Hi
Material ledger is not active. We have four FERT materials and four production orders in April 2011. Material inventory is on standard price. We want closing inventory at actual value. I have tried to change the price via MR21 but system is not allowing me to change price because cost estimate is exist.
Actual production order cost divided by actual production = actual cost per unit.
I want to use this price in MR21 to re-valuate the inventory in current month.
hope clear.
regards

Hi Imdad
Here is a workaround which I used many times
a. Create a New Costing variant, with Costing Type = Release to Prices other than Std Cost
b. The Valuation Variant settings must be as below
For Materials - Strategy J (Price as per Price Control as of Last Period)
For Activity prices - Actual Price of Previous Period
c. At month end, once you calculate Actual Activity price, you can create a Costing Run in Ck40N
The Costing date can be 01.Apr.2011, if you are running the Cost Estimate for March 2011
d. The price calculated to be stored in Plan price 2 field of the Material Master or Tax price field
You can get a comparison of original Std cost and the revised std cost.... If need be, you can pass a JV in FI for the Stock (x) Revised price - Original Std price
5. If need be, you can also revaluate the COGS in COPA using this std cost estimate

Similar Messages

  • MR21 price change for S price material

    Hi all,
    We are facing an unique problem.
    Earlier on 05May, price was updated for a S price material from A to B thru MR21 having posting date 01May. Price change document and its accounting document has got generated successful. On checking the price on 25May, price is A i.e. Old price. I listed the price change documents for the material, I was not able to find the any document after the above said date. So far the movements has happened in old price.
    Further I checked in MBEW, price is A i.e.Old price. In table MBEWH for the april period, price is B.
    New price has got updated nowhere apart from MBEWH and price change document.
    Anyone can advice, how this has happened. What is the reason
    Regards
    Suddy

    you are working with a fiscal year variant, as your fiiscal year does not match with the calendar year.
    In general the month of the posting date is equal with the period, however, using a fiscal year variant the posting date is checked against a customizing table to determine to which period the posting has to be made.
    Those variants are defined in OB29
    and they are assigned to company code in OB37.
    so check OB37 first to find which variant is assigned to your company, then use OB29 to see the definition of the variant.
    Maybe the first day of the new month is defined to fall into the old period.

  • MR21 price changes for split valuation materials

    HI
    I have changed the material price for the material whcih are maintained with split valuation ie. in MR21 i could able to change the price for valuation types only.. i'm not able to change the main material price , its asking to enter the val type?? how to change the the price ? 
    Ex . Mat code : MAT 123, having val types as IN and OV, which has price control of S, here i have changed the price for the val types IN & OV, but i'm not able to change the  price for the main material MAT123, which has price control V?? how to change it

    hi Samuel,
    We have a similar case, need your help;
    Case: Split valuation is activated but parent has price control "V" and child i.e. diff valuation types have "S". We want to make std prices of all valuation types "0". It is done but the parent still shows value in MAP.
    a. How do we make MAP of parent as "0" (price control "V")
    b. Will it impact and how e.g. MB5L
    c. Is it ok if we ignore the valuation of parent
    d. All valuation types under parent are made "0"
    Thx
    Bhushan

  • CO88-Error :Perform the planned price change for material

    Hi Experts,
    While running CO88 i get this error. "Perform the planned price change for material ". My material is manage at S and it doesn't have any marked cost. The status is FR and no other status on cost etimate for the article are active. what i shoul do? why if i run the PP order with KO88 i don't have any error?
    Please help i'm facing the closing period.

    Hi,
    If dynamic price change is active in your system the first posting in the new period of this material tries to
    - release a future cost estimate of that period OR
    - change the price to the future price in accounting view
       (if the future price date is reached)
    Unfortunately this dynamic price change does not work in order settlement. Therefore you are asked to perform the price change first by t-code CKME (or CK24).
    If you are using price determination control 3, any price change or release should always be the first transaction in a new period to avoid any inconsistencies.
    The dynamic price release will only release the price with transactions which involve material movement and this is not the case by posting invoices and order settlements.
    if you are in period 12/2009 then a settlement in 12/2009 does not require the release cost estimate of 01/2010.
    But if you are already in 01/2010 therefore settlement in 12/2009 is a posting into the previous period. This will change also data of the current period. Therefore the cost estimate has to be released first.
    Another option, if you don't want to receive this message, would be to change this message from Error to Warning (check note 434752).
    Please follow the following steps:
    T-CD:OMRM
    Message M8 394
    =>you set the message type to '-' for error message M8394, that means no message is to be issued.
    regards
    Waman

  • MR21 price change not possible

    Dear pal,
    I have a material code X with valuation type RM_IND
    In material master accounting view1- Price determination  is 3 with price control S.There is some stock of material with some value.
    I am trying to change the price in MR21.
    System prevents me from proceeding  price change for X RM_IND not possible.
    There are pending PRs and POs.
    How to go about ?
    thanks
    v balajee

    Hi
    Standard price u hv selected for ur material. This can be changed in MM02 iteself.
    Regards,
    Raman

  • Report painter/writer for actual cost component split

    Hello Gurus,
    Any of you guys ever explored possibility of creating a report using report painter or writer that can give both Standard and Actual cost component splits in one report? Is it even possible without custom ABAP involvement?
    Thanks
    RG

    Hi Raghu,
    After your reply, I am getting a doubt..
    Have you Activated Material Ledger? When you say Actual Cost Component Split, are you talking about it what you get in Actual Costing/Material Ledger?
    If yes, then you can map your cost compnents for Actual Costing in the path SPROControllingProfitability AnalysisMaster Data Valuation--Setup Valuation using Material Cost Estimate -- Define Access to Actual Costing / Material Ledger
    Further, there are no standard reports available in COPA. Try to build a report comprising two columns, 1st column with the value fields which are mapped for Standard Cost Components and 2nd column with the Value Fields which you have assined for Actual Costing under the above path.
    You will be able to get the comparison...
    Pls don't hesitate to call me for further assistance....
    Srikanth Munnaluri

  • Mass price change for inforecord

    Hi All,
    Can I do a mass price change for inforecords? We are in ECC 6.0....
    I have checked transaction MEMASSIN but there is no field for price in this txn.
    Regards,
    V S

    Yes it is Possible. But, not thru any Mass Transactions.
    You need to Perform a BDC for ME12. Go to ME12 and Select Conditions Tab and Select the Gross Price Condition and Click on remove Line and Create New Gross Condition with New Price and Per Unit.
    Hope it will Solve ur Query.

  • Incorrect exchange rate for Actual cost documents

    Dear all experts,
      I have an actual cost documents which was created on 02.10.2006,it should be taking the value date for currency exchange as 01.09.2006,but it is taking 01.
    04.2006 hence it resulting in picking wrong exchange rate.Any solution to solve it and what is the cause of this issue? Thank You

    hie, the currency is set in the table TCURR. the time rederence ? sorry,I am very new to this.the user just told me to that the currency for actual cost taken wrongly,all i managed to check is tat the value date for currency translation for tat particular actual cost document is 01.04.2006,tat's y it took the wrong exchange rate. And i guess the exchange rate is already updated in BW.

  • Permit not assigned for Actual cost

    Hi Dears,
    Permit not assigned for actual cost in maint order
    Actual cost in maintenance order is 3000
    In IPMD, cost1 is assigned with class ACTUAL COST and value 3000 is defined.
    In OIPG,  Permit class ACTUALCOST is assigned.
    Goods issue done to order for value 3000.
    Again cost determination executed, but still cost1 is not assinged to the work order.
    Am i missing anything ?
    Regards,
    Alagesan M

    Hi
    In charac CT04 i maintained one value 3000 and table maintained CSEVPERMIT and IKOSTEN
    In class CL01, assigned the charac for 049 class type
    In OIPG, permit class is maintained with class
    In IPMD, new permit created and assigned class in classification and maintained 3000
    Now order created and component assigned the planned value is 3000.
    through MIGO goods issue done and found the actual value is 3000.
    But still opened the permit found nothing assigned.
    For Estimated cost and planned costs it is working good only for actual cost permit is not assigning.
    Actual cost we need to anything more other than this ?
    Alagesan

  • Price change for materiale mr21

    Hi all..
    I have the following situation.
    I want to chage the price of a material let's say today..
    Today I have in stock 10000 pcs for 10 USD so the value is 100000.
    If I change the value per material to 15 USD the total value of stock is 150000.
    In this case sap is reaevaluating the stock with the new standard price...
    For me it shouold work like this.:
    stock value is 100000 for 10 usd.
    1 pcs of material in for 15 usd....
    so the value of stock would be 100015.
    Is there a flag somewhere for this... ??
    Thanks.

    Hi Andrew,
    a standard price material always have a uniform price, therefore a price change will revalue the complete stock.
    If you changed the price control to V the behaviour would be as you desire. Only you should not use MR21. When you enter a goods receipt at a price of 15 the new stock value would reflect thr former quantities at the old price plus the new quantity valued at 15.
    best regards,
    Udo

  • MR21 price change

    Dear Gurus,
    MR21 in close or open period - Is it necessary that price change should be done in current period only which should remain as it is for coming months too..??
    Please help me out
    Naren

    Hi,
    If you do not maintain a planned price or future price , in the accounting view , the price updated in MR21 will remain same for the next period too.If you maintain a planned price , you need to run a costing run for the same.
    Regards,

  • MR21 Price Changes

    Hi Gurus,
    What will be the impact in subsequent peiods by  opening a closed material period and doing MR21.
    Thanks in advance.

    Hi,
    When you open the closed period and you do MR21. You will make new journal posting that it has been generated from price change document onto previous period, which you've closed earlier.
    For an example the journal will be posted as shown below usually:
    #DR/CR Inventory Account
    ###CR/DR   Gain/Loss Adjustment Account
    This condition is not recommended according the General Accounting practices.. So you should consult to your finance user or client.
    Cheers,
    Girang
    Edited by: girang irawan on Dec 10, 2009 10:17 PM

  • Price change for a material

    Hi Experts,
    Need ur help urgently,
    i have made a PO taking a material with std. price say 1 rs. but before doing GRN i changed the price to 4 rs. Now, when iam
    doing GRN , system post the document taking the old price (1rs.) of the material.
    I want that system should calculate the cost with the new price defined for the material ( 4rs.)
    In Accounting 1 tab of the material display MM03 :
    price control for valuation data for prevoius period is S
    and, price control for valuation data for prevoius year is also S
    Need ur assistance as I am new to MM
    Thanks.
    Dhruv

    Hi Experts,
    Need ur help urgently,
    i have made a PO taking a material with std. price say 1 rs. but before doing GRN i changed the price to 4 rs. Now, when iam
    doing GRN , system post the document taking the old price (1rs.) of the material.
    I want that system should calculate the cost with the new price defined for the material ( 4rs.)
    In Accounting 1 tab of the material display MM03 :
    price control for valuation data for prevoius period is S
    and, price control for valuation data for prevoius year is also S
    Need ur assistance as I am new to MM
    Hi,
    Dhruv,
    Whenever you create purchase order price is suggested from info records (if valid conditions are maintained) , if not from your last purchase order. If info record doesnt exists you have enter the prive manually in the item overview of purchase order. The price mechanism whether Moving average or standard is used basically for valuation purposes only. They are never suggested in purchase order.
    If you have updated your material master record with standard price and has changed it. Then it should be valuated at new standard price during good receipt
    It is always with standard price valuation that good receipt is always valuated at standard price and not purchase order price.
    Kindly check your material master record details.
    Also which transaction you have used for changing the standard price in material master record.Use MM02 Tcode and change the standard price as you like.
    I hope this is useful
    Regards,
    Tushar Patankar

  • Report for actual cost of WBS, Profit center wise

    Hi Experts,
    Do we have any standard report that gives the actual cost of WBS/Project with Profit center wise.
    Thanks,
    Krishna

    Hi,
    Thanks for your solutions.
    But I m looking for the Profit center in the report (display screen), not in selection screen.
    My scenario is like, the cost was posted to WBSE with X profit center/cost center in January, now I changed the profit center to Y for the same WBSE and posted.
    Want to see thru which PC I have posted to WBSE and how much. So that I can reversal.
    Thanks again.
    Krishna.
    Edited by: krishna.gujju on Jul 8, 2011 6:56 PM

  • COPA Costing key for actual cost component split

    Hi,
    I would like to allow the users to specify different period/year in the following screen every month when they do the COPA revaluation. However i noticed this screen is part of customization and cannot be changed by the users without a transport. As such how can we allow the users to change the period/year by themselves every month?

    Hi Sanjay Ram,
    Whatever the marked one i.e. period/year is used especially when you want to consider the PUP or actual cost the material for that specific period only. As you know it can not be changed in every period.
    So, for that purpose only we have the above one i.e. period a/c to line item, by this system is going to pick the PUP or actual cost of the specific period for which the line item has taken place (the line item that may be billing or settlement)
    Regards..
    Jose

Maybe you are looking for

  • Hard Drives Constantly Failing

    I just received a new hard drive Monday through an AASP in Puebla, Mexico, due to a hard drive failure within two months of purchasing my laptop. Sadly, I'm now reinstalling OSX due to what appears to be a very similiar hard drive failure. Luckily, m

  • Import mailboxes

    Yosemite 10.10.1(14B25) Mail 8.1(1993) Previous OS was 10.8.5. I'm trying to import my Mailboxes stored in timemachine backup. Open Mail Browse TimeMachine disk to /Latest/HD/Users/me/Library/Mail/V2/Mailboxes Tried to import them all in one go first

  • Re: 2010 Mac Pro + Yosemite + Radeon 7950

    Just been told by Apple Technical Guy (19 December 14) that my ATi Radeon HD 5770 graphics card (bought from Apple!) is no longer supported in Yosemite!!  I can try replacing with an ATi HD 2600XT, return to Mavericks or put up with the inconvenience

  • HTML Map tag zoom problem.

    Hi, We have discovered a problem with our webpage that only occurs on safari. We have an image with an image where we use an <map><area> tags to indicate click-able hot spots on the image. When you change the zoom level in the browser, increasing or

  • Nokia 3600 slide Alarm Tone

    I really like the default 'standard' alarm tone, and would like to use it as a ringtone (the tone that is used when you select "Standard" instead of "Radio" or "Open Gallery" or "Tone Downloads" in the alarm menu).  I cannot find that melody in the t