Po confirm completely in PO response

We have an extended classic scenario where we create PO responses for PO sent outbound to suppliers. When we need to process the PO response manually, we go into Process PO response and we look at the Response. In this there is an option with a green check box which says PO 12****** CONFIRM COMPLETELY. But we have noticed that if the PO response came in with variance from the original PO, this green check box does not copy the response PO data into the original PO. What is the use of this “confirm completely” button? If it does not carry the PO response data back to the PO in what purpose is this used?
Please advise.
Teresa

Anupam
Thank you very much for your quick response.
While, I just have the SRM ,no SUS , when I click on "'confirm completely'" for PO response, is there inbound delivery in ECC?
Regards,
Hayashi

Similar Messages

  • Storage bin available when posting change is not confirmed completely

    Dear Gurus, I have a question for you:
    My costumer wants to do a posting change when the material is released from QM with a decision usage from Q to unrestricted use. The process is done in two steps: with LU04 the TO is generated and with LT12 is confirmed. When the TO is generated the position is half confirmed. With LT21 we can see the row for the ST (lets say ST 504 Open Storage type) and a second row 922 TR-ZONE. The first row appears green (as confirmed) and the second row appears red (Not confirmed).
    My costumer says that " beacause of the strategy given for the storage entry, the storage bin released in the TO (not confirmed completely yet)   is available at this moment.
    If the storage bin is still physically full, the carrier will found not space for leaving the goods even SAP is telling him there is space available at this storage bin."
    I have read that once yo start a TO the storage bin is blocked until the transaction is fully confirmed.
    If this is correct I need to demostrate it and I don not find the way to do it.
    I hope you understand my explanation and give me any clue.
    I appreciate very much some help.
    Al

    agmogena wrote:
    Ok, I will tell you the configuration I have. Lets point in a movement 921 quality to unrestricted use.
    > Type Storage origin: 902  EQ and RC flags are set on. (confirmation control for storage type)
    > Type storage TR: 922 are set on.
    >
    > Movement type 921 the flags for Confirm immed and Propose confirm are NOT set.
    >
    > I do a LU01 to create a intruction to change a material from Q to Unrestricted.
    > with LT05 I create the TO.
    > At this time if I look LT21 the TO created I see the tag source with two positions one for TS 902 green color and the second 922 in red.
    > For the tag of target We can see the first position 922 In red and the second position 902 in green color.
    >
    > Perhaps this detailed explanation will help you to fully understand the scenario.
    >
    > Thank you again,
    >
    > Al.
    From the above it isn't entirly clear that the first part of the T.O. is actualy confirmed, my settings are to autoconfirm this so I have no example to look at in my system. Perhaps the display shows the first line green before any actual confirmation..
    I assume the stock status has not changed when you first view the T.O.? If the t.o. is partly confirmed I would expect to see the stock status changed and a neg in 922 until the second part is confirmed. Perhaps there is no confirmation at all yet, in LT21 what is the confirmation status? If you view the transfer order header there would be a partial confirmation showing with a yellow triangle, do you see this or no confirmation indicated at all?

  • Is there a way to completely write the  response of a JSP file to another

    Is there a way to completely write the response of a JSP file to another file...? say for example as a new html file..??!!
    Ofcourse, the client side resultant response page of a jsp will be an HTML; so can anybody tell me of a way to do the file wring task?
    i know of one very very lengthy way... using FILE I/O and write each and every HTML tag and dynamic data using Java/JSP... i dont need that..
    any other direct way??

    Yes. u can forword to some other location by using http URL.
    ragards
    DRA

  • What is the actual status of my Silver iPhone 6 Plus 128GB preorder that was confirmed completed by 3:35AM EST?  Reps and websites and emails are ALL messed up.

    So, I placed my order by 3:35 AM EST for my Silver 6 plus 128GB.  All the way through the process, from selecting the phone to the submission confirmation screen on the web it stated delivery by 9/19.  I received my email confirmation and that showed the order date as 9/12 and the delivery date as 9/12.  Well I knew that would not be right.
    So then I go online to check the order status and it states the order has been received and the expected SHIP date is 10/14.  WHAT?!?
    So I called Vz and spoke with a rep who stated that he wasn't sure why it showed that but my ship date would be 9/19.  Call #1
    Well that's fine, I knew he probably mixed those words up.
    So then I check on 9/13 to see if it was updated online, still showed 10/14.  So I call again and this time the Vz rep places me on hold then comes back and says I am sorry to say that your expected ship date is 10/14.  Flustered and irritated I ask how that can happen and change from all the other notices stating the 19th (or sooner according to the email which she laughed about).  Call #2
    So today, I decide to check again after Noon EST and now all day it has said that the expected ship date is NOT AVAILABLE?
    Checking this community, looking at tweets and posts I see all conflicting information, some people getting getting ship notices but most of those are just the 6 and not the plus.
    Where can I find a straight answer.  I have seen another poster state that anyone who completed their order the first couple hours of ordering on the 12th will definitely receive on the 19th according to what they have been told by a Vz rep but honestly with the mixed messages I have seen personally I am not putting a lot of faith in what was told to him.
    OH, also I can only check my order by my preorder confirmation and not my order number.  When trying to check with my order number it gives an error message saying that is not a valid number.
    I have been a customer for almost 20 years, and this is making me think about switching. 

    We know everyone is super exited about these great phones. As your order moves through the process, you can check the status at http://bit.ly/RjmCUB. You may not be able to see a change from Processing until it officially ships, then you'll see the tracking number. If you've received a confirmation email that your order was submitted, any additional information throughout the fulfillment process will be sent to that same email address.
    TrevorC_VZW
    Follow us on Twitter @VZWSupport

  • Client email issues - Logged tickets complete lack of response from BC

    I am creating this post on behalf of a client(challenge insurance) in the hope that someone at Business Catalyst might see it and respond as there seems to be know other way of contacting anyone at the company and they seem to respond to any tickets logged at slower than snail pace.
    On Friday my client tried to move his email service to office365, he ran into the issue of not being able to add txt or srv record properly using the bc interface. so we contacted support by logging a ticket. While it was a Friday we expected we might hear some reply over the weekend to the ticket but have yet to receive any instruction or reply from bc on this ticket at 4pm GMT on Monday thats almost 72 hours later. Given my client needed his email fully functioning on the first Monday back after the new year and with a number of new staff members starting we reverted back to use bc for email whist waiting on a response for bc support.
    After reverting back the email worked fine but now my client is receiving an error when trying to send email's from the system
    "SMTP Error: [451] 4.7.1 <END-OF-MESSAGE>: End-of-data rejected: user has temporarily exceeded the allowed mail recipient relays per day. Please try again later."
    I have googled this issue and seen other posts on here so am expecting the following response from the ever helpful bc staff "The daily limit allowed through our SMTP is 500 emails a day and this can't be increased. "
    My client informs he has not sent 500 emails so maybe they will be able to check it but who knows!
    The complete inability to contact bc support adequately and their tardy response times is an absolute disgrace. While my client is only a small business owner he pays a monthly subscription to use bc's system and should expect a standard level support especially when it comes to such a critical part of any business their email communications. If bc are going to provide the service of hosting mail they should at very least be able to respond to a ticket within three days regardless of the day a ticket is logged with some basic assistance or advise. Even the worst hosting companies I have ever had to deal with have had better response times and support some even had email address or contact number you could get them on.
    So if there is anyone out there at bc who can help please get in touch

    When you create a new email it has a limit to stop them being used and created for spam. 500 emails in one go is rather a lot for just an email (I hope he is not using it for newsletters as there is the BC feature for that job).
    This limit increases over time and you will be blocked on that day when you exceed that limit.
    In terms of your complain about response times - You sent a ticket just on a weekend and expecting a reply over the weekend (reading that should be enough to give you an indication on a response) but further to that it is wrapping up the holidays.
    Support availabily during the winter holidays
    While there will be full coverage now I would imagine there is a back log. I have an issue with my TV - I did a support ticket to Samsung on Friday - I have no reply to that ticket yet either and I expected as such.
    If you really need to speak to BC support you can use the live chat - BC Status (on the right)
    I hear you on the time response but please keep in mind what I said about weekend and holiday period.

  • Service order confirmation/completion

    Hi,
    Can anyone tell me what exactly is meant by service order completion ( flag order) and confirm ( IW41). At what state of the business process do I need it.
    To my understanding a service order is complete after billing and confirmed once customer approves.
    Please throw a light on this.
    Thanks
    Sam

    Hi ASHIsh,
    We do not have the customer service module or the service management but we have the confirmation of service in the document flow. The flow is as follows. standard order ( OR ) - > delivery ( LF ) - > Handling unit - > Confirmationof service. I checked the document flow table VBFA and I see that these confirmation of service is for items which are of item category TAP ( sales BOM header ). That is what I concluded that it shows up for TAP since this item is not pickable ane hence not packable. And we have this come up for all the sales BOM deliveries where there is an item category of TAP for sales BOM header. Still if any one can please throw some light on this that would be greatly appreciated.
    Service Order:Short-term agreement between service provider and service recipient, in which one-time services are ordered by the service recipient and resource-related billing performed upon completion.
    The service order is used to document service and customer service work. In particular, you can use the service order to:
    Plan services specifically with regard to usage of material, utilities and personnel
    Monitor the execution of services
    Enter and settle the costs which arise from the services
    The data for the service order is entered in the history and is important for evaluations and future planning.
    You can also create a one-time customer in the order and transfer the data, for example, to the sales order.
    A service order contains operations that describe the individual work steps. An operation can be divided into sub-operations for greater detail.
    Spare materials and utilities, which are required for service work, can be planned in the operation.
    T.Code: [IW41]
    Path: Logistics -> Customer Service -> Service Processing -> Confirmation -> Entry -> Individual Confirmation.
    After a service order is entered in the system, a service activity would be carried out for the customer. Using this option we would enter the person who carried out the activity, the time taken, the material used with their quantity. Further a billing request would be raised based on these details.
    Reward points if iit helpful
    Cheers,
    Govind.

  • My iphone 4 is completely dead, non responsive and wont charge? Was fine an hour ago, what happened?

    Was literally on my iphone 4, which is in perfect condition less than an hour ago. It was charged, sitting next to my bed and completely uneffected. Went to try to use it again and now its completely dead. Won't charge, hard start, turn on or respond to anything. Thoughts?

    Try to connect in recovery mode, explained in this article:
    If you can't update or restore your iOS device
    If this does not work, contact Apple Support to get it looked at or visit an Apple Store or Authorized Apple Service Provider next to your place.
    iPhone - Contact Support - Apple Support

  • Start process from JSP which continues running after response is completed

    Is it possible to start a process from within JSP which can continue running after the HTTP response is complete, so the response doesn't time out??

    Your question is a little vague. If I am understanding your question correctly, it sounds like you are starting a process in JSP that takes a long time, and the browser is timing out. If this is your question, then here is my response:
    We've had this situation before. Often times it occurs because the JSP page launches a long database operation that could take an hour. You have a few choices, but one good approach is this (any variation of this works too):
    1. When the page loads and you need the process to start, create a new thread and have the long operation run from this thread. You can put the thread object into a session variable and store it for later use.
    2. Have the JSP code output a META-REFRESH tag on the page so that the page refreshes every 30 seconds or so.
    3. On each refresh, you get the thread object from the session context and check it to see if it is done or still running. If it is, then just output another META-REFRESH and the page will keep refreshing itself. If it is done, you can, of course, output a "finished" message to the user.
    You can also have a stop button on the page that you can use to send a message to the thread to stop.
    Hope that gives you some ideas!
    Michael

  • Alert Message displayed according to WebService response

    I've created and used a Web Service in my VC application which simply send a mail. This Web Service returns a boolean response which indicates if the mail has been correctly sent. I want to inform the user accordingly with an alert message.
    If the response is correct, I want the user to be processed to confirmation page;
    If the response is uncorrect, I want to inform th user accordingly.
    Which operator should I use?
    Do I have to use the output point of my Web Service object?
    Thanks

    Hi,
    Thanks Fabien for your answer ... but it hasn't solved completely my problem.
    My webservice effectively returns a boolean, and I use this boolean to show wether a confirmation message or a error alert. But the alert form (which is normally displayed only if WSReturn == "false") is by default always displayed. The response sent by my webservice seems to be by default set to false... very strange, isn't it?
    Has anybody encountered such a situation? I just would like to display one form or the other depending of the result of my WS call.

  • Ooyala v2 API returning "garbled" response in FlashBuilder (4.6)

    I'm attempting to parse the response from a Ooyala REST call using the HTTPSERVICE.
    I've confirmed that the call returns a valid respose with the following attributes (in the browser):
    Type: application/json
    Render Mode: Quirks mode
    Encoding: ISO-8859-1
    The content (again, in the browser) looks like:
    {"original_file_name":"Dell-XPS-14-Laptop-Video-PT-BR.mov","source_file_url":"http://cms.ooyala.com/ZwMjhjNTrhxySuUrqrpyz9Z88b4d8U4-%2F0000000000000-0000057152719?Signa ture=%2F9UGY9EGrDzKU0ixD9ZDl%2BT2fYM%3D&AWSAccessKeyId=AKIAJUAIW2RNELHXXF2Q&Expires=134213 1393&","file_size":57152720}
    The httpservice object has the following attributes:
    querySource.headers = { Accept: "application/json" };
    querySource.contentType = "application/json";
    querySource.resultFormat = "text";
    The response completely garbles the response.  Here's a snippet:
    CWS
    Tf
    It also creates a large number of other properties, also seemingly encoded...
    If anyone has any ideas, please let know.  Ooyala support believes that the result is being corrupted in Flex.
    Cheers!

    Originally Posted by gabrielf60
    Thanks for your answer.
    I'm lost, because this server remains untouched from more then three years now, and never, NEVER, had an abend.
    The only thing to note is that, three days before, a mirrored disk failed and was replaced by a new one. The sync
    completed without error. Could this be the cause?
    Thanks again.
    Oh, so nothing happened except .... a hardware failure?
    Of course it could. I'm sure since the server has not been touch in 3 years, neither have the BIOS, disk controller firmware, drivers, or the other bits that might be involved.
    -- Bob

  • Automatic Time Confirmation for an operation in a Maintenance Order (IW41)

    Hello,
    We have a requirement to do automatic time confirmation (while saving the order) on an operation when the user selects "DONE" standard text key on Operation line item. Is there a user exit or BADI available in Plant Maintenance that can be used for Automatic time confirmation?
    I went through some of the user exist/BADI in PM and didn't find anything for automatic time confirmation. The only thing that I found useful was user exit CONFPM03 (which allows to carry our own checks once and operation is selected for confirmation).
    Appreciate your responses. Thanks

    Hi ,
    Normally thru confirmation we enter actual hrs worked in IW41 .. but if you do not want to run that tcode then not sure of any BADI but i would suggest you to create a Z Programme which runs as a batch job at some 30min everyday . The Z Programme checks all the PM orders of particular order type  which are with  released status and then gets into operations and checks for standard text and if its value is DONE then calls programme SAPLCORU - IW41 Programme .. you can suitably put a variant for that batch job .. plz check the option with ABAPer ..
    regrds
    pushpa

  • Confirmed quantity during sales order migration

    Do any of you experts see any issue with the following approach to set the schedule line confirmed quantity?
    We need to migrate open order from Legacy to SAP system. While migrating we need to keep the schedule lines (dates and confirmed quantities) to be same as that in legacy (Note that legacy has exactly one schedule line per order).
    For Migration we are using the program RVINVB10.
    On order to bring in the confirmed quantity we plan to apply the following logic
    1. Add following logic to user exit - MOVE_FIELDS_TO_VBEP (in MV45AFZZ)
    If the order is a migrated order then
       check if VBAP-POSEX <> ''    (This an unused field so we will use this to pass the confirmed quantity)
          then VBEP-BMENG = VBAP-POSEX
               VBAP-POSEX = VBAP-MTVFP (Save Valye of Checking Group)
               VBAP-MTVFP = ''.        (clear the checking group to override the ATP check)
    2. The following logic is added in User Exit SAVE_DOC_PREPARE (in MV45AFZZ)
    If the order is migrated order then restore the value in VBAP-MTVFP from VBAP-POSEX and clear VBAP-POSEX.
    This way we are able to get the confirmed quantity in schedule lines.
    Any suggestions welcome,
    Regards,

    Here is an alternative functional approach
    Depending on what is being used by your ATP config to determine supply you can create following pseudo supplies only for Sales order migration purpose
    Planned orders
    Purchase requisations
    reservations
    you can load any max quantity such as 9999999 at an earliest Material availability date (MAD) determined from sales orders for Material Plant combination.
    This will help ATP to confirm the same CDD if you pass CDD as required delivery date (assumption it uses backward scheduling)
    Assumption: you are moving only completely open sales order & itu2019s not delinquent (CDD in past, schedule lines not confirmed completely)
    You have to remove this pseudo supply after sales order migration is complete.

  • How to create a response file for Acrobat 9 Pro?

    I with to collect data from a PDF form made with LiveCycle Designer. The instruction say-
    After a user submits a form, open the returned form.
    In the Add Completed Form To Responses File dialog box, select one of the following:
    I am totally baffled as to where the Add Completed From to Responses File dialog box is. I cannot find such a thing.
    It is my understanding that once the dialog box found there are options, including creating a new response file. But, I can't find the box (and neither can my associates).
    Any help in this matter would be greatly appreciated.
    Many thanks in advance.

    In Acrobat 9 Help look under 'Collecting and managing form data' and the other topics under this heading. It is in the "Forms" chapter.
    Collecting and managing form data
    When you distribute a form, Acrobat automatically creates a PDF Portfolio for collecting the data submitted by users. By default, this file is saved in the same folder as the original form and is named  
    filename_responses. You can use this file to compile returned forms.
    Collect user data
    1 After a user submits a form, open the returned form.
    2 In the Add Completed Form To Responses File dialog box, select one of the following:
    Add To An Existing Responses File
    Compiles the data in the response file that was created when you used the Distribute Form wizard to send out the form. (If necessary, click Browse and locate the response file.)
    Create A New Responses File
    Creates a new response file, using the name and location you specify.
    The response file opens after you click OK. Each returned form added to the response file appears as a component file of a PDF Portfolio.
    Compile form data
    1 In Acrobat, choose Forms > Compile Returned Forms.
    2 In the Compile Data dialog box, do one of the following to select a PDF response file:
    Click Browse, and then locate and select the response file.
    Type the path to the response file.
    3 Click Add File, and navigate to the returned form.
    4 Repeat the previous step as many times as necessary to add more returned forms. 
    After you click OK, the data from the selected forms is added to the response file. Each returned form appears as a component file of a PDF Portfolio.
    Add user data to an existing response file
    1 In Acrobat, open the response file.
    2 In the left navigation panel, click Add.
    3 In the Add Returned Forms dialog box, click Add File. Then locate and select the returned forms, and click Open.
    4 Repeat the previous step to add any returned forms in other folders. When finished, click OK. 
    When you finish, each added PDF form appears as a component file of the PDF Portfolio.
    Export user data from a response file
    Use this process to save all the entries in a PDF Portfolio response file to a spreadsheet or XML file.
    1 In Acrobat, open the response file and select the data to export
    2 In the left navigation panel, click Export.
    3 In the Select Folder To Save File dialog box, specify a name, location, and file format (CSV or XML) for the form data, and click Save. 

  • Adobe Document Services - http Response 500 - How to configure the logging?

    We are building an application in Web Dynpro Java that fetches data from an R/3 system via an RFC connection and is then supposed to show said data in a pdf within an iview. For that task we want to use the InteractiveForm UIElement. We bind the data to its pdfSource in the iViewu2019s context. Currently the form only consists of a text field bound to one attribute element of the pdfSource context node.
    The ADS webservice is configured according to the manuals found here:
    http://help.sap.com/saphelp_nw70/helpdata/en/fa/0b700d6cfd4e03a8ec2186ba6ff4af/frameset.htm
    and tested successfully under the following link
    http://<portal_host>:<port>/AdobeDocumentServices/Config?style=document
    However, when we execute the application, an error occurs in the webservice generating the pdf, namely Invalid Content-Type:text/html. The error occurs when the iView containing the form is shown for the first time, even before the attributes of the pdfSource context are filled with data (we expect to see an empty form).
    As it seems the webservice is expected to return a MIME type of either application/pdf or text/xml (we donu2019t know for sure since the SAP manuals and forums are inconclusive here), but instead we get text/html. This seems to be due to the fact that the webservice exits with an http response 500 Internal Server Error (we used several network monitoring tools to confirm that such a response is sent). Since such http responses are but html files with an empty body, yet not xml or pdf, the aforementioned error does make sense to us, but we do not know what Internal Error has caused it.
    The only help that SAP seems to provide for an error u201CInvalid Content-Type:text/htmlu201D in context with ADS points to an expiring password or otherwise poor configuration of the ADSUser, which (most certainly) is not our case here since, and as said above, the configuration was and can be tested successfully.
    We then tried to view the logs for this error on the machine where the J2EE engine is running with ADS installed according to this (not very comprehensible) guide:
    http://help.sap.com/saphelp_nw70/helpdata/de/97/ccfc3f0ac2c642e10000000a1550b0/frameset.htm
    We cannot find anything relevant in the server.log of the Visual Administrator except this message (it is generated exactly when our error occurs u2013 the trace severity is set to ALL for all Adobe application elements according to manual):
    Date , Time , Message , Severity , Category , Location , Application , User
    12/08/2010 , 13:50:46:511 , application [webdynpro/dispatcher] Processing HTTP request to servlet [dispatcher] finished with error.
    The error is: com.sap.tc.webdynpro.clientserver.adobe.pdfdocument.base.core.PDFDocumentRuntimeException: Failed to  GENERATEPDF
    Exception id: [0800274DA7ED00850000005B00000900000496E5919E28BA] , Error , /System/Server/WebRequests , com.sap.engine.services.servlets_jsp.server.HttpHandlerImpl , sap.com/tcwddispwda , Guest
    There is no error.pdf to be found on the file system and since neither have we known nor are we told by the error message, whether the underlying cause is is a render error or connection error or configuration error or what not, we donu2019t know whether the error.pdf is supposed to be generated at all.
    Or could there be any other reason why generation didnu2019t take place?
    Furthermore we canu2019t seem to be able to find any logs more verbose or detailed about this issue - at least not within the Visual Administrator or the portalu2019s nwa.
    How is it possible to properly debug the webservice for pdf-generation or at least to retrieve a fully detailed log containing all notifications and exception stack traces etc.?
    I am assuming that we are making some basic mistakes regarding the logging configuration - but what?
    Our goal is to know what causes the 500 Internal Server Error response that causes the Incorrect Content-Type exception.
    We are using a NetWeaver 7.01 portal installation with Adobe Document Services 7.01 installed on a Windows Server 2003 platform.
    Any help is highly appreciated!
    Serg

    Have you tried restarting the Java PDF object in Visual Administrator?  Once you do all of your config, you have to restart the PDF object (sao.com/tcwdpdfobject) for the changes to take place.  I am assuming you've run all of the test programs in SAP (FP_TEST_00, FP_TEST_03, etc.).  Is there any chance that the ADSUSER is locked somehow?

  • How To Reverse Excess Confirmed Quantity in Process Order?

    Hi Experts,
    Good day!
    I have a Process Order with Total Quantity of 68,180 L which currently have  a status of TECO CNF  DLV  PRC  BASC BCRQ GMPS MACM*. I made my first partial confirmation with a quantity of 1,000 L for my Finished Good u2013 this is a confirmation with automatic goods receipt. Then I mistakenly made my Final Confirmation for this order with a quantity of 71,125 L for my Finished Good. I only noticed that my last confirmation was incorrect after the Finished Good in Stock has been depleted already. The 101 movement for the Finished Good that was posted during my final confirmation was not reversed anymore when I canceled my confirmation in CORS. I tried to reverse using a 102 movement type for this order in MB31 however it didnu2019t allow me to proceed and gave me an error said u201Cdeficit of .....in Unrestricted useu201D.
    Currently my Process Order has a total Delivered Quantity of 72,125 L which is much greater than the required total order quantity of 68,180 L.
    Anybody knows how to reverse this excess confirmed quantity? Your response is much appreciated.
    Thanks. Have a wondeful day!
    Rockz

    Hi Rockz,
    You mean you made Good Receipt (confirmation) excess 3,945L .
    Right now, you want to cancel only 3,945L.
    As you said, FG already depleted.
    If have no quantity in unrestricted Use, how can we make good movement(102) (because error:u201Cdeficit of .....in Unrestricted useu201D occur when you do TCode MB31 for 102)
    If you want to cancel 3,945L, first, you must reverse that Batch of FG 3,945L to Unrestricted use (MMBE to check stock), then you use the TCode MB31 with movement 102 for reverse FG excess, if this finish, quantity in delivery of Process Order will be subtract 3,945L.
    (reverse that Batch of FG 3,945L to Unrestricted use ,mean is  the Batch of FG which you depleted for somethings like fill to bottle....)
    Regard,
    DiepNguyen.

Maybe you are looking for

  • Oracle Rdb Driver 3.1.0.0 problem with blobs

    I am trying to convert an MsAccess application to use an MsAccess front end and an Oracle Rdb back end. I've created the test database under VMS and can successfully link to the Oracle Rdb tables from MSAccess 2000. One of the main reasons for conver

  • AirPrint - Unable to AirPrint from my IPad to HP C360 after firmware update

    I recently updated the HP printer from a notice on the printer screen. Since then I have not been able to print from my IPad. The IPad recognizes the printer but when I click the print button, the connect message does not appear nad nothing prints

  • Bootcamp 5.1 Windows could not prepare the computer to boot into the next phase of installation

    I've searched the internet, I've tried solutions on some of the discussions on here: Windows 8.1 install fails on new 2013 Retina MacBook https://discussions.apple.com/message/23490854#23490854 How to install Windows 8.1 on Haswell MBP https://discus

  • Keynote files stopped working and TOC has disappeared?

    I have a few Keynote files that I brought into iBooks Author. They originally played fine. But now, when I preview on iPad, they simply won't play. Plus, my Table of Contents has disappeared when I go to preview. I can't figure out why. Any thoughts?

  • SQLDeveloper problem in linux

    I have installed sqldev in ubuntu. The instalation was perfect but when i start it. it opens but i cannot do anything i can press button etc even i can create files but just show me a blue window with the menus. what should i do ?