Multiple planning periods on a day

Hi All,
I am using periodic lot sizing where in I am getting deliveries from vendor for number of times on a day to cover multiple requirements on a day. I have defined planning calendar where in at this moment I am able to maintain maximum three periods on a day. But vendor delivers almost 10 times a day. So I want to define upto 10 periods on single day. Do we have any BAdi or user exit to make it possible?
Please let me know If you need more information about requirement.
Thanks,
Shirish

Hi,
Can you check whether Time Phased Planning in R3 suits your needs.Here you define Planning cycle along with delivery cycle.
Thanks,
nandha

Similar Messages

  • Hyperion Planning : Period Dimension in Days

    I need to realize a period dimension in days! Moreover i need to have an organization in week whic include the existence of week day (Sunday, Monday..) to make a comparison beetween all Sunday in differnet Year.
    Is it possible to have a native calendar function in Hyperion Planning, or Does exist another way to solve this problem?
    Thanks

    Best practice would be to use Period dimension down to weeks then create a 'Days' dimension which holds the weekdays, this will help your blocksize too and will allow the reporting requirements you have mentioned.

  • SOP planning periods

    We are planning products in SOP where the planning period is a generated period (weeks and months). Planning will be done first in period weeks and then in months i.e., the requirements will be entered for first 4 periods as weeks and then for next 2 periods as months.
    Example
    Planning
    Period           Requirements
    Week 1     100
    Week 2     250
    Week 3     300
    Week 4     400     
    Month 1     1500
    Month 2     2000
    Now we redesigned our planning period pattern as days, weeks and months.
    i.e., Week 1 and Week 2 as days then weeks and months as above.
    Example
    Day 1
    Day 2
    Day 15
    Week 1
    Week 2
    Month 1
    Month 2
    In Set parameters for info structures and key figures if we define the planning periodicity as T (Day), W (Week), M (Month) and generate the period, the system is giving an information message
    No technical period generated for period unit 'day'
    Message no. MA866
    And the period is automatically changed to day.
    Period unit 'day' is used as planning period unit
    Message no. MA859
    There is NO PERIOD GENERATION in the info structure?
    Is it possible to generate the period pattern as Days, weeks and months ? How ?
    Thanks
    Soundar

    Dear rajesha
    The fiscal year variant will be generated when you save the set parameters for info structure.
    In this case the the planning period is chaged to days and no fiscal year variat is generated.
    Thanks
    Soundar

  • Multiple planned orders for a requirement

    Hi,
           We have PPDS MRP with NEW shelflife w/ lot size profle run for product and produces multiple planned orders for the the requirements.
    I have a requirement of 4,750 and 14,976 in the system and available stock 86,966.
    The system creates two planned orders with 34,632 and 26,771 PCs.
    Why is the system creating two order instead of one??
    The min. lot size is 1876 and rounding is 936.
    can somebody tell me what factors the system is considering??
    Thanks.

    Hi Visu,
    Which lot size procedure you are using , please check in lot size tab in Product master, it should be lot for lot.
    if it is lot for lot , please change it to by period and weekly , is it change the planned order quantity ?
    Manish

  • Restricting of Fiscal year period for Four days

    HI Experts can you pls suggetst
    we are providing a layout for  an enduser for a particular period through web interface, so that he
    can enter the plan data for that period, the issue is like we have a period of 15 days the end user
    has to input the plan data for that period, the planning layout should enable for 5 days only,  latter
    if he want to input the plan data it should not edit or cannot input,  how can i go head with this.

    Hi.
    I suggest you to think about the next approach:
    1. Create variable A (based on IO period) for determining a period (lets say it's input variable with range - this range will be 15 days)
    2. Create layout in BPS0 when data columns are dynamic for period that has this variable A (in manual input click on "additional settings->in "data columns"->"dynamic for" select period)
    3. Create another variable B (I guess it should be user exit variable that gets values from variable A and decides which values will be locked)
    4. Create data slice and restrict it with variable B.
    This way you will see in layout 15 days in period, but only some of days, depends on variable B, will be opened for input.
    Regards.

  • Planning Period , Planning Horizon terminology in MRP

    Dear Sir,
    While going thru the MRP related literature on SAP Help , I  have not been able to understand the meaning , purpose and usage for the following terminology :
    Planning Period
    Planning Horizon
    I request SAP experts to kindly help me to understand these terminologies and if possible pl give the example under the scenario of Make-To-Stock and Make-To-Order both please .
    With Thanks and Rgds
    Sonia

    Hi,
    Planning period facilitates you to put your demands as per your process e.g. day, week or month level.
    e.g.
    In demand mgmt you can put demands as given below by selecting planning period as per your requirements.
    option 1. day level-----
    day -               05.12.2009      06.12.2009       07.12.2009   08.12.2009
    quantity           1000                1300                  0                   800
    option 2. month level------               
    month                         12.09         01.10       
    quantity                      10000        12000
    Likewise for other planning periods.
    Regards,
    Yogesh

  • Combining multiple planned orders into single purchase requisition

    Hi Gurus,
    could anyone please tell me how to convert multiple planned orders generated during MRP run into a single purchase requisition? Also, is there any other way of getting single purchase requisition fcreated after MRP run for a procured item which is part of multiple BOMs?
    Thanks and regards,
    Abhik

    Hi,
    Conversion of Multiple planned order to single Purchase requisition is not possible.
    But you can have a single Pur.Req for Multiple requirements.
    You can do this by:
    1. Individual/collective indicator "2" collective requirements for the Header Material so that you will get your dependent requirements clubbed together.
    2. Period Lot sizing : Daily/weekly/monthly Lot size so that system will club the entire period requirements and propose a single lot.
    3. for low value materials you can have Reorder Point planning also.
    Hope this helps..
    Regards,
    Siva

  • T-code to close multiple posting periods in mm

    Is there is any t-code to close multiple posting periods in mm?
    Regards,
    Surendra babu.

    Dear Surendra,
    Open & Close Posting Periods
    FI posting periods:
    IMG->Financial Accounting->Financial Accouting Global Settings->Document->Posting Periods->Open and close posting periods.
    OB52
    MM posting periods:
    Logistics->Materials management->Material master->Other->Close period
    MMPV (to open current period)
    Logistics->Materials management->Material master->Other->Post to prev.period
    MMRV (shows what is open)
    Also check OB52 for type M
    Reward Me If Helpful

  • "Error determining planning periods for calendar "  when running a program

    Hi,
    When i am running a program with date range say "01/05/2011" to "30/06/2011",the program is executing successfully without any error. When i am executing the same program with date range as a) "01/05/2009" to "30/06/2011" and b)"01/05/2008" to "30/06/2011" the program is failing with error as "Error determining planning periods for calendar". Can anyone suggest me what i should do to avoid the failure of the program with above date ranges also.
    Thanks in advance,

    Dear,
    Error message 61123:"Error determining planning periods for calendar &".The PPC planning calendar specified in the material master MRP 2 view for the material is  incorrectly.
    The planning calendar periods are insufficiently maintained for the planning calendar used.
    Check the period of planning calendar in MD26 and generate the correct period.You can avoid the problem in several ways:
    Maintain the planning calendar far enough in the future (at least until beyond  the end of the planning horizon).
    Also check any demand is lies beyond the validity period of planning calendar.
    Reduction of the planning horizon of MRP also can control such issue, as MRP planning horizon lies in an area in which the planning calendar is no longer maintained
    Regards,
    R.Brahmankar

  • Value of planned delivery time in days not updating

    Hello Experts,
    i have created a material using BAPI_MATERIAL_SAVEDATA.
    IN Mrp2 VIEW
    PLANNED DELIVERY TIME IN DAys is not updating
    i have passed
    la_plantdata-plnd_delry =  P_PLND_DELRY.
    la_plantdatax-plnd_delry =  'x'.
    i have commited the work too but the field is not updated
    Please help.
    Thanks & Regards,
    Naresh

    Hi,
    This question is not related to APO, i would suggest you to post the thread in ABAP forum.
    However can you check
    can you check whether la_plantdatax-plnd_delry field is 3 charcter or one character field.
    Generally it will be like below.
    la_plantdata-plnd_delry = 100
    la_plantdatax-plnd_delry = 'X
    Regards,
    Srini

  • Line Item Grace Periods  Vs Min Days in Arrears(Acct)

    Hi All,
    While configuring Dunning @ FBMP, there are two fields which serve almost the same purpose. They are,
    Min. Days in arrears (acct)......If we give say here 3 days, then 3 days will be added to the due date for determining whether dunning can be generated for an open invoice.
    Line Item grace periods...........If we give say here 3 days, then 3 days will be added to the due date for determining whether dunning can be generated for an open invoice.
    It is observed that if you put equivalent or less than the number of days in Min Days in Arrears field as compared to the number of days entered against Line Item field, then no dunning will be generated.
    On the other hand if you put more no of days aginst Min days in arreas field as compared to the no of days put against Line item grace periods field, then the dunning will be generated on the invoice date plus no of days mentioned in Min days in arrears field.
    Could any body throw some light on why this happens. More specifically:
    1. What is the basic difference between these two fields and their significance for Dunning. I am pretty clear about the meaning of  Min days in arreas filed, but not about the other field's significance.
    2. Why the system behaves in the fashion that I have described above for different combinations of figures entered in these two fields.
    The brief scenario is as below for easy reference:
    Details    Min Days in Arr   Line item gr Pd   Dunning Possible
    Days            3                       3                    Not Possible
    Days            3                       2                    Possible
    Days            2                       3                    Not Possible
    Please throw some light on this.
    Regards
    Sudhakar
    But it is observed that,

    Hello,
    Do not leave grace period blank or less than days in          
    arrears if you do not want to include items in dunning level "0" in your
    dunning notice.                                                                               
    As per the documentation, the number of grace days (line item) and   
    days in arrears (first dunning level) you enter will normally be        
    identical. So if your days in arrears for level 1 is 14, you should also
    indicate grace days of 14.  Otherwise, if you leave the grace days      
    blank or less than 14, the system will include also items in arrears    
    earlier than 14 days (level 1). 
    As per online documentation:                                                                               
    Grace period shorter than days in arrears                                                                               
    In this case there may be items which are overdue but which do not      
    reach a certain dunning level due to the days in arrears. Although      
    these items are printed out, they receive the dunning level zero.       
    These items alone cannot trigger a dunning notice.                                                                               
    Regards,
    Renan

  • Multiple planned orders in MRP run

    Hi All
    I have a requirement where I need to create multiple planned order for the same material during MRP run. I understand that once I run MRP a planned order creates. If I run again for the same material, the quantity will be changed for the same planned order. Do we have any configuration so that system creates multiple planned orders for same material for each MRP run.

    Hi Adithya
    Planned orders may be changed by MRP until they are firmed. Therefore, what you need to do is to firm the planned orders after the MRP execution.
    You can use for example, transaction MD19 to mass firm planned orders after each MRP run.
    Otherwise, you can user BAdI MD_PLDORD_CHANGE to automatically firm the planned orders created by MRP.
    BR
    Caetano

  • Is there any provesion to convert  multiple planned order to one PR

    hi,,
         i want to know is there any provesion to convert multiple planned orders to one PR .let it may create as different line item in PR. if is there please let me know
    thanks in advance
    regards
    madan

    Hi madan,
    i dont think there is any way of clubbing multiple planned orders into single PR.  Like Taj suggested, you could decrease the number of planned order created thro MRP run by working on different strategies on your lot sizing key / procedure. 
    Also, i am assuming here that you want to club the planned orders of a single material into a single PR and also it is no way related to different account assignments. 
    The other way possibly u could do it is, do a Z programme and modify your MD15 transaction.  This idea is bit vague, possibly the forum could build on it.
    reg
    kiki

  • Planned delivery time in days is not updating

    Hi Experts,
    planned delivey time in days is not getting updated with BAPI_MATERIAL_SAVEDATA.
    The same type gr_pr_time is getting updated i have commmited it even though it is not reflecting the value.
    i have passed
    la_plantdatax-plnd_delry  =100.
    Please Help.
    Regards,
    Naresh
    Edited by: naresh.k.dasari on Feb 18, 2011 6:31 AM

    Hi,
    This question is not related to APO, i would suggest you to post the thread in ABAP forum.
    However can you check
    can you check whether la_plantdatax-plnd_delry field is 3 charcter or one character field.
    Generally it will be like below.
    la_plantdata-plnd_delry = 100
    la_plantdatax-plnd_delry = 'X
    Regards,
    Srini

  • Multiple plans for my SQL- Which one is following?-11gr2

    11gr2, windows-64-bit
    I have one sql_id part of 3rd part application, need to tune it. When I tried to get its execution plan im seeing multiple plan_plan values. That means, multiple plans for
    same sql_id
    How could we know that which plan my sql_id is following.?
    SQL> set lines 300
    SQL> set pages 50
    SQL> select * from TABLE(dbms_xplan.display_awr('5z1r29wc6514q'));
    PLAN_TABLE_OUTPUT
    SQL_ID 5z1r29wc6514q
    SELECT INVOICE_ID,min(CHARGE_DATE),MAX(CHARGE_DATE),
    sum(TOTAL_EXCL_VAT),sum(case when instr(LEVEL2,:"SYS_B_0")>:"SYS_B_1"
    then SUM_QUANTITY else :"SYS_B_2" end) as KB from
    RATOR_CDR.INVOICE_DETAIL_LINE I  INNER JOIN SUBSCRIPTION S ON S.ID =
    I.SUBSCRIPTION_ID  inner join SERVICE S1 on S1.SUBSCRIPTION_ID=S.ID
    WHERE INVOICE_ID in (SELECT id from  RATOR.INVOICE WHERE
    invoice_number is  null) and  S1.PHONE_NUMBER=:1   and LEVEL1=:2  group
    by  INVOICE_ID
    Plan hash value: 216300602
    | Id  | Operation                            | Name                  | Rows  | Bytes | Cost (%CPU)| Time     | Pstart| Pstop |
    |   0 | SELECT STATEMENT                     |                       |       |       |  1350 (100)|       |          |       |
    |   1 |  HASH GROUP BY                       |                       |   333 | 40293 |  1350   (1)| 00:00:17 |       |       |
    |   2 |   HASH JOIN                          |                       |   333 | 40293 |  1348   (1)| 00:00:17 |       |       |
    |   3 |    NESTED LOOPS                      |                       |       |       |            |       |          |       |
    |   4 |     NESTED LOOPS                     |                       |  1638 |   161K|   866   (0)| 00:00:11 |       |       |
    |   5 |      NESTED LOOPS                    |                       |     1 |    34 |     2   (0)| 00:00:01 |       |       |
    |   6 |       TABLE ACCESS BY INDEX ROWID    | SERVICE               |     1 |    23 |     2   (0)| 00:00:01 |       |       |
    |   7 |        INDEX RANGE SCAN              | SERVICE__PHONE_NUMBER |     1 |       |     1   (0)| 00:00:01 |       |       |
    |   8 |       INDEX UNIQUE SCAN              | SUBSCRIPTION__ID_PK   |     1 |    11 |     0   (0)|       |          |       |
    |   9 |      PARTITION RANGE ALL             |                       |  1684 |       |    46   (0)| 00:00:01 |     1 |    17 |
    |  10 |       INDEX RANGE SCAN               | IDL_SUB_ID            |  1684 |       |    46   (0)| 00:00:01 |     1 |    17 |
    |  11 |     TABLE ACCESS BY LOCAL INDEX ROWID| INVOICE_DETAIL_LINE   |  1581 |   103K|   864   (0)| 00:00:11 |     1 |     1 |
    |  12 |    TABLE ACCESS FULL                 | INVOICE               |  6048 |   118K|   481   (1)| 00:00:06 |       |       |
    SQL_ID 5z1r29wc6514q
    SELECT INVOICE_ID,min(CHARGE_DATE),MAX(CHARGE_DATE),
    sum(TOTAL_EXCL_VAT),sum(case when instr(LEVEL2,:"SYS_B_0")>:"SYS_B_1"
    then SUM_QUANTITY else :"SYS_B_2" end) as KB from
    RATOR_CDR.INVOICE_DETAIL_LINE I  INNER JOIN SUBSCRIPTION S ON S.ID =
    I.SUBSCRIPTION_ID  inner join SERVICE S1 on S1.SUBSCRIPTION_ID=S.ID
    WHERE INVOICE_ID in (SELECT id from  RATOR.INVOICE WHERE
    invoice_number is  null) and  S1.PHONE_NUMBER=:1   and LEVEL1=:2  group
    by  INVOICE_ID
    Plan hash value: 1282779260
    | Id  | Operation                            | Name                  | Rows  | Bytes | Cost (%CPU)| Time     | Pstart| Pstop |
    PLAN_TABLE_OUTPUT
    |   0 | SELECT STATEMENT                     |                       |       |       |  1392 (100)|       |          |       |
    |   1 |  HASH GROUP BY                       |                       |   325 | 39000 |  1392   (1)| 00:00:17 |       |       |
    |   2 |   HASH JOIN                          |                       |   325 | 39000 |  1391   (1)| 00:00:17 |       |       |
    |   3 |    TABLE ACCESS FULL                 | INVOICE               |  5972 |   116K|   550   (1)| 00:00:07 |       |       |
    |   4 |    NESTED LOOPS                      |                       |       |       |            |       |          |       |
    |   5 |     NESTED LOOPS                     |                       |  1794 |   175K|   840   (0)| 00:00:11 |       |       |
    |   6 |      NESTED LOOPS                    |                       |     1 |    34 |     2   (0)| 00:00:01 |       |       |
    |   7 |       TABLE ACCESS BY INDEX ROWID    | SERVICE               |     1 |    23 |     2   (0)| 00:00:01 |       |       |
    |   8 |        INDEX RANGE SCAN              | SERVICE__PHONE_NUMBER |     1 |       |     1   (0)| 00:00:01 |       |       |
    |   9 |       INDEX UNIQUE SCAN              | SUBSCRIPTION__ID_PK   |     1 |    11 |     0   (0)|       |          |       |
    |  10 |      PARTITION RANGE ALL             |                       |  1836 |       |    48   (0)| 00:00:01 |     1 |    18 |
    |  11 |       INDEX RANGE SCAN               | IDL_SUB_ID            |  1836 |       |    48   (0)| 00:00:01 |     1 |    18 |
    |  12 |     TABLE ACCESS BY LOCAL INDEX ROWID| INVOICE_DETAIL_LINE   |  1722 |   110K|   838   (0)| 00:00:11 |     1 |     1 |
    ------------------------------------------------------------------------------------------------------------------------------also, Any suggestions to tune this query
    Thanks

    Harry wrote:
    11gr2, windows-64-bit
    I have one sql_id part of 3rd part application, need to tune it. how do plan on modifying 3 ^rd^ party application?

Maybe you are looking for

  • Configuration Scenario -  Inbound Delivery

    Configuration Scenario How can this scenario be best configured on SAP? This is how the client receives goods ordered: A PO is created and sent to the relevant vendor.  The vendor does not deliver the goods directly to the client; the goods are deliv

  • XSLT processor

    which XSLT processor do you use ? Xalan , cocoon ? please suggest a good XSLT processor

  • HT2204 I have a different email address and itunes will not allow me to use my new ID! I cant download anything!

    Why is itunes not allowing me to use my new email address? Itunes wont authorize to me to dowload anything - I haven't accessed Itunes for over a year during that time my computer crashed, I had to change email addresses and things got lost...like pa

  • Message problem in iphone 3gs

    I'm unale to receive or send any sms in iphone 3gs, please help.

  • Custom XSLT for Biztalk Maps

    Hi, I have a input xml file and the output xml file. The input message is multi-part message. I have to create a custom xslt to convert input xml to output xml. The xslt should give an xml output. I have an another xslt to take this output as input a