Order Confirmation Error...

Dear,
For a particular prodn order, we have 5 operations in total. All the operations except the third are used only for costing and confirmation possible indicator through control key. Where as the third or Opr 30 is ONLY a scheduling operation with a fixed duration of 14 days. The last operation in the order has the scheduling, costing, auto GR and milestone confirmation indicators set.
Now, since we have partial confirmations along with overdelivery set in the parameters hence people normally confirm say 1000 pcs for a 100 pc order.
I have this strange error in CIF which says: Error in activity of Opr 30; Complete confirmation of an activity is not possible"
Note: We use ECC 6.0 and APO 5.0
Any reasons for such a behavior???
Thanks in advance!

Hi Team Eusap,
This error can be avoided if "delivery completed" tick is made on the production order on "Goods receipt" tab as and when the posting is completed.  This list can be obtained from production orders with REL and PCNF download and REL and Partially delivered status.  Similarly, while confirming by operations and activities by the users, the operation 30 which is causing the problem needs to be final confirmed. This will ensure that all operations and operations are confirmed by the production order.  In SCM 5.0, the APO system will accept the order only if all operations and activities are confirmed.  You can also refer sap note 832393 which states that "Remaining duration adjustments
RESTRICTIONS The solution covers adjustments of the Remaining Durations in APO exclusively. The current R/3 confirmation doesn't reduce capacity requirements level in APO. This will not change with the new solution even if in R/3 the capacity requirement reduction takes place. The part of the R/3 capacity requirements for production order integration without PPM/RTO in APO remains unchanged. The solution is only valid for PP-production ordres, not for PPPI-process orders or repetitive manufacturing orders. (For process orders in R/3 release 4.70 the capacity requirement reduction can be configured similar to the PP-workcenters in R/3  but these customizing isn't valid for the confirmations). Partial confirmation of an activity allows the maintenance of a forecast finish (date) or adjusted defaulted forecast values. These values are not transfered to APO and therefore APO doesn't expect that the left activity differentiate from the original planned activity.
( Changed at 02.11.2005 )".
Regards
R. Senthil Mareeswaran.

Similar Messages

  • Process order confirmation error in COR6

    Hi Gurus,
    I am working as sap manual tester and facing below issue in Process order confirmation in t-code COR6.
    Batch 456 for component 350515 does not satisfy BOM requirements
    Message no. Z_MFG017
    Need ur help.
    Regards,
    Imran
    Edited by: imran.shek38 on Jan 25, 2011 7:16 AM

    Hi,
    Please check whether the Batch-Management checkbox is maintained for the component in the Material Master (MM02).
    Also, check the Transaction MSC2N for this component and activate the checkbox for batch-managed item in the BOM.
    Hope it helps.
    Regards,
    Kaushik

  • Process order confirmation error

    Hi, i have set backflush in mrp2 view as always backflush for raw mat. when i do order confirmation with cork tcode, order status shows as CNF but raw mats are not withdrawn. pls note that backflush indicator is also copied in order. do i need to issue mats manually thru mb1a? what could be the reason.

    Hi,
    Check in the confirmation parameters for process order
    in the Process control field
    Also check in the BOM item details screen for the raw material
    storage location is mentioned.
    Regards,
    nandha

  • Production order Confirmation Error

    Hi All,
    Need your help on a Issue we are facing. The user is trying to do confirmation using co11n. After entering the order number and operation the system is throwing the error below
    formula &1 for calculating work contains division by zero
    The &1 stand for a labor calculation formula. We have checked all the parameters defined in the formula and find that there is no divide by zeror issue in any prameter.
    This is the formula that is throwing the divide by zero error:
    Formula:            Setup Labor + (Labor / Eff. Factor * Op. qty./ Base qty.)
    Std Units:          H + (H/PROPOR * NoUnit/NoUnit)
    Std values:        0.00 +(0.00 /100 * 1.00/1.00)
    Any help in resolving this issue would be great.
    thanks and regards,
    sharath
    Edited by: sharath nelaturu on Sep 28, 2011 2:10 PM
    Edited by: sharath nelaturu on Sep 29, 2011 5:12 AM

    Dear,
    Kindly check routing for labor field. If you have maintained labor as standard value, you must have maintain any figure in routing.
    After maintaining labor field in routing, kindly re-read master data of production order.
    Check and revert back.
    Thanks
    Muhammad Ashfaq

  • Urgent -  Transfer Order Confirmation Error- Item category Type Not defined

    Hi Gurus
    i need your help for an <b>urgent production issue</b>
    FYI we have full fledged Wm implemented
    the users are not able to confirm the TO's created and it shows an error that <b>ITEM CATEGORY NOT DEFINED, </b>
    i have checked in the STO in me23n which has many different materials in it and it is all having item category = U and also delivery is generated and it also has some item category defined in it also
    so can you please help me why this is happening and not able to confirm the Transfer orders
    thanks in advance for any help
    regards

    Chakri
    Could you solve the problem. If so could you tell us what the solution.
    Thanks
    Aju Paul

  • Transfer Order Confirmation error

    Hai all,
        WHen I am trying to confirm the transfer order it is showing the error
    'Enter storage unit'
    and does not allow to confirm the transfer order. what may be the problem?.
    Kindly help me to resolve this.
    Thanks in advance,
    S.Jenibalet.

    Hi
    There seems to be a lot of information for you to take in but let me try to simplify it.
    In the strategies in the config you can specify which storage unit types can go in to which storage type and which bin types can go in to which storage uniy type etc.
    If (and I am sure that you have) you have SUT check ticked in the config of your storage type then everytime you want to place stock in to this storage type the system will check the SUT and if required will ask you for it.
    There are two ways round this.
    1. Take off the SUT check in the appropriate st types if you do not need it and this issue goes away.
    2. Ensure that all of your strategies in OMM1 are set and that you have the LE QTY, UOM and SUT set up in the WM2 view in the material master. If you do this the system will know the SUT and will default it in for you.
    I hope that this makes things clearer. Whilst I appreciate all of the replies you have had if you do not do one of these two things it will continue to happen.
    Regards

  • Production Order Confirmation Error  in "BAPI_PRODORDCONF_CREATE_TT"

    Dear all,
                Recently i've faced some problem regarding "BAPI_PRODORDCONF_CREATE_TT". whenever it'll create the production Order the system show me an error 'Two operation times are not in ascending order'. What's that it mean? i've only 1 operation in Routing. Can anybody please help me to figure it out.
    regards,
    sameek mazumder.

    Dear Santosh,
                          I've already do this into ascending order like START DATE: 10.02.2011
                                                                                    START TIME: 06:00:00
                                                                                    END DATE: 10.02.2011
                                                                                    END TIME: 07:00:00
    BUT THEN ALSO IT WILL SHOW THE SAME ERROR.
    REGARDS,
    SAMEEK.

  • COGI error generated while collective order confirmation

    hi ALL, this is the real  task for all PP GURUS.
    the issue is related with collective order confirmation.
    client is using customised program ZPP_CONF to confirm the collective order which is based on the sap spro program CORUPROC.this include automatic goods receipt,backflush & actual cost update .as user use zpp_conf for confirmation all this actions happened in backgruond.
    now after using ZPP_CONF . the confirmation is not happening .instead of that it is going in COGI where they are getting a error massage which is as follows
    "You have no authorization for this transaction with movement type 101u201D
    this error continues for 10-15 minutes after doing refresh it goes. & confirmation happens.
    this is not happening for all orders but for 8 out of 10.
    users have proper authorisations.
    they have enough stocks in st. locn.
    they are loosing lot of time becuse of this.
    HOW CAN I RECTIFY THIS ERROR GURUS?
    when i search i found this is written in the CORUPROC documentation
    Incl. incorrect goods movement: Not only preselected but also incorrect goods movements that are usually processed with transaction COGI are  selected and processed. 
    VENKADESH

    Hi,
    The Program CORUPROC only can adjust the Errors in Goods movements. It can not handle the Table Locks..
    The Program CORUAFWP, can taek care of table locks also, apart from the Errors in Goods Movements.
    Refer below thread for similar type of problem..
    COGI errors
    Hope this helps..
    Regards,
    Siva

  • Sales order stock error in Process order confirmation

    Hello SAP Gurus,
    In Make To order scnario while I do COR6 order confirmation it gives me Error that Sales order stock does not exist.
    Can anyone suggest me which way I can remove the error?
    What is the Transaction and movement to transfer stock to SALES ORDER?
    Please reply...
    Thanks & Regards,
    Bhavik Dangi.

    Hi,
    As per your mail, you can move the stock from normal stock to sales order stock through transaction MB1B with movement type 412 E.  This route is generally follow if want to assign stocks manually to sales order stock otherwise if follow the PP route then system generates the stock against the sales order line item at the time of produciton confirmation and requirement type use in this are KSL, KE.
    Rewards if it helps.
    Regards
    Goutham

  • Urgent error in output determination   while sending order confirmation

    hi all
    while sending the order confirmation i m getting the following error
    window TITLE is not defined for form RVORDER01 and
    error during readingTVBUR (return code 4) pls let me know if u have any inputs.

    Hi
    The Title window is either modified or deleted from the Layouot.
    You can contact your ABAP , they will help to correct this issue.
    This is a ABAP error and no confirguration involved.
    Regards
    KRSNA

  • ABAP Programming Error when saving the Process Order confirmation in COR6N

    Hello,
    We have an issue related to Process Order confirmation using Tcode COR6N. When we enter all the inputs to confirm( Activity, yield and phase) and click on save it gives ABAP Programming Error (Exception condition "SEQ_NOT_FOUND" raised).
    Any inputs in this regard, would be appreciated.

    Hello
    I can observe that you have implemented the report ZOPSECRE and that an inconsistency was found.
    This repor corrects inconsistent orders which do not have an operation or a sequence, or the two of them.
    The report checks whether there is at least one operation or one sequence and creates both including status objects.
    Therefore, you need to have the default valus for the operation generation defined on OPJG for this order type/plant.
    BR
    Caetano

  • Error during Production Order Confirmation

    I get a real wierd error during production Order confirmation.  The error message is
    "Additional items are not allowed
    Message no. ZOAL010"
    Can anyone throw some light on this?
    Regards
    Raj

    it is not std SAP message.
    you can check the user exit for confirmation.
    check in transaction code CMOD/SMOD for CONF*

  • Posting related Error during Order Confirmation

    Dear Experts,
    I am from PP forum and had to post this in FI forum as i am getting an error message during process order confirmation after the goods posting is done thro backflush "Acct. 21701300 for trans./event key BSX, postable directly" .The error explanation says "the stock account determined automatically by the system is one that is directly postable. However, this stock posting can only be made to an automatically postable account. How to solve this please help.....
    Regards,
    Sunit

    Hi
    Stock account should be 'Post automatically only'. This option should be selected in the respective GL master in FS00.
    Change the GL 21701300 to post automatically only in FS00 or assign a different stock account in config - OBYC - BSX for the respective material valuation class
    Thank You,

  • CORK error at process order Confirmation

    Hi all
    While Process order Confirmation (CORK) iam getting the following error
    G/L account 499999 is not defined for chart of account 1000
    Message no.F5507
    I have run the same in Dev. Client
    but unable to do in the quality client
    i have checked in OBYB in both the clients
    setting are same
    plz.. provide the solution
    thanx in advance
    useful solution points will be awarded

    Hi,
    While confirming the Process Order, the following will be the effect in Accounting
    FG Stock Account Dr.
    To COGM Account
    The followings are the possibilities in your quality client
    1. whether you have defined the above account in Chart of Account and Company code segment level?
    or
    2. You should check it in OBYC > GBB > AUF (COGM account) and in BSX key (Stock account for Finished Inventory)
    or
    3. Whether it is blocked for posting or marked for deletion at Company Code level or Chart of Account level?
    Regards,
    Jigar

  • Order confirmation output error.

    Hi All,
    There is an output type which prints the Order confirmation. A new functionality was added to this. If a material has warranty it prints at the end. This can happen for more than one material and this text is taken from SO10. Whenever a print out of this order confirmation is taken there is an attachement created automatically(pdf).
    this attachement  shows wrong warranty i e output sometimes.Other times it correct. however the preview is correct. How do i correct this.
    Regards,
    Amit

    somewhere in the code the <b>CLEAR</b> statement is missing... due to this sometimes the previous one is taken and printed instead of actual one.

Maybe you are looking for

  • Weather not shown in Notification center in iOS 7

    I recently upgrade to iOS 7 on my iPhone 5 and noticed upon restoring the OS and setting up as a new iPhone there is text weather and tomorrow summary in the notification center. But as soon as I restored the phone backup there's no text weather betw

  • Switching from Old Appraisal System to Management By Objective (MBO)

    Dear fellow practitioners, I have a requirement to switch or migrate from the OLD appraisal system to the NEW appraisal system (MBO). Does anyone have any information of the implications of switching the value of REPLA in T77SO from blank to 'A' or '

  • IMac 27" late 2012 + new Apple TV 3: bluetooth disconnections

    Hello, I have an iMac 27" late 2012 working perfectly with wireless keyboard, magic mouse, and wireless trackpad until two days ago, when I purchased the Apple TV. Since then I have continous disconnections whith Mavericks. Mouse, Keyboard and Pad lo

  • How to make table

    hi, i have a 2 tables of same structure ,i want to make a new table from thoese tables, but problem is that both table has some same data & i want to make new a table that should not have duplicate data . table 1 table 2 table 3 must be 123 200701 12

  • PR status not changed ..?

    Hi experts Can anybody give some inputs for below issue 1.PR has been created , same PR conevertd into PO. 2.After creating PO with reference to PR, the status of PR should change . 3.Here PR status is showing as not edited..? After converted to PO.