MS PPM 2013. May I hide the Gantt chart in Project Center

Hi:
I know that in previous versions of Project Server you can't hide de Gantt Chart, but in Project 2013?
Thanks
Pablo

In all honesty I don't think that is likely to happen.  May I ask why you want to remove it?  As an alternative, you could set all of the bar colours to white, and that will in effect display nothing.  
Ben Howard [MVP] | web |
blog | book

Similar Messages

  • Project Owner not allowed to see Gantt charts in Project Server 2013

    Hi
    A user of Project Server 2013 is unable to see the Gantt chart of his own project. It says in red letters (translated): "You are now allowed to access this page".
    I cannot see any difference between this users account and rights and I have tried as a test user to create a project, but I am unable to reproduce this error.
    Any suggestions?
    Regards
    Jakob

    Hi,
    One of the things I would suggest is to to Inactive the user and save and then Re-active the user and save in order to re-apply user permissions.
    I am assuming the user has the correct permissions etc.
    Hope this helps
    Paul

  • How to make the Level of Effort task visible in the Gantt Chart?

    Hi,
    I am facing an issue when trying to add a level of effort task. The bar of the task is simply not visible in the Gantt Chart.
    I take the following steps:
    - Add new task
    - Link task to predecessor milestone and successor milestone
    - Change task from activiy type to level of effort
    I can see the task being added in the Gantt Chart, the name of the task is visible, the duration of the task is calculated, but I do not see the green bar..
    What could be the problem? Can anybody help me with this issue? Thanks!

    Go to View .. Bars... and enable the bar for Level of Effort activities. If it's not there, create one.

  • Printing the Gantt Chart

    Hi,
    Does anyone know how I can select some Legends and print them within the Gantt Chart, preferrably at the bottom.  I stumbled unto the minutes of meeting of the "Project System Special Interest Group(PS-SIG)", in which this issue was raised to SAP in 2003, I could not find any other information on whether or not it was resolved.  Does the PS-SIG still exist and how can I contact the moderator?
    Best Regards,
    Oge Aniagboso

    Check your page set up options when you do print preview. The last tab has some toggles where you can turn on/off printing the activity table and Gantt Chart.

  • Printing only the Gantt Chart

    Is there a way to print only the Gantt Chart?
    Mike
    R-Investments

    Check your page set up options when you do print preview. The last tab has some toggles where you can turn on/off printing the activity table and Gantt Chart.

  • Gantt Chart in Project Status Report

    Hi Folks,
    We are doing a custom development and creating our own Project Status Report PDF form. Is there a way (standard FM or otherwise) to generate a Gantt chart and show it on the PDF form.
    The Gantt chart itself is not of the whole project structure. It is only the phases. Most projects will have 4-5 phases maximum. The Gantt chart also does not need to be too sophisticated, we just need a high level graphical representation of the phase timelines.
    Let me know if my question is not clear and I can elaborate.
    Thanks
    Lashan

    Hello Lashan,
    Building the Gantt chart in a PDF report is quite tricky. The Gantt chart view you see in cProjects is a different SAP component, JGantt (developed in Java), which is connected to the system.
    Adobe forms don't have a standard Gantt element, so you'll have to render it somewhere else and send it to the form in a binary format.
    For creating and rendering the graphic you can use the SAP IGS (Internet Graphics Service).
    You can find some details here: http://help.sap.com/saphelp_nw04s/helpdata/en/17/86c039c7811f11e10000000a114084/content.htm
    This is a little bit more complicated, you also need to use iXML libraries to transform all the Gantt data into the IGS required format.
    The end result will not really look like the Gantt view, but it will contain all necessary information:
    Is this the kind of graphic you need to develop?
    Cheers,
    Tudor

  • Sender Cost Center may not be the same as Receiver Cost Center

    Hello every body
    I am trying to create a report that shows the hours that an employee has spend on an activity in a project.
    Key Figure:
    Hours
    Characteristics:
    Sender Cost Center (Employees Cost Center)
    Receiver Cost Center
    Activity code
    What happens is that in some cases the Sender- and Receiver Cost Center do have the same value (are the same) in a row. The task in front of me is to exclude these rows from the query result.
    One way to resolve the problem is to make a variable for each object; use replacement path and bring the values of their key into query as keyFigures; subtract one from the other, and use a condition that only allows values different from 0.
    The problem is that the key value of the Cost Centers are not always numeric values (e.g. M10110). These values can not be a part of a subtraction.
    I can resolve this issue by deleting the data in the cube and make a key Figure in update rules with values 0 (sdr. and rec. have different keys) and 1 (sdr. and rec. have same keys).
    Does any one knows of a way to accomplish the result I need in BEx, so I can avoid deleting every thing in the cube?
    Best regards
    /FZA
    Message was edited by: Fariborz Zangoui

    Hello Roberto
    Thank you very much for your help.
    Some times it is difficult to search the forum if you do not know what you are looking for (in this case 'virtual key figure').
    Best regards
    /FZA

  • Help with a Gantt chart view (Project Tasks) - Tasks and chart misaligned vertically

    I have created a Gantt chart for a task list and on some computers (all on I.E. 9), the chart is misaligned with the table on the left.  The "row height" of the bars on the chart is less than the height of the rows in the table, so about 10-15
    tasks down the lists things become very misaligned, and by the bottom of the page, the table goes 2-3 complete rows past the bottom of the chart.  How can I correct this?
    On a similar note, is there a way to color code the bars or anything to make it easier to associate them with a task/assigned to/etc?

    This is a rendering error on IE, try changing your zoom level on the browser.

  • CProjects - How to show purchase order dates in the Gantt chart

    We link several types of procurement objects like a purchase order or a production order
    out of our ERP system to several cProjects tasks.
    As described in the SAP help we specify the date type in the user settings, e.g. to
    Basic Dates.
    With the production order everything is ok, a separate bar appears.
    But the bar for the purchase order is missing.
    Is it possible to choose a date type, which shows the scheduled dates for purchases
    and production orders both? Which one?
    Kind regards, Mafi

    HI,
    Did you mean that your issue was on PO's creator on the top on the Po screen ?
    If yes, I think that some issue existed in your system. In the standard system, the system will show full name of PO's creator if the SAP account is available on SAP system ( existed on check SU01 tcode). Otherelse, system will show the SAP account ID on the Po screen if SAP account was deleted.
    Hope this usefull for you.
    Otherelse, Please specify ur problem  more clearly?
    regards,
    Alex Vo.

  • [SOLVED]The Gantt Chart Component Demo/viewlet not working

    Hi,
    I've tried to watch the demo but I got an error message, it seems the swf file is not on the server.
    Thanks,
    Seb.

    We are working to resolve the issue. It should be available Monday afternoon.
    --Ric                                                                                                                                                                           

  • Gantt chart- How to change the color of time bars of different versions

    Hi All,
    My Client wants to see all changes in planning schedule. I made different versions of these changes but he also want to see all these changes in gantt chart and in different colors. I tried to change the color in planning board assistant but in this screen (CJ27/ CJ2B). we cannot view all versions together. And if I use CN41, there I cannot change the colors of time bars.
    Secondly, we can change colors of times bars of basic dates, forecast dates and actual dates but there is no provision to change the colors of schedule bars of different project versions. Kindly reply-
    1. How to see all project versions in CJ27 or How to customise bar chart in cn41 or if we change in SPRO, then how to change graphic profile in project info profile
    2. How to change colors of different time bars of different versions.
    3. How to mention these legends (meaning of each color in chart) at footer of gantt chart (in print outs)
    Please Help.
    Thanks & Regards
    Dinesh Chauhan

    Thanks,
    actually I've created new project planning board profile where planning board assistant is customized but unable to use this profile in CN41. we can change PS info profile in CN41 and that;s why I thought that planning board profile may be assigned somewhere in PS info profile so that changes in planning board assistant will be applied in CN41 through PS info profile. Graphic profile is too complex to understand and not sure if it will help to get colored time bars of projct versions in gantt chart. Still not clear.
    Secondly not able to see all versions (snap shots) in gantt chart with different colors of time bars.
    I mean planning board screen can be customized but we cannt see different versions here which are possible in CN41, but we cannt customize the gantt chart (time bars) in CN41. Pls help.
    Thx & Regards
    Dinesh Chauhan

  • Hide progress on Gantt chart

    Hi
    I've produced a gantt chart based the following query
    Select Null Link,
              Task_Name,
              Task_Id,
              Parent_id,
              actual_start,
              actual_end,
              null progress,
              planned_start,
              Planned_End
    From   query_table
    It all looks good, except that I don't want to display progress since we don't actually hold this value. I've tried setting it to null, as above, but it displays on the chart as 0%. Is there any way of removing this value from display on each task on the chart?
    Thanks

    Hi,
    You'll need to customise the XML to achieve this behaviour.  On the Chart Attributes page, set "Use Custom XML" to Yes, and in the XML remove all references to:
    Complete: {%Complete}%
    Doing so will remove references to the progress bar from the tooltips used on the Gantt chart.  Next you'll need to update the <task_styles> tag to include some label information for the <actual> bar.  It looks like the Complete label is the default label associated with a Project Gantt, although I haven't found anything in the online documentation stating this.  I'll follow up with AnyChart on this.  In the meantime, I would recommend reviewing their online User's Guide, specifically Labels in Tasks, where you'll find information on the possible labels you can define for the bars in the timeline region of the chart.  If you leave the <text> tags empty, or simply don't include them, it looks like the bar displays without any label, which may be the behaviour you're trying to achieve.  Here's the XML you can add to your chart:
             <actual>
                <bar_style>
                  <labels>
                   <label anchor="Right" valign="Center" halign="Far">
                     <text></text>
                     <font face="Verdana" size="10" bold="true" color="White">
                     </font>
                   </label>
                  </labels>
    ...where the tags in grey above already exist in the chart XML, so should not be copied.  I hope this helps.
    Regards,
    Hilary

  • Project 2013 - Gantt Chart Printing/PDF issues

    Hello,
    I will try and explain this strange issue best I can - I am having some issues with creating a PDF from Gantt Chart view. The main problem here is when printing to PDF it seems to modify my Gantt at will as soon as i hit print preview. When I return to the
    Gantt I created it is very much the same as before; here are the issues:
    When Linking tasks or summary tasks (marked as milestones) to the other summary tasks (also marked as milestones) with an FS task dependency: The Gantt in Project displays an arrow linking the finish of the predecessor to the start of the linked summary
    task as would make sense. Once I hit print preview this arrow is now moved to point from the finish of the predecessor to the milestone located at the end of the linked summary task. A simple work around has been to not mark the linked summary task as a milestone
    (the predecessor can be, this doesn't seemmatter); the print preview then matches the Gantt I created.
    When hitting print preview the task list stays in tact but the Gantt Chart displays very unusual colors (Deadline arrows become vibrant green), components of the legend become invisible, and task bars become invisible as well. The problem is very sporadic
    and comes and goes as it pleases. 
    Any thoughts?
    Regards,
    Chris

    Gentlemen,
    I am working with Project 2013 - I have the latest service pack installed.
    I found another way to accomplish what i needed/wanted with the milestone - that is not my main issue here.
    I have seen other forum posts with the same issue regarding Phantom Gantt bars and strange colour issues when creating a PDF. I can send you screen shots if you'd like of the results. The problem comes and goes and nobody seems to have any solution for it.
    I just need my print preview to match what I have created in the project, and then for my PDF to match the print preview.
    Regards,
    Chris

  • Publication of the big-sized Enterprise projects from Project Professional 2013 to Project Server 2013 takes about 60+ minutes.

    Dear Sirs,
    I need your support over the following MS EPM 2013 issue:
    Publication of the big-sized Enterprise projects from Project Professional 2013 to Project Server 2013 takes about 30+ minutes. We
    need to reduce this total publication time down to acceptable working values 10+- minutes.
    Environment information:
    Single App Server (Virtual): 16 Gb RAM, x64 4xCPU, HDD > 50 GB free disk space, OS Windows Server 2012 Standard Edition x64 Service
    Pack 1, MS SharePoint Server 2013 and MS Project Server 2013 with CU December 2013 (KB 2850024) applied.
    Single RDBMS MS SQL Server (Virtual): 8 Gb RAM, x64 4xCPU, HDD > 200 GB free space, OS Windows Server 2012 Standard Edition x64 Service
    Pack 1, MS SQL Server 2012 x64 SP 1 Enterprise Edition.
    We have 1Gbit LAN between APP, DB server and 1Gbit LAN between APP and Proj Prof Client.
    Yes, we are on the way of migrating to the Prod environment
    with 3-tiered architecture (with SP1 slipstream and CU December 2014 applied), but this issue also
    presents there.
    Project’s file information:
    Tasks in the file: [~4900], resources in the file [~396] enterprise task’s custom fields used in the file [~23].
    Project save procedure for this new project would last about 7 minutes. Project publication would last about 47 minutes. We noticed that
    tasks synchronization process took about 1 second for each ~2,5 tasks, to add them to the sharepoint tasks list. So for all 5148 tasks it took about 5148/3/60 =  34 minutes. Other 13 min was used for reporting database publication and other tasks relevant
    for new sharepoint site creation.
    Case 1: Issue description:
    During the Enterprise project’s file save and publication we have the following sharepoint 2013 log messages:
    07.31.2014 12:43:17.22 Microsoft.Office.Project.Server (0x0358) 0x3D5C SharePoint Foundation Monitoring b4ly High Leaving Monitored Scope
    (Persisting list changes). performing time =376.068676326181 22dca99c-4696-70f1-e9e2-06851d0bcffd
    07.31.2014 12:43:17.69 Microsoft.Office.Project.Server (0x0358) 0x3D5C SharePoint Foundation Monitoring b4ly High Leaving Monitored Scope
    (Persisting list changes). performing time =361.652807828928 22dca99c-4696-70f1-e9e2-06851d0bcffd
    It shows that sharepoint spend at least ~350 milliseconds (or 0,35 sec*4900 tasks = 1715 sec, or 28,5 min) for each task update during
    project publication. And we also have another log file that shows that about 0,7 sec (or 0,7 sec*4900 tasks = 3430 sec, or 57 min) sharepoint spend for save each task in project file to project server. So total save and publication time more then 60+ minutes
    for that project file. The same result we have even if user didn’t do any changes at the project file.
    We use only enterprise projects (dbo.MSP_EpmProject_UserView.projectvisibilitymode = «False»), and do not use sharepoint tasks lists,
    but the synchronization between MSP Plan and SharePoint tasks list works at any case.
    Case 2: Issue description:
    - For the second test we created a new project with new sharepoint project’s site on basis of our «issue» project, with total amount
    of tasks in it of 5148 (yes, we increased the tasks list default limit at the sharepoint site up to 6000 items in it – standard limits for sharepoint view list – 5000 items).
    - Project save procedure for this new project would last about 7 minutes. Project publication would last about 47 minutes. We noticed
    that tasks synchronization process took about 1 second for each ~2,5 tasks, to add them to the sharepoint tasks list. So for all 5148 tasks it took about 5148/3/60 =  34 minutes. Other 13 min was used for reporting database publication and other tasks
    relevant for new sharepoint site creation.
    -Then we deleted the
    tasks list for that new test project from the sharepoint site and republish the project plan one more time. This time project save procedure took about 7 minutes, project publication about 2 minutes and 3 minutes for other relevant queue jobs. So total time
    is 12 minutes.
    As a conclusion: yes, we have determined
    the exact problem - during synchronization process (from Project Server to SharePoint) it perform copying all tasks and related data from Project to SharePoint in spite of fact that you changed only ONE task or ALL of them. At any case, synchronization will
    copy ALL of them from Project Server to SharePOint task’s list.
    Our workaround is to disable the task’s synchronization for such big-sized project plans:
    – to delete the SharePoint «tasks» list at the SharePoint site tied with project plan.
    - or deattach the SharePoint site from the project plan.
    Thank you for reading this topic, please if you also forced with such issue provide us any known workaround or maybe any official response
    \ feedback from MS about it.
    Thank you in advance,
    Best Regards, Andrey

    Regarding my topic, I also said that every time when sync works it updates All items from project’s plan at Project Server to corresponded task’s list at SharePOint server. Inspire of the fact that you changed only One task or group /
    all of them at your project’s plan.
    And it seems to me and my colleagues that it’s probably (maybe) a “bug” at the product. Here is what we have if looked a little bit closer to the code:
    Share Point determines what task to sync from Project’s plan to sharepoint list. To do that sharepoint needs to know was that task changed or not, based on the following fileds (check SQL stored procedure “[MSP_READ_TASKS_FOR_SYNCRONIZATION]”):
    TASK_UID    TASK_NAME    TASK_START_DATE    TASK_FINISH_DATE    TASK_PCT_COMP    TASK_PARENT_UID    TASK_OUTLINE_NUM   
    WSS_LISTITEM_UID   TASK_ID    TASK_IS_ACTIVE
    We noticed that at any case synchronization performs for all tasks, EXCEPT the ROOT one. Then we looked at the comparison of TASK_PARENT_UID field. So sharepoint compares TASK_PARENT_UID with ParentID (this is internal name for lookup
    field “Tasks” at the Sharepoint, and it stores their values at the format "ID;#Title").
    And comparison performs like following:
    SharePoint looks for Task at the Tasks’s list corresponded to Project’s plan with ID represented at the TASK_PARENT_UID field. Then it takes SharePoint ListItem ID (“int” type) and store it to the “num” parameter;
    num = this.GetCachedListItemByUniqueId(listItem.ParentList, nullable.Value).ID;
       2.Then it compares “num” with task’s “ParentID” at SharePOint as follow with operator “!=”:
    ((SPItem) listItem)["ParentID"] != (System.ValueType) num
       3. If comparison was success (true) – then it tell us that values (at the Project’s plan for tasks) was changed, then it need to be synchronized. Corresponded Method setup “true” flag, and then returns it.
    The “bug” is that this expression at the Step 2 will always return “true”, because in fact it compares “string” (see above – that this is lookup field at SharePoint side)
    with “number”. For example if the parant task ID is “55”, then we get:
    "55;#Task 1" != 55
    And by the rules of .Net the “string” will never equal “number”
    Furthermore this is approved by the SharePoint logs:
    In that case we always get the note “Setting ParentID to” at the logs (we see it if turns on Verbose for “Project Server” -> “Sharepoint Integration” category).
    So at any case of publishing project’s plan we always get that note at the logs for tasks that have Parent task, and we have Parent for all of them EXCEPT the ROOT one, exact logs represented further:
    10/15/2014 02:37:32.26    Microsoft.Office.Project.Server (0x07D8)    0x06E8    Project Server    Sharepoint Integration    ado0d   
    Verbose    Setting ParentID to 1    bf2fc29c-7727-b00d-fa4a-34f22ea9ec1d 10/15/2014 02:37:32.62    Microsoft.Office.Project.Server (0x07D8)    0x06E8   
    Project Server    Sharepoint Integration    ado0d    Verbose   
    Setting ParentID to 1    bf2fc29c-7727-b00d-fa4a-34f22ea9ec1d 10/15/2014 02:37:32.63    Microsoft.Office.Project.Server (0x07D8)    0x06E8    Project Server   
    Sharepoint Integration    ado0d    Verbose   
    Setting ParentID to 1    bf2fc29c-7727-b00d-fa4a-34f22ea9ec1d 10/15/2014 02:37:32.67    Microsoft.Office.Project.Server (0x07D8)    0x06E8    Project Server   
    Sharepoint Integration    ado0d    Verbose   
    Setting ParentID to 1    bf2fc29c-7727-b00d-fa4a-34f22ea9ec1d 10/15/2014 02:37:32.69    Microsoft.Office.Project.Server (0x07D8)    0x06E8    Project Server   
    Sharepoint Integration    ado0d    Verbose   
    Setting ParentID to 5    bf2fc29c-7727-b00d-fa4a-34f22ea9ec1d
    The following is the complete Method’s code from the corresponded reflector:
    private bool UpdateParentID(DataSet taskDS, DataRow row, SPListItem listItem, Dictionary<Guid, SPListItem> redoEntries)
    bool flag = false;
    int index = taskDS.Tables[0].DefaultView.Find((object) DataRowExtensions.Field<Guid>(row, "TASK_PARENT_UID"));
    if (index >= 0)
    Guid? nullable = DataRowExtensions.Field<Guid?>(taskDS.Tables[0].DefaultView[index].Row, "WSS_LISTITEM_UID");
    int num = -1;
    if (listItem.Fields.ContainsField("ParentID"))
    if (nullable.HasValue)
    try
    // STEP 1
    num = this.GetCachedListItemByUniqueId(listItem.ParentList, nullable.Value).ID;
    catch (ArgumentException ex)
    if (redoEntries != null)
    if (!redoEntries.ContainsKey(DataRowExtensions.Field<Guid>(row, "TASK_UID")))
    redoEntries.Add(DataRowExtensions.Field<Guid>(row, "TASK_UID"), listItem);
    //STEP 2
    if (num != -1 && ((SPItem) listItem)["ParentID"] != (System.ValueType) num)
    ((SPItem) listItem)["ParentID"] = (object) num;
    ULS.SendTraceTag(845443U, (ULSCatBase) ULSCat.msoulscat_PS_ProjectSharepointIntegration, ULSTraceLevel.Verbose, "Setting ParentID to {0}", new object[1]
    ((SPItem) listItem)["ParentID"]
    //STEP 3
    flag = true;
    else if (((SPItem) listItem)["ParentID"] != null)
    ((SPItem) listItem)["ParentID"] = (object) null;
    ULS.SendTraceTag(2495056U, (ULSCatBase) ULSCat.msoulscat_PS_ProjectSharepointIntegration, ULSTraceLevel.Verbose, "Resetting ParentID to null");
    flag = true;
    return flag;
    Any thoughts about it would be much appreciated!

  • Traffic light in Gantt chart and Colour change in the same.

    Dear All,
    I have designed an interactive ALV report and put a button in the output to display Gantt Chart. The Gantt chart is displaying fine after pressing the button based on the output.
    I have two questions as below.
    1) Is it possible to diplay Traffic light in Gantt chart output from an interactive report. Please provide the code as well as process.
    2) How to change the colour of the fields like date or time field of the Gantt chart output from an interactive report. Please provide the code as well as process.
    Shyamal.
    ABAP.

    Hi friend,
    For displaying trafic lights there is a simple options in the layout
    under exceptions there are few fields,
    lights_fieldname type slis_fieldname,
    lights_tabname type slis_tabname,
    lights_rollname like dfies-rollname,
    lights_condense(1) type c.
    First two fields will server the purpose if you need extra manipulation can go for other two also.
    And for changing color in the fields there is an option called emphasize(4) in fieldcatlog which will do your purpose.
    I think you know your requirement and code better so its better to adapt this in your logic the using our logic which will make you confuse.
    if you want to highlight a particular cell in the ALV go for this codes in Wiki.
    If you still need any help please revert back to me i will help you.
    Thanks,
    Sri Hari

Maybe you are looking for

  • How to Correctly update Macbook Pro's video chip drivers

    I am currently using Boot Camp with Windows 7 64 Bit on my MBP Early 2011. My question is how can you successfully update the video chip drivers when using windows 7? When I try to install drivers the AMD updater can not recognize my video card. But

  • Issue : drag and drop from list control to tree control

    Hi, I was trying a drag and drop from list control to tree control. I have used some sample data to populate list and tree controls . It is working fine . except one problem .. Prob : when i drag an item to tree control .. it gets added .. now tree c

  • Re: iBot issue

    Hi Srini, can you please provide the path of NQClusterConfig.INI file in 11g . Regards, fiaz

  • I want recover in ABAP program a "Long Text"

    Hi,  In FB01 transaction when you go to "Enter Fixed Asset posting: Correct G/L account item", there are a button with a label: "Long Text". When you push this button appear a little window with name "Long Text for Document Line Item" and you can wri

  • Ess page problem

    Hi All, I have got one requirement where i have to copy one iview(Create Education Document) from ESS Business Package.When i am trying to see the iview preview the webpage will open and it is showing following error Error when processing your reques