Open Period for material master record

Hi gurús
                We´d just create a new company code and plant. After the activation of ML we started to make some materiales movements, but the system show the error message "Posting only possible in period XXX".
Whe we opened the period through MMPV tcode system confirm us that the last period open is 06/2005. But the company code and plant was created after that date (11/2009).
How it is possible? From where the system is taking the date?
Thanks in advance for the help
Regards
Enzo

Hi,
See the date came as from which Company code your Company is Created, as well the Factory calender Might be Copied with the Calender and never Started the Update program. there are many reason's it happens.
So one thing As Your ABAPer to Try execute the program RMMMPERI upto today's Period. so that you can be able to do the process.
as Well as ABAPer to maintain background job through SM38 for program RMMMPERI in SAP so that you will never found the place to update the periods per month.
Regards,
Ninad Kshirsagar

Similar Messages

  • Close period for material Master record error

    my current period is 07 2010.
    I want to close period 07 2010, and make new posting to period 08 2010.
    but when i do the posting, system show error "Posting only possible in periods 2010/07 and 2010/06 in company code C999"
    PS: C999 is the company code that contains the plant P999
    And when i try to close the current period of material Master record  by MMPV, system show below information :
    "L O G
    Mode: Check and close period
    Client: 000
    Period entered (month/year): 07 2010
    Incorrect period in control rec. of CoCd C999; no conversion The current period (month/year) of the control record is 07 2010
    Period closing complete; log issued.
    E N D"
    and my current OB52 setting is below:
    Please help to supply some suggestion.
    P999     +               1     2010     12     2010     13     2010     16     2010
    P999     A          ZZZZZZZZZZ     1     2010     12     2010     13     2010     16     2010
    P999     D          ZZZZZZZZZZ     1     2010     12     2010     13     2010     16     2010
    P999     K          ZZZZZZZZZZ     1     2010     12     2010     13     2010     16     2010
    P999     M          ZZZZZZZZZZ     1     2000     12     2010     13     2000     16     2010
    P999     S          ZZZZZZZZZZ     1     2010     12     2010     13     2010     16     2010
    V001     +               1     2000     12     2010     13     2000     16     2010

    Hi,
    Check in T.code: MMRV and see which period is open for ur Co.Code and back posting is allowed or not. If you are sure to open new period now of  new posting to period 08, then
    use t.code: MMPV ,
    enter
    Company code C999
    Period to open 08
    Fiscal Year 2010
    Execute
    ( system will close the period last period 07 and automatically system open the new one 08)
    Now try ur transaction.
    if any problem, then check  in FI Side:
    Use t.code: OB52 and open the 08,2010 period in Account Types A, K, D,M, S and specially Account Type u201C+u201D which stands for valid for all accounts type and save. Better consult FICO consultant for OB52 step.
    Regards,
    Biju K

  • Problem with MMPV(close period for material master records)

    Hy,
    I'm really stuck in this weird problem.
    I have already open 04.2008 period in MMPV  and in MIGO transaction I got this error message:
    Document date lies in the future.
    Posting period 004 2008 is not open.
    What should I do?
    Please, someone help me.

    First check the date in MIGO transaction.... is it current date ?
                                                                                  (April's )
    and then
    go to OBBP  and check the posting period variant,
                           of your Company code..
    Now, go to OB52  and check the periods, they should be in
                               year 2008 for your posting period variant..

  • XML message for material master records

    Hello experts
    We want to implement an interface with material master records to be sent to our customers. This interface is proposed to be in XML. Can you please provide me with links or documents that explain how to integrate XML within SAP regarding master data maintenance.
    I need to know how we can trigger the XML message and where to include the logic of the attributes to be sent.
    Thank you in advance,
    Alejandra

    Hi
    You can do this scenario in BSP , better sit with ABAP and Portal(BSP) Consultant .
    they can give much more idea about this. Using BSP you can evaluate this requirement.
    Best regards
    Ram

  • Classification Data Creation for Material Master Record

    Hi all.
    I've a batch that update material master record with a Bapi "Bapi_material_savedata". After Material creation or changing we also need to insert or to change a classification data in the classification view of the material master record.
    Is there a function module that could be useful to update the classification data of a material?
    Thanks
    Carlo

    Hi Ravikumar,
    I tried to use the function module, but it doesn't works well, is it necessary thet material must have the Calssification view already set on?
    Thanks
    Luigi/Carlo

  • Open a previous period in material master record

    I'm working in a test system and current period was closed and so was the next period. So period 3/2008 is closed, period 4/2008 is closed, and now 5/2008 is the current period. I know I can post to the previous period but that doesn't help me because I need to post for 3/2008.
    My question is can I reopen 3/2008? If so what is the potiential problems I'll run into if I do?
    Thanks,
    Matt

    Hi,
    NOTE: Involve also FICO Consultant and collect all the documents before proceeding.
    MMRV: to check which period is open & also set back posting allowed,
    MMPV: to open the period.
    It is possible to re-open a previously closed period. However, it is NOT advisable to do so because the valuation data of the previous period could be affected.
    In general, it is only safe to reopen a previously closed period when no material postings have been done after the period shifting to the new period.If there has already been a posting after the period shifting to the new period, reverting the period back will cause database inconsistencies in the history tables.
    If you decide to proceed with this process, you can use the program RMMMINIT, but, please review the documentation of this program first!! and the check the SAP notes 487381 (for the error message that you are receiving) and the 369637 (for an explanation about the inconsistencies that will be generated.
    Steps are as below;
    Go to Transaction Code SE38
    Enter program name RMMMINIT
    Execute or press F8 function button
    Enter your company code (From and To)
    Enter relevant date: Say 01/02/2008 for Feb. 2008 month to be opened as of now
    That means, user can post for the month of Jan 2008 as well as Feb. 2008
    Refer SAP Note No. 487381 for more details.
    As per SAP Notes 487381 ( If the periods are opened in advance in mmpv to again change it to current period the following process should be follow ), Go to Tcode MMPI, then go to menu bar and select system -> user profile->owndata.In that screen , under the parameters tab enter MMPI_READ_NOTE in Parameter ID field and enter, then under short description you will get Initialise period. Next Save.
    Again go to MMPI enter company code, period and year and execute.
    OR
    NOT ADVICEABLE THIS METHOD, ONLY TRY IN SANDBOX NOT IN RUNNING SYSTEM OR TEST SYSTEM1.
    Use T.codes:
    1.OX18, and delete the plants assigned to your CO.CD and save.
    2. Use t.code: OMSY and change the posting period to the one u want and save.
    3. Use t.code:OX18 and assign the plants you have deleted in step 1.and save.
    Regards,
    Biju K

  • Material master records

    Hi,
       i tried  to initialize period for material master record and i am getting error  * follow the instruction in note 487381 before initialization* .any suggestion would be appriciated thanks
    cheers
    jothi

    Hi
    FYI--from sap note
    the initialization of a posting period has the following effects concerning the period stocks:
    The initialization of the posting period to a previous or to any posting period may lead to the loss of the information of the inventory balances of the previous periods.The book value of the current posting period is taken as the basis also for values of the previous period in this case.
               If you want to continue working with this new posting period, in addition you should execute report Z_DEL_HIST_ENTRIES attached so that history entries greater or equal to the new posting period will be deleted.
    If you have to briefly reset the posting period by one period (for example, postings must still be posted in a certain period) just to make a correction (and for a small number of postings), you should initialize the posting period back again to the old value so that the values of the previous period will not be lost (you should forbid postings when carrying out corrections).
               However, afterwards the values of the previous period or the history records (as of Release 4.5) of the materials posted in this case are inaccurate.
               You should NOT execute report Z_DEL_HIST_ENTRIES in this case.
    However, if the posting period is generally reset again to a previous posting period and if postings were made during this time, all information on the inventory balance of the previous periods is lost.
               As of Release 4.5a, you should use the cited correction report Z_DEL_HIST_ENTRIES in order to delete history records that are more current than the current posting period.Otherwise, it can result in deviations (inconsistencies) for the update of the history records.
    Important! If there are open physical inventory documents that have status 'counted' or for which indicator 'Freeze inventory balance' has been set, you should reject these if they refer to a previous period or have been created in the former previous period.The inventory difference to be posted can be determined from the current book value of the previous period and the book quantity frozen in the physical inventory document (ISEG-BUCHM) and does not match the inventory balance of the previous period that is currently valid.
    Reg
    Raja

  • PR, PO, GR for a consumable material without material master record

    Hi,
    I have created a complete cylcle till Invoice Verification for a material without a material master record.
    But i have one query i.e. in the cylce i created i had to create a GR before entering MIRO.  Is there any way by which i need not create a GR for a consumable material i.e. to be posted directly to a GL without any inventory management.
    In my case, the GR checkbox in the PO was automatically ticked.
    Can anyone help on this please.
    Regards,
    Laxmi

    Customizing Error Message in ME23N
    When displaying of modifying Purchase Orders with a document type of Framework Order,  a user selects the LIMITS tab, they get the error message Customizing incorrectly maintained, message number SE729.
    The problem is caused by version upgrades of the SAP software.
    Number of entries in table T162V is different to the number of columns in table control for screen SAPLMLSP (400).  You can use screen painter SE51 to display the screen.  View the Element list for TC_VIEW.
    The list of fields can also be viewed within the program.  Transaction code ML81N (service entry sheet), program SAPLMLSR.  Click on the Configuration button (top right hand corner) select Administrator.  This shows the number of fields as 67.
    Using SE16N to view table T162V shows 69 fields.  This table contains six layouts (variants), they must all be the same.  Before the change the total count was 414 (69 x 6). 
    The ME23N transaction only checks that the number of entries is correct.  You will notice that the fields are not in the same sequence, but that should not matter if you donot use the service transaction ML81N and it is not a selectable tab on ME23N.
    Transaction SM31 was used to delete the extra fields.  As this is a SAP table, you may need extra authorisations to make the change.
    Note:  the number of fields shown above will be different in each site.  This is because of different SAP versions and in what software is loaded. 

  • How to open again the past period for Material?

    Hi All,
    by t.code MMPV, I can close a period for Material.
    I wonder if is possible to turn back.
    Thanks

    hi
    If you want to open previous period for reversal entry or additional entry
    The following are steps for Opening previous period in MM :
    1. Go to TCode SU01 (see OSS NOTES 487381)
    2. Choose "change" tab with your loging Name
    3. Choose "Parameter" tab
    give Parameters MMPI_READ_NOTE with date format as YYYYMMDD
    (say today 20100302)
    4. SAVE.
    5. Go to T-code MMPI
    6. open the old periods which you want to post into,
    Note :
    the period opening will be valid for only for the particular day only.
    7. Complete the posting you want to reverse or add
    8. Go to MMPV to close the periods
    Note :
    If we enter the date or month in MMPV means we are opening that date or month by closing previous date or month
    (Never use MMPV without completing the transaction in previous month)
    POSTING ENTRY INPAST PERIOD IS NOT RECOMENDED check note  487381

  • Batch Management Indicator not getting set for material master

    Hi,
    In one of the material we need to mark the Batch Management Indicator in Material MAster. We had removed all the stocks from the material. But still we are getting error, Stock exists for the material in Plant XXX and Sloc YYY.
    I checked in MARD table and MMBE that for this maaterial there are no stock for said Sloca and Plant.
    One thing which I noticed in the Material Master and MARDH table that there exists some stock in Previous persiod for the said Sloc and Plant.
    Need to know is this error is due to stock shown in previous period. Why system is checking the previous period stock.
    How can we resolve our issue and check this Indicator.
    Please let me know as earliest as possible.
    Thanks
    SG

    Hi,
    Refer OSS Note 30656 - Change base unit of measure/batch mngt requirement
    Following are the details of this note;
    Symptom
    When maintaining a material master record, you change the base unit of measure or the batch management requirement indicator or the valuation category. The system then tells you that this change is not possible since stocks still exist. However, no stocks are shown for the material in the stock overview.
    Reason and Prerequisites
    The message that stocks still exist refers not only to stocks in the current period, but also to stocks in the previous period.
    The reason for checking previous period stocks is that postings can also be made to the previous period when entering goods movements. This would result in inconsistencies if the base unit of measure had meanwhile been changed.
    Solution
    Please check whether stocks still exist for the previous period by displaying, for example, the plant stock view or storage location stock view of the material. You do this by selecting "Extras -> Previous period -> Prev. pd SLoc. stock or Prev. pd plant stock".
    If previous period stocks exist, you can make a withdrawal posting as follows:
          1. Post the same amount to current period stock (for example, using movement type 561) so that previous period stock and current period stock are identical.
          2. Make a withdrawal posting in the previous period for the stock together with posting date (for example, using movement type 562).
    You can now try again to change the base unit of measure or the batch management requirement indicator.
    Since the posting of the previous period values to zero is identical with posting to the stocks of the current period, you should reverse the above stock postings (i.e. the stock from the previous period should be booked in again) to make sure that the stock values from the previous and the current periods correspond to the state before the change. Please note, however, that the postings are then carried out using the changed master data from the current period (e.g. account determination, etc.)
    Regards,

  • Creating MDM repository for Material Master Data

    Hello MDM Gurus,
    I am new to SAP MDM. I want to create MDM repository for Material Master. What I unddertand is, I can create repository using Bussiness Content shiped with MDM software. I will copy *.a2a file to archive folder of MDM server and unarchive repository. I have following question for you.
    1. HOw do I use export maps and import maps which I found in Busines contenst\Material folder?
    2. How do I use MDM Lookup Tables which is xml document in Busines contenst\Material folder?
    3. Why is the use of MDMGX_55520_Material.txt file which I found in Busines contenst\Material folder?
    4. What is the use of *.xsd files and how can I use them?
    Thanks,
    Bhupesh

    Hi Bhupesh
    1. HOw do I use export maps and import maps which I found in Busines contenst\Material folder?
    save all the map files on your loacl machine. open import manager and select file-> Import, browse to the .map file and save the map with a meaningful name. now next time connect to the source file you want to import and OPEN the map saved.
    2. How do I use MDM Lookup Tables which is xml document in Busines contenst\Material folder?
    Businees content contains the standard  ECC refernce tables like countries, regions etc which can be refreshed from ECC. for this you have to configure MDMGX, defining all the ports in MDM and in ECC the tables from which data has to be refreshed. refer to below threads for details.
    Extract Data usnig MDMGX
    How to Export Materials from ERP to MDM 7.1 via MDMGX?
    3. Why is the use of MDMGX_55520_Material.txt file which I found in Busines contenst\Material folder?
    This helps us in configuring the table extraction from ECC, refer to thread-> Extract Data usnig MDMGX
    4. What is the use of *.xsd files and how can I use them?
    Schema files are used for syndicating the records from MDM to source system. Say we want to syndicate material master from MDM to ECC and in ECC they will be posted via MATMAS05 IDoc. these schemas are the structure of IDoc which will contain the values which will be syndicated from MDM.
    Let me know if you know some more details.
    regards
    Ravi

  • Delet Material Master Record but not the range

    HI experts,
    I have more material master records in production data base; now i need to delete them but at the same time don't remove the range numbering.
    I.E.
    there are 10 master record with range number from 1 to 10.
    now, deleting these 10 master records, i would like to avoid that the numbering starts from 11.
    thanks in advance
    C.

    Hi Jurgen,
    I've gone through the data archiving project in the past. I was actually hoping I don't have to go through this big exercise for this minor situation.
    The storage locations in the SAP system are fine. The problem is that when I came in to this organization, I found out that the procurement users have accidentally extended material master record to those storage location irrelevant to them. Those users don't post any stock to those accidentally extended storage location. They admit that it was a mistake. So, I don't really have to do stock movement or GI out from those affected storage location because there's nothing in them.
    Now that I've initially flag for deletion (MM06) of those mistakes done by those procurement users over the few years counting to 2000+ material master records affected. But the standard behavior of the SAP system allows change to proceed in MM02 except for that warning message MM081. So, I was actually asking around to explore if there's actually an option to make it an error prompt instead and stop the whole change process at MM02 transaction level.
    If I may re-confirm, what I've done so far via flaging for deletion of material master record at storage location level - is this the only correct solution available?
    Hope this clarifies my intention of opening this thread. Sometimes, users are quite tough in accepting the results from standard SAP system behavior.
    Thanks for the time in explaining.
    Steven

  • Material Master Record - How to remove or delete storage location

    Dear all,
    Is there a way to remove or delete a storage location accidentally extended via MM01 due to extending the general plant view?
    I've tried the following:
    1. I've used MM06 to flag the particular storage lcoation for deletion. However, when go to MM02 and select the plant view, the storage location that already been flag still exist for selection. I only get the warning prompt "The storage location has been flag for deletion".
    2. I tried MMSC attempt to delete and I get either messages with different material master record:
    a) "Material not fully maintained for this transaction/event"
    OR
    b) "Storage location 60BF already exists and cannot be deleted"
    P/S: If this question has been asked before by others, please point me to that thread.
    I'm grateful for any suggestion. Thanks.
    Steven

    Hi Jurgen,
    I've gone through the data archiving project in the past. I was actually hoping I don't have to go through this big exercise for this minor situation.
    The storage locations in the SAP system are fine. The problem is that when I came in to this organization, I found out that the procurement users have accidentally extended material master record to those storage location irrelevant to them. Those users don't post any stock to those accidentally extended storage location. They admit that it was a mistake. So, I don't really have to do stock movement or GI out from those affected storage location because there's nothing in them.
    Now that I've initially flag for deletion (MM06) of those mistakes done by those procurement users over the few years counting to 2000+ material master records affected. But the standard behavior of the SAP system allows change to proceed in MM02 except for that warning message MM081. So, I was actually asking around to explore if there's actually an option to make it an error prompt instead and stop the whole change process at MM02 transaction level.
    If I may re-confirm, what I've done so far via flaging for deletion of material master record at storage location level - is this the only correct solution available?
    Hope this clarifies my intention of opening this thread. Sometimes, users are quite tough in accepting the results from standard SAP system behavior.
    Thanks for the time in explaining.
    Steven

  • Step by step instruction for Using LSMW Recoding method for Material Master

    Guys,
    Can some one explain step by step procedure for uploading the materials master data to R/3 by using LSMW Recoding method. By the time you reply I will go through the rule of uploading the data..
    Thanks guys,
    Dhanu.

    Hi,
    The Legacy System Migration Workbench (LSMW) is a tool recommended by SAP that you can use to transfer data once only or periodically from legacy systems into an R/3 System.
    The LSM Workbench covers the following steps:
    (1)Read the legacy data from one or several files (e.g. spreadsheet tables, sequential files)
    (2)Convert the data from source format to target format
    (3)Import the data using standard interfaces (Batch Input, Direct Input, BAPI, IDoc).
    The Steps for LSME are:
    Example: Customer Master upload:
    LSMW to Update Customer Master Records with Transaction Recording
    Call Legacy System Migration Workbench by entering transaction code LSMW. Every conversion task is grouped together as Project / Subproject / Object structure. Create a Project called LSMW_DEMO and a Subproject as CUSTOMERS and Object as CUST_REC
    Step 1: Maintain Object attributes
    In this example, you will be updating the customer master records with the help of recording a transaction (XD02). Choose radio button Batch Input Recording and click on the recording overview icon to record the R/3 transaction. Enter the Recording name as XD02_REC, the description as Customer Master Updates Recording, and the transaction code as XD02.
    Step 2. Maintain Source Structures
    Give a name and a description to the source structure
    Step 3. Maintain Source Fields
    In this step, you need to list what fields are present in the source structure. The easiest way is to click on u2018Table Maintenanceu2019 icon to enter Fieldname, Type and Length for each field
    Step 4: Maintain Structure Relations
    Execute a step to u2018Maintain Structure Relationsu2019. Since, there is only one Source and Target Structure, the relationship is defaulted automatically.
    Step 5: Maintain field mapping and conversion rules
    Field RF02D-D0310 represents that you chose u2018Sales viewu2019 for the customer Master screen accordingly its value should be set to X. Keep your cursor on field RF02D-D0310 and click on Constant rule icon to choose the constant value of u2018Xu2019.
    If your source file already has the field value, you choose rule u2018Source Fieldu2019.
    Keep cursor on field u2018KUNNRu2019 and click on u2018Assign Source fieldu2019 icon to choose source field CUSTOMER from structure XD02S
    Step 6: Maintain fixed values, translations, user-defined routines
    You can also maintain re-usable translations and user-defined routines, which can be used across conversion tasks. In this case, that step is not required.
    Step 7: Specify files
    In this step, we define how the layout of the input file is. The input file is a [Tab] delimited with the first row as field names. It is present on my PC (local drive) as C:\XD02.txt.
    Step 8: Assign files
    Execute step u2018Assign Filesu2019 and the system automatically defaults the filename to the source structure.
    Step 9: Read data
    In this step, LSMW reads the data from the source file (from your PCu2019s local drive). You have the option to read only selected rows and convert data values to Internal format.
    Step 10: Display read data
    This step is optional. If required, you can review the field contents for the rows of data read.
    Step 11: Convert data
    This is the step that actually converts the source data (in source format) to a target format. Based on the conversion rules defined, source fields are mapped to target fields.
    Step 12: Display Converted data
    Again this is an optional step to view how the source data is converted to internal SAP format
    Step 13: Create batch input session
    Once the source data is converted in an internal format, you can create a batch session to process updates.
    Step 14: Run Batch Input Session
    You can execute the BDC session by Run Batch input session. Executing a batch input session is a standard SM35 transaction for managing BDC sessions. Once you have successfully executed the batch input session, the customer master records are updated in the system. You can confirm this by viewing the customer master records (XD03).
    Follow the link for material master
    http://www.sap123.com/showthread.php?t=98
    Regards,
    Biju K

  • How to enter a material on SO without a Material Master Record?

    Hi guys,
    Pls help me 2 flowing problem:
    1. How to enter a material on SO without a Material Master Record? And all case need to enter a material on SO without a Material Master Record.
    2. How to use customer material number if there isn't Master Data
    Thanks

    Hi Friend,
    I dont think we can go with a sales order with a material without material master record.
    But there are some cases where in we can create a sales order by entering a material which does not have a material master.
    1. Through material determination
    You can create a material determination for a material (1234) which exists in sap by a material(XYZ) which does not; For example in VB11 you can create a material determination for a material 1234 ( exists in sap) through a material XYZ which does not exists in sap.
    While creating the sales order when you enter the material XYZ is not give any error and automatically determine the material 1234 which exists.
    2. Text material
    We can create a order/quote by directly entering a text in the material description and without entering the material. This the case for text material wherein text item category will be determined.
    Please let me know if this help you. Else kindly elaborate the scenario.  
    Abhishek

Maybe you are looking for

  • How to print special characters in sqpllus gui, for example "double dagger"

    Hello, I have a SOAP call procedure which retrieves data which is delimited by " double dagger", on screen I get a filled block instead of ‡. If I do a copy/paste in here, the double dagger shows up, but not in sqlplus. how can I resolve this? Thanks

  • Issue with - Connector Framework  SAP EP 7.0

    HI Need assitance on usage of connector framework to connect to SAP R/3 using SSO. I am trying to call a BAPI from a jsp iView using sap connector framework. Release :  EP (SAP NetWeaver 7.0 (2004s) SPS 12). Steps I did so far : 1. imported following

  • When syncing my IPAD, I am unable to scroll when in the photo ITunes window so that I can select specific albums to sync

    I am attempting to sync photos to my IPAD but am unable to scroll down my albums when I am in the ITunes device window named 'photos'. How to I scroll to see all of my albums so that I can select which albums to sync?

  • Levels not correctly visualized

    Hello, I'm using Discoverer v. 10.1.2, and my database version is 10g r. 1 (10.1.0.4.2). My olap objects are in CWM2 catalog. When I build a new crosstab, the levels of my dimensions are not correctly visualized: for example, a node of a level that h

  • Doubt on 'default' access modifier

    How JRE access the main method even if the class has 'default' access. ie, following run without declaring the class as public. As per my understanding only classes in the same package access the method. Is the 'default' package belong to JRE ? class