Operating level snapshot to prepare a test setup from a production database

Hi ,
Can any one explain the detaild process about Operating level snapshot to prepare a test setup from a production database
Thank You

Hi;
Can any one explain the detaild process about Operating level snapshot to prepare a test setup from a production databaseMainly; We are using IBM disk and our disk team take snapshot of disk and we can work on those snapshot than storage team again revert back system orginal state.
As you can see its performed by storage team contact wiht your vendor.
If you dont have storage team than I suggest see my below post:
http://heliosguneserol.wordpress.com/2011/12/08/11g-snapshot-standby-for-real-time-testing/
Regard
Helios

Similar Messages

  • Cloning a test CMS from a Production environment - process?

    Hi there - I am attempting to clone a test environment from a production CMS system database.
    ENVIRONMENT
    BO Version: XI3.1
    O/S: Linux
    Web Server: JBOSS 4.3
    Database platform: Oracle 10g
    BOXI SETUP
    1. BOXI environment type on Production (clustered with two nodes.)
    *. Linux servernames for each BOXI node=Prod100 and Prod 101.
    *. JBOSS ports on both nodes=15000. CMS port on both nodes=6400.
    *. Database Sid=BOCMS@PROD
    2. BOXI environment type on Perf (clustered with two nodes)
    *. Linux servernames for each BOXI node=Perf100 and Perf 101.
    *. JBOSS ports on both nodes=15100.
    *. CMS port on both nodes=6400.
    *. Database Sid=BOCMS@PERF
    Process and requirement
    For each project, as part of performance testing, we copy the production database (CMS / system database) in order to clone it. The idea is that we have a copy of production which we can then use for performance testing. We do not need to rebuild the BOXI 3.1 server (that remains there), but we need to rebuild system database. In version five we would copy the BO_REPADMIN schema into the PERF database and then change the connections in Supervisor. Can this process also be done in XIR3.1 ?
    Options considered so far
    1. The DBAs recommended just copying the BOXI CMS / System Database tables from PROD to the PERF database. My question is - don't we then need to change the settings in the CMS database (PERF) to somehow so point to the correct physical servers / correct SIA etc.? Could I just alter th FRS references and use the cmsdbsetup.sh to alter all the details or are there other steps required (manally altering ccm.config) ?
    2. Copying the CMS from the PROD to the PERF CMS schema. However it seems like this is not an option as the Admin guides stipulates:
    "However, you cannot change the BusinessObjects Enterprise installation path, operating system, and machine name"
    As the installation path for the BOXI performance environment is different to production and they reside on different physical machines it sounds to me that this isn't an option, right?
    3. Use the cmsdbsetup.sh script - create a blank new CMS on the PERF database then migrate all production objects from PROD to PERF using the Import Wizard.
    Could anyone recommend further options? Thanks in advance.

    Hi;
    Can any one explain the detaild process about Operating level snapshot to prepare a test setup from a production databaseMainly; We are using IBM disk and our disk team take snapshot of disk and we can work on those snapshot than storage team again revert back system orginal state.
    As you can see its performed by storage team contact wiht your vendor.
    If you dont have storage team than I suggest see my below post:
    http://heliosguneserol.wordpress.com/2011/12/08/11g-snapshot-standby-for-real-time-testing/
    Regard
    Helios

  • Hi, we need to create the test environment from our production for oracle AP Imaging. we have soa,ipm,ucm and capture managed servers in our weblogic. can anyone tell me what is the best way to clone the environment, can I just tar the weblogic file syste

    Hi, we need to create the test environment from our production for oracle AP Imaging. we have soa,ipm,ucm and capture managed servers in our weblogic..
    Can anyone tell me what is the best way to cloning the application from different environment, the test and production are in different physical server.
    Can I just tar the weblogic file system and untar it to the new server and make the necessary changes?
    Can anyone share their experiences and how to with me?
    Thank in advance.
    Katherine

    Hi Katherine,
    yes and no . You need as well weblogic + soa files as the database schemas (soa_infra, mds...).
    Please refer to the AMIS Blog: https://technology.amis.nl/2011/08/11/clone-your-oracle-fmw-soa-suite-11g/
    HTH
    Borys

  • Staging a Test Environment from a Production Environment

    I trying create new test environment follow Oracle guide but I always get errors, look like this documentation is not correct
    Oracle® Application Server
    Administrator’s Guide
    10g Release 2 (10.1.2)
    B13995-08
    Is someone have correct guide(documentation/link) for copy production environment to test

    Hi,
    It looks like you have created an  SR 3-10253705511 with Support team and request you to follow up the same.
    Regards
    Sreedhar

  • Operation level Component Assignment

    In MTO scenario with VC and Engineering, the sales order specific engineering BOM is
    derived through VC and around 80% complete at the time of sales order creation.
    Engineering activities are carried out and sales order specific production BOM is derived
    very late in the process.
    So, operation level component assignment is not at all possible in advance.
    need to get different components assigned to different operations at at time of
    production order creation/change automatically.
    Is there any function module,exit or Bapi or some other method with help of which
    operation level component assignment can be done automatically in the production order.

    Hi,
    Just a quick thought:
    If your order is having status CRTD or REL (but without any confirmations, goods issue, settlements) then you can use the Read PP Master Data (Order header - Functions - Read PP Master Data) & this will re-read your routing & BOM. But for this to work for you, the routing should be updated with the assignments.
    So what you could do is start processing your order as late as possible, thereby you can re-read the BOM & Routing as the modifications take place.
    But if this is not possible in your scenario, then i am not aware of a BAPI or a FM which adds components to different operations in production order, you might evaluate writing a BDC program for the same. Anyways will update you if i manage to find a BAPI or a FM for this.
    Hope the above helps.
    Regards,
    Vivek

  • Assign role request through code not going to Operational level

    Hi All
    We are trying to assign roles through code using the OIM API's as suggested in the documentation
    "http://docs.oracle.com/cd/E27559_01/doc.1112/e28183/oim_up.htm#autoId40".
    We have 2 Approval policies one is at Request Level (i.e. Auto Approval) and the other is Operational level(Scope=ALL Scope) with workflow, So once the request is getting raised with the code successfully it is getting completed. The expected behavior is that it should go to the approval workflow attached at operational level.
    When we tried to attach a workflow at the request level, the request is going through Approval workflow attached at request level and once we approve at request level it is getting completed and not going to operational level.
    But we will have Request level as auto approved and Operational level with two level of Workflow.
    Thanks in Advance

    Check whether you have configured Request Type in your approval policy properly for operational level approval. In the Rule Components section check whether you have configured everything correctly. Also dont raise the request from system admin login as it will be treated as a direct provisioning request and your approval policies will not be invoked. Login through an end-user and test it

  • To check ink levels I am told to print self test. page from cpu or printer.

    There is no way to print a test page on my" psc 2410 all in one" connected to a HP cpu with Win 7, 64 bit. Is there a workaround/

    The page here shows how to print a self-test report from the front panel, but it does not appear to have ink level information.  I have not used a PSC 2410 for years, but the following may give you what you need:  press the # and * buttons together on the printer.  The screen will say "Enter special key combination".  Press 1 2 3.  This should bring up a service menu.  Use the right arrow button repeatedly to bring up a "Special Reports" screen, OK, then right arrow to select "Cartridges" or some similar, then press OK. A page will print with ink level information shown about the middle of the page.
    Bob Headrick,  HP Expert
    I am not an employee of HP, I am a volunteer posting here on my own time.
    If your problem is solved please click the "Accept as Solution" button ------------V
    If my answer was helpful please click the "Thumbs Up" to say "Thank You"--V

  • Standard Report for missing parts at production order operation level?

    Hi PP Gurus,
                We have standard report for missing parts at production orders level.
    For our client, they need a report for missing parts analysis at production order operation level. Do we have any such standard report in the SAP?
    Please help.
    Thanks,
    Reddy.

    Hi Arvind,
          Thanks for for your response.
    1. List: Components,  Layout: Standard layout          set the Missing part
           It shows the component requirement/withdrawn  quantity for each operation of production order. It is not showing the commit quantity.
    2. List: Components,  Layout: Pick list          set the Missing part
           It shows the component requirement/withdrawn  quantity for each production order.
    3. List: Components,  Layout: Missing Parts List-Material View          set the Missing part
           It shows the component requirement/commit quantity for each production order. It is not showing the commit quantity at opertion level.
    4. List: Components,  Layout: Missing Parts List-Order View          set the Missing part
           It shows the component requirement/commit quantity for each production order. It is not showing the commit quantity at opertion level.
          We are unable to get the solution from all these 1 to 4 reports from COOIS.
    Do we have any option to change the existing layout (ex: 3 ) to get the commit quantity for operation with missing parts indicator?
    If avilable, what is the procedure to be followed?
    Thanks,
    Reddy.

  • PM: change all Orders from sub-operation to operation level

    Hi Folks,
    I've a requirement to change all PM-Orders from Operation-SubOperation to only Operation Level.
    Example:
    Op SubOp --> New Op   (no subOp)
    10__10__-->____10
    10__11__-->____11
    10__12__-->____12
    10__13__-->____13
    10__14__-->____14
    20__10__-->____20
    20__11__-->____21
    Does someone here know, how I can make do this in an easy and save way?
    The only way I see is to make an own report with calling BAPI BAPI_ALM_ORDER_MAINTAIN.
    Have someone another solution
    - SAP-Standard-Report?
    - LSMW?
    Regards

    Hi Raghu,
    Many Thanks for your quick reply.
    Okay ... no LSMW.
    And also no Standard-Reports?
    Do you think, making my own program is the best way?
    Regards,
    Daniel

  • User status at operation level

    Hi,
    I have created one user status profile and attached in order type. In this profile I have included Operation and Order header as an "Allowed object type"
    My problem is when I am changing  user status at order level , it is not getting changed automatically at operation level.
    Pls suggest me the solution.
    Thanks

    Hi,
    I dont think it is possible .
    A suggestion not sure if it works .
    Assign user status profile operation wise and then have some development to check the operation status and
    then update production order status with same user status you mentioned in operation.
    FM: STATUS_CHANGE_EXTERN will help you to change the user status of order.
    Regards,
    Vishal

  • BAPI to change data at operation level

    Hi,
    I have this requirement:
    I need to change data at operation level, more particularly Person No (PERNR) by using a BAPI.
    Is there any BAPI - in which I can pass the basic data (say Order data and Operation data) and change the PERNR for it.
    The name of the BAPI and its usage will help.
    Ankur

    Hello,
    Assuming you are talking about maintenance or service orders, you can use BAPI_ALM_ORDER_MAINTAIN. See function module documentation from SE37. The structure BAPI_ALM_ORDER_OPERATION contains PERS_NO field.
    -Paul
    Please use Enterprise Asset Management (EAM) forum for PM/CS specific topics
    Enterprise Asset Management (SAP EAM)

  • Error in operation level result recording

    Hi,
    I need held; result recording of inspection type =03 (operation level Quality inspection)
    A product manufacture via three operations (10, 20, 30)
    All operation quality inspection active let operation no-10, all products reject and confirm as rework.
    Next operation level quality record is done but confirmation not allow Reason is operation -10, rework quantity, (Actual quantity is more than planned quantity)
    How to add the quantity after reworks for next operation quality inspection?
    Pl helps me finding the solution.

    Hi,
    As per your more clearence , As per Example  production order Quanity =1, passes 3 operation10,20,30
    Operation=10 require rework as per quality ,
    Operation =20 system raise the error message = Operation =10 rework .
    If want to operation =10 ok Quantity =1 then system raise error messges =Actual quanity more than planned Quanitity
    ( 1 Rework + 1 Ok ) .
    Supose rework order create and confirm then next 20 & 30 operation how complete .
    Real scenerio :- Rework on operation =10 then again Quality check then goes to 20 operation Quality check pass / Rework if rework then again quality pass then goes to next operation level
    I hope under stand my problem
    Need help- please

  • Cannot attach documents at order operation level in PM order.

    Hi,
    We have recently upgraded to EHP6 and I have activated the EAM business functions including LOG_EAM_CI_6. In my PM work order, on the Additional Data tab, I can see the "Document Assignment" section at the bottom. Here I attach an existing document and choose Assign to Order. Then I attach another existing document and choose Assign to Operation (0010). After saving the order if I go back into it (IW32/IW33). the document assigned to order header is still there but the document attached to the operation disappears.
    I have defined the document type that I am assigning at header level and operation level in Customizing for Cross-Application Components under Document Management --> Control Data --> Define Document Types. I have also specified in Customizing that the assignment to objects PMAUFK (order) and/or PMAFVC (operation) is allowed for the document type of those documents.
    Can someone please advise what's wrong here ? I have to attach/assign docs to operations.
    Thanks,
    Sandy

    Hi Sandy
    Can you please make sure two things:
    1) IMG --> DMS --> Control Data --> Define Document Types --> Select Doc Type ---> Define Object Links. It must be something similar to this one. Without entering CREATE DOCUMENT settings, you may not be allowed to attach a document. That might be causing the issue. If you do not want from within IW31, someone is creating documents then make sure this setting has value =2.
    One more possible reason for this is 1:n field in this same setting. If 1:n is not selected, please read the help for that field and make sure the uniqueness of your document attachment to objects.
    2) IMG --> DMS --> Control Data --> Maintain Screen for Object Link
    For this one make sure that you have a screen entry for PMAUFK and PMAFVC.
    Now if attachment does not work, try creating a document and let us know what is the error message.
    And do you know that there is another way of attaching documents to the operation which is attaching them as PRT. Just select the operation, click on PRT button and select document and attach it.
    I hope this will help.
    Regards
    Savas
    Message was edited by: Savas Yazici

  • In process inspection - Rejection Booking at operations level

    Hi All,
    Need some help regarding inporcess inspection.
    As we aware about '03' insp type is not stock relevant
    The requirement is , i having operations are like 0010 ,0020 ,0030 ,0040,0050 in Production order in Routing
    Now while operation wise confirmation i want to book the rejection and that needs to get effect on further operation confirmation.
    For example : Suppose I have confirmed 50 TON against operation 0020 , hence at the time of confirmation 0020 i want to book the rejection 2 TON
    Hence while confirming 0030 system should not allow to cofirm 50 TON , system should allow to confirm only 48 TON through CO11N and Some where that rejection has to be display in report.
    Is there any provision in standard to enter rejection at operations level.
    Stock posting not required , Only qty tracking required like operation wise confirmation.
    Please advise to make this scenario success.
    Thanks,
    Abhishek

    Hi Abhishake,
    As in inspection type 03 lot you dont have stock posting option, you can scrap the rejected material operation wise in CO11N at the time of confirmation (Mov Type 551).
    As scraped material will no more in system, you can also look forward for bi-product assignment in bom if you don't want to go with first option.
    Also you can check for early lot creation if can solve the purpose, as in this case you will get inspection lot of inspection type 04 at the time of release of production order and stock will be adde to quality inspection as you do confirmations operation wise.
    Regards/Rohit

  • Printing the Pick List at operation level

    Hi all,
    Is  it possible to Print the Pick List at operation level.
    Components are assigned  to each operations and release of  production order takes place at operational level. Once operation is released then only relavent component assigned to that particular operation should come in pick list.
    Thanks in advance for your time and efforts.
    Regards,
    Siva
    Edited by: Siva Kumar M on May 19, 2008 3:40 PM

    Hi ,
    System will not select the Opertaion which has status CRTD by default.
    For further selection please try with below settings. ,
    Profile = std profile
    Production Order Number,
    Selection at Operation level
    System status = CRTD  and Actiavte Excl .check box.
    Now system will display the pick list for  released operation and it`s component only 
    Please check, Reward if it is useful.
    Pradeep
    Edited by: Pradeep Kumar on May 19, 2008 3:45 PM

Maybe you are looking for

  • Photoshop 2014 Program Error in text

    I am currently using photoshop CC 2014. And sometimes when I am tying text, or copy/pasting text into the PSD file, an message would pop up that I "Could not complete your request because of a program error" After which, I would be totally unable to

  • Are you a UK O2 iPhone user? Want to recieve MMS on your iPhone? Read on...

    For those based in the UK with an iPhone on any of the O2 tariffs, you can now view your recieved MMS Messages on your iPhone itself, rather than just getting a link to view it on a computer. All you have to do is use the iPhone's Safari and navigate

  • How do I delete pages...

    I accidentally hit auto complete when i was half was through my book and it added loads of unnecesary pages to the back of my book. I have removed all the images. How do I remove all those extra pages?

  • Running Java Program in WinCE

    Hi all, I am writing a mobile software using Java that going to run in WinCE. Since Java is a platform independent, is advisable to be program and run in Win CE? TQ. -Eugene-

  • Business area and its sample scenario / example.

    Hi SAP GURUS,  please suggest ASAP. scope of business area with any simple scenario or example which we will used