Hi gurus,
We are trying to implement the Change Request Management scenario in
Solution Manager 4.0 SP12 in a POC.
The TMS are created with Solution Manager as Controller and with the settings are correct.
We have created a Maintenance Project with the following landscape :
system1 - Client 100 as Development System - Type of Rol "Source System"
system2 - Client 200 as Quality System - Type of Rol "Target System"
system2 - Client 100 as Production System - Type of Rol "Production System"
In the Change Request tab, when we check "Activate Change Request Management" checkbox, the following error is shown:
"System system2-100 is to be changed in a Solution Manager project, but no
system in the system landscape exports transport requests which are
imported into this system."
What is happening? Any idea??
Thanks

The reason may be, that your "POC" is not valid due to the fact, that you use "clients" and not "systems" to transport
What you can try to verify that is - take out the QA client/system out of the transport route and try then to activate just with DEV --> PRD.
We wanted to setup something similar in the past and TMS failed to get configured properly - due to exact that reason.
Markus

Similar Messages

  • Regarding logical system assigining to transport request

    hi, all,
    how to assign the transport request for logical system.,....because i transported the interfaces to quality system..please guided me in this

    Hello Sai
    I am not sure about the meaning of your question.
    You do no assign any logical system to a transport request but you must define the target system (see Properties of request). Calling the search help for this field you see that the target systems are coming from the active transport configuration (STMS).
    Perhaps your question is about how to set the client in which the request is imported. Regarding workbench request containing client-independent objects it does not matter whether you import into client '000' or your productive client.
    For customizing requests containing client-dependent objects you set the client when executing the import (either in STMS or via command line when calling the tp command directly).
    Regards
      Uwe

  • Import and Export transport requests on Netweaver 2004s Sp11 Sneak Preview

    Hi Experts,
    I have configured the transportation system <STMS> in order to import and export transport requests on the NSP system. The configuration is working properly as files can be imported and exported out of the C:\sapmnt\trans directory. (configuration distributed by STMS -> Overview -> Systems -> Extras -> Distribute TMS Configuration, Folder SAPMNT shared).
    The problem I'm facing with the import of some example transports is given by the hanging import queues. In phase 'Import ABAP Dictionary Objects' I have the following message for almost all objects -> '... was not imported in this step'.
    I tried to solve this issue by running SE38->RDDNEWPP with DDIC user to schedule job RDDIMPDP for TP imports. I also made the config in TP_DOMAIN_NSP.PFL with SYSTEM_PF = C:\SAP\NSP\SYS\profile\DEFAULT.PFL.
    The error is still in logfile SLOG0732.NSP
    ERROR:       The following call returned with exit code 7:
    ERROR:         sapevt.exe SAP_TRIGGER_RDDIMPDP -t name=NSP
    and logfile dev_evt
    ERROR ***: MsSndTypeOnce, rc = -20
    ERROR ***: Event raise failed
    With the exports there is a similar issue in the EXPORT phase, given the note
    0 entries from WDY_APPLICATIONT exported.
    Batch process is available (parameter rdisp/wp_no_btc = 1)
    Profile has been activated by rz10->utilities->import profile->ofactive servers.
    Any ideas what still can be wrong? Does the import export and DDIC activation really work with the sneak preview?
    Thanks
    Christoph

    Hi Peter
    First of all thanks for your advice.
    I did No. 1. 2. 3. steps.
    Step 4. reacts with the folowing error message.
    Transport control program tp ended with error code 02008.
    Errors: error in transportprofile (param missing, unknown).
    My  license expires in four days. I tried to extend it via http://www.sap.com/minisap
    1. System-ID *   
    2. Hardware-Schlüssel (HWID) *   ?
    3.Systemnummer  ?
    What is to be entered in 1 and 2.
    Where should I look for HWID and Sysnr ?
    Thanks a lot again for your help
    With regards
    Fisseha

  • Sequence for collecting the Infocube in a transport request

    Hi SDNers,
    What is the sequence for collecting the Infocube in a transport request.
    Thanks,
    Satya

    Hi Sathya,
    Just giving a second thought to your question i think you need the steps of how to capture a info cube in a request:
    Step1
    go to T code RSOR----->Select object Types ->in the next column you can find Info Cube ->open the Info Cube ->Select Objects>double click on the Select Objects-give the Info Cube name that you want to collect to the request(find the Info Cube)
    Step2
    now you will find the required Info Cube , Drag the Info Cubeto the Right hand side
    Step 3
    Just above the the Info Cube that you have collected you will find Grouping click on it and select -
    >Necessary Objects
    Step 4
    now check the Info cube.
    Step 5
    Now click on the Lorry like symbol on the top.
    Step 6
    The system will promt you to enter the request
    Step 7
    Click on your own request ---> give the name of the request (note down the Name of the Request Example BWDK900109)
    Step 8
    now it will ask for the package (select the tranportable package , do not select $TMP)
    Step 9
    Press Ok now and you will find the Required Info Cube getting stored in the Request
    Step 10
    now go to the Transaction SE09 give your user name and select modified and click on Display
    Step 11
    Search the request name (ex BWDK900109) you find the Info Cube stored.
    Sttep 12
    Relese the request and import in to Quality(this is Basis Job no need to worry)
    Hope this helps.
    Thanks,
    rahul

  • Error while exporting transport requests

    Dears,
    In our PI 7.1 server,configured with CTS +,We are getting below error while exporting transport requests:
    Caused by: com.sap.tc.di.draft.ts.TsExecutionException: Error executing function (check stacktrace for details): EPS_OPEN_OUTPUT_FILE, (service=com.sap.tms)
    at com.sap.tc.di.draft.cts.impl.adapters.jco.TmsJCoExceptions.throwTsServiceException(TmsJCoExceptions.java:74)
    at com.sap.tc.di.draft.cts.impl.adapters.jco.EpsJCoAdapter.openFile(EpsJCoAdapter.java:98)
    at com.sap.tc.di.draft.cts.impl.adapters.jco.AbapEpsOutputStream.open(AbapEpsOutputStream.java:83)
    ... 40 more
    Caused by: com.sap.conn.jco.AbapException: (126) OPEN_FAILED: OPEN_FAILED
    at com.sap.conn.jco.rt.MiddlewareJavaRfc$JavaRfcClient.execute(MiddlewareJavaRfc.java:1492)
    at com.sap.conn.jco.rt.ClientConnection.execute(ClientConnection.java:1065)
    at com.sap.conn.jco.rt.RfcDestination.execute(RfcDestination.java:987)
    at com.sap.conn.jco.rt.RfcDestination.execute(RfcDestination.java:977)
    at com.sap.conn.jco.rt.AbapFunction.execute(AbapFunction.java:300)
    at com.sap.tc.di.draft.cts.impl.adapters.jco.JCoAdapter.executeFunction(JCoAdapter.java:103)
    at com.sap.tc.di.draft.cts.impl.adapters.jco.EpsJCoAdapter.openFile(EpsJCoAdapter.java:78)
    In SE01 it show tp 12 while releasing request.
    Please suggest.
    Shivam
    Edited by: Shivam Mittal on Mar 16, 2010 1:04 PM

    File Permission Issue.

  • Re Run Client Export Transport Request

    Dear Experts,
    I was trying to do system refresh of Production data to quality. While executing the transport request in quality (STMS_IMPORT) quality server abruptly stopped. Now after starting the server I am checking the status of the "Client Export - Specific Object" Transport. It shows "Import Running". In import monitor the execution start is showing yesterdays date and status as running.
    How can I rerun the TR
    Ranjit Simon

    Hi Ranjit,
    You can check the import monitor and see if you can cancel the import request.
    Once this is done, check TRJOB and TRBAT tables.
    On OS level, if you can see abandoned tp processes, you can kill that.
    Regards

  • Export Transport Request to a File

    Hi Everyone,
    I have a package that contains number of programs and tables and I would like to ship this package to a customer.
    I need some help in creating a new transport request that will allow me to export this transport as a file that I can give to
    the customer so that they import the transport in easy and fast way.
    Thanks
    Misbah

    I run this transaction to perform a test (RSTPTEST ):
    Check Transport Tool                                       16.12.2009  14:27:47
      |
      ---   NSP System NSP
          |
          |--   tp Interface
          |   |
          |   |-----Host Name             thinkpad
          |   |-----Version               1.80
          |   |-----Transport Directory   \\thinkpad\sapmnt\trans
          |   ------Logging               On (TPLOG contains 1760 entries)
          |
          |--   Transport Profile
          |   |
          |   |-----Path                  \\thinkpad\sapmnt\trans\bin\TP_DOMAIN_..
          |   |-----Profile               Cannot read tp profile
          |   ------Version               tp profile has an invalid format
          |
          |--   RFC Destination
          |   |
          |   |-----Destination           CALLTP_WindowsNT
          |   |-----tp Path               C:\SAP\NSP\SYS\exe\run\tp.EXE
          |   |-----tp Executable         Size: 5.709.824 bytes
          |   ------RFC Ping              timeout during allocate / CPIC-CALL: '..
          |
          ---   tp Call
              |
              |-----RFC Link              timeout during allocate / CPIC-CALL: '..
              |-----tp Version
              |-----DB Connect
              ------Offline Call          timeout during allocate / CPIC-CALL: '..
    Edited by: Misbah on Dec 16, 2009 9:31 PM

  • Collecting the Piece list in Transport request.

    Hi All,
    For Currency translation, i have created the Piece list in Development system.
    Can you please guide me how to collect it in transport request and transport to other systems.
    Please suggest.
    Thanks.

    Hi,
    This is useful if your system is ECC or Bw.
    at Dev system which t code you created  your list.
    From same screen, explore with menu options, there will be a option like direct object entry - its used to collect into transport request
    or
    Below method useful if your system is BW.
    Standard way - You can use Bw RSA1-->transport connection, find your object from middle pane and move to right side pane, later you can collect into transport request.
    Thanks

  • How do we know the size from the our objects in transport request no?

    Dear All,
    I have the need to know the size from the objects that we're gonna transport where those objects are attached in transport request no.
    Is that the way to know it ?
    If yes, could you kindly let me know regarding it ?
    Thanks a lot,
    Best regards,
    Daniel N.

    Hi Niel,
    If you want size and information of co files and data files, then the manual procedure is like this.
    1. Using transaction code AL11 (to see files on server)
    2. Goto folder DIR_TRFILES  ( or  /usr/sap/trans)
    3. Double click on that row.
    4. Inside that you will find two folders (among other folders)
        cofiles, data
    5. Goinside the subfolder you are interested. Eg. cofile
    6. Now suppose you request number is ABCK900168
       where ABC will be your system number, then the file name will be
       K900168.ABC
      or you can search for K900168
    7. The data file will have the name (in data folder)
        R900168
    There you can see the size (length column name) of the file.
    Hope this helps.
    regards,
    amit m.

  • How to delete the Logo under any Transport Request?

    Hi all,
    I have one Logo in SE78. it is under one TR number. This TR already moved to QA.
    Now i want to delete the Logo in Dev and saved in new TR or same TR number. then i will move the changes to QA.
    I try to delete the Logo in DEV. it is not asking any new TR number. simply it is deleted. So how can i move the TR to QA
    Thanks in Advance,
    venkat

    If deletion ask for a transport request, then you have no problem, the transport request will contain a "delete object" request. (Look at SE11, there is a flag for deletion in object list)
    If deletion has not asked for a transport request, then when you have created you new request, add the deleted object to request (here two ways to perform it , there are others
    - On SE03 (click on tool icon if on SE01) there is an option "Merge Object Lists "
    - On SE01 there is an icon (icon ICON_INCLUDE_OBJECTS) to include object of another request(s) into yours.
    Transporting the same request again and again should have absolutely no effect, as the object is saved into the request when releasing it. (saved in a binary format on a directory of the application server dedicated to transport)
    Regards

  • Transport Request doesn't appear in File System

    Hello everybody,
    i want to Transport a Request via File System. If i release the Request it doesn't appear in File System. The Logfile looks like this:
    1 ETP199X######################################
    1 ETP183 EXPORT PREPARATION
    1 ETP101 transport order     : "DA5K900033"
    1 ETP102 system              : "DA5"
    1 ETP108 tp path             : "tp"
    1 ETP109 version and release : "380.03.58" "720"
    1 ETP198
    2 EPU230XExecution of the export pre-processing methods for request "DA5K900033"
    4 EPU111    on the application server: "SRV64"
    4 EPU138    in client                            : "100"
    2 EPU235XStart: Version creation of the objects of the request "DA5K900033"
    3 EPU237 Version creation started as update request
    2 EPU236 End: Version creation of the objects of the request "DA5K900033"
    2 EPU231XStart: Adjusting the object directory for the objects of the request "DA5K900033"
    2 EPU232 End:  Adapting the object directory for the objects of the request "DA5K900033"
    2 ETN085 "Adding component vector" " " " " " "
    2 ETN085 "Finished." " " " " " "
    1 ETP183 EXPORT PREPARATION
    1 ETP110 end date and time   : "20140519103034"
    1 ETP111 exit code           : "0"
    1 ETP199 ######################################
    I've allready granted Everyone Full Control to the \trans Directory for testing purposes.
    OS: Windows Server 2008 R2
    DB: MS SQL Server 2008 R2
    Any suggestions?
    Best regards
    Dominik

    Hi Dominik
    What is the target of this transport request? Are you sure it's not marked as "local" in transaction SE01 for example? Because if it is a local transport request, it will not generate a file.
    Best regards
    Tom

  • EREC: Question concerning system landscape

    Hi all,
    I'm looking for someone who has excperience with a systemlandscape like this:
    development-system: one frontend-system and one backend-system
    quality-system: one frontend-system and one backend-system
    produktive-system: one frontend-system and one backend-system
    training-system: only one system (backend=frontend)
    The customer has no transport connection between the frontend- and backend-systems. There are transport connections between the frontend systems and the backend systems.
    The question is: which transport requests go into the training-system? Do we have a problem, when the frontend- and backend-transports go into the training-system?
    Thanks in advance!
    Regards
    Chris

    Hello Chris,
    first of all I am a bit confused why there is no connection between the frontend and the backend systems. The best practice approach for implementing an e-recruiting project with frontend / backend separation is to do all customizing and development on the dev backend server and then transport to the dev frontend system to ensure th systems are in sync. Parallel customizing and development in frontend and backend is not adviced.
    In general the training system should have the same system architecture as all other eRec systems in the landscape. This way even if there are customer developments which have been done in a way that only supports your project landscape instead of supporting all possible eRec landscapes (integrated / standalone, frontend / backend separation, ... ) they will work properly on training. Furthermore the system setup will be the same.
    Of course it could work if you use a training system without frontend / backend separation if this has been thoroughly planned during the project. If you can ensure that all developments have been done in a way that they support this landscape this should work. Special in your case, if you have really implemented in parallel on frontend and backend you must have applied and tracked sufficient naming conventions to prevent any conflict in development objects when they are combined on one system. (As the effort to implement the required processes and tools to ensure the compliance to such development standards is usually exceeding the costs for a small separated training frontend server having the training landscape aligned to the other systems landscape is the bst solution).
    Kind Regards
    Roman

  • Project landscape and system landscape

    hi all
    what is thifference between system landscape and project landscape??
    anil

    Hi Anil,
    System landscape:
    They system landscape basically is the set-up or arrangement of your SAP servers. Ideally, in an SAP environment, a three-system landscape exists. A three-system landscape consists of the Development Server-DEV, Quality Assurance Server-QAS and the Production Server-PROD. This kind of set-up is not primarily designed to serve as server clusters in case of system failure, the objective to enhance "configuration pipeline management".
    A Typical SAP Three-System Landscape.
    At this juncture, it is important to state that a test system - Sandbox can also exit separately. The essence of the sandbox is to test the configuration of the business processes of a company, especially at the inception of the project (before the Business Blue Print is signed). It can also serve as a practice environment, even after go-live.
    Pipeline is the environment where the configuration in the development system is moved to the quality assurance system and finally to the production system. The whole idea is to ensure that the configuration of these systems is in sync at any point in time. Suffice to say that, configuration/changes are first made in the Development system, thoroughly tested in the Quality Assurance system before been loaded into the production (Live) system.
    This approach throws up the transport management system concept. Transport management system is the coordination of the movement of objects and configuration changes from the development system to the Quality Assurance system and then to the Production system. At times, this sequence of movement is not possible, especially in cases where an SAP note mandates that changes be made directly on the production system.
    In such rare cases, objectively confirm that the change transport cannot be performed. Very likely, your system must have been configured to "not modifiable" (a system locking strategy that enforces the three-system landscape change transport rule); unlock the system by changing the global setting option to "modifiable" using transaction SE03. After you have done that, effect the change(s) on the system. Immediately lock the system back by changing the global setting option to "not modifiable" using transaction SE03. Replicate the changes on the other system. Note that transaction SCC4 can also be used to lock the system so that client dependent and independent configuration changes are not carried out directly on the production system.
    By and large, the SAP system landscape ensures that the integrity of data is enhanced via enforcing a controlled configuration changes effect on the target system - production.
    Project landscape:
    It's about the kind of soultion customer would be implementation in his project. Like CRM, SCM, ERP.
    Reward points if it helpful.
    Thanks & Regards
    Sasikanth.Ch

  • No Transport request in Virtual system

    Hi,
    I have setup the STMS , where we do not have production server hence i have used virtual system.
    All Transport request moved from Dev to Quality which appears fine the queue of QAS Server, but not appearing in Production Server which is virtaul.
    kindly advise.
    Thanks you
    irfan.

    Hi,,
    We do not have any QA Approval procedure, but all requests are assigned to one project.
    Seconldy i went into the Tcode SE01 entered the released transport number but i could not see any such logs which says waiting for QA approval.
    all it says is this..
    Log Overview for DEVK900421
           DEVK900421              MM-Release Strategy
             DEV        System DEV
                        Checks at Operating System Level         14.09.2010 02:14:24    (0) Successfully Completed
                        Pre-Export Methods                       14.09.2010 02:14:27    (0) Successfully Completed
                        Export                                   14.09.2010 02:14:33    (0) Successfully Completed
                 Import steps not specific to transport request
             QAS        Quality Server
                        Selection for Import                     14.09.2010 02:14:33    (0) Successfully Completed
                        -> Continue: Other Transport Ggroup      14.09.2010 14:53:51    (0) Successfully Completed
                 Import steps not specific to transport request

  • Transporting Transport Request from One System to other

    Hi All,
    I want to create tranport request from ECC 5.0 System to ECC 6.0 system.
    Please let me know steps for creating transport request and transporting transport request from one system to other system.
    Thanks in advance.
    Best Regds,
    zubera

    Hi,
    You cannot transport request from ECC5.0 to ECC6.0.
    Instead follow this:
    <b>In ECC5.0</b>
    Include all the objects into a transport request & provide the transport request no. to BASIS.
    BASIS team will create 2 files for you based on the transport request no.
    <b>in ECC6.0</b>
    Provide the 2 files to BASIS Team & ask them to import them.
    The objects would be available in ECC6.0
    Best regards,
    Prashant

Maybe you are looking for

  • Can I connect the mini to an older G5?

    Can I connect the new iMac Mini to an older Power PC G5 (3.0) and make the mini the dominant hard drive?

  • Want to put URLs into a custom field in the requirements

    I tried to put some code into a custom field in Empirix eManager. I was trying to add a URL to the requirement where the person could see more information. Specifically, we have use-cases online and a mockup of the final product to be developed. I wa

  • By default Office 365 Proplus save as Office 2010

    Hi, Operating System: Windows 7 (SP1); Office 2010 Professional SP1 and also Office 365 proplus... By default I have installed office 2010 and later I installed office 365 proplus online. My issue is when I am saving office365 proplus (Word,excel) fi

  • Opengl and labview

    Does anyone have a way to use opengl applications in labview? I have seen interfaces out there, but they are pretty expensive. Anyone done this yet?????

  • First Program

    Hello All, I installed Mini-SAP Basis system yesterday. I got it in a CD when i purchased a book on ABAP Objects. I am able to run the application and login and I can see the existing ABAP objects/programs created by authors of the book. When I try t