Can I have two operations in routing?In one operation operation number can be 10 for other it is 20.For operation 10 i hv to show consumption of sfg & for operation 20 i hv to show production of FG.i will confirm by co11n first for operation 10 & then for 20.Is it right?for automatically good recipt for operation 20 which control key will be used & at the time of confirmation it will show movement type 101.Plz reply.

Dear ,
Find belwo the answer :
Can I have two operations in routing?
Yes .You can have .For operation 10 -Please assing the Control Key PP01.You can assing the same in Work centre Default tab so that it will be automatically picked up in Operation 10 .In Co11n , You can confirm the same .
For operation 20 which u  hv to show production of FG-Assing the Cpntrol Key PP03-Auto Good recipet Active  so that in CO12 /CO11N , you can keep the Operation Number 20 -Final Confirmation -Hit the Good Movement tab -Check the Movement Type 101 ,Storage Loaction -either Raw or FG as per your business requirement and then Save .
However , you can use Back Flash opetion for SFG in FG production order .For that you need to have the below set up :
Backflash can done based on the following set up :
1.In material master MRP2 view of the item , Backflash field should be kept -1-Alaways back Flash
2.In work Center where the routing operations are done , -Goto-Basic Data View -Back Flash Indicator -to be marked .
3.In routing Componenet Alocation -Item Line -Back Flash Indicator to be ticked once assinged to a particualr operation .
Priority will be always Work centre even you keep the Material master MRP2 view kept always back flash .
Hope this will solve your problem
Regards
JH

Similar Messages

  • Branch operation and return operation for routing in alternative sequence

    Hi all experts.
    I would like to ask which table and field store the value of branch operation and return operation for routing in the alternative sequence. I can only find them in structure (PLFLD-VORNR1 and PLFLD-VORNR2) but I want the table field of them. Would anyone please suggest a solution? Thank you.

    Hi,
    look in table AFFL, here the BKNT1 and BKNT2 refer to those vornr1 and vornr2 of the operation. For example in user-exit ZXCO1U01 you will find the values (BKNT1/2) in the sequence table, and when, for example, filling the LOIPRO01-Idoc, you can use the found VORNR for the E1AFFLL-segment.
    See coding for example on determining VORNR1/2 (sequence_table/operation_table as in user exit EXIT_SAPLCOBT_001):
    SORT operation_table BY vornr.
      LOOP AT sequence_table INTO l_sequence.
        MOVE-CORRESPONDING l_sequence TO l_affl.
    * Read the operation table to determine the vornr1 and vornr2
    *via the value of field BKNT1/2
        IF NOT l_sequence-bknt1 IS INITIAL.
          READ TABLE operation_table INTO l_operation
          WITH KEY aufpl = l_sequence-aufpl
                   aplzl = l_sequence-bknt1.
          IF sy-subrc = 0.
            l_affl-vornr1 = l_operation-vornr.
          ENDIF.
        ENDIF.
        IF NOT l_sequence-bknt2 IS INITIAL.
          READ TABLE operation_table INTO l_operation
          WITH KEY aufpl = l_sequence-aufpl
                   aplzl = l_sequence-bknt2.
          IF sy-subrc = 0.
            l_affl-vornr2 = l_operation-vornr.
          ENDIF.
        ENDIF.
    Cheers,
    S.

  • CA02: Delete Operation from Routing

    Hello,
    My question is: how can i delete an operation from routing, like in CA02, but using FM or BAPI and avoiding Batch Input?
    Right now it's done with Batch input, but when there is more than one routing per material it crashes, due to extra screens.
    Thanks in advance...

    Dear,
    if you have created operation through CA01 then
    Go to CA02-- Select your operation and then header manu Edit--Delete or use (Shift+F2) and save it.
    If in CO01 production order then in operation details screen and select your operation and delete it.
    Please try and come back.
    Regards,
    R.Brahmankar

  • Assignment of components to more than one operation in routing.

    Hi to all,
    I am trying to allocate components of material BoM to more than one operation in routing. I know one way to do it is to define that components again & agin in material BoM & assigned them to operations in routing. Are other ways available to do the same.
    Thanks & regards,
    Abu Arbab

    Dear,
    Now I am clear.
    You need to create different 2 BOM and with BOM items, as below,
    example - total requirement of material A is say 10.
    Semi finished Product- X BOM
    BOM item 1 - material A-qty 8
    BOM item 2 - material B-qty -5
    Finished material Y - BOM
    BOM item 1 - semifished material X-qty 10
    BOM item 2 - material C-qty 10
    BOM item 3 - material A-qty 2
    BOM item 4 - material D-qty -2
    You need to create above 2 BOM's if you want to see semifished product into inventory, if not proceed as below
    Finished material Y - BOM
    BOM item 1 - material A-qty 8 assign it to routing operation 10
    BOM item 2 - material B-qty -5 assign it to routing operation 10
    BOM item 2 - material C-qty 10 assign it to routing operation 20
    BOM item 3 - material A-qty 2 assign it to routing operation 30
    BOM item 4 - material D-qty -2 assign it to routing operation 30
    I think this is the only way you can map it.

  • Mass addition of operation to Routing

    Hi,
    I need to add one operation (as final operation) to 8000 materials in routing. How can i do this?
    Thanks
    SS

    Hi Srini,
    Go to CEWB, select SAP_OPEARTION as work area and edit routings as per the selection criterion you give.
    You can add single operation to multiple routings. play with selection criterion and it should be failry simple.
    Other option is to create a LSMW object based on recording to add new operation to routing.
    Check and revert.

  • Error while creating external operation in Routing

    Hi Freinds,
    I am creating an external operation in a routing and I enter the purchasing info record which is created for the material.
    But when I try to enter this info record in the external operation then I get the Error: "Enter info record without Material"
    Already info record is created for this material then what could be the problem. This is stopping the routing creation .Please help.
    Regards
    Shailesh Nadkarni

    >
    shailesh nadkarni wrote:
    > Hi Prasobh,
    >
    > Thnks for the quick response but can you throw somelight between the difference in Inforecord with Material and Inforecord without Material. Thnks....
    Shailesh,
    If the material is procured by means of subcontracting process, then we need to assign in the material master MRP2 view with special procurement key 30, create the BOM for the material, which would contain the components which would be Issued to the vendor. In this case you would be performing all the transaction with referance to the Output material number, so an Inforecord of SubContract category needs to be created with referance to the Output material, where you Issue the components and you can recieve your material.
    In case of operation subcontract the PR or Purchase order would be with account assignment to the production order and not with referance to any material, so there wont be any referance to any material number (Product), you can Issue components for processing, but when recieving it is again not with referance to any material but operation delivery.
    Hope i was able to explain, what you wanted.
    Regards,
    Prasobh

  • How to maintain time spec.of operations in routing and work centers

    Dear consultants,
    We dont have any time specifications in routing or work center ..
    we just create an order and the execution of the production involves many operations....
    now we want to be specific about the time of operations as the need is to track the operations.( In the sense which of the operations are delayed).....
    How and where should i do these in the routing and workcenters..
    Please explain in detail....
    Karthick

    Hi Karthick,
    In your work center in basic data page you maintain std. value key eg: SAP1, this has Setup Machine & Labor fields. In the default values page you specify the unit of measure Eg: HR
    Now when you add this work center in your routing operation page, you will find Setup Machine & labor, here you maintain the time required for each of the process.
    Now while doing confirmation via co11n, you inform the user to specify the time actually spent on each of the activity. In OPK4 for order type - plant combination you can specify a few defaults such as propose the value etc.
    Hope the above is clear.
    Regards,
    Vivek

  • External operation in routing

    Hi
    In routing if I maintain controlkey with external operation, I have to enter the info record details.
    (I have to create info record without ref to material, the pur req/Pur ord created will be account assigned).
    When ever I create an order the system will generate pur req for external opeation with ref to info record and it wil be always send to the vendor which i have maintained in info record.
    My requirement is, I have 5 vendors who can do the same processing with different cost and lead time. I need to select the vendors.
    Please let me know how to achieve this.
    I cant go for Quota arrangement,since material number is not involved.
    I dont want to create different routing with different info record details.
    Regards
    S.Senthil

    Hi ,
    In Your Scenario what i feel is you can create one routing in which u can mainatin vendor info record which is commonly used.Create a production order,but before releasing  it,u can change purchase info record by making the customised setting as below.
    Go to OPL8,for particular order type and plant combination,maintain order type dependent parameters in which in planning tab -purchase requistion -try to put 2 or 1 and test (1-never it will not create,2 -purchase requistions will be created after release,3-Immidiately when order is created)
    Hope it will solve ur problem
    Edited by: Girish  Adaviswamy on Mar 20, 2009 7:18 AM

  • Assigned document to operation in routing isn't printed in production order

    Hi experts,
    I have assigned the document to the BOM and also to the operation in the routing.However this document is not printed when the production order is printed.This document can be seen at the routing,CA02, on the screen with all components, but it is not shown in the production order transaction  CO02, at the routing.Is there something in customizing that has to be activated?
    Thanks a lot .
    Best regards,
    Danijela Zivanovic

    Hi experts,
    I have assigned the document to the BOM and also to the operation in the routing.However this document is not printed when the production order is printed.This document can be seen at the routing,CA02, on the screen with all components, but it is not shown in the production order transaction  CO02, at the routing.Is there something in customizing that has to be activated?
    Thanks a lot .
    Best regards,
    Danijela Zivanovic

  • External planned operation in routing

    Hello,
    I have a scenario in my company. In the routing, an operation (heat treatment/machining) needs to be carried out by the vendor. We issue the goods (Material X) from WIP & receive goods (material X) after electroplating. Then we continue with other manufacturing process. 
    Please tell the configuration steps.
    Thanks,
    Murthy.

    Hi,
    External Processing of Operations
    Purpose
    An externally processed operation is not carried out within your own organization, but is assigned to a vendor, who then does the work.
    This type of processing is particularly important for subcontracting. It can also provide a company with a feasible alternative to in-house processing, if capacity bottlenecks occur.
    If certain components are required to carry out an external operation, you can also provide these components for the vendor (see Provision of Components).
    Prerequisites
    An operation can only be processed externally if its control key allows or prescribes external processing.
    Since an external operation has to be sent to a different company, additional data needs to be maintained on the External processing tab page. You can maintain the data in the routing or in the production order.
    Process Flow
    When you create an order, the system creates a purchase requisition for an externally processed operation.
    When a purchase order with reference to a purchase requisition is created, all data necessary to process the material externally is transferred to the purchase order. After the material has been processed, the vendor delivers the material back to stock.
    Result
    The goods receipt of an externally processed material causes the status of the operation to be updated:
    For partial delivery, the status is: EOPD (External operation - partial delivery)
    For final delivery: EOFD (External operation - final delivery)
    After the goods receipt, the material can be processed further in-house, if required.
    Subcontracting Steps:
    1. Define all the materials in your plant (subcontracting and packaging etc).
    2. In the material master MRP 4 view there is one field in which you can mention that this material is not relevant to MRP planning, use this field for subcontracting material so that it will not be planned in MRP runs ( generally use this field for re-order point planning).
    3. In the BOM for the subcontracting material put the special procurement key as Subcontracting and do not keep relevance for costing.
    4. If you're using packaging material of your company and want to capture the cost of these materials in the subcontracting production order then put relevance for cost.
    5. Define alternate BOMs for each customer.
    6. Generally the routing will be the same but materials will change, define different prodcution versions for each alternate BOM and assign to the routing.
    7. Define the activite types for packing and mixing in the work center and assign them to the cost center, use these for your routing.
    8. Whenever you recive a sub-contracting order, use the relevant production version depending on the customer.
    9.Please use control key PP02 (customizing in OP00)in routing and maintain
    info record for subcontracting vendor
    Hope this will help you.
    regards
    radhak mk

  • Assignment of component to an operation in routing

    dear gurus,
    By default all components of a BOM are assigned to the 1st operation in the routing. If we assign the component to other operation will the default assignment get cancelled or not? If not how to cancel the assignment of a component to an operation?
    Reply will be rewarded.
    Thanks and Regards,
    Jejesh

    Hi jejesh,
    By default all the un assigned components will be assigned to the 1st operation on the routing. 
    You can change the assigned components from one operation to another operation also. Use the button
    "Re Assign " in the component overview screen of the Routing.
    Regards
    Krishna

  • Parallel operations in Routing

    Dear All,
    is it possible that we can have two parallel operations in the routing.
    scenario is: ona production line every thing is same except one operation i.e, melting where there are two furnaces 1 and 2. 50 % of the material melts through furnace 1 and remaining 50 % through furnace 2. so how can we cater this in routing.

    Waiting

  • Sub operations in routing

    hi sap gurus,
    while creatng routing we want to create suboperations for the finished product. pls tell the flow path how to create suboperations with transaction code.
    regards and thaks in advance
    muralidhar.t

    1. Create the operation as usual (say 0010)
    2. In the next line again give the main operation number & in the Suboperation column i.e. column next to operation i.e. in SOp enter the suboperation no u want i.e. say 0002. The moment u enter Sub operation no and press enter; system will prompt u to enter time for activities and finally it is created...
    All the other steps are similar to creating operation
    Once it is created; you can see a "check box" under Sub operation for 0010 (before base quantity)
    Also u click on that Sub operations and can see the details within it....
    Hope it clarifies
    Rgds

  • No of operations in routing &Overlapping not reflection in Production order

    Greeting for all gurus.
    Process
    We have three set of operations , one will be blend, , other will be cured and the third will be finished goods.
    Basically one FG and three components , the components will be consumed in the first process. The same  FG materials will be used for the 2nd / 3 rd Process
    ,1)  we want to confirm the first set by making auto GR/GI
    2) The Overlapping is 8 weeks , the 2nd operation should start , after that and the third operation should wait for 6 days . 2ND  operation  is confirmation only.
    3) The third will be for standard process, Only GR
    We have to use the same materials . Say 1st process O/P will be 50,000 and second process will be 40,000 and third will be 30,000. We want to account the loss in between the 1st and 3rd operation . 2 nd operation , no need to record .
    Requirements  - Discrete Manufacturing
    u2022     How to set the control key for three operations.
    u2022     How to confirm every stage in a single production order.
    u2022     How to  consider all the operation days in the Production order
    u2022     How to report loss in various stages
    u2022     How to print all the operation at various stages in the shop floor
    Any help will be highly appreciated
    Thanks
    JJ

    Thank you very much
    As you use single production order, input the overlapping time in routing in "Min Overlapping time" = 8 weeks (in no. of working days) for the first operation and 6 days for the second operation after selecting "Required Overlapping". ( If you mean it as wait time, you can control the same with the wait time in work center).
        ----I already set it , but it is not considering the days , it took only the base qty and no of hrs calculation
    in the prod order ,Our base qty and hrs will set for two hrs only . the remaining 6 weeks is not consider -
    With Single Production order, you cannot do goods receipt after the first operation. Since 2nd and 3rd operation are pending, why do you want to do goods receipt at this stage?
    ----- We want to account the loss , as it will be loosing pounds at various stage -
    Carry out confirmation for the sequence of operations in CO11N with the yield qty and use reason for variance as the loss of qty. Using confirmation tables, create z-report to know the actual qty after the last operation. ..
    --- Where to set the sequence of operation - i am getting error , No zero sequence ---
    I want the system to consider the 7 weeks for this production time. How to do this ?
    You can print the operations from pull-down menu in CO02 - order - settings - List control - Op. control ticket

  • Collective access to Allocation of BOM Items to operation in Routing

    Hi, Experts
    My requirement is to generate a collective report that includes on a material what are the operations to be performed on which work center and component allocated to that operation.
    This is similar to as we go through CA03 than go through operations and than component allocation to operation, only difference is I have to do it collectively for group of material.
    Is there any standard way to do it or we have to right ABAP query.
    If ABAP query is the only possible way will you please help to find out relevant tables and joining conditions etc.
    Thanks & Regards
    Ashish Garg

    Hi
    Pl chk the Reports COOIS for Production orders and COIO for Process orders with input data in the Fields say Plant and Basic start date and Finish dates under dates for Header level and Execute it
    In the Next screen Click on the + mark to Expand the order no to view the Operations , Material allocation etc
    Regards
    Brahmaji

Maybe you are looking for

  • How to open reports in same portlet when clicked on item report links in menu portlet

    Hi, I am not sure what forum I should ask this question. Anyway, I am trying in the content areas forum. Let me explain what I trying to do. I have reports links as menu item links in a menu. I have published this menu to portal and added it to a pag

  • Two calls at the same time on agent detail

    Hi All, Pulling an agent detail report for an agent im showing two calls with exact same start and end time.  The first is listed as inbound non-acd and the second is listed as inbound acd, assigned to a queue which the agent is assigned to. never sa

  • Excel 2013 Conditional Formatting problem

    Hello! A customer of mine has recently transitioned from Office 2007 to Office 365. This has been a major hurdle for them, and they're still experiencing some issues with things not behaving the way they used to. I'm not an Excel expert, so I have no

  • How to give the length , cardinality and format when creatin a data type?

    Hi, I am new to XI and i wish to know how to give the cardinality ,format and length when creating a data type .Also please let me know how to give the following? cardinality --repeating and required                   non repeating , optional thanks

  • I need help uploading my website through my ftp

    I believe I have all the settings right... I have a www.justhost.com account, and a flash page up currently. I am trying to upload my site but it wont override that... can someone help? I cant figure out whats going on...