group, but using only account coming from T030 table 
    FRB1 is linked to cost component 2 using origin group FRB1 and the same acocunt used for condition PB00 coming from T030 table
    RUC1 is linked to cost component 3 using origin group RUC1 and the same acocunt used for condition PB00 coming from T030 table
    At this moment, when I try to execute the cost estimate with transaction CK11N, the split is not done, and all condition types (all amounts) are linked to cost component 1. The set-up done in OKYO is not considered by the system.
    In the material master there's any origin group, if I try to fill in origin group FRB1 all condition types (all amounts) are linked to component 2, and if I try to change the origin group in the material master from FRB1 to RUC1, all condition types (all amounts) are linked to component 3 --> this means that the set-up done OKTZ is correctly considered by the system to link the origin group to the cost components.
    The problem is that the system reads the origin group from the material master, instead of transaction OKYO.
    How can I solve this problem?
    Thanks and Regards,
    Jody

    Pl verify following two things -
    Check valuation variant.
    Strategy sequence should have 'L - Price from purchasing info-record' and Sub-strategy should be 'A Quotation price via condition table' or 'B PO price via condition table'.
    OKYO setting should have valuation variant associated with your costing variant, along with other details (dont leave that field blank).
    Let us know if that works.
    Regards,
    Subodh

  • Sliced metrics with non-additive measures

    Post Author: jmdupreez
    CA Forum: Performance Management and Dashboards
    I have a sliced metric for a actual say X with the sliced dimensions A,B and C. This is an additive metric, thus A + B + C rolls up into the global slice. I have used the CI_PROBE universe to take the aggregated values of X to determine the average value say Y on a 7 day rolling basis for each day for each slice of X (A,B,C) in so to create a means of having thresholds based on these values. The issue is that these measures do not roll up as they are averages.... Does anyone know a better way of creating this scenario without having the global slice rolled up incorrectly. Thanks

    Thanks for replying. Since the requirement needed diff values at different levels, in the calc script, I fixed on dimensionsI want to include & it works great for a really small set of data. When I load the actual data file & try to calc, it comes up with the following essbase error.I tried to increase the datacache size but the error does not go away. Does anyone have any suggestion on why it works for a subset of data and what needs to be done to over come the error.Thanks a lot.-Nithya[Fri Apr  5 09:59:18 2002]Local/CPTest2/Cptest2/nvenka/Serious Error(1008110)Unable to Allocate Memory. Refer to the Application Log for details.[Fri Apr  5 09:59:18 2002]Local/CPTest2/Cptest2/nvenka/Info(1008112)Memory Allocation error codes: O/S error = [12], O/S return code = [0].[Fri Apr  5 09:59:18 2002]Local/CPTest2/Cptest2/nvenka/Info(1008114)Allocation request for [1481760000] bytes of virtual memory. Percentage of memory in use is [28%].[Fri Apr  5 09:59:18 2002]Local/CPTest2/Cptest2/nvenka/Info(1008116)Total swap space is [25652363264] bytes. Available swap space is [18546425856] bytes.[Fri Apr  5 09:59:18 2002]Local/CPTest2/Cptest2/nvenka/Info(1008119)Memory page size is [4096] bytes.[Fri Apr  5 09:59:18 2002]Local/CPTest2/Cptest2/nvenka/Error(1019003)Unable To Read Information From [db2olap/app/CPTest2/Cptest2/Cptest2.otn][Fri Apr  5 09:59:18 2002]Local/CPTest2/Cptest2/nvenka/Error(1007119)Loading New Outline for Database [Cptest2] Failed[Fri Apr  5 09:59:19 2002]Local/CPTest2/Cptest2/nvenka/Error(1042012)Network error [32]: Cannot Send Data

  • App for measure phone cost

    Hi,
    Wonder if any have found an app for measure phone calls, sms, mms costs?
    Would be great to have this an check this against the invoice.
    /Per

    Will check but I suspect they dont have this. I have checked on their site and cant find anything there. I still wonder if it can be any app out there in the app world? I'm searching for an app that can measure number of calls, sms and mms. Also if the app can measure the lenghts of call. Then its up to the user to setup each cost for each part. I assume an app could pick this data and calculate each cost for calls, sms and mms.
    Message was edited by: Per Soderman

Maybe you are looking for

  • Can't hear usb keyboard

    Hi, i can't hear my m-audio keystation49e keyboard when i press the notes on it. I have only opened the tutorial song at the moment, as i have only just got logic pro7.2 and am still using the tutorial song to experiment and learn. I went to audio mi

  • Latest patch for 11.2.0.3, OS is windows 2003 service pack 2 (32 bit)

    Hello everyone, Can any body let me know what is the latest CPU and PSU patch for 11.2.0.3, OS is windows 2003 service pack 2 (32 bit). I found this patch 16042647 i don't no either it's CPU or PSU. Re: Patch 16042647: Oracle Database Family 11.2.0.3

  • Moving selected parts of text

    This is probably a dumb question, but how do I move select parts of text? I have a "B" and a "G" that I put into Illustrator using the text tool. When I go to move the "G" onto the lower corner of the "B", it selects both letters and moves them as a

  • Silverfast PlugIn

    Hello, i have installed Adobe Photoshop Elements 12 Editor and Siverfast 8 for my scanner Canon CanoScan 8800F under MacOs 10.9. The software function is ok, but i found under photoshop no PlugIn for my scanner. Installing the software in Windows wit

  • F4140 Pringting blank page from web pages & pdf

    My F4140 is working and printing but is printing blank pages when I try to print from a PDF.  I just tried to print a word document and it only printed the black and white section and left the color sections blank.  It is also only printing the  blac