Dear Guru's,
By mistake, Sale revenue GL accounts have been created as cost elements under "01" category instead of 11 category.
Due to this mistake, Sales values are not flowing to COPA,
Please help me in this regard, how to correct it.
Regards
Anuj

Hello,
If you have dependent data (actual and/or planning data) on the cost
element for the fiscal year there is no way to change the category type
until the next fiscal year. This is to prevent inconsistency in the data
for a given fiscal year.
What I can advise is to change the validity period of the cost element
as of the next fiscal year in KA02 to change the master data in
relation to the cost element type. This should be no problem.
In case you need to execute this change for periods where you already ha
postings on the cost element, all the previous postings to this cost ele
within the fiscal year need to be reversed or deleted. In most cases thi
not easily possible - so it mainly depends on how many postings you have
made to this cost element. In case you can remove the previous CO-docume
use note 175522 by deleting the postings with report ZKACOR21.
Delete all the actual postings for the particular cost element\fiscal
year combination so that there are no dependant entries in the CO tables
There are entries in the following tables COEP, COSP, COSS and
COKA.
Notes 37093, & 38955 that explain how to delete cost elements
where there is dependent data.
"the cost element can only be deleted, if you delete first the entries
of following tables: COEP (CO object:  period-related line items),
and with the information document number and line item of COEP you can
delete the entries in table COBK (CO Object: Document header). The name
of the summarized table is COSP (CO Object:  Cost Totals - External Post
ings). The last table is the most important one it is the control table.
The Transaction KA04 will select this table before deleting a cost elem
ent. Its name is COKA. If you delete all entries it should be possible
to delete your cost element."
Even if the COEP table line items are 'zeroed out, they are still
considered as line items. Please review your COEP table.  If there
is a posting to the cost element, you can reverse the posting so that
that the cost element has a zero balance, ('zeroed out'). Then please
review attached note 175522 and try running report RKACOR21 described
in the note. Please try this in your test system first.
Please try this way to delete table COKA/COSP entries:
-run report:RKACOR20(refer to note 45122) to delete the CO documents
for the GL doc and its reversal document
-run report:RKPLNC27 (refer to note 549760) to delete zero records in
table COSP (with parameters:object number,fiscal year,version)
-Then run report:RKPLNC25 to delete dependency record in table COKA.
br, Guido

Similar Messages

  • Error while Creating cost element under category 90

    Dear Experts,
    I have some Balance Sheet related G/L account, which I have created as cost element through transaction KA01, system gives an info message saying its an BS related account, if I ignore that message and proceed further it creates a Cost element with category (system automatically picks the category and the field gets into gray mode) 90.
    We have created one more BS G/L account today and trying to create the cost element for the new G/L account, system is producing an error message:
    G/L account 3200220 is a balance sheet account
    Message no. KS036
    Field status group     R005     Material accounts is maintained
    Can some one guide me to rectify this error?
    Thanks in advance,
    Regards,
    Praveen

    Hi,
    The use of cost element category 90 is only provided                            
    in the following two cases (note Note 75980):                                                                               
    1. asset acquisitions and down payments which are                           
       assigned directly to a fixed asset or asset under construction can       
       be assigned to an account on internal orders or WBS elements             
       statistically.                                                                               
    2. cost elements of category 90 can also be created                         
       for material stock accounts to display material make-to-order stocks     
       on sales orders or customer projects.                                                                               
    If you G/L account does NOT correspond to the standard cases 1) or 2),      
    you can (on your own responsibility)                                        
    both deactivate the account assignment                                      
    check in the CO interface (message KI098) and when you create cost          
    elements (message KS036). Both checks are deactivated by maintaining        
    Transaction OBA5. Deactivate message KI098. Message KS036 cannot be         
    deactivated directly with Transaction OBA5 - rather, it is deactivated      
    indirectly when you deactivate message KI098.                               
    The message must be DE-ACTIVATED. Please do not set it to any other         
    type. Please proceed as follows:                                            
    Please call OBA5 in the production system - if not set to changeable        
    please do this in Your development system.                                  
    In OBA5 choose KI and in the detail screen add 098. 
    Then set the type of warning to "-".  
    Best regards,
    MLM

  • How to create cost element in mass

    Hi All
    I want to create cost element in mass. i created to new GLs . and now i want to create there cost elements in more than 60 company codes . is there any way to create it in mass . please suggest with t.code
    Thanks in Advance
    Nikhil

    Yes you can create cost elements in a batch session automatically.
    Please use tcode OKB2 for default settings. 
    Define batch input session - OKb3
    Execute batch session : SM35
    Regards

  • How to create cost element in controlling

    how to create cost element in controlling for Direct meterail.
    i have to create for each materail or on rm consumption is enough
    please give me replay
    thanks

    Hi Nagaraju,
    First you create the required account as cost element through FS00 and select your gl account and edit cost element and give 1 in cost element category.
    Afterwards in OKB9 You create the cost element whether it is required for Bus Area mandatory, profit centre mandatory and Valuation area is mandatory.  Based on your selection you have to assign 1, 2 or 3.  Ex. You have selected for consumption account profit centre is mandatory.  You give 3.  and you have to assign the cost centre against profit centre.  Then automatically your consumption will post to the cost centre.
    BSR

  • Creating Cost Elements for OBYC Accounts

    Hi
    We are implementing COPA and we have manufacturing scenario (MTS) also. Now i have created cost elements (with category as 1). Now its giving me error for CO object when i post any SD entry (at the time of PGI and releasing billing document to accounting) or MM entry (MIGO / MIRO). So please help me cost elements needs to be created for following accounts:
    Price difference A/c
    Rounding off A/c
    Small difference A/c
    If i do not create it as cost element, will it effect my COPA / Product costing / Cost center planning.
    Please help

    We are implementing COPA and we have manufacturing scenario (MTS) also. Now i have created cost elements (with category as 1). Now its giving me error for CO object when i post any SD entry (at the time of PGI and releasing billing document to accounting) or MM entry (MIGO / MIRO). So please help me cost elements needs to be created for following accounts:
    Price difference A/c
    Rounding off A/c
    Small difference A/c
    If i do not create it as cost element, will it effect my COPA / Product costing / Cost center planning.
    When your postings hit CO (COPA) from Billing the system is expecting the Real CO Object (e.g. Cost Centre, Internal Order, WBS, Profitabilit Segment etc) to be Profitability Segment.
    The RWIN interface (program group that posts to FICO - includes COPA) is checking and finding that there are Cost Elements created for the 'account determination' (accounts determined in Billing) that have a Cost Element category of 1 and I assume that you have determined these postings should go to COPA. Thus the error.
    For CE Cat 1 (Primary costs/cost-reducing revenues) the system expects a Cost Object that is not a Profitability Segment.
    The solution is to not create them or to use CE Cat 11 or 12 which allows Prof Segment.
    Take into account the fact that if you are using the Reconciliation Ledger then CE Cat 11 or 12 should be used (i.e. adding the REAL (not statistical) postings in COPA + Cost Centre Accounting + WBS + Internal Orders = FI P&L).
    Please test the use of CE Cat 11 or 12. The problem is that if you have already posted to the old CE's you will need to create new ones as you can't change CE cat once posted to.
    The Business Analyst Question would be: Where does the Business want to see the REAL postings of Price Difference, Rounding Off and Small Difference? In COPA (then see above explanation - I would assume the Business want it here) or in Cost Centres (adjust your config and use CE cat 1).
    Hope this helps.

  • Error when createing cost element

    Dear Friends ,
    Following error appering when createing cost element , please suggest and explain the process in details ,
    Create the G/L account 94100040 first
    Message no. KS034
    Diagnosis
    You chose the function "Create primary cost element". Primary cost elements/revenue elements must have an equivalent in FI, meaning the account must already exist as a G/L account in FI. Account 94100040 was not created in FI, so you cannot create it as a primary cost element.
    Procedure
    Check whether you need to create cost element 94100040 as a primary cost element and for what purpose it is to be used for.
    If the cost element is to be assigned to accounts in FI, create a G/L account in an FI company code.
    Manually create G/L account
    If it is not to be assigned to FI accounts (additional CO costs), it suffices to create the G/L account as a chart of accounts item.
    Create G/L account in chart of accounts
    You can create the cost element as a secondary cost element in CO. This does not require an equivalent account in FI.
    Regards
    Raghu

    Hi,
    use T.code FS00 and enter G/L account number and co.code and enter required details and in application tollbar click edit cost element and enter required details.1st consult FICO consultant for above and use of G/L account group and other details for creating G/L.You can cretae Cost Element in t.code: KA01 also.
    For more check the links to Create Primary and Secondary Cost Elements
    http://www.copacustomhelp.state.pa.us/infopak/nav/finance/controlling/file1402/index.htm
    http://www.copacustomhelp.state.pa.us/infopak/nav/finance/controlling/file2595/index.htm
    http://www.sap-basis-abap.com/sapco004.htm
    Regards,
    Biju K

  • When not to create cost elements for P&L accounts? Implications?

    I noticed some P&L gl accounts are not created as cost elements eg. R&D expense, COGS (posted during SD delivery), sales (posted during SD billing), freight charges, production variance (posted during prod.order settlement), etc.. I'm thinking if cost elements are not created, FI and CO will not reconcile.
    Example of our SD delivery posting :
    Debit   COGS (sales order assignment)
    Credit    Stock
    From above posting, there is amount posted to COGS gl account but no CO assignment except for sales order. Is there supposed to be a follow-up to this posting to reconcile FI with CO ? Or is our setup wrong?
    Fyi we do not use CO-PA.
    Thanks in advance.
    Edited by: Pixel8 ation on Aug 3, 2010 5:16 PM

    Hi,
    Sorry, I probably confused things by mentioning Revenue. Your settings are correct, with Revenue defined as a revenue element (11) rather than a cost element (1).
    With respect to WIP (P&L), I would create it as a cost element, since it represents the absorption of cost centre costs and materials into the production of goods, even though the goods are not yet complete. When the goods are completed they will be credited in CO-OM and debited to stock using a similar entry. The impact of these credits (to WIP or to Stock) is to move costs out of CO-OM into the goods produced (CoGS). In CO-OM, the net result of Costs less credits to WIP/Stock, indicates the efficiency of your cost centres or the accuracy of your standards.
    I would also create the manufacturing variance accounts as Cost Elements and settle them back to your production costs centres (or possibly CO-PA if you used it), since they are also a reflection of the efficiency of your cost centres - i.e. if a Cost Centre manager is not achieving the standards, (s)he should be accountable for the variance, and if you are concerned about reconciling CO-OM and the costs in P&L, you won't reconcile if the variances aren't posted back to CO.
    Regards,
    Marc

  • HI Cost element

    Hi all
    By mistakely i created cost element one G/L Account
    In that G/L Account need not maintain cost element
    what can i do
    pls suggest me
    know
    That g/l account  i don;t need cost elements
    know i want to remove
    pls suggest

    Hi Supriya,
    This msg comes as u hv already some transactions.
    now u cannot delete this.
    so what u can do is, u can change the cost element category from primary to any other. this will stop data flow from GL to CO.
    so go to edit cost element/change cost element and then change the category.
    *award points*
    Reg,
    CA. Karthik Narayan N S
    SAP-FICO Consultant

  • CO-PA: COGS accounts created as cost elements

    hello,
    I have a question regarding COGS accounts, being created as cost elements. This was not causing problems, because client was using real internal orders for profit analysis. In the next phase of project, during implementation of costing based CO-PA, now I have problem, because of this situation, because I can not delete created cost elements  (only possible at the beginning of the new fiscal year) , and the system asks for cost object assignment during GI creation. I was considering OKB9 assignment, but I think this will cause double values in CO-PA. Maybe temporary solution, by using real internal orders till the end of the year, and then deleting existing cost elements for COGS accounts, could work?
    Please, advise what to do to solve this situation.
    Thanks in advance,
    Dusko

    Hope you are not using account based COPA
    To avoid double values in COPA, you can do one of two things,
    1) after the costs are transferred to the internal order, you can just keep them there without doing settlement, let the users know that there will be under absorption for the internal order.
    2) If the users are not willing to have under absorption in the internal order, you can transfer the costs to a value feild in COPA which is not reflected in the report in KE30 (Remember that you may loose one value feild in COPA this way)
    Both make no effect on KE30 report as data will be transfered to COPA at the time of billing
    Br Naveen

  • Consumption accounts not created as cost elements - Implications

    Hi
    There are following GL accounts as an Expense GL accounts:
    Cost of Raw Material Consumption
    Cost of Finished Goods Manufactured
    Cost of Finished Goods Sold
    Change in Stock WIP.
    I have not created them as cost elements since its asking me cost center when i do any PGI or issue to sub contract stock, etc.
    So i wanted to know the implications on CO-PA if i do not create cost element. I believe that value will flow to CO-PA on the basis of material code.
    Further my doubt is, if i do not create it as cost element, how it will impact my cost center reports and product costing.
    Please help. I am confused very much.
    Edited by: Meenu_ND on Aug 4, 2011 7:55 PM

    Hi Meenu
    cogs - can not be created as cost elements- GBB-VAX- COSTING BASED COPA- MTS
                Can be created as cost element -GBB-VAY- COSTING BASED COPA- MTO
    always as a cost element GBB-VAY- Accounting based copa
    Thanks
    ram

  • Can we create a cost element for a Balance Sheet account?

    Hi folks,
    Is it possible to create a cost element for a balance sheet account? If yes, what are the scenerios we would need it and how is it done?
    thanks in advance

    Hello
    Please review the below information regarding cost elements category 90 : Financial Accounting Balance Sheet Accounts                                                                               
    Category 90  is automatically assigned when you create cost elements in CO whose   general ledger accounts in FI are asset reconciliation accounts            
    (special balance sheet accounts), not income statement accounts. You       
    cannot change this category in CO master data maintenance.                                                                               
    FI does not require CO account assignments to cost elements of             
    category 90. However, if you enter an account assignment, it is only       
    recorded statistically for real objects.                                                                               
    Category 90 allows you to check order or project budgets for fixed         
    asset procurement. To do so, enter the investment order or WBS element     
    in the corresponding field in the asset master. The Asset Management       
    component ensures that the order or element automatically appears in       
    the document when you access the asset procurement.                        
    The R/3 System debits the order/WBS element statistically in the           
    Controlling component, which you can then monitor with availability        
    control.                                                                   
    You can treat cost elements of category 90 as activity-independent as      
    part of cost center planning. 
    Also see note 75980  for further information.  From the note:
      The use of cost element category 90 is only provided in the standard        
      system in the following two cases:                                                                               
    1.  As of Release 3.0G, asset acquisitions and down payments which are      
          assigned directly to a fixed asset or asset under construction can      
          be assigned to an account on internal orders or WBS elements            
          statistically. In this manner, for example, an availability check       
          can be triggered on the order or the WBS element for asset posting.                                                                               
    2.  As of Release 4.0, cost elements of category 90 can also be created     
          for material stock accounts to display material make-to-order stocks    
          on sales orders or customer projects.                                   
    Regards
    Javier Reviriego

  • Cost Elements not to br created

    Hi Gurus,
    Which Cost Elements should not created againts the GL accounts apart from Assets & Laibilties' GL.
    Like WIP change A/c should not created as Cost Elements.
    regards
    Shiv.

    Hi,
    There are different kind of Cost Elements which depends upon the Cost Element Category...
    01: Primary costs / cost-reducing revenues
    This cost element category can be debited for all primary postings, for example, in Financial Accounting (FI) or in Materials Management (MM).
    Cost-reducing revenues are revenues that are to be handled in CO similarly to overhead costs, and which reduce the prices of an activity type or the costs to be assessed. This is the case, for example, with rent revenues, which reduce the room costs to be assessed. Cash discount amounts and exchange rate amounts are also cost-reducing revenues.
    03: Accrual Calculation Using the Percentage Method
    You can only use this cost element category during accrual calculation in Cost Center Accounting (component CO-OM-CCA) when you are using the percentage method. You can post directly from FI to take account of the actual costs incurred. The system also uses cost elements of this category to post the accrual amounts within Cost Center Accounting CO-OM-CCA.
    If you do take actual costs into account (say, for additional costs), create cost elements of this category in Controlling (CO) only. The account must be defined in the chart of accounts, but you do not need to create the general ledger account in FI.
    04: Accrual Calculation Using the Target=Actual Method
    Used in Cost Center Accounting (CO-OM-CCA) only for accrual calculation when you are using the target=actual method. You can post costs directly from FI to register actual costs incurred. At the same time, the system uses this category of cost element to post accrual cost amounts within Cost Center Accounting CO-OM-CCA.
    If you do take actual costs into account (say, for additional costs), create cost elements of this category in Controlling (CO) only. The account must be defined in the chart of accounts, but you do not need to create the general ledger account in FI.
    11: Revenues
    Used to post revenues. These revenues are generally posted during make-to-stock-production directly into the operating profit, or with make-to-order-production to the sales order.
    In Controlling (CO) revenues are displayed with negative +/- sign. An exception to this is Profitability Accounting  (CO-PA, costing-based), in which all values, including revenues, are displayed with a positive +/- sign.
    12: Sales Deductions
    Used to post deductible items (sales adjustments, sales corrections) such as discounts and rebates. Certain deductible items (freight charged separately in the invoice, surcharges for small quantities, special orders) are not classified as sales deductions, but as revenue elements.
    You can use this category in the same manner as revenue elements (category 11). Values on cost centers are displayed as statistical only.
    22: External Settlement
    Used to settle order costs, project costs, or cost object costs to objects outside of CO. These objects could be assets (Asset Management), materials (Materials Management), or general ledger accounts (Financial Accounting). The R/3 System creates an accounting document when the costs are settled.
    Cost elements of this category cannot be used for settlement within CO (cost centers, orders, projects, and so on). Use secondary cost element category 21 for this purpose. The system does not create an accounting document when costs are settled within CO.
    U can also create the cost element for Balance Sheet Account for below mentioned purpose
    90: Cost Elements for Balance Sheet Accounts in FI
    Automatically assigned when you create cost elements in CO whose general ledger accounts in FI are asset reconciliation accounts (special balance sheet accounts), not income statement accounts. You cannot change this category in CO master data maintenance.
    FI does not require CO account assignments to cost elements of category 90. However, if you enter an account assignment, it is only recorded statistically for true objects.
    Category 90 cost elements enable you to check the budget of an order or project when you acquire fixed assets that can be directly capitalized. To do this, enter the capital investment order or the WBS element in the corresponding field of the asset master data. Asset Management (AM) ensures that the specified order or WBS element is automatically entered in the document during the asset acquisition.
    In CO the order or WBS element is debited statistically. This statistical debiting is checked by the system using the budget during availability control.
    Hope you Understood....
    Reward Points to Help You Better
    Regards,
    Jigar

  • Two Cost Element for the same GL

    Hi,
    We have 2 Company Codes - 1000 & 2000. We are using same CoA in both the Company Codes. We have a GL, say 12345678 for posting short/excess amount. So during MIRO, the accounting entry would be:
    GR/IR a/c dr.          10,000
    GL 12345678                  2
                       Vendor            10,002
    GL 12345678 would be dr or Cr would depend on short/excess amount.
    We have created Cost Element for this GL 12345678. If I post the MIRO without attaching a Cost Center to this Cost Element system thows an error to attach the Cost Center. I have separate Cost Center for Company Codes 1000 & 2000 however I can only put one Cost Center in this Cost Element.
    Can anyone advice how can I post the above mentioned entry with different Cost Center. This line item (GL 12345678) is generated automatically and the Cost Center field is greyed out hence I don't have option to enter the Cost Center during MIRO. I checked the FSG of this GL, Cost Center field is 'Optional' over there.
    Thanks,
    Sandy

    Solution Option* -You can  assign Differant Cost Centers to Company Code 1000 and Company Code 2000 in OKB9 Transaction Code.Follow the  below process....
    --- Go to OKB9
    --- Select New Entries button
    --- Give the Company Code 1000 in first row and 2000 in 2nd row
    --- Enter the Cost element 12345678 for company code 1000 and 2000
    --- Enter the relevent cost centers  for company code 1000 and 2000
    --- Select Save
    Thanks
    Fit 4 Nothing

  • Creation of cost element or not for GBB-VAX,GBB-INV and UMB

    Dear Experts,
    I have few doubt regarding creation of cost element. Whether i will create Cost element or not.
    1) GBB-VAX - used in PGI(Vl02n)We have costing based COPA .whether we will create cost element or not.If i will create cost element then need to be bydefault in okb9 with PSG tick.
    2) GBB-INV- Used for Material taging(MI01,MI04,MI07)whether we will create cost element or not.If i will create cost element then what will be my cost object and how i will charge from my product costing.
    3) UMB- is used whenever standard price is changed. Shall i create cost element for the same
    If yes hen what will be my cost object and how i will charge from my product costing.
    Request you to help me on the same.
    regards
    RR

    1) GBB-VAX -  No, Goods Issue for sales order with no assignment object and hence without Cost Element
    2) GBB-INV- Yes to post expenditure/income from inventory differences
    3) UMB- Yes
    Regards
    KS

  • Creation of cost elements automatically

    Hi,
    When I selected "manual creation of cost elements" in OB13, Then we can create a group of cost elements in OKB2 followed by OKB3 and SM35.
    Even I need to do same thing  I when I select " automatic creation of cost elements" ??
    I tried selecting " automatic creation of cost elements".  and I checked in KA03 whether it had created any cost element automatically. but it didnt created any thing...
    Please suggest..

    Dear Santosh Dharana,
    Good Question.  i can clarify you. this question
    1. when you select in ob13 create cost elements manually
    when your are using in obk2  we have to maintain here Acc from no. to Acc to no. ranges for Gl's and cost element categeory.
    after we can run batch in put in obk3 & SM 35 it's updated successfully.
    Note: After execute, *when you are try create another GL account with cost element we have to give cost element categeory by manually.
    2.when you select in ob13 create cost elementsAutomatically
    when your are using in obk2  we have to maintain here Acc from no. to Acc to no. ranges for Gl's and cost element categeory.
    after we can run batch in put in obk3 & SM 35 it's updated successfully.
    Note: After execute, when you are try create another GL account with cost element we don't have to give any cost element categeory here  system automatically give .
    Please try it.  i worked for this one
    Thanks & Regards
    shankar

Maybe you are looking for

  • 8.1.6 install fails during linking

    OK, after about 3 hours, I'm at a loss... I'm getting a bunch of linking errors after the Installer finishes copying over the files. Specifically, it says 'Error in invoking target ntcontab.o of makefile ... 8.1.6/network/lib/ins_net_client.mk'. Note

  • Max Hard Drive Size for Airport Extreme 4th Generation (A1354)?

    I've got a 4th gen Airport Extreme (A1354) (MC340LL/A). Currently I'm using a 2TB Western Digital USB2 hard drive connected externally. I'd like to add a larger capacity hard drive so that I can back up more computers. What's the maximum HD size and

  • Mini not updating

    The iPod mini has no problem charging, but it will not update. The songs are added to iTunes but can't get on to the actual iPod. What can I do about this?

  • Origin Group

    hi,, Please tell me what is exact purpose of Origin gorup under costing 1 view  in material master and is there any relation between origin group and overhead group ?? Regrds, Samrat

  • Migration cant find my external drive

    I can USB connect my external drive that I ran time machine backups on before I repleaced the hard drive.  I've now installed Mountain Lion and I am trying to utilize migration assistant to reload apps and files but it just spins like it can't find m