Hi
Experts
In matrial master  1 BI = 0.4 kg
We have Stock transfer order for 1 BI (BI is a unit of measure) which  0.4 kg.
but goods issue is done with 1 BI but qty 0.2 kg with movement 641.
User has  created inbound delivery with 1 BI  but for 0.4 kg.
He also confirmed the TO & created the handling unit.
But when he go for doing PGR it is giving error that PL stock in transit exceeded by 0.2 kg
I want to do PGR with qty 0.2 kg only. Please let me know how I can do this.
As TO is confirmed & handling unit is created it is not possible to cancel  the inbound delivery.
Thanks,
Kiran

conversion rate is not changed in between GI and Goods issue.
Goods issue is done with only 0.20 kg that what I can see in GI document.
Unit of entry is Kg in goods issue document , in the qty tab >>> qty unit of entry & qty in sku is 0.2 kg.
If I do change handling unit qty to 0.20 kg , inbound delivery to 0.20 kg & TO qty in 0.20 kg at table level then will my issue get resolved.
I think as per TO it is considering batch xxxxx  of 0.40 kg qty but as stock in transit stock is only 0.20 kg for that batch it is throughing error of  PL Stock in transit excedded by 0.200 kg
Am I correct if I do table level entry.
As I am stuck I am not able to do PGR or not able to cancel inbound delivery & not able to cancel inbound delivery as TO is already confirmed.
Please helpppp

Similar Messages

  • Post PGR at Inbound delivery error

    Hi guys
    We are trying to Post PGR at Inbound delivery
    Error : E     M7     022     10     PL Stock in transit exceeded by 1 00 : 2182597
    Please suggest a solution
    Thanks in Advance
    Satyam Madhu babu

    you have less stock in transit than you would like to receive.
    so you can either receive one less or post one more into transit before you receive.

  • Stock Transfer Inbound Delivery with HU Stuck - Unable to PGR

    Hi Gurus,
    Please help me with the situation.
    For 7 HUs there was a Two-Step Sloc to Sloc to transfer that was attempted to be performed.
    1. An Outbound Delivery is created from Plant 1000/0061 (313-)
    2. Picked and PGI-ed
    3. Inbound Delivery is created in the Receiving Plant 1000/0028
    5. This was done through a two step Sloc to Sloc Transfer (313 and 315)
    6. Since the receiving Sloc is WM Managed, a TOs were created and confirmed
    7. This happened sometime in April 2008
    8. THE PROBLEM NOW IS WE ARE UNABLE TO PGR THE INBOUND DELIVERY BECAUSE THE STOCK IN TRANSIT IS UNAVAILABLE
    9. Checked for SIT Stock; Unavailable
    10. Checked for any 315 movements after the TO Confirmation Date, but could not find any, until today's date
    11. LT0G is not working citing the reasons that LT0G will not work for TOs with HUs
    12. Cancellation of TO is not working under any Transaction
    13. The Stock of the material is 0 in Plant 1000/All SLocs
    THE HUs ARE SHOWING IN HUMO IN 1000/0028.
    How can I PGR the stock, or even cancel the whole transaction and scrap the stock.
    KINDLY HELP.
    Thanks.
    Ananth.
    Edited by: Ananthram Sundarababu on Jul 2, 2010 5:31 PM

    Hi,
    my situation is:
    - a WM managed warehouse, society A;
    - a HU managed warehouse (without WM), society B;
    - a purchasing process of HU from society A towards society B.
    Society B have a scheduling agreement; when a delivery schedule appears, in society A born a sales order and a delivery. After the registration of the delivery good issue, an idoc transfer information for inbound delivery creation.
    This process is ok without WM, but with a WM managed warehouse the idoc has the following problem:
    "V51VP - item was not found - process cancelled".
    Can you help me to transfer these HU?

  • How to receive goods through Inbound Delivery?

    Hi All,
    I have created a PO with confirmation control for IBD and OA. Then I created an IBD referring the PO and then I did Post Goods Receipt through the IBD. In he document flow, I can see a confirmation of service but when I checked the stock of the material, the stock was not updated by the quantity for which I did PGR thru IBD.
    Could you please help me with the process of gods receipt through IBD?
    Thank you all,
    Rana

    Hi,
    After PGR through InBound Delivery, you can observe the status in Confirmation Tab at item level in the PO (in the table- EKES). The stock in the MMBE will be updated only after MIGO (ie GR in Inventory Management).
    Regards,
    Narayana.

  • PGR error at Inbound delivery

    Hi Guys
    I have one inbound delivery and When I do PGR
    It is giving Error :PL Stock in transit exceeded by (10 quantity)
    In good movemnet tab Movement  type is 901
    Please provide your suggestion
    Thanks in advance
    SAP MM

    Hi,
    Please check the stock for the material and batch if you use batch.
    It seems the available stock is less.
    Thanks,
    Venkat

  • Multiple Inbound delivery PGR

    Hi All,
    I am using IDOC_INPUT_DELVRY for Post Goods Receipt of an inbound delivery. My requirement is I have to Finalize multiple Inbound deliveries at same time. I copied the E1EDL20 segment and pasted it at the same level 4 times. I am passing 4 Inbound deliveries in the idoc for PGR. But the last inbound delivery which is the bottom most segment of the idoc only gets PGRed.
    The other inbound deliveries, the batchs are getting created. But the IDOC_INPUT_DELVRY has the standard code for performing the PGR, then it should do the PGR for multiple E1EDL20 segments. But it is not happening.
    Do I need to do something additional when I am passing multiple Inbound deliveries for processing.
    Regards,
    Joseph M

    Hi...
    First create inbound delivery and do GR against inbound delivery by using t code MB0A
    Once GR is completed create TO with reference to Material document .
    Config - For inbound delivery document type remove putaway relevancy .
    Spro - Logistics execution - shipping - deliveries - define item category for deliveries
    here for relevant item category remove putaway relavancy .
    Hope it helps
    Jinoy

  • GurtVLO6if will not show PGR Date in inbound delivery

    hi gurus,
           Pls provide me the flow on how to link the inbound delivery number with the material document number, as I need to get the material doc number based on that delivery number and then I need to get the receipt date i.e. document date or posting date  from the material document master tables and fill in the enhanced structure field that I added for the goods receipt date in standard structure,, for this purpose and  at last inside the user exit to fill values for report vl06if.
    Regards
    NNeeti

    hi nneti,
               put thevariant parameter and check with material master

  • VLO6if will not show PGR Date in inbound delivery

    hi Gurus,
                VL06IF will not show the Post good receipt date of an inbound delivery,
    need this date inserted in the report.last column good recepit does not show any dates
    showing last column empty
    please check
    thanks,
    Joan

    Hi,
    Check Note 128150 - VL06: Designing your own display variants. It explains how to do with enhancement V50Q0001.
    I hope this helps you
    Regards,
    Eduardo

  • Document flow of Inbound Delivery

    Dear Gurus,
    We have upgraded to support pack SAPKH60018 from SAPKH60010.
    Earlier the process for goods receipt was followed as described below
    1. Purchase order
    2. Inbound Delivery
    3. GR in to Blocked stock against Inbound Delivery (mvmt type 103)
    3. Release GR blocked stock (mvmt type 105)
    Now after upgrading the support pack when GR blocked stock is made against the Inbound Delivery system is not updating the Document number in the document flow and PGR button is not disabled though 103 mvmt type document is made through migo.
    System is also not allowing to make the Release GR block stock through MIGO and prompting to use Inbound Delivery Dialog instead.
    Request for immediate assitance in regard to this issue.
    Regards
    Danish Alam.

    With the support pack in case if material is serialized for such plant you can post goods receipt only in VL32N which would happen only during 105 mvt type and you cannot post goods receipt using MIGO.

  • Goods receipt during inbound delivery

    Hi all,
    We have a Plant (DVOP) and Subcontractor (Vendor- 2010113) in Japan
    region and have mapped this Vendor as a MRP Area Vendor (2010113) in
    the Japan Plant (DVOP). We do safety stock planning at each location.
    Based on the Master Data set up for the Subcontracting components MRP
    creates the Purchase Requisition for the components (which needs to be
    delivered to Subcontractor) and to this PR we convert into STO to
    deliver the material from Plant DVOP to MRP Area (2010113). System is
    allowing us to create the PO’s with Document type UB. We are delivering
    the PO using transaction VL10F to the MRP Area. In the document type we
    are not mentioning Item Category as ‘L’ as the document type UB is not
    allowing us to change the Item Category to U.
    After creating the delivery and PGI to the MRP Area, subcontractor
    receives the stock by inbound delivery (VL32N), and during the PGR
    time, we are getting the below error in the inbound delivery.
    Message no M7 226
    The System could not find entry in 101 X X O B X in any of the movement
    type control tables
    please can anyone advise,,,
    thanks
    sudhakar

    Hi,
    For creating inbound delivery , Confirmation tab must be entered in PO. It is must.then only you can post GR wrt Inbound delivery.
    Try it and any quries let me know.
    Regards,
    Smitha

  • Posting goods receipt against Inbound Delivery

    Hi,
    Our process is creating Purchase order with Confirmation control for Inbound delivery. Then we create a Inbound delivery.
    1) After inbound delivery is done we do PGR through VL32N, the system updates the PO history with GR along with the Inbound delivery no. as a reference document against the GR & also the Inbound delivery document flow is updated.
    2) But our problem is if we try to do Goods receipt through T-code MIGO against Puchase order or inbound delivery we are not getting reference no. updated in the PO history & also there is no update in the document flow. Also the inbound delivery remais open.
    Can you explain why this is happening?
    Regards,
    Sagar

    Hi Sagar,
    It is very much possible to do GR using MIGO and document flow will also be updated, you have to do certain config settings for this which is as follows:
    in SPRO go to Logistics execution - Shipping - Basic shipping functions - Configure global shipping data - tick document flow update.
    Now when you check in Table VBFA you will get the Material Document No. in field VBELN and the status shall aso be updated and inbound delivery will be closed after complete GR.
    Hope it solves your problem

  • Inbound delivery for Sub-Contracting Scheduling Agreement

    Hi All,
    I am working on inbound delivery creation --> PGR for sub-assembly (Semi-finished product) which we receive from sub-contracting vendor through scheduling agreement. At time of PGR, it should do MVT#101 for sub-assembly and 543-O for raw components.
    I already created JIT/FRC releases and did PGI (MVT # 541-O) for raw components. Now I am manually creating inbound delivery (VL31n) to post PGR. When I am doing PGR with VL60, I am getting below error.
    Any help or suggestion please ?
    As observation, I have seen that in inbound delivery I am only seeing sub-assembly (semi-finished) product. I am not able see "SC Component" tab which I have seen on other environment (ECC 6.0 with EHP4). Is it related to system limitation where we can't do PGR for sub-contracting ?
    Thanks.

    Hi AKPT,
    Sorry if i miss understood but note 352243 says to refer note: 338119
    "In the current release, it is not possible to process the components to be cleared when you post the goods receipt for the inbound delivery. (See Notes 338119, 197864 and 199703 also).
    However when you implement these corrections, the error log is also displayed for the subitems to be cleared and further processing can be carried as described in Note 338119."
    When I refer note : 338119, there is no correction. Am I missing anything ?
    Again my issue is I am not able to perform Post Goods Receipt. Even after doing PGR, if system do 543 for raw component, I am fine.
    Thanks.
    Regards,
    Ravi

  • Goods receipt through Inbound delivery for Sub-Contracting Purchase order

    Hi
    I am trying to do goods receipt for the inbound delivery /shipping notification created for a sub -contracting Purchase order. The Finished product and the component part are batch managed, When I try to perform PGR in VL32N , I am getting a blank screen as error message and Goods receipt is not getting triggered . I checked for OSS note and found 645119 close to my issue but not an exact match . We are in ECC 6.0 with EHP 4. Can some one clarify whether it is possible to post GR through inbound delivery for a Subcon Purchase order .
    Thanks in advance for your immediate response.
    with regards,
    Joseph Anand B

    Hi, The issue may be due to this - the component is batch managed but the batch data is blank in the component list of the Purchase Order Item. Or a batch is maintained in the PO item component list but the stock for the same batch is not available with Vendor, i.e. stock with some other batch may be available.
    In a receipt for Sub-cont PO, 101 happens for FG and 543 happens for component. But there is no option to provide the component details in a delivery. So in standard system, when 101 happens via a delivery, 543 will be posted in the background. So any error in posting 543 will result in a blank screen without any error message.
    You can fix this by maintaining correct batch in the PO component list.
    But there is another issue - you cannot do 'cancel posting' and 'return delivery' for this receipt. Only you can reverse the inbound delivery and you should know that the  recevied stock shouldn't have been processed to do reversal of inbound delivery.

  • Error while doing inbound delivery

    HI,
    In our process we do GR by using mvt type 561 initial stock upload and then against the material documents , create inbound delivery( PGR).. While doing PGR we are facing the error as follows,
    STORAGE UNIT XXXXXXXXX IS WITHOUT APPENDANT HU
    Could any one tell what is the problem?
    Regards,
    abi

    Hi ,
    Pls refer path Delivery Issue in PGI
    Thanx....

  • After reversing the Inbound delivery in VL09, lock in LT0G

    Hi,
    I am canceling a Inbound delivery (Plant - WM managed) thru VL09 and then trying  return to stock using LT0G.
    But I am getting lock, unable to reverse stock/TO , and the log says " Scheduled quantity exceeds available/picked quantity ".
    LS24 shows no stock available for the material in the Storage type,
    but surprisingly this LT0G some times works fine & some times show this lock and unable to proceed further.
    What is the setting or process missing? are we not suppose to use VL09 and LT0G subsequently?
    Is there any other better way to do this? and what is the proper way to do this?
    Appreciate your suggestions to either unlock the item or reverse the stock or unpick the qty in the Inbound delivery.
    Thankyou,
    Ravi

    Hi Chris,
    Please find the detailed process steps in my scenario
    Creation process:
    1. Create Inbound delivery : VL31N & save it.
    2. VL32N- and then subsequent function- create TO & save it.
    After confirmation of the TO, the below happens in background.
    TO - Putaway the stock from 902 to 011 storage type.
    3. VL32N - PGR.(Post Goods Receipt)
    Cancelation process:
    Successful Example: (pre-existing stock)
    1. VL09 - Cancelation successful
    2. LT0G - Successful.
    Before PGR: LS24 Stock
    Inbound delivery qty =1
    After TO created.
    After TO confirmed
    After PGR :LS24 Stock  (Before VL09)
    After VL09
    After LT0G successful
    After the TO is confirmed