Problem with MMPV(close period for material master records)

Hy,
I'm really stuck in this weird problem.
I have already open 04.2008 period in MMPV  and in MIGO transaction I got this error message:
Document date lies in the future.
Posting period 004 2008 is not open.
What should I do?
Please, someone help me.

First check the date in MIGO transaction.... is it current date ?
                                                                              (April's )
and then
go to OBBP  and check the posting period variant,
                       of your Company code..
Now, go to OB52  and check the periods, they should be in
                           year 2008 for your posting period variant..

Similar Messages

  • Close period for material Master record error

    my current period is 07 2010.
    I want to close period 07 2010, and make new posting to period 08 2010.
    but when i do the posting, system show error "Posting only possible in periods 2010/07 and 2010/06 in company code C999"
    PS: C999 is the company code that contains the plant P999
    And when i try to close the current period of material Master record  by MMPV, system show below information :
    "L O G
    Mode: Check and close period
    Client: 000
    Period entered (month/year): 07 2010
    Incorrect period in control rec. of CoCd C999; no conversion The current period (month/year) of the control record is 07 2010
    Period closing complete; log issued.
    E N D"
    and my current OB52 setting is below:
    Please help to supply some suggestion.
    P999     +               1     2010     12     2010     13     2010     16     2010
    P999     A          ZZZZZZZZZZ     1     2010     12     2010     13     2010     16     2010
    P999     D          ZZZZZZZZZZ     1     2010     12     2010     13     2010     16     2010
    P999     K          ZZZZZZZZZZ     1     2010     12     2010     13     2010     16     2010
    P999     M          ZZZZZZZZZZ     1     2000     12     2010     13     2000     16     2010
    P999     S          ZZZZZZZZZZ     1     2010     12     2010     13     2010     16     2010
    V001     +               1     2000     12     2010     13     2000     16     2010

    Hi,
    Check in T.code: MMRV and see which period is open for ur Co.Code and back posting is allowed or not. If you are sure to open new period now of  new posting to period 08, then
    use t.code: MMPV ,
    enter
    Company code C999
    Period to open 08
    Fiscal Year 2010
    Execute
    ( system will close the period last period 07 and automatically system open the new one 08)
    Now try ur transaction.
    if any problem, then check  in FI Side:
    Use t.code: OB52 and open the 08,2010 period in Account Types A, K, D,M, S and specially Account Type u201C+u201D which stands for valid for all accounts type and save. Better consult FICO consultant for OB52 step.
    Regards,
    Biju K

  • Open Period for material master record

    Hi gurús
                    We´d just create a new company code and plant. After the activation of ML we started to make some materiales movements, but the system show the error message "Posting only possible in period XXX".
    Whe we opened the period through MMPV tcode system confirm us that the last period open is 06/2005. But the company code and plant was created after that date (11/2009).
    How it is possible? From where the system is taking the date?
    Thanks in advance for the help
    Regards
    Enzo

    Hi,
    See the date came as from which Company code your Company is Created, as well the Factory calender Might be Copied with the Calender and never Started the Update program. there are many reason's it happens.
    So one thing As Your ABAPer to Try execute the program RMMMPERI upto today's Period. so that you can be able to do the process.
    as Well as ABAPer to maintain background job through SM38 for program RMMMPERI in SAP so that you will never found the place to update the periods per month.
    Regards,
    Ninad Kshirsagar

  • XML message for material master records

    Hello experts
    We want to implement an interface with material master records to be sent to our customers. This interface is proposed to be in XML. Can you please provide me with links or documents that explain how to integrate XML within SAP regarding master data maintenance.
    I need to know how we can trigger the XML message and where to include the logic of the attributes to be sent.
    Thank you in advance,
    Alejandra

    Hi
    You can do this scenario in BSP , better sit with ABAP and Portal(BSP) Consultant .
    they can give much more idea about this. Using BSP you can evaluate this requirement.
    Best regards
    Ram

  • Classification Data Creation for Material Master Record

    Hi all.
    I've a batch that update material master record with a Bapi "Bapi_material_savedata". After Material creation or changing we also need to insert or to change a classification data in the classification view of the material master record.
    Is there a function module that could be useful to update the classification data of a material?
    Thanks
    Carlo

    Hi Ravikumar,
    I tried to use the function module, but it doesn't works well, is it necessary thet material must have the Calssification view already set on?
    Thanks
    Luigi/Carlo

  • Problem with updating ABC indicator for Material

    Hi All,
    My client wants to run cycle count for one warehouse.Since the material master does not have ABC indicator in Storage view, Iam using MIBC for updating the Material Master. But after executing MIBC also ABC indicator is not getting updated in the Material master. Please help.
    Rgds
    Srinivas

    Hi, You need to have an history of at least several months of movements in order to do this analysis. You need also to flag "all articles held in stock" in order to select articles without ABC indicator. Rgds, Philippe

  • Open a previous period in material master record

    I'm working in a test system and current period was closed and so was the next period. So period 3/2008 is closed, period 4/2008 is closed, and now 5/2008 is the current period. I know I can post to the previous period but that doesn't help me because I need to post for 3/2008.
    My question is can I reopen 3/2008? If so what is the potiential problems I'll run into if I do?
    Thanks,
    Matt

    Hi,
    NOTE: Involve also FICO Consultant and collect all the documents before proceeding.
    MMRV: to check which period is open & also set back posting allowed,
    MMPV: to open the period.
    It is possible to re-open a previously closed period. However, it is NOT advisable to do so because the valuation data of the previous period could be affected.
    In general, it is only safe to reopen a previously closed period when no material postings have been done after the period shifting to the new period.If there has already been a posting after the period shifting to the new period, reverting the period back will cause database inconsistencies in the history tables.
    If you decide to proceed with this process, you can use the program RMMMINIT, but, please review the documentation of this program first!! and the check the SAP notes 487381 (for the error message that you are receiving) and the 369637 (for an explanation about the inconsistencies that will be generated.
    Steps are as below;
    Go to Transaction Code SE38
    Enter program name RMMMINIT
    Execute or press F8 function button
    Enter your company code (From and To)
    Enter relevant date: Say 01/02/2008 for Feb. 2008 month to be opened as of now
    That means, user can post for the month of Jan 2008 as well as Feb. 2008
    Refer SAP Note No. 487381 for more details.
    As per SAP Notes 487381 ( If the periods are opened in advance in mmpv to again change it to current period the following process should be follow ), Go to Tcode MMPI, then go to menu bar and select system -> user profile->owndata.In that screen , under the parameters tab enter MMPI_READ_NOTE in Parameter ID field and enter, then under short description you will get Initialise period. Next Save.
    Again go to MMPI enter company code, period and year and execute.
    OR
    NOT ADVICEABLE THIS METHOD, ONLY TRY IN SANDBOX NOT IN RUNNING SYSTEM OR TEST SYSTEM1.
    Use T.codes:
    1.OX18, and delete the plants assigned to your CO.CD and save.
    2. Use t.code: OMSY and change the posting period to the one u want and save.
    3. Use t.code:OX18 and assign the plants you have deleted in step 1.and save.
    Regards,
    Biju K

  • SAP integration with bio matrics devices for HCM master record

    Hi Experts,
    Do we have the option of using Bio Martix with HCM Master data unlike photo
    Regards,
    Masoom Ali

    Sasikanth,
    Usually before you switch UME to AD, you would read it with an LDAP web compliant browser, to check if you could access your OU, Group, and Users. Are you sure you can read the complete LDAP structure on AD?
    Kindly re-check the process, to see if you missed out on any steps.
    http://help.sap.com/saphelp_erp2004/helpdata/en/cc/cdd93f130f9115e10000000a155106/frameset.htm
    Check note 772620 - UME 4.0: Create Groups on Microsoft Active Directory Server
    Regards,
    James

  • Material master records

    Hi,
       i tried  to initialize period for material master record and i am getting error  * follow the instruction in note 487381 before initialization* .any suggestion would be appriciated thanks
    cheers
    jothi

    Hi
    FYI--from sap note
    the initialization of a posting period has the following effects concerning the period stocks:
    The initialization of the posting period to a previous or to any posting period may lead to the loss of the information of the inventory balances of the previous periods.The book value of the current posting period is taken as the basis also for values of the previous period in this case.
               If you want to continue working with this new posting period, in addition you should execute report Z_DEL_HIST_ENTRIES attached so that history entries greater or equal to the new posting period will be deleted.
    If you have to briefly reset the posting period by one period (for example, postings must still be posted in a certain period) just to make a correction (and for a small number of postings), you should initialize the posting period back again to the old value so that the values of the previous period will not be lost (you should forbid postings when carrying out corrections).
               However, afterwards the values of the previous period or the history records (as of Release 4.5) of the materials posted in this case are inaccurate.
               You should NOT execute report Z_DEL_HIST_ENTRIES in this case.
    However, if the posting period is generally reset again to a previous posting period and if postings were made during this time, all information on the inventory balance of the previous periods is lost.
               As of Release 4.5a, you should use the cited correction report Z_DEL_HIST_ENTRIES in order to delete history records that are more current than the current posting period.Otherwise, it can result in deviations (inconsistencies) for the update of the history records.
    Important! If there are open physical inventory documents that have status 'counted' or for which indicator 'Freeze inventory balance' has been set, you should reject these if they refer to a previous period or have been created in the former previous period.The inventory difference to be posted can be determined from the current book value of the previous period and the book quantity frozen in the physical inventory document (ISEG-BUCHM) and does not match the inventory balance of the previous period that is currently valid.
    Reg
    Raja

  • Problem with mass IDoc for Material Master

    Hi All,
    Can anyone suggest a solution to work with mass IDocs for Material master?
    We have DEBMDM and CREMDM as mass capable IDocs for Customer and Vendor. How do we get mass Material Master IDocs from R/3 in a single XML file?
    Also the standard Material repository supplied with SAP MDM 5.5 SP3 doesn't have any XSD definition for MATMDM. Can anyone throw some light on this problem?
    Regards
    Pooja

    Hello Pooja:
    The standard way to do it is to generate a single file containing multiple idocs (And for the sake of performance, I suggest you stick to this technique).
    In the case of material master, everything is straight forward. In the case of customer and vendor master, when data flows from R/3 to MDM no idoc conversion needs to be performed by XI.
    However, for the case of customer and vendor master, when data flows from MDM to R/3, XI needs to separate the data in CREMDM to CREMAS and ADRMAS in order for R/3 to be able to process the idocs; as well as separate the data in DEBMDM to DEBMAS and ADRMAS.
    The good thing is that you do not need to worry about all this mappings and conversions in XI. The only thing you need to do in XI is to import the standard business content for SAP MDM 5.5 into XI.
    Hope this helps.
    Regards,
    Jorge.

  • Problems with the posting period....

    Hi guys,
    every once in a while the old problem with the posting periods occurs. This morning it hit me and I went out to repair it.
    Starting out from MMRV I checked the open period and it said 062009.
    Using MMPV, by mistake, I opened 112009, so that I'm able to post to 112009 PLUS the previous period 102009 (which is ok so far). Later on I checked OB52 to see, if finance is not the problem. The opened period lasts from 012009 to 122009.
    Long story short: everything seems perfectly alright, however it still doesn't work. It says: Posting only possible in periods 2009/11 and 2009/10 in company code 1000
    I don't see where there could be a problem now...
    Any help is greatly appreciated!
    Thx & regards,
    Bobby

    Hi,
    It is possible to re-open a previously closed period. However, it is NOT advisable to do so because the valuation data of the previous period could be affected.
    In general, it is only safe to reopen a previously closed period when no material postings have been done after the period shifting to the new period.
    If there has already been postings after the period shifting to the new period, reverting the period back will cause database inconsistencies in the history tables.
    If you decide to proceed with this process, you can use the program RMMMINIT, but, please review the documentation of this program first!! and the check the SAP notes 487381 (for the error message that you are receiving) and the 369637 (for an explanation about the inconsistencies that will be generated.
    Steps are as below;
    Go to Transaction Code SE38
    Enter program name RMMMINIT
    Execute or press F8 function button
    Enter your company code (From and To)
    Enter relevant date: Say 01/10/2009 for Oct. 2009 month to be opened as of now
    That means, user can post for the month of sept 2009 as well as Oct. 2009
    Refer SAP Note No. 487381 for more details.
    As per SAP Notes 487381 ( If the periods are opened in advance in mmpv to again change it to current period the following process should be follow ), Go to Tcode MMPI, then go to menu bar and select system -> user profile->owndata.In that screen , under the parameters tab enter MMPI_READ_NOTE in Parameter ID field and enter, then under short description you will get Initialise period. Next Save.
    Again go to MMPI enter company code, period and year and execute.
    Other way of doing it is follow these steps: ( *TRY in Sandbox But do not try in PRODUCTION SYSTEM*)
    1. Use t.code: OX18, and delete the plants assigned to your CO.Cd and save.
    2. Use t.code: OMSY and change the posting period to the one u want and save.
    3.Go to OX18 and assign the plants you have deleted in step 1.and save.
    Regards,
    Biju K

  • How to open again the past period for Material?

    Hi All,
    by t.code MMPV, I can close a period for Material.
    I wonder if is possible to turn back.
    Thanks

    hi
    If you want to open previous period for reversal entry or additional entry
    The following are steps for Opening previous period in MM :
    1. Go to TCode SU01 (see OSS NOTES 487381)
    2. Choose "change" tab with your loging Name
    3. Choose "Parameter" tab
    give Parameters MMPI_READ_NOTE with date format as YYYYMMDD
    (say today 20100302)
    4. SAVE.
    5. Go to T-code MMPI
    6. open the old periods which you want to post into,
    Note :
    the period opening will be valid for only for the particular day only.
    7. Complete the posting you want to reverse or add
    8. Go to MMPV to close the periods
    Note :
    If we enter the date or month in MMPV means we are opening that date or month by closing previous date or month
    (Never use MMPV without completing the transaction in previous month)
    POSTING ENTRY INPAST PERIOD IS NOT RECOMENDED check note  487381

  • PR, PO, GR for a consumable material without material master record

    Hi,
    I have created a complete cylcle till Invoice Verification for a material without a material master record.
    But i have one query i.e. in the cylce i created i had to create a GR before entering MIRO.  Is there any way by which i need not create a GR for a consumable material i.e. to be posted directly to a GL without any inventory management.
    In my case, the GR checkbox in the PO was automatically ticked.
    Can anyone help on this please.
    Regards,
    Laxmi

    Customizing Error Message in ME23N
    When displaying of modifying Purchase Orders with a document type of Framework Order,  a user selects the LIMITS tab, they get the error message Customizing incorrectly maintained, message number SE729.
    The problem is caused by version upgrades of the SAP software.
    Number of entries in table T162V is different to the number of columns in table control for screen SAPLMLSP (400).  You can use screen painter SE51 to display the screen.  View the Element list for TC_VIEW.
    The list of fields can also be viewed within the program.  Transaction code ML81N (service entry sheet), program SAPLMLSR.  Click on the Configuration button (top right hand corner) select Administrator.  This shows the number of fields as 67.
    Using SE16N to view table T162V shows 69 fields.  This table contains six layouts (variants), they must all be the same.  Before the change the total count was 414 (69 x 6). 
    The ME23N transaction only checks that the number of entries is correct.  You will notice that the fields are not in the same sequence, but that should not matter if you donot use the service transaction ML81N and it is not a selectable tab on ME23N.
    Transaction SM31 was used to delete the extra fields.  As this is a SAP table, you may need extra authorisations to make the change.
    Note:  the number of fields shown above will be different in each site.  This is because of different SAP versions and in what software is loaded. 

  • Batch Management Indicator not getting set for material master

    Hi,
    In one of the material we need to mark the Batch Management Indicator in Material MAster. We had removed all the stocks from the material. But still we are getting error, Stock exists for the material in Plant XXX and Sloc YYY.
    I checked in MARD table and MMBE that for this maaterial there are no stock for said Sloca and Plant.
    One thing which I noticed in the Material Master and MARDH table that there exists some stock in Previous persiod for the said Sloc and Plant.
    Need to know is this error is due to stock shown in previous period. Why system is checking the previous period stock.
    How can we resolve our issue and check this Indicator.
    Please let me know as earliest as possible.
    Thanks
    SG

    Hi,
    Refer OSS Note 30656 - Change base unit of measure/batch mngt requirement
    Following are the details of this note;
    Symptom
    When maintaining a material master record, you change the base unit of measure or the batch management requirement indicator or the valuation category. The system then tells you that this change is not possible since stocks still exist. However, no stocks are shown for the material in the stock overview.
    Reason and Prerequisites
    The message that stocks still exist refers not only to stocks in the current period, but also to stocks in the previous period.
    The reason for checking previous period stocks is that postings can also be made to the previous period when entering goods movements. This would result in inconsistencies if the base unit of measure had meanwhile been changed.
    Solution
    Please check whether stocks still exist for the previous period by displaying, for example, the plant stock view or storage location stock view of the material. You do this by selecting "Extras -> Previous period -> Prev. pd SLoc. stock or Prev. pd plant stock".
    If previous period stocks exist, you can make a withdrawal posting as follows:
          1. Post the same amount to current period stock (for example, using movement type 561) so that previous period stock and current period stock are identical.
          2. Make a withdrawal posting in the previous period for the stock together with posting date (for example, using movement type 562).
    You can now try again to change the base unit of measure or the batch management requirement indicator.
    Since the posting of the previous period values to zero is identical with posting to the stocks of the current period, you should reverse the above stock postings (i.e. the stock from the previous period should be booked in again) to make sure that the stock values from the previous and the current periods correspond to the state before the change. Please note, however, that the postings are then carried out using the changed master data from the current period (e.g. account determination, etc.)
    Regards,

  • Problem with multiple condition type for VAT &CST

    Hi,Gurus,
    pl. suggest  the procedure for the following problem.we configured  seperate  pricing procedures for our product material and scrap material.We have configured same condition types for VAT(ie.condition type:ZVAT) and CST(cond type:ZCST), in both pricing procedures. Now We want to maintain  seperate condition types for VAT and CST for pricing procedure for Product material and Scrap material. I have created two new condition types for scrap sales ZSCT- cst for scrap and ZSVT-vat for scrap by copying the same from existing conditions ZCST & ZVAT, and the same is included in the scrap pricing procedure. And also maintained OB40,OBCN,OVK1,OVK3,OVK4, FTXP,FV11 and VK11.
    now I am facing the following problems.
    1. while creating the Material master & customer master, in tax category sub screen all conditions i.e. conditions defined for  product material( ZCST,ZVAT) and defined for scrap material (ZSCT, ZSVT) displaying and these are compulsory fields.
    2. While creating the sale order for scrap material, system is considering the TAX classes from ZVAT/ ZCST (defined for product material) and taking the condition value from the condition type ZSVT/ ZSCT with the TAX class values of  ZVAT/ZCST.
    Now I would like to know is there any procedure  to assign the Material type and Customer  Account group to Tax category.
    Thanks & Regards
    sam

    Hello Sam,
    The Access Sequence Assigned to your New Condition types ie, ZSCT and ZSVT are same as the Previous Condition type ZVAT and ZCST.
    After Adding new condition type in the Tax category in the Masters you have to take care of the Sequence of the Condition type.
    If ZSCT and ZSVT is on the 3rd and 4th number in the masters the Condition table you are using in the access sequence should have fields  Taxclassification3-Customer and taxclassification3- material. For ZSCT
    Likewise Taxclassification4-Customer and taxclassification4- material. For ZSVT
    Please add New Condition table in the access sequence with the required Field
    And next when you are maintaining the condition record for say ZSCT you will have to maintain condition record for the condition table which has Taxclassification3-Customer and taxclassification3.
    In Document the values will be flown correctly after changing this.
    Hope I have Solved your Query.
    If any Doubt please revert.
    Regards,
    Rohit Dongre

Maybe you are looking for

  • Failed to create LOGIN from a domain account on SQL Server 2012

    Hello, My environment is like, A Domian Controller (with the domain name: CONTOSO) hosted by a Windows Server 2008 R2.   --- Server 1 A SQL Server 2012 x64 runs on another Windows Server 2008 R2 (this Server has been added into the CONTOSO domain). 

  • RV042 Port forwarding stops working when Firewall is enabled

    Hey all, I have a RV042 router on a single WAN and an internal LAN. I have configured port forwarding as follows: HTTP[TCP/80~80]->10.0.0.6 HTTPS[TCP/443~443]->10.0.0.6 IMAP[TCP/143~143]->10.0.0.5 IMAP SSL[TCP/993~993]->10.0.0.5 SMTP SSL[TCP/587~587]

  • Mouse laggy or unresponsive after leaving sleep

    Sometimes when my MBP leaves sleep the mouse (trackpad) jumps randomly around the screen. I've discovered that enabling the wifi causes it to be better behaved, but it remains slightly jerky and laggy. If I turn the wireless back off, it will jump ar

  • Making .php accessible only by the SWF

    I have a PHP file that my flex is connecting to as its backend. How do I make sure that this PHP is callable only through the SWF and not by direct access to it from the web or some other illigitimate way? Does it involve changes to the SWF itself or

  • CAD 8.x on UCCX 7.0 - Compatible?

    I'm doing a UCCX upgrade for a customer from 7.0 to 8.x.  The customer wants to upgrade all of the agents before we upgrade the servers, so that the upgrade process will be that much smoother.  The question is, can I upgrade the CAD server (and agent