Net requirement calculation in MRP

Hi Gurus,
Is there any way we can exclude Created Purchase order ( Not yet released ) in MRP run for the Net req calcualtion . ( pl suggest other than exit )
Regards,
Prasanna

Hi prasana
Net requirement calculation in MPR will include firmed receipts. ( P.O.). You can only block what are all given in plant parameter.
We can exclude in Availability Check, in scope of Availability check setting.
Regards
J. Saravan

Similar Messages

  • MRP Net Requirements Calculation

    Hi Guys:
    I defined a Planning Horizon of 40 days, for Example if  today is the start date Since Planning horizon is 40 days (01/30/2012).
    Vendor Lead time = 2months
    Purchase order to vendor with Delivery Date (12/20/2011)  : 5000 Pc
    Purchase order to vendor with Delivery date ( 03/04/2012): 6000Pc
    Onhand Inventory = Zero
    So i have Sales order for 10000 with Delivery Date ( 12/28/12) with in the Planning horizon.So when I run MRP using MD02 ,
    Does the system consider Purchase orders with delivery dates  that are outside planning horizon into the net requirements calculation?
    thanks for the help.
    Kodali

    dear friend,
    as far as i know the available stock is calculated as follows:
    plant stock
    safety stock
    +
    receipts (pur.orders, prod. ordersfirmed proc. proposals)
    requirements quantity (say, PIRs, mat. reservations,...)
    =
    available stock
    shortage occurs if available stock is negative, that is, the requirement quantities are greater than expected receipts and stock quantity.
    so, system specifies the date of the issue (for example, customer requirement, planned independent requirement, reservation, forecast requirement) as the requirements date.
    regards,

  • Net requirement calculation for Sales Order

    Dear Experts,
    I have configured a strategy comprising both( KE,040) and (LSF and 100), say the strategy is Z0.But the system is not doing net requirement calculation for the dependent requirement(always proposing Pr Req though there is stock).Checking group and checking rule, I have created like the standard PP order.Will anybody Pl. guide me regarding this?
    Regards
    Reshmi

    Hi,
    1. The MRP group or the strategy group in the MRP view of the material master record determines what requirements type is used.
    If you have not specified this information, the requirements type will be selected through the item category of the sales order item and the MRP type in the MRP view of the material master record.
    If you have maintained both an MRP group and a strategy group, the system uses the strategy group (precedence to strategy group).
    You can enter the strategy group directly in the MRP view. If you have specified a strategy group, you do not need to enter an MRP group.
    The configured Strategy group need to be copied from a standard Strategy and even if you group many Strategies(Max 7) you ned to check the req Type assigned to it .
    2. The item category is derived from the item category group in the Sales view of the material master record and from the order type of the sales document. Together with the MRP type in the MRP view of the material master record, the item category determines what requirements type is selected. The MRP group in the material master record is irrelevant here.
    The advantage of this method is that the selection of the requirements type depends on the business process (such as quotation, sales order, or repair).
    All the above Points need to checked in your case
    Pavan

  • Rescheduling horizon impact on net requirement calculation

    Dear MRP experts ,
    What is the impact of Recrudescing horizon on net requirement calculation .
    Regards
    Sasikanth

    Dear Sashikant,
    The rescheduling check is used to change the dates of already existing firmed receipts not planned on the same day as the requirement to suit the requirement date.
    If you look at MD04, the rescheduling date is based on the Stocks Requirement date. 
    In the net requirements calculation, the system checks whether warehouse stock or firmed receipts are available to cover requirements. If a material shortage exists, the system usually creates a new procurement proposal.
    Within this rescheduling horizon, the net requirements calculation checks whether, after a requirement, a firmed receipt exists, which can be used to cover this requirement. Then the system displays a rescheduling date as well as the exception message Bring process forward for this receipt. The net requirements calculation then uses this receipt and the system will only create another procurement proposal if the receipt quantity is not sufficient to cover the complete requirement. Several firmed receipts can be used to cover one requirement.
    hope it helps. please revert back.
    Regards,
    Alok Tiwari

  • Net requirement calculation

    Dear Gurus
    In Net requirements calculation, Safety Stock, Recipts (Purchase Orders, Production Orders, Firmed Procurement Proposals), Requirement qty(Pir, Customer requirements, Material reservations) are considerd
    In My Situvation, I want to exclude considering Safety stock while doing net requirements calculation
    Kindly tell me the setting i have to do
    regards
    palaniappan

    Dear Planiappan,
      In IMG Production + Material Requirements Planning + Planning + MRP Calculation + Stocks + Define Safety Stock Availability maintain 100% in AvSafetySt field. So in planning your 100 % safety stock will be considered.
    Regards
    Sunil Kumar

  • Excluding Stock From Net Requirement Calculation in PPDS

    Dear All,
    We can exclude stock on hand from Net Reuirement Calculation in ECC MRP by selecting Strategy 11 ( Gross requirement Plannung). Is there any Functionality like this in APO PPDS or SNP to exclude the Stock.
    Regards
    Sunil Kumar

    Hi,
              Its possible in SNP, try modifying stock on hand macro in planning book and overwrite initial column value to zero. hope this helps.
    Regds,
    Prasad

  • MRP Net Requirements calculation in External procurement Vs STO

    Hi gurus,
    Lets say I have a FG 1234 which has raw component 9999.
    Case1:
    Setting for 9999 is externally procured.
    I have a stock of 50 pc for 9999.
    I got order for 60 pc for FG 1234.
    so system will only create purchase reks for 10 pc of 9999 as it already sees 50 pc in stock.
    Case 2:
    Setting for 9999 is externally procured but from one of our own plant (Using SPK 40)
    I have a stock of 50 pc for 9999.
    I got order for 60 pc for FG 1234.
    will system create STR for 10 pc of 9999 as it already sees 50 pc in stock? or will it create STR for 60 pc without checking stock in the ordering plant?

    >
    dorian661 wrote:
    SPK 70 will not create an STR. Stock of 9999 will be checked in supplying plant. In case there is a shortage, a procurement proposal will be created against the dependent requirement here. Stock is not checked in ordering plant. You will notice that dependent requirements for 9999 will be seen in the supplying plant.
    Dorian,
    Thanks for the reply. so are you saying that in SPK70
    In ordering plant - MRP will not look at the stock situation for that material
    In supplying plant - system will check stock requirement and create dependent requirement for the shortage amount
    and in spk70 case, against what element is the delivery done to the ordering plant? in spk40 delivery is done against STO.
    Thx

  • Net requirement calculation considering stock ( Strategy 52 )

    Hi All,
    we are using the planning strategy 52 for process industry and according to the standard functionality the stock of finished product will NOT be considered when MRP run and consumption.
    For various reason like customer return we might have the stock of FG. when forecast is finalized and PIR is build in demand management MRP will generate the planned order (type VP) based on the consumption logic. but if stock exist system will not consider it and continue to generate the dependent requirements for the raw material. this is really not acceptable by my client. we want the MRP run considering the stock of FG whensystem generates planned order for PIR.
    Is there any other way to fix this issue?
    we try to use user exit and set consumption indicator 4 for requirement type of VSE.but we failed. the answer is PIR ONLY consumes the requirement elements. Stock somehow a receipt element.
    any pointer is highly appreciateed.
    Reagrds,
    Mao Ye
    Edited by: Mao Ye on Apr 7, 2008 5:38 PM
    Edited by: Mao Ye on Apr 7, 2008 5:41 PM
    Edited by: Mao Ye on Apr 7, 2008 5:43 PM

    Dear,
    Stg 52, will create planned order equivant to the PIR created. and when sales order is created, the planned order is created.
    Hence the wayout is use stg 40. this will suit your requirement, create PIR and run MRP. Planned order is created.
    Do not convert the planned order to production order and give this autjorization to one who can take decision in shopfloor and coordinate.
    You can also use stg 74 ...just see the help link
    http://help.sap.com/saphelp_47x200/helpdata/en/cb/7f9b7043b711d189410000e829fbbd/frameset.htm

  • Exclude Stock Transfer from MRP Net Requirements

    Hi,
    Is it possible to exclude the Stock Transfer Orders from the Net Requirements generated by MRP? I want to base the requirements only from historical consumption. In my Stock/requirements list (MD04) for example, the Requisition generated by MRP increases in quantity since there are open Stock Transfers which are to be served by that plant to other plants.
    Regards,
    Lee

    Nazrin,
    Availability check configuration (OVZ9) has no impact on MRP.  MRP relies on its internal rules when it is performing its net requirements calculation.  You have very little control over which elements are included/excluded.
    You can exclude selected storage locations from MRP planning.  Stock and reservations against these storage locations will therefore also be excluded. 
    You can exclude a material from planning, change the material master MRP type to ND.
    Your best bet, though, would be to set your PM planning process up such that these materials never create the reservation in the first place.
    Regards,
    DB49

  • Best Method to calculate Net requirement

    Hi Expers,
    can you suggest the best methods to calculate net requirement for FMCG products in APO Production and distribution planning.
    Best Regards,
    Anandharaj

    Hi Anandharaj,
    There are multiple threads, SAP Notes and documentation in the web about this.
    Please read this note that explains everything about Net Requirements:
    448960
    - Net requirements calculation (documentation)
    You can also check this article:
    Net Requirements Versus Pegging in SAP ERP and SAP APO - SAP Planning
    Hope this helps.
    Kind Regards,
    Mariano

  • MRP Net Required/Available  Qty

    Hello Gurus ,
    I am carrying out MRP at plant level .After that MD04 We are analysing the result .We are developing Z report where we need to show Net Required Quanity(-) or Avaialable Quanity .We are using MDKP/MDTB table .
    1.Material Requirement Planning No xxxxxxx is not getting updated in MDTB table .I am getting MRP Table no from MDKP using Plant /Material Combination .
    2.What is the SAP Table -Filed name   to retrive Net Required/Available Quatity  (Planned quantity on the time axis that results from comparing receipts, issues, and current warehouse stock)
    Thanks and regards
    JH

    Hi,
    You can try with below function module, goto SE37 and test it
    MD_STOCK_REQUIREMENTS_LIST_API
    Regards,
    Sankaran

  • I followed the same procedure of reverse calculation from MRP pricing calcu

    hi,
    sap gurus,
    i followed the same procedure of mrp calculation but
    MRP Pricing Procedure:
    Go through the following:
    I will brief your requirement in short
    MRP = 1012.5/-
    VAT = (1012.5/1.125) = 900/-
    so price before discount will be = 900/-
    discount given at the rate of 10% = 100/-
    Initial Price = 1000/-.
    1. Create condition types as below:
    ZR00 for price
    Condition class = B
    Calculation type = C
    Plus/minus = A
    ZSET for settlement (to knock off the effect of ZR00)
    Condition class = A
    Calculation type = C
    Plus/minus = X
    ZWST for tax
    Condition class = A
    Calculation type = H
    Condition category = D
    Plus/minus = X
    Z007 for discount
    Condition class = A
    Calculation type = H
    Plus/minus = A
    ZDUM for net price
    Condition class = A
    Calculation type = A
    Plus/minus = A
    YWST for tax (to knock of the previous effect - to be used for posting to G/L)
    Condition class = A
    Calculation type = A
    Plus/minus = X
    YOO7 for discount (to knock of the previous effect - to be used for posting to G/L)
    Condition class = A
    Calculation type = A
    Plus/minus = X
    2. The following will be the pricing procedure configuration:
    Step......No........Cond Type........... From.........to..........Man.........Req........Sta................Acc Key
    10........0..............ZR00..................--..........--..........-...........-........---.................ZDU
    20........0..............ZWST..................10............19...........----.............X............X...................
    30........0.............text.......................10...........29...........---...........----.........X
    40........0.............Z007.....................30...........39...........-----.............X............X
    50........0..............text.....................30............49...........---...........-----.........X
    60........0............ZSET.....................10...........19...........----............X............--.................ZDU
    70........0............ZDUM....................50...........59...........----............X............---...............ERL
    80........0............Y007.....................40...........49...........----.............X...........---...............ERS
    90.......0..............YWST..................20...........29...........-----............X...........---................ZWS
    ZDU - dummy account key for posting extra not required items.
    ERL - account key for price
    ERS - account key for discount
    ZWS - account key for tax.
    3. Condition records in VK11
    Condition type----
    Condition record.......
    ZR00........................................1012.5.....................INR will be positive (1012.50 +)
    ZSET.......................................100%...............................will be negative (100 -)
    ZWST.......................................10%................................will be negative (10% -)
    Z007.........................................12.5%.............................will be positive (12.50 +)
    ZDUM.......................................100%..............................will be positive (100% +)
    Y007.........................................100%.............................will be negative (100% -)
    YWST.......................................100%.............................will be negative (100% -)
    Condition records for Z007 & ZWST will be decided as per the conversion required. You will first have to manually calculate the amount for the condition type.
    4. I create a sales order for single quantity for an item & the pricing will be as under:
    ZR00 = 1012.5 (dummy account) - positive
    ZSET = 1012.5- (dummy account) - negative will knock off effect of ZR00
    ZWST = 112.5- (negative & no posting)
    Z007 = 100 (positive & no posting)
    ZDUM = 1012.5 (positive & posting)
    Y007 = 100-(negative & posting)
    YWST = 112.5 (positive & posting)
    but its not throwing any condition records for ZWST and YWST
    can any body help me
    plz
    regrds,
    balaji.t

    HI,
    Plz try Routin for Vat formula.
    i am worked on MRP pricing but in our case formula is different.
    eg.: If i want to calculate VAT for B=1000 Rs. it is like
    A=1000 * ((100/100 + (12.5- VAT 5)))
    = 889
    VAT (Value) = B - A = 1000-889 = 111 which is passed to GL account.
    For that we developed one Routine with the help of ABAP and assign to Pricing Procedure.
    Regards,
    PM

  • Pricing - Requirment / calculation type / base value

    Dear Friends,
    Thnaks for the support and guidance provided by you for my previous posts
    In Pricing Procedure we give Requirment, Calculation type and Alternative formula for condition base value, I would like to know where do we exctly define all this?
    Or are they standard? If standards where we can see how they works?
    Regards
    Vishal

    Hi,
    go through the below Examples for better understanding ..
    Example: 1
    Condition Type: PR00
    Requirement 2 Item with Pricing
    Purpose:
    This is an example of a pricing requirement.  This requirement is met if the document item category is relevant for pricing and no previous condition in the pricing procedure has set the condition exclusion flag. This requirement can be assigned to condition types in the pricing procedure to avoid unnecessary accesses to the database when an item is not relevant for pricing or a condition exclusion indicator has been set.
    Example: 2
    Condition Type:  Net value
    Calculation Type: 2 Net value
    Purpose:
    This is an example of a condition value formula.  This type of formula can be used to influence the value shown for the condition in pricing.  A condition value formula is assigned to a condition type or value line in the pricing procedure.
    Formula '2' sets the value equal to net value that has been calculated so far for the item in the pricing procedure.  It contains the amount excluding taxes.
    Example: 3
    Condition Type: R100
        Alt.Condition Base Value: 28 (100% Discount)
    Purpose:
    This is an example of a condition base value formula.  A condition base value formula can be used to influence the basis the system uses when computing a pricing value.  A condition base formula is assigned to a condition type in the pricing procedure.
    Formula '28' sets the rate of the condition to a 100% discount.  This formula was delivered with condition type R100 to support free goods functionality.
    Reward if it is useful,
    Chandramohan

  • Open PO LSMW Quantity conversion error in net price calculation

    Hi gurus,
    I encountered an error as I was tring to upload purchase orders - "Quantity conversion error in net price calculation". What does this mean and how do I fix this?
    Please help
    Thanks

    Hi Jürgen,
    Where in the Material Master can I find the conversion ratio between both units?
    Also, I am trying to upload POs for Spare Parts and that's when I get the error. But when I try to use other materials like FGs, everything is ok. I can proceed with the upload without any problem
    Please help

  • Get "Error in Net Price Calculation" error while creating a Purchase Order

    I am getting a error when i try to create a PO. Says "Error in Net Price Calculation item 00010(Please correct)"
    I have defined conditon records with the price for the material  and have also created info record.However the price in the info record (including currency i.e USDN is different than the one defined in the conditon records currency is USD).
    However the price is different from the one defined in info record and in material master.
    Where is it picking the price from also is there any way to edit the price in material master or info record ?
    Also when i view the condition records by using Tcode MEK1 i get the following error
    "Access Pricing Purchasing Z00q 20 contains no fields"
    I know Z001 is the access sequence
    Can any one tell me wht is this error message about ?
    Edited by: Dspsac on Jan 29, 2008 4:31 AM

    how can u maintain the condition record as well as info record for a vendor -material in the same time frame
    it is not possibe
    as info record is also 1 of the condition table
    if u have maintained the info record then system is going to fetch the data from there but point top notice is it depends on the validity of record
    system fetch the price from info record
    and the currency used is fom vendor master

Maybe you are looking for

  • Display Issues in Elements

    Hey all, I recently bought an HP all in one Touch as well as Adobe elements 8. My computer resolution is set at 1920x1080. I shoot in 16:9 widescreen standard defintion. I also edit stills and video in the same aspect ratio. Whenever I create graphic

  • Syncing Google Chrome Bookmarks to iPhone (/iPad)

    So, I've used Chrome long enough to realize that it lays the smack down on Safari in terms of memory handling.. and I'd really like to start using it as my primary browser. Just one problem: I can't sync my bookmarks from Chrome to iOS. Any solutions

  • Changing default value

    Hi, Is there any way to change the material master weight unit of measure defaulted to LB instead of KG. Thanks, Chandu.

  • CTI jumps frames during RAM Preview

    I find myself having to build a graphic opener with music for the first  time in AE. Needing to time elements to the music, I've discovered  something that probably has been happening since I've owned AE, but I've  never paid attention to til now. Wh

  • PLM and CS

    Dear fnds.. Please Help me out this... Iam going to Implement Customer servuice module for my client.. Should i Need to Implement Plant maintence ...or can i go for nly Customer service... Regrads Raj