Over head group

hi guys,
i created over head key, and over head group.  but in material master record it did not accepted to give that over head group.  what is the configuration it was required.  is it assaign costing sheet, if it is where over head key assaign to costing sheed.
waiting for result.
thanqu
raj
Moderator: thread locked due to double posting

Hi,
By assigning Overhead group to the material master we can pick up that material for overhead calculation as well to have different percentages of overhead. This is being done through Costing Sheet. This overhead group is assigned to overhead key as one to one Then Overhead key shall be assigned to different overhead rates. Thus through one single costing sheet, we can able to bring in overhead for multiple products/material.
Trust this answers to your query!
Cheers!

Similar Messages

  • Over head key

    Hi Gurus,
        I want clarification regarding over head key and over head group.my client is required the two diff types of cost sheets 1.cost sheet at Domestic and 2.Cost sheet at Exports.Finished Goods are differs at Domestic and Exports but Raw material and Semi finished goods are may same r not.My Problem is how I define the  mat o.h at cost sheet.plz help me boss. this is very imp for me next week is golive for our project.
    As early as possible plz send u r reply iam waiting for u r replays.
    Give me with exp it is easy for me also
    Thanks and Regards
    Nagaraju sami

    hi sami
    u can define costing sheet on the base of material it means urs base is RAW material is it corrct.(kzb2)
    based on that u can define ur over head persantage in (kzz2)
    after creating deferent overhead groups u gest enetr particular over head group in material master costing screen .
    and the costing sheet in costing varient attachement screen.
    it will pick the over head

  • Adding over heads to the process order

    Dear All,
    We  are executing one projrect for which production of goods will be started from 01.01.2012.so for this we need to caculate cost of the product before the production order executed.
    For RM one BOM will be created & issued to the production order so that the cost of RM can be identified with the production order.
    For Over heads we need to provide the facility to enter manually for each order based on qty. & rate in the production order.
    So that before the production order executed the total cost of the order can be arrived.
    Now pl. advice how to provide the facility to enter manually for each order based on qty. & rate in the production order
    Thanks
    Shivaji

    HI shivaji mohanty,
    I have seent the same process in the Production Order.  I hope it will work to process order also.  Pl check the path
    Contorllling --> Productin Cost Controlling --> Basic Settig for Material Costing --> OH Key & OH Group. 
    Pl do the necessary setting & assign the Process Order!
    I hope it will work.  pl check & revert back!
    Regards
    Raj

  • Report to display Mat Cost Planned Labour Cost and Over head cost

    Hi Abapers,
    Greetings of the day..
    I need a Report that Display Material Cost , Planned Labour Cost,Actual Labour Cost and Over head value
    where do i start from and what are the tables involving in this report..
    if already done this A code snippet is more helpful...
    Thanks In Advance...
    Thanks & Regards
    Sathish

    Assuming you are talking about Maintenance Order.
    Use table: PMCO.
    Here the line with field VORGA having value KPPS gives the Planned Costs of the Order in the field WRT01.
    Similarly, the line with field VORGA having value RKL gives the Actual Costs of the Order in the field WRT01.
    Also have a look at Tcode KKBC_ORD.
    Jogeswara Rao K

  • Could not able to show a scalar value in Page Header/Group Header of the re

    Hi,
    I could not able to show a scalar value in Page Header/Group Header of the report which is returned from Sub-report. But I am able to display it in both Group Footer and Page Footer.
    I used shared variable in formula filed of both main and sub report and both are placed in the main and sub-report.
    Please do needful.
    Thanks & Regards,
    Mani G.S.

    You can only show Shared variables in main report in a location after the subreport has executed.
    If you want to show values in page header or group header you must place subreport in a section above these. This is unlikely to be possible so you will have to live with displaying results in Group/page footer.
    Alternatively you can execute subreport twice, once where subreport is hidden in a section above page/group header and pass summary figure you require and then again where you currently have subreport so you can see details as required.
    Ian

  • Standard over head report

    Hi Frnds,
    In CK13N i can see all the details of a particular material like the raw materials details , over head cost and other things .which can be seen only on each material basis.
    Is there any standard report where i can see all these details for multiple materials???
    Regards
    rajesh

    Hi,
    Try with the below t-codes:
    *CK82, where you can provide multiple Material codes. This report provides Total cost and OH cost. If you require each component level, you can call Cost Components from the same report.
    *CK83
    If you would like to develop custom report use the below tables:
    MBEW
    KEKO
    KEPH
    Rgds,
    ADI

  • Over head issue

    Hi Experts,
    Can we run the Overhead on WBS elements that do not have planned values ? is there any SAP notes on this.
    awaiting your replies.
    Regards
    Srinivasa Chary

    Hi
    IMG>Controlling>Product cost controlling>Cost object controlling>Product cost by sales order or order>basic setting for product cost>define over head gropus
    Tcode OKZ2
    Hope it helps
    Thanks/karthik

  • Tips or tutorial for how to scroll content over header or over fixed photos ...

    ... like these two Adobe Muse Site-of-the-Day websites:
    Scroll over header: <http://www.zacharycrawley.co.uk/index.html>
    Scroll over fixed photos: <http://www.lauranet.nl/>
    Thanks much for any advice
    Bradley

    And here's another site that repeatedly scrolls new content over a photo — almost like sliding a new page over a preceeding one, but as a function of scrolling.
    I doubt this added website was done in Muse, but can Muse do this sort of thing repeatedly ... or just at the top of a page?
    <http://www.thesochiproject.org/en/chapters/the-summer-capital/&>
    Thanks again!
    Bradley

  • How to Close Planned Over Heads in product costing

    HI,
    We are maintaining planned over heads through KP26 and Costing sheet.Kindly tell me how to close planned over head wether it is periodicall closing or other?
    Kindly provide me the guide lines  how to do this Planned overheads closing in the system?How many ways are there to close planned overheads in the system?
    Kindly adviice me?
    Thanks
    Sunitha

    Dear Sunitha,
    To run the Cost estimate or close the planned overhead KP26 and Costing Sheet is not enough you have to move forward and you need to define Cost component Structure (OKTZ) Path: SPRO > IMG > Controlling > Product Cost Controlling > Product Cost Planning > Basic Setting for Material Costing > Define Cost Component Structure. After maintaining cost component structure you need to define Costing variant T.code OKKN Path: SPRO > IMG > Controlling > Product Cost Controlling > Product Cost Planning > Material Cost Estimate with Quantity Structure . Here you copy PPC1 standard and create your own costing Variant.
    After Maintaining the Configuration go to T.code CK11n and run your costing and if it is correct then save it. To update Price in MM run T.code CK24 and release Material and update it.
    thx.
    Ganpat

  • How can I do a Header Group Using Group columns for WD ALV tables

    Hi
    I want to group columns into a header group.
    Eg:
                       from Date
    Availability
                       to date
    Any ideas if it is possible with WD ALV tables?

    Hi,
    Try to use the if_salv_wd_field_settings for the column grouping of the Model object.
    Also check the class CL_SALV_WD_FIELD.
    Regards,
    Lekha.

  • How to change Over head percentage

    Dear friends,
          I want to change the Over head percentage which is already maintained,   how  and where to change the percentage.
          Please advice me.

    Hi
              Overhead rate and percentage is maintained for transaction code KZZ2 and to move the changes to QAS systems from DEV - Is it via a transport ?? or do we make them individually in each system etc ...
    or to  this addresses this issue check Oss Note:164222.
    Tables in which  overhead rate and percentage is
    T685 - Conditions: Types
    KONX - Overhead Rates: Help Table for Variable Fields
    Regards

  • How to Calculate over head for a material?

    Dear Experts,
    How to Calculate over head for a material? please explain me step by step.
    Regards,
    Santhosh
    Moderator: Please, avoid asking basic questions

    Dear Santhosh,
    Please review the following documentations in the SAP Library for details:
    [Applied Overhead |http://help.sap.com/saphelp_47x200/helpdata/en/7e/cb815143a311d189ee0000e81ddfac/frameset.htm]
    [Costing Sheet|http://help.sap.com/saphelp_47x200/helpdata/en/7e/cb815143a311d189ee0000e81ddfac/frameset.htm]
    [Overhead Keys|http://help.sap.com/saphelp_47x200/helpdata/en/7e/cb815143a311d189ee0000e81ddfac/frameset.htm]
    Best Regards,
    Antje

  • Actual Over Head Calculation for process order

    hi!
    I have created a costing sheet for  over head, which will be based on labour activity cost.
    the base is labour cost for which I have given secondary cost element ( assigned in activity type for labour hours) in costing sheet and maintained over head rate for planned & actual. in credit of costing sheet for over head I have given secondary cost element with internal order.
    first question is : when internal order posting will happen? I am assuming , when production order settlement is done, over head cost has to be accrued to internal order. is my assumption is correct? because in line items of internal order , i couldn't see any thing.
    second question is : in process order, system is showing over head cost under planned cost, but it is showing ZERO in actual cost column. I have executed KGI2, system is not showing any senders or receivers. but when I executed KGI2 with dialog dipslay check box, system shows the calculations as per cost sheet correctly under condition value column.
    Please let me know where I missed ? how to get actual over heads in process order.
    in process order in cost analysis in the actual/target cost layout, system is showing the over head costs. but where as in "cost trend" layout, system is not showing over head cost.
    can any one help on above points.
    regards,
    ramesh b

    Hi
    Maintain the Overhead rate in KZM2 or KZZ2 as the case may be
    Then execute CO43... The moment overhead is charged to Process order, it would post credit to IO
    br, Ajay M

  • Where to create over head key and percentage

    Hi,
    Where to create over head key and percentage
    Please it is urgent I will assign points
    Thanks
    Radha

    Hi
    Given below is the path for Creating Overhead key, This is in SPRO.
    Controlling
    Product Cost Controlling
    Product Cost Planning
    Basic Settings for Material Costing
    Overhead
    Define Overhead Keys
    We define % in the below mentioned path in spro. The same can also be done in user menu.
    Controlling
    Product Cost Controlling
    Product Cost Planning
    Basic Settings for Material Costing
    Overhead
    Costing Sheet: Components
    Define Percentage Overhead Rates
    Anand

  • How the Sales OH (Over Head) Calculated

    Dear Experts,
    I have query regarding Sales OH Calculation,
    How the Sales OH (Over Head) will be calculated  and what basis system will take it.
    My requirement is OH reporting in COPA.
    And send me customizing steps for Sales OH Calculation.
    I am awaiting for your kind perusal.
    Thanks,
    KBR

    Hi Kurru Bhaskar,
    If u want to apply OH to material or production that will come from define costing sheet under product costing and assign  to valuation variant OKKN keep ur costing sheet under overhead tab in valuation variant.
    if u want specifically want to apply indirect cost to sales order define sepeate costing sheet and give that costing sheet .
    IMG>Controlling>Product Cost Controlling>Cost Object Controlling>Product Cost by Sales Order>Control of Sales-Order-Related Production/Product Cost by Sales Order>Check Requirements Classes.
    under requiremetn type under costing sheet tab.
    let me know any douts ML Bhaskahr.
    thanks
    kareem

Maybe you are looking for

  • VC: Syntax error while defining procedures

    Requirement is to calculate value of characteristic Volume from the values of characteristics width, height & depth. To achieve this, defined following source code $self.volume = $self.width$self.height$self.depth But could not able to execute condit

  • HP PhotoSmart Essential error on startup

    Hello, Up until the other day I was not having any issues when I would start my computer.  A few days ago when I started the computer I got a pop-up box titled "HPPhotosmartEssential" and it stated "Please wait while Windows configures HPPhotosmart E

  • What is the AS3 command to stop your Flex 2 Application

    I've been looking thru the documentation and I can't find the AS 3 command (or mxml command) that stops the Flex 2 application. I have a 'Log Out' button that will do some general clean up, then it should also cause the Flex application to cease oper

  • Batch Input in RFC function module

    Hi, I am creating a function that change the location of an equipment in transaction IE02. When i execute this function  from SAP it works fine, but when its call from .Net connector does not work, no changes to equipment are realized. i am using cal

  • Servlet thread pool

    Is there any way I can create my own init() for the threads in the servlet thread pool (by overriding some method or through other means)? (Not to be confused with the servlet's init().)