N:1 replication from multiple ERP source systems on different EHP levels

Hello,
The situation is that the customer has multiple ERP systems on different EHP levels. Therefore, in newer EHP systems, some tables will have different structure (additional columns). The intention is to setup N:1 replication into one target DB schema
Would this be possible to support/setup in SLT ? How would the different table structure be handled?
Thanks and best regards,
Cosmin

Hi Cosmin,
I think this can be achieved. First of all you have to investigate which structures are available for the different releases. At the and the target structure has to consist of all available fields with the same name.
Before oyu start with the replication you have to specify the same target structure for all configuration.
What SLT is doing during the mapping from the source structure to the target structure is a "move-corresponding" command. So it is important that the names of the fields are the same. At the end you will have sometimes fields filled, sometimes not (depending if this field is in the source filled).
Let me know if you need further input.
Best,
Tobias

Similar Messages

  • Material Replication from Multiple R/3 System to SRM

    Hi,
    Please help me reagrding the below error.....!
    I am trying to replicate material from two backend (r/3) systems, i am getting an error  (Exception condition "LOGSYS_FOR_GUID_CHANGED" raised.).
    Regards,
    Nish Kel

    Hi
    Check the note 765018.
    In case of multiple backends and also if systems are refreshed with other instances (client copy), the logical system ID will be changed.
    So we need to run the report mentioned in the said note and run the replication.
    Rgds
    Reddy

  • Master data from Multiple SAP source systems

    Hi Gurus,
    In my present project we are having an ECC6 and r/3 from which we need to extract master data.
    ex: vendor
    same vendor has different entities in the systems.
    I am aware of the data inconsistency as it would be overwritten.
    We don't want to use MDM,compounding or transfer duplicate records options.
    MDM - not in use
    Compounding - expensive Option
    transfer duplicate records - not reliable 
    Merging r/3 in to ECC6 is also under consideration but it would be late 2010.
    I am sure some of you might have been through this scenario and your help is appreciated and will be rewarded.
    Thank you,
    Ram.

    We went with Compounding option.
    Can you justify Expensive ????
    We compounded 0LOGSYS,infact you can use 0SOURCESYSTEM.
    So that 0SOURCESYSTEM will have the server details.I mean your ECC6 or R3.
    or
    Some crude solution would be add some character to the beginning of your master data like from ECC 6 append E.
    or
    Have you heard of Consolidated infoobjects Concept.You can go with that too.
    Hope this helps.
    Edited by: Praveen G on Oct 1, 2008 9:04 AM

  • ERP source system appearing in BI folder

    Hello All,
    We have done a refresh of our ERP system from PROD to QA.
    When I restored the connection of the source system in BI it is appearing under the Source System folder BI, instead of the SAP folder.
    Also the symbol is different of that of an ERP source system.
    Does this matter?  Why does it think it is a BI system when it is an ERP system?  Has anybody experienced this or no how to resolve it?
    Many Thanks,
    Nick.

    Hello All,
    Has anybody experienced this?
    Any help appreciated.
    Thanks,
    Nick

  • Data Extraction from Multiple data sources into a single Infoprovider

    Hi Experts,
    Can anyone send me links or examples on how to extract data from multiple data sources into 1 Cube/DSO.
    Can anyone send me example scenarios for extracting data from 2 data sources into a single Cube/DSO.
    Thanks
    Kumar

    Hi Ashok,
    Check the following link from SAP help. Ths is probably what you are looking for.
    [ Multiple data sources into single infoprovider|http://help.sap.com/saphelp_nw70/helpdata/en/e3/e60138fede083de10000009b38f8cf/frameset.htm]
    Data from multiple data sources which are logically related and technicall have the same key can be combined into single record.
    For example, if you have Sales order item and sales order item status .
    These both have the same key - sales order and item and are logically related.
    The Sales order item - provides information on Sales order item - material , price, quantity, plant etc.
    The item status  - povides information on delivery status, billing status, rejection status....
    These are two different data sources 2LIS_!1_VAITM ad 2LIS_11_VASTI.
    In case you have few master data attributes coming from different systems ie tow data sources in different systems say completely defines your master data. Then you could use a DSO or infoobject to combine the records.
    If you want to see aggregated data you use a cube.
    ie say you want to analyzae the customer revenue on a particular material and a particular project.
    The project details would come from Project syatem and Sales details fom sales flow.
    The data is then combined in the DSO with key cutomer and sales area say.
    Then it is aggregated at cube level...by not using sales order in the cube model...so all sales order of the same customer would add while loading the cube.. to give direct customer spend values for your sales area at aggregated level.
    Hope this helps,
    Best regards,
    Sunmit.

  • How to load data into an ods from multiple info sources.

    hi all...
    i am given a task to load data into an ods from 3 infosources ...
    can someone plz give me the flow .
    thank u in advance..

    Hi Hara Pradhan,
    You have to create 3 update rules by giving the 3 different infosources while creating each update rule. And u have to create the infopackages under each infosource. with this u can load the data to the same data target from multiple info sources.
    Hope it helps!
    Assign points if it helps!

  • Collecting data from two R3 source systems

    Dear All,
    Scenario:
    We are in the process of implementing SAP BI 7.0 in our organisation.
    We have a single BI server (7.01) collecting data from two source
    systems from two different divisions within the group.
    The first system is of Company 1 where we have IS u2013 MILL (ECC 6.0).
    BI has been implemented and running successfully in this unit. Now we
    have started implementing BI in the second unit u2018Company 2u2019
    where the industry specific solution IS u2013 AFS (ECC 6.0) is the source
    system.
    We are activating BI Standard Content for AFS. When we try to upload
    master data, we face a problem.
    The master data (0Division, 0Mat_Grp_3, etc.) is already loaded with
    IS Mill data (data from the first source system). Now when the data is
    loaded from IS AFS (second source system), wherever, the same key
    exists in the info object, we notice that the existing data is
    overwritten by the freshly loaded data, thus causing loss of existing
    data.
    A typical example is as follows:
    BW Data u2013 Source system 1 u2013 (Before upload of data from source system
    2):
    0Division
    99         EN          Stock Transfer Out
    AFS Data (Source system 2) -
    0Division 
    99         EN             STO
    BW Data u2013 Source system 1 u2013 (After upload of data from source system 2):
    After uploading the master data from AFS, the Values areu2026
    0Division
    99        EN            STO
    The original data is lost.
    Similar problem is noticed with other master data as well.
    Please suggest the right methodology for upload of master data when
    data to BW is sourced from two systems. How to retain the data in the
    same Infoobject but at the same time maintain distinction between the
    data from the two systems.
    We donu2019t find any specific mention of such scenarios in the standard
    documentation.
    Will such a problem recur when we upload transactional data?
    Regards,
    Aslam Khan

    Hi Aslam,
                Please use some compounding attribute for your master data object like Sourcesystem ID.  While loading the master data from different source systems... you should have two different flows to fill the same master data object.  In each flow you can specify the Source system ID as constant value ... eg SS1 (Source system 1)  and SS2(Source system 2) in each of the data flows.   This should solve your issue without overwriting your master data
    Thanks
    Kishore

  • Master Data cleansing and transformation from non-SAP source systems

    Hi all,
    Our client (Media)wants to cleanse and transform his master data from non-SAP source system to be uploaded into BW (no R/3 yet). If anybody has a document regarding this topic that i could use, i will appreciate if u sent it to me.
    thanks.

    Hi,
    https://websmp203.sap-ag.de/~sapidb/011000358700001965262003
    https://websmp203.sap-ag.de/~sapidb/011000358700006591612001
    https://websmp203.sap-ag.de/~sapidb/011000358700001971392004
    https://websmp203.sap-ag.de/~form/sapnet?_SHORTKEY=01100035870000471477&_OBJECT=011000358700008927932002E
    /manfred

  • Error in Previewing data from a UD Source System

    Hi,
    I have created a data source from a UD Source System; however, when I preview data, I am prompted by this message:
    "Inbound processing of data package 000001 finished"
    There is no error, but there is also no data preview that is displayed.
    Can you help me with my problem?
    I look forward to your reply experts!
    Regards,
    Ramon

    Hi,
    sampling is out of a directory placed on the CLIENT. On runtime the directory must be placed on the SERVER.
    So you must have two locations: one for sampling (*local) and one for (*remote) and before deployment you must switch from _local to _remote.
    The _remote location points to a directory on the SERVER, don't forget to grant read/write privileges to the oracle user on the file system.
    Regards,
    Detlef

  • Mapping source system in different Systems.

    Hi experts,
    I want to define different source systems for different development, quality and Production systems.
    I have defined it on "TOOLS/ Conversion of logical system names"
    I want to have directly the new assignements when transporting.
    I have the source systems defined in each system.
    Do I nedd to define it anywhere else?
    Thanks!
    Artur.

    Hi Artur,
    This can be done in transaction RSLGMP in destination system.
    So thats the same thing, you have done as well. so nothing else required, provide we have the RFC connections set right.
    Naveen.A

  • Replication from Multiple HR systems

    Hi SRM Gurus,
    has anyone ever had the requirement to replicate HR data (Org, Positions, Central Persons) from more than one HR system?
    At the first glance, I technically do not see why it should not be possible. Setting up the ALE distribution modell on multiple HR backends and processing the docs should work, shouldn't it?
    Any ideas, suggestions, hints, reads, practical experience for me?
    Thanks in advance and best Regards, Udo

    Hi
    <b>Yes. As long as you maintain separate distribution model for each client, you can distribute the same content to 'N' receiving systems.</b>
    Message type used is HRMD_ABA.
    Note 497557 - HR integration: Multiple organiz. assignment change, user li
    Note 637221 - RHINTE00: Old holder relationships are not delimited
    Note 437775 - HR-BBP/CRM integration: User links are delimited
    There is also a document called TRANSPORTING_EBP_14.pdf in http://service.sap.com
    Use the search engine to find this official document.
    Please check OSS notes 550055 et 934372 that explain everything.
    Please check OSS note 945523 for BP duplication
    The program to run from R3 is rhaleini, you'll find more information about this replication in note 312090.
    Did you already read OSS note 588701 "Change of the logical system name in R/3 Backend system " ? 
    Also Check the note 765018. In case of multiple backends and also if systems are refreshed with other instances (client copy), the logical system ID will be changed. So we need to run the report mentioned in the said note and run the replication.
    Please check the note 934372 SRM/CRM: HR integration for business partner - new. or post the specific problem.
    <b><u>Related links -></u></b>
    The specified item was not found.
    HR Master Date replication from HR to SRM
    Re: Multiple Backends
    HR integration with SRM
    HR replication
    Re: Multiple Backends Connected to the same SRM client.
    R/3 to SRM
    Employee Org and Personnel Data from HR
    Re: SRM intregation with HR
    Business Partner(BP) and Central Person(CP) distribution
    SRM and HR integration
    Re: HR_Master Data to SRM
    HR Organisation unit replication
    Re: SRM organization plan...
    <b>Hope this will definitely help. Do let me know.</b>
    Regards
    - Atul

  • Error is data loading from 3rd party source system with DBCONNECT

    Hi,
    We have just finished an upgrade of SAP BW 3.10 to SAP NW 7.0 EHP1.
    After the upgrade, we are facing a problem with data loads from a third party Oracle source system using DBConnect.
    The connection is working OK and we can see the tables in the source system. But we cannot load the data.
    The error in the monitor is as follows:
    'Error message from the source system
    Diagnosis
    An error occurred in the source system.
    System Response
    Caller 09 contains an error message.
    Further analysis:
    The error occurred in Extractor .
    Refer to the error message.'
    But, unfortunately, the error message has no further information.
    If we look at the job log in sm37, the job finished with the following log -                                                                               
    27.10.2009 12:14:19 Job started                                                                                00           516          S 
    27.10.2009 12:14:19 Step 001 started (program RSBATCH1, variant &0000000000119, user ID RXSAHA)                    00           550          S 
    27.10.2009 12:14:23 Start InfoPackage ZPAK_4FMNJ2ZHNNXC6HT3A2TYAAFXG                                              RSM1          797          S 
    27.10.2009 12:14:24 Element NOAUTHORITYCHECK is not available in the container                                     OL           356          S 
    27.10.2009 12:14:24 InfoPackage ZPAK_4FMNJ2ZHNNXC6HT3A2TYAAFXG created request REQU_4FMXSQ6TLSK5CYLXPBOGKF31G     RSM1          796          S 
    27.10.2009 12:14:24 Job finished                                                                                00           517          S 
    In a BW 3.10 system, there is no  message related to element NOAUTHORITYCHECK. So, I am wondering if this is something new in NW 7.0.
    Thanks in advance,
    Rajib

    There will be three things to get the errors like this
    1.RFC CONNECTION FAILED
    2.CHECK THE SOURCE SYSTEM
    3.CHECK IT OUT WITH Oracle Consultants WEATHER THEY ARE FILLING UP THE LOADS.TELL THEM TO STOP
    4.CHECK I DOC PROCESSING
    5.FINALLY MEMORY ISSUES.
    6.CATCH THE DATA SOURCE FIRST CHANGE IT AND THEN ACTIVATE AND RUN THE LOAD
    7.LAST IS MEMORY ISSUE.
    and also Check the RFC connection in SM59 If  it is ok then
    check the SAP note : 692195 for authorization
    Santosh

  • BI Content collecting objects from wrong/old source system??

    Hi Gurus! Lovely day here on the westcoast of Sweden - springtime is coming!
    I have selected an infosource for installation in trx RSOR. I also want to pick up some objects in the dataflow before and after that specific infosource. So I guess the system keeps trying to collect metadata from diffrerent source systems that we have assigned.
    I don't know the complete history of the systems - other than it's a bloody mess. We have right now a ECC 6 system connected to BI - but before that we had an older version connected (I guess 4.x something) on a diffrerent server.
    Somehow the collection process picks up some data from the ECC 6 system - but sometimes it asks for a login to the old system as well.
    This is my problem. I don't have an issue with logging on to the old system - because I have all the necessary rights to do that. But I don't want BI trying to collect metadata from our old system. So somewhere there's a pointer of some sort to the old system that I need to delete....
    The old system is not visible in the "source system assignment" view so I can't really find out where to change this settings....
    Any ideas??

    It's probably so. Would I still carry out the instructions Andreas gave me for checking this? Or should I just delete everything and do it all over again, just to get the connections straightened out?
    I'm more or less the only one at  this point using the system - as it is a kind of sandbox environment. So extreme measures is not a problem

  • Will an BI Content upgrade from affect the source systems?

    Our current BW has BI Content 7.02 patch 003; we are planning an upgrade to 7.03 patch 012.  Will we have any impact on the source systems (ECC and SRM)?  We are trying to decide if we need to archive and backup the operational systems.  Since it is a lot of extra work and increases the number of people affected, we prefer not to do it unless necessary.
    What type of regression testing is most common after a BI Content upgrade?
    thank you very much,
    LLK

    Hi
    As a data fetching from Source system -- the BI Upgrade does nt have any impact on Source Systems normally -- But u need to prepare a check list with before and after upgrade with DS ( Some times DS get de activated while upgradation ) and the DS are source system dependent so you may have to re activate the same based on requirement/possibilites-- And also you may have to empty the Delta Queues on Source System side -- otherthan that no impact , as far I know.
    Hope it helps and celar

  • 0HR_PA_EC_01 Extractor error converting from currency in source system

    Hi all,
    when I run the standard extractor 0HR_PA_EC_01 , I get the following error message in the source system (application log):
    Error converting currency from USD to  on 09/03/2008
    Message no. HRECM00SERVICE006
    Thus, the requst in the PSA  in BI / BW is Red.
    Any recommendations?
    Points will be assigned.
    Thanks

    Rajan,
    You can try this function module for converting currency from one format to another format...
    CONVERT_TO_FOREIGN_CURRENCY...
    other wise... you can try with this function module..
    RSW_CURRENCY_TRANSLATION............ this one i'm not sure abt that will convert ur data into required format..

Maybe you are looking for

  • How I add a LIBRARY ITEM to a page layout, top/bottom ?

    how I add a LIBRARY ITEM to a page layout, top/bottom ? in dwmr mx 2004 and cs4 ?

  • 13 MacBook pro motherboard

    Have others had issues with the motherboard in a 13" MacBook pro? I am finding it difficult to find information.

  • Title-blurry but Title 3D Crisp

    Hello again, after just returning from Macworld, I met with my client and showed the movie we're working on, and while they were overall pleased, the plain text titles were blocky and pixelated. We were watching the video off a dvd, and the metallic

  • Error message 29 when Sharing to DVD

    When trying to create a disk image of my movie project, I get this error message: The operation couldn't be completed. (DSPPublishing error -29.)  What's the source of the problem, and what's the solution?

  • AVCHD Log and transfer problem

    Hello guys, I shot AVCHD footage. I take SDHC card right from my camcorder and insert it into card reader Plug the reader into USB My Mac recognizes the CAM_SD folder on my desktop I open new project in Final Cut 7 and go to LOG AND TRANSFER No clips