Pass or fail based on sample average

Is there a way to base a test pass or fail on the average of measurements of a lot rather than pass or fail of a certain number of individual members. 
In the situation I need to solve we have 4 tests to perform on a lot.  The first three are rather straight forward, test individual serialized material and if x or y pass the test passes.  In the last test the test results for the entire sample are taken, averaged, as well as some other calculations, and then based on the average the test passes or fails.  The results of the individual material measurements are not evaluated as stand alone item.
Thank you for any help.
Regards,
Ron

Hi Ron,
I try to explain.
1.     Letu2019s say as per sampling procedure your sample size is 5. LENGTH (50mm u2013 55mm) is one of the MICs that you need to inspect.
2.     Here you need to enter the readings 5 times. (provided you have opted single results in control indicators)
3.     When you enter results one by one in QA32, system calculates average of these readings.
4.     Check the phi symbol (ф)
5.     System shows the average of readings against this symbol.
6.     If you have entered results as 55, 50, 52.5, 54 and 53 your average would be 52.9 mm
Regards,
Anand Rao

Similar Messages

  • Display pass or fail in Report based on return value

    Hi,
    I'm trying to integrate TestStand with TestComplete using the ActiveX/COM server adapter.  I have the COM setup so that TestStand can call a test in TestComplete and have TestComplete return a string value (true|false) to TestStand.
    Now I need to get the TestStand report to display "pass" or "fail" text for this sequence call,  based on the return string from TestComplete.
    Is there someplace in Expressions or Post Actions that I can state and how:
    return value "True" = pass
    return value "false" = fail
    Thanks.
    Solved!
    Go to Solution.

    Hi,
    Option 1.) Use a String Value Test.   The Limits.String would be 'True'.  This would be the easiest because you already returning strings from your ActiveX call.   You could make your ActiveX calls a String Value Test.
    Option 2.) Use a Pass/Fail Step.   You could set the returned string to a local variable and then create another Pass/Fail step that would have the Pass/Fail criteria as Locals.StringReturned == 'True'
    These are two options that hopefully can get you started....
    Thanks,
    PH

  • DIO Pass or Fail Tests: LabVIEW would have to determine the expected result or results (1 or 2 of a possible 25) based on the output pattern send out (1 of 65K).

    I am trying to come up with a plan to write a LabVIEW VI to do the following test. Can you give me a few ideas how to do this in LabVIEW. I am a new to LabView. I think I how to read and write I/O ports and do comparisons. I need a little guidance on the error checking. In simple terms the test will go like this:
    I have 16 digital inputs and 16 outputs.
    The 16 outputs are turned on in a specific pattern (i.e. 1001000101011101) and then the 16 inputs (i.e. 1000101111111111) are read in after a time delay. The inputs are checked to see if they match the expected results. If they do it's a pass if not it's a f
    ailure. This seems pretty straightforward. And I think I have an idea how to do it. Here's the problem. The inputs are changed sequentially so that all possible combinations are tried. The test needs to determine if the resulting input pattern is correct based on the outputs that were sent out. 16 outputs give 65K possible tests. For each tests there would be 1 or 2 possible results with a total of 25 results for the entire 65K possible tests. LabVIEW would have to determine the expected result or results (1 or 2 of the 25) based on the output pattern send out (1 of 65K). Then it would have to compare the actual input pattern received to see if it's a pass or fail?
    Any ideas how I can approach this?

    The 16 outputs are simulating inputs to the device under test, (simulating remote switches and contacts). The object of the test is to test every possible combination to ensure that nothing unexpected happens at the output. The device under test is a logic motor control system and we want to make sure (among other things) that we don’t start or stop the motor when its not suppose to. How can only two tests do that?
    I think you are describing how to create an array with the results. But I still don’t know how to determine what the result should be and if it is correct.
    I’ve identified 25 possible valid states the motor controller can be in.
    I’ve also identified the correct outputs that determine each of the 25 states.
    I’ve also
    identified the possible valid states you can go to from each (previous) state, You can only get to a valid new state from a previous state if the right combination of inputs is applied (we hope).
    If you know what state you are in when start and you know the valid states you can go to and the inputs required to get there, you should be able test the system against that. You verify this by checking the outputs against what they should be. With 65K possible inputs combination, checking them all manually would be quite is a task. Putting this into LabView is my task.

  • Custom Pass or Fail

    I am looking for a way  to display a final result slide of a quiz with a score and review area showing more than one brakpoint. Say  you have a quiz of 10 graded questions. Less then 30% correct answers gives a review text of "You are not good enough". Between 30% and 70% gives "you can do it"and more  than 70% gives "You are excellent in it !". I am using CS4

    If you want to set 3 or more messages: You can remove the review messages (both pass and fail text) from project preferences. Add a text caption on the resul slide and set its text based on the value of yourScore variable.
    If you can do with only 2 messages, set pass percentage as the one you want to in Edit Preferences -> Quiz -> Pass or Fail. In quiz result messages dialog customize pass and fail text

  • How can I create a view of top five teams averages based on individual averages of that team?

    I have created a list that groups teams by their Team name (Team column) with the individuals members (participants column) averages and their team average (total average view option).  I want to only display the top five teams that have the overall
    top team averages.  I have a list that contains a team name, average minutes, week, and participant. The team manager plugs in each week a new entry for each participant on the team.  I have a view that computes each team average but I want a view
    of the top five teams based on the top averages of the team (not individual participant average).  Unfortunately, I can only seem to get all teams grouped with individuals of that team, their individual averages and the team average but can't figure out
    only how to show the top five teams top average.  Because it's a total (team average) and not a separate column, I can't get a view by team based on total average.  I can by top individual average but not by the team.  Can some one help me figure
    out a solution?

    A calculated column won't work because a calculated column can only reference the individual item, not the entire list or a subset.
    You could do javascript to build this, but to me it's easier to just use Excel.
    Andy Wessendorf | Solution Foundry [email protected]

  • I want to write a program in LabView then pass the test results to teststand to check if it pass or fail without displaying the test stand program,

    I want to write a program in LabView and create an execute but I want to be able to pass test results to test stand to find it the unit pass ar fail the test then save the data to a database. How would i go about it.

    What's confusing is your statement that you want to do this "without display the test stand program". You can minimize the TestStand UI to the task bar but if you don't want TestStand to be running, how can TestStand evaluate the result. Explain a little more please.
    In the message body of your post, you just say you want to create a LabVIEW exe and pass the results to TestStand. What I would recomend is that instead of an exe, you create a dll and use TestStand's DLL adapter to call it and return the results. TestStand will evaluate it and do the logging.

  • My status change to pass from fail after 40 days. Microsoft Exam 74-409 Score

    Microsoft update 74-409 exam.
    My status change to pass from fail after 40 days..
    Recived below email. is this possible ?
    Dear Valued Customer,
    You recently took Microsoft Exam 74-409: Server Virtualization with Windows Server Hyper-V and System Center. After close evaluation of the exam, we have made some revisions that resulted in a change to your exam results. We are pleased to inform you that your
    status has been changed to ‘PASS’. This update will be reflected in your official transcript within two weeks. A new score report will be mailed to you within two weeks.
    Thank you for taking this exam and for your support of our program.

    Yes its possible, but its also possible that its a scam trying to entice you to provide information that could be used for identity theft.  I would wait a couple weeks and then check your transcript on the MCP site.  If the exam shows then it was
    for real.  If it doesn't then it was probably a fake message.
    The reason it might be for real could be that someone challenged the clarity of one of the questions in their comments and Microsoft decided after looking into it that some question was misleading.  This might have lead them to accept more than one
    answer or to throw the question out.  That could have modified your score in some way and promoted you above the Pass line.  It is possible, but not likely.
    Paul Stork SharePoint Server MVP
    Principal Architect: Blue Chip Consulting Group
    Blog: http://dontpapanic.com/blog
    Twitter: Follow @pstork
    Please remember to mark your question as "answered" if this solves your problem.

  • Number value average based on time average

    Hello,
    I am in need of help of trying to develop a formula to determine numerical average based on time average.  The example I have is, 
    Time 
    Value
    9:00:00
    102
    9:00:05
    103
    9:00:10
    104
    9:00:15
    105
    9:00:20
    106
    9:00:25
    107
    9:00:30
    108
    9:00:35
    109
    9:00:40
    110
    9:00:45
    111
    9:00:50
    112
    9:00:55
    113
     Is it possible to create a formula that would spit out the average value for a one minute average?  Thank you.

    Not really sure, If I get what you need... but anyway - there are statistical functions in Excel, that could help you achieve that result ..
    First idea - you don't have the whole "minute" data - so we can calculate the target value, if the time gets to 9:01:00 ... since you have linear data (see chart in attachment), we can use LINTREND function, that calculates one new value based
    on known previous values... for time 9:01:00 the value would probably be 114. After that, you can calculate the standard AVERAGE function..or am I missing something here? :)
    Try to go through the attachment and let me know it it works for you..
    Milan
    attachment

  • Output pass or fail result to printer

    Hello,
    I need to add a printer to our existing test system fixture and write a VI that would print the either pass or fail result once the product has been tested.  But I don't know what kind of printer I need and where to start writing VI.  Do I need one of receipt printer or any kind of printer would work?  Any ideas.
    Thank  you in advance. 

    Any printer will work.  Like crossrulz said, the Report Generation Toolkit will print to the default printer.
    Here's a cheap-and-easy method Ive used:
    This may work if you don't have the Report toolkit:
    I switched to the first method when I found that the second doesn't work well in Windows 7, but I haven't tried it in LabVIEW 2013 (it's a bug that may have been fixed).
    With either method, simply make the Front Panel of your VI look like the report you want.  I'll usually hide any controls (Print, Exit) before printing then re-show them when it's done.
    Jim
    You're entirely bonkers. But I'll tell you a secret. All the best people are. ~ Alice

  • Captivate 5 Quiz pass and fail issues

    Hi all,
    Still new and working with Captivate 5 (Win7 OS). I have a project with five quiz questions at the end. The goal is for the learner to have to pass the quiz to continue and the passing score required is 80%. I am allowing three tries at the quiz before failure. The problem I am running into is when the learner has failed on the final attempt, the quiz results screen is shown and will not advance to the next slide. Here are the settings I have so far:
    Preferences>Project>Start and End>Project End options-Action-Close project
    Preferences>Quiz >Reporting>Quiz: Enable reporting for this project-checked
    Preferences>Quiz >Settings>Quiz> Required-Pass required
    Allow backward movement-unchecked
    Show score at the end of the quiz-checked
    Preferences>Quiz >Pass or Fail> Pass/Fail options-80%
    If passing grade-Go to the next slide
    If failing grade- Allow 3 attempts. Show Retake button. Action-Go to the next slide
    All quiz questions are set to one attempts
    I have a “Retake” button directly on top of  the  “Continue” button on the quiz results page. The retake button appears correctly on each of the attempts and the “Continue” button appears if the learner gets a passing score. If the learner fails at the end of the third attempt, the continue button appears and at this point and is not active (due to failing score). I can only get the project to advance to the final slide if the learner passes the quiz.
    The learner needs to be able to resume the project if they stop and exit. I also want the project to close the browser window after the last slide has played. I do have a playback controls (clients requirement).
    Any help is greatly appreciated!!

    Change your Quiz > Required > Pass Required to Optional instead.
    You've told the quiz that it should force the user to pass before allowing them past the Quiz Results slide.  That's probably why the Continue button or playbar won't allow them to move further.  By making pass optional it should work.
    Getting the course window to close automatically at the end is by no means guaranteed to happen.  That depends on many factors that may be outside your control (e.g. browser settings, LMS player, security, etc)
    For 300 more troubleshooting tips like this, read the book!
    http://www.infosemantics.com.au/troubleshoot-adobe-captivate

  • I added Edit Preferences Quiz Pass or Fail If Passing Grade Go to the next slide

    Unfortunately, it doesn't work. The playback frame stays on the quiz reporting page. Please, can anybody tell me what I could be doing wrong?

    Rod -
    At the end of the quiz I have my "PASS" and "FAIL" screens set up, one after another. In the Captivate Preferences, under "Quiz Pass and Fail" - I have that if they Pass, they jump to the "PASS" slide, and if they Fail they of course go to the "FAIL" slide.
    When I play the course and pass, the pass screen that I built shows up after it shows my results, but then immediately goes to the fail screen that I built. How can I stop that from happening? Do I need to hide the playbar when the user gets to that page? I'd rather not as I want the user to be able to restart the course if they want to without having to close then reopen.
    Many thanks -
    Kevin

  • Quiz Preference Pass or Fail Settings

    I have a 5 slide Captivate Project. I have a next button set
    up on each slide for a total of 4 buttons. Each button is set to a
    value of 1. Add to Total and Track Score is checked for each button
    with report answer is left blank. I am using AICC with Pass/Fail,
    Slide view only, Score and Report Score. The issue that I am having
    is that when I go to the Pass or Fail option under the Quiz heading
    I change the Pass/Fail Option to the second option labled "points
    or more to pass." To the side in () it indicates the number 4. When
    I enter the number 4 into the select box and hit ok it appears to
    have worked. When I reopen the select box indicates 0. Why will it
    not stay at 4?

    Hi all
    I just tested this. The four points does work, despite what
    the dialog indicates if you close and re-open it. Aside from simply
    being a quirk with the way the dialog functions, I'm not really
    seeing that it impacts behavior in production.
    Just thought I'd report what I found... Rick

  • 'Pass' or 'Fail' depending on another field?

    What script do I enter so a field (Field1) enters 'Pass' or 'Fail' depending on whether a number in Field2 is <2 or >1? Do I enter this as a custom calculation in Field1?

    You need to give more information about exactly when you want "Pass" or "Fail" to display.
    If you want to display "Pass" if the value is > 2, and "Fail" if it is < 1, try this:
    //Custom calculation script for Text1
    var f1 = this.getField("Text1").value;
    var f2 = this.getField("Text2").value;
    //Make Text1 blank if Text2 is > 1 and < 2 or is blank
    if (((f2 > 1) && (f2 < 2)) || (f2 =="")){
    f1 = "";
    //Make Text1 Pass if Text2 > 2
    else if (f2 > 2){
    f1 = "Pass";
    //Make Text1 Fail if Text2 < 1
    else if (f2 < 1){
    f1 = "Fail";
    //Show result in Text1
    event.value = f1
    You will need to replace "Text1" and "Text2" with the names of the fields in your form.

  • Finding a pass or fail.

    hi.
    Im using numbers for mac. I am trying to find out how to create a pass or fail into a cell. BUT... i need it to pass or fail from the 5 precceding cells in the row.  I have to carry out 5 tests. at the end of the tests in order to pass it has to be 5 out of 5 so if any 1 test fails its a fail.  please can someone help me out  and explain it nice and simple how to do it.  

    Just what the doctor ordered!!
    If possible, is there a way that i can include a variant into it? ie.  pass,pass,n/a,pass,pass and still get a pass result. but not a fail.
    VISUAL INSPECTION
    CURRENT LEAKAGE TEST
    EARTH TEST
    INSULATION TEST
    FUNCTIONAL CHECK TEST
    PASS             FAIL
    PASS
    PASS
    N/A
    PASS
    PASS
    FAIL
    EDIT
    EDIT
    N/A
    EDIT
    EDIT
    FAIL
    EDIT
    EDIT
    N/A
    EDIT
    EDIT
    FAIL
    PASS
    PASS
    FAIL
    PASS
    PASS
    FAIL
    EDIT
    EDIT
    N/A
    EDIT
    EDIT
    FAIL
    EDIT
    EDIT
    N/A
    EDIT
    EDIT
    FAIL
    EDIT
    EDIT
    N/A
    EDIT
    EDIT
    FAIL
    EDIT
    EDIT
    N/A
    EDIT
    EDIT
    FAIL
    EDIT
    EDIT
    N/A
    EDIT
    EDIT
    FAIL
    EDIT
    EDIT
    N/A
    EDIT
    EDIT
    FAIL
    EDIT
    EDIT
    N/A
    EDIT
    EDIT
    FAIL
    EDIT
    EDIT
    N/A
    EDIT
    EDIT
    FAIL
    EDIT
    EDIT
    N/A
    EDIT
    EDIT
    FAIL
    EDIT
    EDIT
    N/A
    EDIT
    EDIT
    FAIL
    EDIT
    EDIT
    N/A
    EDIT
    EDIT
    FAIL

  • Judge testing result pass or fail

    I use teststand to call dll(writen by CVI),my question is I get a result from instrument by dll ,how judge the result pass or fail by teststand,the limits is defined by user .
    thank you!
    Solved!
    Go to Solution.

    Hey Sean,
    I think I may be confused by your question so can you answer the following-
    When you say "judge" do you mean that you want the step to determine if the result lies within the limits defined by the user?  Is the result numeric?  String? Boolean?  How is the user inputting the limits?
    Most of the time people use the Numeric Limit Test step to determine limits on measurements.  This determination is accomplished by the Status Expression of the step combined with the limits set for that step.  How that is setup defines whether the step passes or fails.  If you let me know how the user is inputting the limits I can help you dynamically set the limits.  Which is most likely what you'll have to do.
    Regards,
    jigg
    CTA, CLA
    teststandhelp.com
    ~Will work for kudos and/or BBQ~

Maybe you are looking for

  • Todays update to 7.1.0 broke "Display PDF in browser"

    I do ***NOT*** want PDFs displayed in my browser. I ***DO*** want PDFs displayed in a separate Acrobat window. Version 7.0.9 was working this way until the update to 7.1.0 went in today. Now, regardless of the of the setting of the Edit --> Preferenc

  • Embedding a Lightroom Gallery in a webpage?

    Hi guys... need some help here.  So I have created a web gallery in Lightroom and now would like to embed it in my website but not sure how to go about it.  The Lightroom gallery is pretty much a stand alone gallery, the thing is I don't want to link

  • Problem with repair

    Hi just wondering has anyone had this problem with Lenovo I bought an idea centre 750 in November 2014 and it wasn't shuting down properly the fan would still run so I rang up and told them there was a hardware problem they were very nice on the phon

  • Need avice..for beginner with FCP

    I captured all my footage, however when wanted to start editing it asked me to render first which I did. But after I wanted to play my footage in the canvas it told me that some clips were dropped. I reset my canvas on "Full Window" and I was able to

  • Error message during OS update

    I keep getting an error message during the update for my ipad2.  it tells me an error occurred and if i continue everything will be lost on the ipad.  any ideas as to what i should do?