I'm setting the PP routing master and using the capacity requirement planning.
Do you have any definition or document about the overlapping and splitting in routing master ?
In part of overlapping. There are the options
- Required overlapping, Optional overlapping, Continuous flow prod
Could you please explain how does the system calculate the lead time in production when I use the different option together with Min.overlap time or Min. send-ahead qty ?
Best Regards
JN

Hi,
Refer the SAP help given below it comes with an example & should clarify your query
http://help.sap.com/erp2005_ehp_04/helpdata/EN/8b/67221404f111d293560000e8323492/content.htm
Regards,
Vivek

Similar Messages

  • Overlapping and splitting

    Dear All,
    What is Overlapping and splitting, where do i  assign?

    Now
    Splitting
    An operation is split if it is carried out on several machines or by several persons at the same time (see figure).
    Splitting an operation has the following effects on the operation dates:
    The processing time/execution time becomes shorter.
    Setup and teardown must be carried out more than once for the operation
    http://help.sap.com/saphelp_47x200/HELPDATA/EN/7e/d419b7455911d189400000e8323c4f/frameset.htm
    Overlapping
    To reduce the lead time of a routing or production order you can overlap operations. This means that an operation starts before the previous operation has finished
    You can define for each individual operation whether it should overlap with the next consecutive operation and in what way. To do this you can set the following indicators:
    Required overlapping
    This means the operations always overlap
    Optional overlapping
    This means the operations overlap if scheduling uses a reduction level that allows overlapping
    Flow manufacturing
    This means the system extends the lead time of all operations, that overlap using flow manufacturing, to the same length as the lead time of the longest of these operations. As with required overlapping, the operations always overlap.
    For every type of overlapping you can
    Define a minimum overlap time which only allows overlapping after a particular minimum limit has been reached.
    Define a minimum send-ahead quantity to ensure that the operation is performed for a particular minimum quantity of the material to be produced, before the next operation starts.
    http://help.sap.com/saphelp_47x200/HELPDATA/EN/8b/67221404f111d293560000e8323492/frameset.htm
    pavan

  • Problem with Updating of Routing Master data

    Hi,
        My requirement is I have to download Routing Master data into excel sheet. Once downloading is over, user can change some fields data in excel sheet. Again u’ll upload the changed excel sheet data to SAP. Finally these changes will effect to  the Routing Master data.
    I am  downloaded routing master data using FM ‘CARO_ROUTING_READ’.
    I changed some fields in excel sheet. I tried so many FM’s for updating the routing master data, but system not allow to me to change the Master data.
    I tried with ‘CP_BD_DIRECT_INPUT_PLAN’,
                 ‘CP_BD_DIRECT_INPUT_PLAN_EXT’,
                 ‘CP_BT_PLPO_UPDATE’, for updating Routing Master.
    And  Standard program RCPTRA02 also.
    Please send me one function module which can update the Routing Master data. But that FM have the same structure of CARO_ROUTING_READ. Otherwise type conflicts will come.
    System throws error ‘YOU CANNOT  EDIT TASK LIST OBJECTS WITH ACTIVITY TYPE&’.
    Regards
    Shaik

    Hi,
    I have found in OSS the following programs to download and upload routings:
    - Note 107242: You can create the sequential input file with report RCPDIRO1
    - Note 106965: Direct input routings: reading datasets
    Maybe this can help you to upload your routings in another way. Unfortunately I haven't figured out yet how the program exactly works. So if somebody can give me some info about that one, it would be great.
    Thanks,
    Steve

  • Cross-tenant email and split domains - how to set up?

    I've successfully deployed exchange 2010 sp1 in /hosted mode with multi-tenancy and the install is working great. We are running into a problem configuring the send connectors
    for inter domain email and split domains. We have several customers wanting to only put a couple of email accounts on the exchange server and have the rest of their email accounts resolve to a pop server at an external location. Currently I have a internal
    send connector set to relay email between the domains on the server so they can send emails to one another. Directions for this were found at: http://www.zerohoursleep.com/2010/10/step-by-step-starting-with-exchange-2010-sp1-multi-tenant-sending-and-receiving-emails/
    I created the connector: new-SendConnector -Name 'TestOrg' -Usage 'Internal' -AddressSpaces 'SMTP:domain1.com;1','SMTP:domain2.com;1' -IsScopedConnector $false -DNSRoutingEnabled $false -SmartHosts '[127.0.0.1]' -SmartHostAuthMechanism 'None' -UseExternalDNSServersEnabled
    $false -SourceTransportServers 'Exchange' 
    I added all my internal domains to the connector listed above and email is able to flow from one domain to another.
    My problem is we have a number of customers who need split-domains set up where users who arent on the exchange server are relayed to an external server. Example to route unknown users on a domain to google my send connector looks as is: 
    New-SendConnector -Name "Internal Relay - domain1.com" -Custom -AddressSpaces "SMTP:domain1.com;5" -SmartHosts aspmx.l.google.com -SourceTransportServers "server"
    This results in an internal loop error when sending from one internal domain to another. Sending from an external domain everything is fine. If I remove the "internal" connector listed above the split-domain send connector works perfectly fine delivering locally
    and to the external server.
    How can I make it so both send connectors work?

    Hello,
    did you solve the problem and how?
    Thanks,
    Victor
    Exchange and Outlook utilities at
    http://www.ivasoft.com

  • Planned order to prod order----order type and prod version/ routing

    Hi,
    My client produces a material in three different locations. The process at all the locations is same. Each location has the set of same work centers. We have differentiated the workcenters at the three different locations by naming conventions. I am mainting three counters in the routing with different set of work centers.
    We want different order types for the production orders processed at these three locations. Also I should be in a position to select the routing/ production version manually for the production orders processed at the three different locations. When I am creating a production order manually, I can select the order type and even the routing or production version.
    But here I am converting the planned order to production order. The system is picking the order type as maintained in OPPE. In OPL8 I maintained manual  selection of prod version. But version 1 is selected default by the system. Can I have any control over the selection of order type and prod version/ routing?
    Thanks and Regards,
    Raghu

    Dear,
    Selection of production version is only possible at manual creation of production order, but not when converting planned order to production order. you can manually change the production version if u want to in the planned order.When you have a planned order it would default contain a valid production version. So system would just take the Production version in the planned order to use the same in Production order. If you want to change the production version in production order then go to CO02-FunctionRead PP Master data and change it.
    (Goto OPL8 and select Manual Selection of Production Order in Production Version field
    And in MRP4 view of material master select - Selection only by production version as the option for the Selection method field )
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Remove Batch Management and Split Valuation Dependencies

    Hi,
    I need to remove Batch Management Indicator and Split Valuation for a material. Which one should I do first? Are these dependent on one another?
    Thanks,
    Jograd

    You are correct. It did cause lots of error when i tried to do it in test client.
    I am trying to remove the valuation category of one right now. It has zero stock and no open documents.
    I saw in note Note 155874 - Change valuation category in material master that you need to do this:
    2. If you change from split to joint valuation, no valuation data must
    exist for a valuation type.
    I dont know where to start doing that? Because there is not data for the material. However i noticed that there is valuation for previous period. do i need to delete that too? But there are no stocks for the previous period.
    Please help.
    Thanks,
    Jograd

  • Route TCPS01 is not maintained in route master

    Hi Gurus,
    At VT01N level, I fail to understand what this message or error from the system means:
    "Route TCPS01 is not maintained in route master"
    Can anyone help me solve the problem?
    Thanks
    regards
    Chris

    Hello Chris,
    Route TCPS01 needs to be maintained in TVRO table.
    Following customization settings are required for this route determination;
    SPRO>>Logistics Execution>>Transporation>>Basic Transportation>>Routes>>Define Routes EVery point has to be configured and determined.
    SPRO>>Logistics Execution>>Transporation>>Basic Transportation>>Route determination
    SPRO>>Logistics Execution>>Transporation>>Basic Transportation>>Route Schedule Determination
    Following SAP documentation will also be useful
    http://help.sap.com/saphelp_46c/helpdata/en/dd/5607da545a11d1a7020000e829fd11/content.htm
    Br,
    Tushar

  • Overdelivery % ignores while confirmation with capacity category and splits

    Dear all,
    System ignores Over-delivery % while confirmation with capacity category and splits only.
    Note:
    1.Error message set for overdelivery in OPK4. 
    2.Check box for Unlimited Overdelivery in material master(Work Scheduling View) as well as in the production order is OFF.
    Thanks,
    Satyajit

    Hi,
    Set in OPK4=>
    1)Overdelivery =  Error when overdelivery tollerance is exceed.
    Set in material MM02= in Work scheduling
    1)Maintian Underdelivery Limit and Overdelivery Limit
    2)Remove Tick of Indicator: Unlimited (Indicator: Unlimited Overdelivery Allowed)
    Overdelivery tolerance limit=> Percent by which the quantity that is posted to goods receipt may exceed the production order quantity.
    Indicator: Unlimited Overdelivery Allowed=> Indicator that specifies whether the quantity actually delivered may infinitely exceed the required production order quantity.
    With Regards,
    Ashish

  • Split Domain Routing issues

    Hi All,
    We are currently running Split Domain Routing between Ms Exchange 2010 and Zimbra, with exchange box set as primary MX, sharing a single domain (domain.com)
    Emails for [email protected] will be received by Ms Exchange, emails for existing user in exchange is delivered directly to mailbox and all other non-existance [email protected] is routed via smart-host to zimbra.
    Is it possible to configure exchange "only" to route emails to users we know exists in zimbra to zimbra, rather than to route all emails for non-existance [email protected] to zimbra ?
    Thanks.
    George

    The most effective way I have found for configuring split-domain routing is to set it up so it's not really routing for a single domain.  In your example, I would do the following:
    Configure the Exchange side to receive all inbound messages and be authoritative for domain.com
    Create two additional accepted domains:  Exchange.domain.com and Zimbra.domain.com
    Import all addressees in the Zimbra system and give them the external email address of
    [email protected]
    Give all of your Exchange mailboxes the secondary proxy address of
    [email protected]
    In Exchange, create a send connector for the address space zimbra.domain.com that uses smart host routing and sends directly to the Zimbra servers
    In the Zimbra system, tell it that all email bound for exchange.domain.com needs to be delivered to the Exchange hub servers directly
    If users get added to Zimbra, you add associated contacts in Exchange.  You can have your Exchange users as contacts in the Zimbra system, but if you do, you will need to make sure they have the
    [email protected] address, so their mail gets routed accordingly.  You can also create a receive connector that accepts mail from Zimbra so that it needn't go through the same hygiene products if
    you wish, but this isn't necessary.
    Oh, and this will give you the solution you asked for in your final question - you will only route mail to Zimbra for mailboxes that actually exist in Zimbra.
    Sounds like a good idea. I'll try it first and let you know if it works.
    Thanks.
    George

  • Route master configuration

    Dear Friends
    i need some guidance as to how to configure route master in SAP to calculate the freight in a PO automatically. this is a completely new area for me and any doc to help out on the issue would be really welcome and appreciated
    regards
    gurvinder

    show phy
    show circuit
    verify that status of the physical link.
    show arp
    make sure you have aro entries for the servers and gateways.
    Finally, if you are reusing the same ip addresses, make sure to clear the arp table of the servers and gateways.
    Regards,
    Gilles.

  • Wc and splits

    hi, confused regarding work center- capacity view- individual capacities and no of splits of routing? pls explain with one example how to use these 2 fields (individual capacities & no of splits) and how they are related, how it will effect the capacity.

    Dear,
    Individual capacities in work center we use for same capacity of machine. Suppose you have 5 lath machines for that we create one work center and define Individual capacities as 5
    Number of splits in routing is use to use these Individual capacities suppose you say 3 then system will schedule the order on three Individual capacities instate of 5.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Dates Overlaps and Gap

    Hi Everyone,
    Can you please help me solve this issue? I have dates overlapping and with gaps. I shouldn't have any overlaps, so I need to split them as below.
    Here is my test data.
      create table test_dates (
        prov_id varchar2(20 byte),
        start_date date,
        end_date date,
    attribute_value varchar2(10 byte)
    insert into test_dates(start_date, end_date, prov_id, attribute_value) values (date '2010-01-01', date '2010-01-31', '1', 'A');
    insert into test_dates(start_date, end_date, prov_id, attribute_value) values (date '2010-02-01', date '2010-02-28', '1', 'B');
    insert into test_dates(start_date, end_date, prov_id, attribute_value) values (date '2010-04-01', date '2010-04-30', '1', 'C');
    insert into test_dates(start_date, end_date, prov_id, attribute_value) values (date '2010-04-15', date '2010-05-31', '1', 'D');
    insert into test_dates(start_date, end_date, prov_id, attribute_value) values (date '2010-07-01', date '2010-08-31', '1', 'E');
    insert into test_dates(start_date, end_date, prov_id, attribute_value) values (date '2010-07-01', date '2010-07-31', '1', 'F');
    insert into test_dates(start_date, end_date, prov_id, attribute_value) values (date '2010-08-15', date '2010-08-01', '1', 'G');
    insert into test_dates(start_date, end_date, prov_id, attribute_value) values (date '2010-09-01', date '2010-12-31', '1', 'H');
    commit;
    Expected Results:
    ID
    START
    END
    1
    1/1/2010
    1/31/2010
    1
    2/1/2010
    2/28/2010
    1
    4/1/2010
    4/14/2010
    1
    4/15/2010
    4/30/2010
    1
    5/1/2010
    5/31/2010
    1
    7/1/2010
    7/31/2010
    1
    8/1/2010
    8/31/2010
    1
    9/1/2010
    12/31/2010

    Hi,
    Depending on your requirements:
    WITH change_points AS
        SELECT  prov_id
        ,       change_date
        ,       change_type
        ,       SUM  (change_type) OVER ( PARTITION BY  prov_id
                                          ORDER BY      change_date
                                        )  AS active_cnt
        ,       LEAD (change_date) OVER ( PARTITION BY  prov_id
                                          ORDER BY      change_date
                                        )  AS next_change_date
        ,       LEAD (change_type) OVER ( PARTITION BY  prov_id
                                          ORDER BY      change_date
                                        )  AS next_change_type
        FROM    test_dates
        UNPIVOT (    change_date
                FOR  change_type  IN ( start_date  AS  1
                                     , end_date    AS -1
    SELECT    prov_id
    ,         change_date      + CASE
                                     WHEN  change_type = 1
                                     THEN  0
                                     ELSE  1
                                 END   AS start_date
    ,         next_change_date - CASE
                                     WHEN  next_change_type = -1
                                     THEN  0
                                     ELSE  1
                                 END   AS end_date
    FROM      change_points
    WHERE     active_cnt   > 0
    AND       change_date  < next_change_date
    ORDER BY  prov_id
    ,         start_date
    Thanks for posting the sample data; that's helpful.
    It also very helpful to explain how you get the results you want from the given data.  For example, what role does prov_id play in this problem?  (It's  hard to guess when every row in the sample data has the same value for prov_id.)  Also, sometimes, the start_dates or end_dates in the output are not exactly the dates in the table; sometimes they are 1 day earlier or later.  How do you decide which?
    In the sample data, start_date can be later than end _date, for example:
    insert into test_dates(start_date, end_date, prov_id, attribute_value) values (date '2010-08-15', date '2010-08-01', '1', 'G');
    Was that a mistake?

  • How to for HP CP1525nw Apple AirPrint and Netgear WNDR3700 router

    How to setup AirPrint on an iPhone & iPad with a HP CP1525nw and Netgear WNDR3700 router
    Date written:  April 17, 2011
    I did this twice. It took 2 days the first time and 3 hours the second time. 
    Equipment used:
    iPhone 4 on AT&T
    iPad 2 on Verizon
    HP LaserJet CP1525nw color laser
    Netgear  N600 Wireless Dual Band Gigabit Router WNR3700 v2
    Abstract: Upgrade Apple products software, upgrade router firmware, upgrade HP Printer firmware and installer. In that order. Reboot a lot. Test as you go.
    APPLE - Upgrade iTunes to the latest version  10.2.1.1 Released around mid April, 2011.
    This will Upgrade iPhone 4 to version 4.3.2 (AT&T) Check in Settings under About.
    This will Upgrade iPad 2 to version 4.3.2 (Verizon) Check in Settings under About.
    NETGEAR - Upgrade the Netgear 3700 router from version 1.0.0.6 to version 1.0.0.8 using the built in webpage to check for updates. The router will download and install the updates. This will also update the built in Web setup GUI from 1.0.0.56 to 1.0.0.67.  Power off and on the router.  To see your version, check Status under Maintenance
    Now is a good time to setup Wireless security in the router. Set to WPA PSK (TKIP) + WPA2-PSK (AES). Uncheck Enable Wireless Isolation.
    Enter a password for both bands 2.4 GHz and 5.0 GHz, I used the same for both. (the iPad can use the 5 GHz WiFi band but not for printing {?} so use 2.4 GHz when you print.) You should give them different SSID names, like NETHOME and NETHOME-5. These will show up on your wireless devices (like the iPad but not iPhone)
    Make sure your computer, iPhone and iPad can connect to the internet before you go on.
    HP PRINTER – Go to HP’s website and down load the latest Installer and firmware for the CP1525nw.
    Printer webpage
    This is the webpage but you can just search for CP1525nw at the HP website.
    Select your Operating System, such as Win 7 32 bit. And look at the list of downloads that appear below.  Under Drivers (2), you want to download the HP LaserJet Full Feature Software and Driver. It says it is version 2.0 The Installer you will use is version 3.0.3.5253 as you will see.  The Installer on the CD is much older (1.4).
    Now under Firmware (1)  download the newest firmware utility for the printer.  HP LaserJet Firmware Update Utility.  The file name is  CP1525_Series_FW_Update-20101125.exe [1/1, 6.87M]
    Note the date is 20101125. My Printer had 20100430. These are the firmware version numbers.
    So 2 programs from HP. One is the Installer and the other is the Firmware Updater. You can just click on the HP Full Feature Installer to run it. No CD needed anymore. You have to get the printer working on the USB port next, and then you can update the firmware in the printer.
    You should uninstall any old drivers if it asks you. You are going to uninstall and reinstall 2 or more times. Uninstall old stuff, install new USB drivers from the new download, uninstall USB drivers, and install Wireless drivers.  But first get the USB working and printing. Print Config from the printer control menu to see your firmware version…. Reports/Config Report. Look at Firmware Date.
    Now you can double click the 2nd HP program to upgrade the Printer firmware.  The file is called CP1525_Series_FW_Update-20101125.exe  This will upgrade the firmware over the USB port. When it is done you will get a yellow Happy Face. You can print Config Report from the printer controls to see the firmware version… 20101125.
    Power off/on Printer.  Turn off cell phones, go into Airplane mode on the iPhone and iPad. You can turn on the iPhone and iPad WiFi but leave the 3G phone stuff off. This seems to be important, I think some of the “not found” problems are RF interference with the WiFi.  
    Run HP Installer again. Uninstall the USB driver and then run it again to install the printer as a Wireless Device. You will need to pick the router and enter the password so the printer can log on to the router. 
    Once you reboot the printer, check for the blue light on the front. Make sure the Wireless is turned on in the Printer Wireless settings.
    Your iPad and iPhone will go through the Router and back out to the Printer to print. Uninstall Print n Share, Print Pro and other printing helpers.  (for now) Try printing now.  It doesn’t work with Notes, so try printing in Safari with the BoxArrow icon.
    The first time you print, you should see the Printer in list, but I had to get out of the app and get back in to Print the first time. After that is works with the CP1525nw without picking the printer again. You will see a big print button.
    We so excited…. AirPrint works.  (Needs some printer settings…landscape?)
    Disclaimer – I don’t work for Apple, HP, Netgear, AT&T or Verizon. I work for free…  I would be willing to beta test for them, they need help.

    My question is if its possible for the N devices to still use N network while the G devices not demoting the whole wireless network to G?
    Yes. To do so, you would need to connect the Netgear to the new 802.11n AirPort Extreme Base Station (AEBSn) by Ethernet, and then, reconfigure it as a bridge (disable both its NAT & DHCP functions).
    In this configuration, the AEBSn & AXn can provide the 802.11n network and the Netgear can provide the 802.11g network.

  • Remote and direct update of master data at the same time

    Hello
    Is it possible to do remote and direct update of master data at the same time? If yes where it could be used?
    Thanks

    Hi,
    What do you mean by Remote Update ?
    regards
    Happy Tony

  • RA VPN on ASA and Split Tunneling

    Hello Forum,
    I'm having an issue with RA VPN and split tunneling. Our company doesn't allow split tunneling.
    I have the following....
    ASA 5520 - ASA Version - 8.0(3)
    Group Policies defined for different groups. My test group, I thought I disabled split tunneling but they are still able to surf the net.
    For Split Tunneling Policy...
    Inherit is unchecked
    I have "Tunnel Network List Below"
    Testing_splitTunnelAcl is my acl. I have a bunch of host IPs in the list. I don't have any or 0.0.0.0 in the list.
    But they can still surf the net.
    I would like to block access to net. No hairpinning or internet u-turns.
    How do I do this?
    Any help greatly appreciated.
    Regards,

    What does your Testing_spliTunnelAcl have?
    To disable split tunneling, your Testing_spliTunnelAcl should only have this...
    access-list Testing_splitTunnelAcl standard permit any
    ...which means all traffic will be encrypted and will be sent to ASA no matter what. If you add any IP Address, only those traffic destined to the IP Address in the list will be encrypted and send to ASA, everything else will go to internet from the client.
    It may be confusing but try and see what happens.

Maybe you are looking for

  • Different Comboboxes in the same AdvancedDataGridColumn

    I have an AdvancedDataGrid in my application that works inside a search tool and one of its columns used to be a text editor to type the desired word to search. Now i need to change from text editor to a ComboBox with different options, but when i im

  • Firefox PDF links - Trying to Open in Pages

    Hi all, I have a bit of a hiccup in that every time I attempt to click on a PDF link in Firefox 3.6.3 to open the file in Preview, the system attempts to open it with pages and I receive the following error message: The document "PhotoVideo_Solicitat

  • Tomcat Connection pooling problem

    I am using Tomcat connection pooling (DBCP) to get the connection from the Database It really works great with Oracle, MySQL, Sybase and as well as DB2. Recently I tried to integrate apache with tomcat to improve the performance. But now the problem

  • Can't install OSX from OS 9.1

    I have done a clean install of OS9.1 but when I try to install OS 10.0.3 my ibook (dual USB) asks me to restart to do the install but as it is booting up it shuts down soon after the happy Mac screen appears. I have tried to resart by holding down th

  • Error Khmer Unicode font in Adobe indesign

    i want you show me to this case , how can i do to fix this error in Khmer Unicode fonts i try many way to fix this but still know recognize in adobe indesign , how can i do let show me step by step.