Multiple Tier System

Hi,
I have a problem here where I need to be able to create a
multiple level tier system for a directory website. For example our
website may have a category setup such as: Directory > Plumbers
> (Business Name) but I may also need to add more levels:
Directory > UK > DJ's > Mobile DJ's.
Is there a way this can be done in ASP VB? I thought about
maybe creating a table via asp code although I have no Idea how I'm
going to control such levels.
I hope all of that makes sense but please ask for more
information if you are a little confused by what I'm going on
about. I'm really stuck here and would be extremely grateful is
somebody could give me some help or perhaps a link to a tutorial.
Many thanks in advance,

Dan,
Do you want to preserve the Display set to :1.0 (y/n) [y] ?This is for the DISPLAY environment variable that need to be set in the context file, and in the CM script (one usage of setting this variable is to view bitmap concurrent requests).
Do you want to use a virtual hostname for the target node (y/n) [n] ?:See (Note: 356433.1 - Using Oracle Applications Release 11i with Virtual Hostnames and Business Continuity).
Does the target system have more than one application tier server nodeWhen you have more than one application tier node (for example, load balancing).
Does the target system application tier utilize multiple domain namesThis is also applicable when more than one domain is used (for example, load balancing).
Regards,
Hussein

Similar Messages

  • Multiple SAP systems on a Single LPAR

    Hi Gurus,
    We are planning to install ECC, BW, SRM, PI, EP, SolMan, NWDI on one LPAR on IBM i6.1 OS. I came to know that this is the common practice of installing SAP on IBM iseries.
    Do I need to review for any dependencies or the technical limitations?
    Obviously, the DB2 instance will be the same for all these systems and will be a MCOD solution.
    If you have done any recent installations on IBM iseries, please let me know the lessons learned.
    Thanks
    Kalyan

    Hi my friend
    No problem to have multiple instances installed in one LPAR, like you said it's the common way to place your non-prod environment. Just make sure that OS level parameters of AS/400 are well tuned for this many instances running together from performance perspective, use IT4J JVM for AS Java instead of classic JVM. Here's some FYI:
    Note 484548 - iSeries: 3 tier system installation
    Note 192658 - Setting parameters for BW systems
    Note 541508 - iSeries: Checking the system parameters for BW
    Note 307077 - iSeries: Performance optimization for BW systems
    Note: installing multiple instances in one LPAR doesn't mean it's a MCOD installation. They still have their own DB library, known as database on other platforms. In the case of MCOD, all instances will use the same DB library as database instance.
    Regards,
    Effan

  • Multiple Logical Systems in Partner Profile for one instance

    Can we create multiple Logical Systems in Partner Profile (WE20) for one instance or one System?  If it is possible, can we create Logical System with respect to Plant/Country?

    I am not quite sure if I understood your problem completley. But let's see...
    Usually you use on on MSCS Cluster Group per SAP instance. So you have your already existing NW 7.0 ABAP stack in a separated Cluster Group, and you create a new Cluster Group for your new Java system.
    You can find more information about it in this guide here on SDN:
    Link: [High Availability;
    More information about High Availability Setups for SAP System can be found here on SDN:
    Link: [High Availability]
    If you want to use the same database for your clustered ABAP stack and your new Java stack you can do a MCOD installation.
    Please see Link: [SAP Note 388866 - Multiple Components on One Database - Installation|https://service.sap.com/sap/support/notes/388866]
    Hope this helps.
    Best regards,
    Mathias

  • Please help me get my laptop back someone has cracked the master password and is running multiple operating systems which I have no access to

    Okay so I am not a computer expert by any means and have no clue how to fix my system. My father worked for intel for over 20 years as an engineer I asked him to restore my laptop to its original factory state and instead he cracked the master password
    installed multiple operating systems and made himself the administrator or domain controller. Many features and options I do not have access to so reading the trouble shooting and going through the steps always leads me to a dead end. The laptop is TOSHIBA
    SATELLITE L875D-S7332 a6 VISION AMD WINDOWS 8. As far as I can see my profile is actual running a version of windows 7. I do see reference to a windows 8RT windows 2003 windows vista wow64 and 32 I don't know what all that means I would just like to know how
    wipe everything and get back to the factory condition I bought it in. If anyone can help it would be much appreciated

    Do you have Win 7 installation disk? If yes, then go ahead and format the laptop if you don't need any data. If you need the data it it, then copy the same to USB disk and format it. Removing OS and deleting these things will anyhow keep some remains on
    HDD. TO get the speed and performance back, you might need a fresh installation. 
    Arnav Sharma | http://arnavsharma.net/ Please remember to click “Mark as Answer” on the post that helps you, and to click “Unmark as Answer” if a marked post does not actually answer your question. This can be beneficial to other community members reading
    the thread.

  • How to use a Web Template with queries from multiple BW Systems?

    Hi all,
    can anybody help me how to use a Web Template with queries (DATA PROVIDER)in it from multiple BW Systems?
    Thanks in advance, best regards
    Frank

    Great! Thanks for the quick response.
    Have you tried this for XMLA datasources created within the EP system also?
    i.e use Web Analyzer to create a view from the XMLA source and use that view within WAD?
    Thanks.

  • How can I handle deploying multiple test systems on the same PC that have been developed using different versions of LabVIEW, TestStand, and/or Switch Executive?

    The major issue here is that the test systems must be documented and validated before being released to the production floor. Given this if a test station has multiple test systems deployed on it that have been developed on various versions of LV, TS, and Switch exec how can I force the test system selected to use the correct versions of TS, LV, and Switch exec.? I understand that the solution would be to recomplie everything and bring them up to the latest version but that would then require re-validation according to the QA department. Any advice would be greatly appreciated.
    It would be nice if theTS deployment was more like an LV executable... meaning when a LV executable is launched it always knows what LV runtime engine to use when there are multiple engines installed on a PC.

    Hi,
    Multiply versions of teststand can reside on the same system, but only one version can run at a time. They is a utility that has to be run to set the active version.
    The SequenceFiles have a version number, and you will find an error will be generate if you try to Load the sequencefile in the wrong version of TestStand.
    The labview VIs will only work providing the correct version of the RTE is also installed on your system, even a labview executabe requires the correct RTE to be installed, either as part of the executable installation or as a seperate installation, before the labview exe will work correctly.
    I'm not fimilar with the Switch exec but I would expect that it will also require the correct lower level device drivers to be available for the version you are using.
    Therefore, as you are indicating that some of your system are at  a older version, its difficult to image how you could achive this, considering if you say you have different versions of the software(s). For a start, you may have the problem that newer code/ sequencefiles using additional functionatily not available in the older versions.
    I would think your only solution would  be to have different deployments covering the different versions you have, or at least bring all your test systems up to the same version of teststand.
    Regards
    Ray Farmer
    Regards
    Ray Farmer

  • Creation of sales order in CRM and replicating it to Multiple ECC system.

    We have a requirement for creation of sales order in CRM and replicating it to Multiple ECC system.
    We have checked the following standard Adapter objects in transaction R3AC1.
    BUS_TRANS_MSG
    The initial flow contexts does not support target site type as R/3(SMOF_ ERPSITE). So we are not able to replicate the sales order from CRM
    to ECC.
        2. SALESDOCUMENT
    Here the initial flow contexts does not support flow from CRM -> R/3 as we don’t see the target site as CRM.
    Please let us know if the standard sap middleware objects don’t support the sales order flow from CRM to multiple ECC or is there any
    other adapter object we need to use for this.

    Hey Vijay Duvvada,
    I hope you are already referred below sap note  and which explains scope & how to do   -
    1084315 - Consulting: Information about the multiple backend scenario
    1763516 - How-to: Basic Setup of MEP
    As explained by Rohit Sharma data should be start flowing to multiple sites.
    please let me know if it does help.
    Regards,
    Arjun

  • Multiple SRM Systems One SRM-MDM Catalog?

    Hi
    I'm currently upgrading our SRM 5.0 to SRM 7.01 with SRM-MDM Catalog 7.01.  Is it possible to use one SRM-MDM Catalog in our non-production environment and connect multiple SRM systems to it?
    For example our sandbox, development and QA SRM 7.01 systems would all connect to the same SRM-MDM Catalog 7.01.
    Thanks.
    Neil

    Hi,
    for non-production use and if it is just a catalog without custom coding running I see no problem in using one MDM server for multiple SRM systems (especially sharing one for sandboxes and dev). It is a setup I have seen multiple times and it worked always without problems.
    You should set up different repositories for each SRM system so that you don't interfere with each others data (i.e. suppliers or other lookups tied to SRM).
    You have to keep in mind that you have to upgrade all systems together. But you can always use separate MDM servers during the upgrade process and then consolidate onto one server when the upgrade is done.
    If you are running custom coding with your MDM catalog I would recommend having a separate MDM system for the QA SRM in order to be closer to the production set-up when testing your custom solution.
    Regards,
    Martin

  • Find exact RFC Destination for Multiple backend Systems In SAP Gateway

    Hi Gateway developers,
    I have requirement,if gateway hub system has multiple backend systems( for example two backend systems: ECC and SRM ) then  how  hub system can get the suitable backend alias for exact entity collection..
    Here i have developed two entities one entity regards: ECC and second one regards SRM system..within this when I run the service it is always taking any of the same alias for both the collections..
    Can you please suggest me..
    Thanks
    Sreenivas Pachva

    Hi Srinivas,
    You can add the respective system Alias Name: Like logical system name in your URI also.
    Example:
    /sap/Service Name;mo=ECCCLNT210/zentity1?Customer1='0001'
    /sap/Service Name;mo=SRMCLNT400/zentity2?Customer2='ABCD'
    May this help you.
    Thanks,
    Saurabh Gupta

  • Unable to define connector for multiple backend systems in BRM

    Hi,
    I am on GRCFND_A V.11 and SP04
    I have multiple backend systems integrated with GRC box. So far I was using one backend connector as default one for role maintenance but it is not feasible if you have to create roles in variuos backend connected systems. I know one way to do so, i can keep changing the default connectors whenever i need to create roles but that is obviously not at all the onw any one would like to go with.
    So, I tried to create unique connector groups for every individul backend connectors. But the issue is, the moment i assign the backend connector to the respective connector groups, the same gets reflected to other connector groups as well. So, whenever i either add or delete some of the connectors to any connector groups it gets modified/changed from all of the connector groups.
    These are the backend connectors where i have to create roles from BRM whenever needed.
    These are the connector groups:
    I followed to the ink: GRC AC 10 BRM: Default Connectors with Multiple Back-end R/3 Systems , which is the same as mine issue, but not able to come to the solution point.
    would appreciate for your quick response.
    Thanks,
    Ameet

    Could anyone suggest solution to the above mentioned issue please?

  • Multiple SAP systems in MSCS

    Hello,
    We would like to install an ECC 6.0 and a CE in a cluster MSCS of two nodes.
    I've found the SAP documentation "Installation of Multiple SAP Systems in MSCS: Oracle" but the doc version is 03/30/2007. Could you please tell me wether there is a new version of this document? or where can I find more documentation about this?
    Is it recommended to create a domain between the cluster nodes? We're going to have 3 MSCS clusters with two systems in each cluster, should I create a domain for the three clusters, one domain per cluster or no domain at all?
    Thanks and regards,
    Ana.
    Edited by: systems2111 on Feb 3, 2010 9:46 AM

    Hello Shailesh,
    The scenario is the following:
    - MSCS between ECC and CE.
    - MSCS between Solution Manager and nothing.
    - MSCS between Websphere and SAP Business Objects
    Every MSCS has two machines. for example, ECC will run on one machine, CE oon the other machine and in case of problems the cluster will run the ECC in the CE node.
    I don't know if I have explain myself, but, anycase, please ask me with your doubts.
    Regards,
    Ana.

  • Multiple SAP systems in MSCS with Oracle

    Hello,
    We are going to install a BI instance in a MSCS cluster in which there is already a SAP system installed and clustered.
    The SO is Windows 2008 and Oracle 10.2.0.4.
    My problem is about the Oracle sw. In previous SAP releases there was a guide called "Installation of Multiple SAP systems in MSCS: Oracle".
    For my release Netweaver 7.0. EHP1 SR1, there is no specific guide. All the references are the installation guide and part related to MSCS installation and a white paper about "new configuration of multiple SAP systems with Windows 2008 Failover Clustering".
    In all that documents I haven't found what to do with the database. In the beginning of the installation documents says that Multiple Oracle_home for different database instances are not supported in an MSCS configuration. But in the pages related to the MSCS installation says "if required, set up multiple Oracle Homes".
    So, what's the option? Multiple Oracle_homes or MCOD? Be in mind that I already have a SAP system in this cluster, so I already have an Oracle home c:\oracle\<SID>\102
    Have you work in this scenario?
    Thanks and best regards,
    Ana.

    Hi,
    Officially SAP does not support Multiple SAP Systems in One MCSC Cluster. If such installation & configuration has been done by SAP Global Technology Partner then and then only SAP provide support.
    what's the option? Multiple Oracle_homes or MCOD?
    GO for multiple oracle_home , in which the same drive letter for oracle_home should be used on local disks in both MCSC cluster nodes.  And the same oracle_home should be junctioned to the shared location on shared space.
    The Chapter 7 High Availability with Microsoft Cluster Service of [Inst. Guide SAP NetWeaver 7.0 incl. EHP1 SR1|http://service.sap.com/~form/sapnet?_SHORTKEY=01100035870000659894&_OBJECT=011000358700000353072009E] contains all the required information with detail. Refer it.
    Regards,
    Bhavik G. Shroff

  • Multiple SAP Systems In One MSCS Cluster

    We have installed a NW 7.0 EHP abap stack in a MSCS Cluster with 2 nodes.
    This was installed as a standard Cluster Install.
    We have now higlighted a requirement to install a 2nd (Java ) instance in this Cluster Group.
    The NW 7.0 EHP1 documentation and Note 1321854 shows that multiple SAP systems in one  MSCS cluster is supported.
    The documentation, however, is not clear if the 2nd instance can be installed when the 1st instance was installed without the preperations for Multiple Systems.
    There are no further documentation or guidelines to help.
    Has anyone come across this situation or managed to install 2 SAP instances in one Cluster Group based on Windows 2003, SQL Server 2005.
    Regards

    I am not quite sure if I understood your problem completley. But let's see...
    Usually you use on on MSCS Cluster Group per SAP instance. So you have your already existing NW 7.0 ABAP stack in a separated Cluster Group, and you create a new Cluster Group for your new Java system.
    You can find more information about it in this guide here on SDN:
    Link: [High Availability;
    More information about High Availability Setups for SAP System can be found here on SDN:
    Link: [High Availability]
    If you want to use the same database for your clustered ABAP stack and your new Java stack you can do a MCOD installation.
    Please see Link: [SAP Note 388866 - Multiple Components on One Database - Installation|https://service.sap.com/sap/support/notes/388866]
    Hope this helps.
    Best regards,
    Mathias

  • R/3-extraction to multiple BW-Systems

    Hi everybody,
    I was asked if it is possible to do the same data-extraction from one R/3-source-system to multiple BW-Systems (I don't mean various cubes in one system)
    I can't find any information about this topic!
    I hope one of you can help me!
    Thanks in advance!
    Greetz
    Patrick

    Hi Patrick,
    this topic has been recently discussed in another thread named "One R/3 to multiple BW" under "Business Information Warehouse Implementation".
    Hope it helps
    GFV

  • Multiple Business Systems for Multiple Receivers?

    hi,
    idoc > xi -> multiple receivers with xml payload
    I have a scenario where i have to configure multiple receivers for each Supplier from an IDOC. All the receivers will be either HTTP or SOAP.
    When the mapping would be the same for all the Suppliers but during configuration we have to determine the receiver based on an IDOC value to route the xml via HTTP or SOAP
    For this to achieve do we have to create multiple business systems for each receiver?
    If i create a receiver in the business service how can we determine the interface mapping in this scenario?
    Thanks,
    Tirumal

    Hi Tirumal,
    <i>For this to achieve do we have to create multiple business systems for each receiver?</i>
    As you know,Business system is a logical name for the Techincal Systems, Theoretcially it is not required to create different Business systems for the each receivers.
    Generally Business Systems are grouped/created based on the Business Process/Functionality/Type of Receivers etc.
    So if you think, your each receiver is of type different type/process then create different Business systems.
    It depends~
    If you create Business Service, then you need to add your Message Interfaces explicitly into the Business Service( By open the Business Service->You can see the Sender/Receiver Interface tabs).
    Hope this helps,
    regards,
    moorthy

Maybe you are looking for