PO creation from Accepted bid

Hi All
We are on SRM 7.0 classic scenario.
Trying to create a local PO from an accepted bid in Plan driven scenario
1) Is there a way to alter the quantity in the PO, or create partial PO's from 2 or more accepted bids.
I didn't see any way to do this as the PO is instantaneously triggered & no option to change
2) The scales and Pricing conditions entered by the supplier in the bid , are not transferred to the PO?
Only the final Price calculated , based on the conditions is transferred? Is there a way to transfer the conditions and scales too?
3) The bidder can enter the validity dates in the Price conditions. However what is the effect of those? If the buyer tries to create a PO from the accepted bid, beyond the validity date, is there a hard stop error?
Is there any other place at Header level, where the bidder can specify the validity date for the bid, except the conditions?
Thanks
Kedar

https://wiki.sdn.sap.com/wiki/display/ESpackages/Service+Procurement
Please check with SAP via OSS message refering the same.
sorry i could not help you
What is the item type (category) ? in the Material works fine but service not works?
dont hesitate to create a new thread for geting quick reply.
Check your back end docuemnt type PO too.(Item category- D)
Service PO  item has different layout of Purchase order than material. you may require to map accordingly.
Note 1268336 - Synchronous peer-to peer Services Configuration
Any clues
Note 1270144 - Backend PO tracking in RFX & Classic Scenario SC BE PO fix
1.Backend PO number not getting displayed in RFX tracking during PO creation from winning quote through Enterprise services.
2.Classic Scenario : SC with services created in SRM with supplier details, does not create a follow on PO in the backend system returning an error in process status on the User interface.
Other terms
Enterprise services,SOA,BID,RFX tracking,winning quote,quote,Back End PO ,classic scenario,services,error in process
Reason and Prerequisites
Programming error.
Prerequisite:
For RFX tracking:
Backend PO creation successful from winning quote through enterprise services.
Solution
Import the support package or implement the attached advance correction manually

Similar Messages

  • Error in Generating PO from accepted bid

    Hi
    When i am clicking "Generate Purchase Order" as the follow on document from accepted Bid invitation.
    It is giving the error "Purchase Order has not been created". I also went to history tab of Bid invitation and checked if the PO would have been created but it wasn't created any clue on this.
    Regards
    Ashish

    you have not given yr tech scenario (classic or ECS) and you are expecting PO in ECC or SRM
    assuming you are in Classic
    there are many things you need to check:
    backend system definition is correct.
    for the trans type of BI you have defined BUS2201 as a follow-on trans type under cross applns-->trans type
    you have set the backend PO no range under cross applns--> no ranges
    you have set same no range as internal for SRM PO no ranges
    set the same as external in ECC MM PO no ranges
    linked to the ECC PO doc type under MM -->purchasing >PO>doc type
    the backend PO type is available for attribute BSA
    multiple PO doc types can be achieved by specifying doc types in DP_PROC_TY
    BR
    Dinesh

  • Pointers require to debug the error while generating PO from accepted bid

    Hi
    I am getting error when PO is generated from accepted bid.
    I want some pointers to debug this problem.
    Regards
    Pooja

    Hi
    Pls see the following thread.
    Error in Generating PO from accepted bid
    Regards
    Ashish

  • PO  creation From accepted RFx response

    Hi,
    Please can you help ME, i am not able to create PO of services, here is my process :
    SC created in SRM - > SC goes to sourcing -> buyer creates RFx -> RFx is sent to bidder -> bidder processes RFx Response -> buyer accepts RFx response -> buyer creates follow on document (PO) from RFx Response (create PO).
    Error message:  /SAPPSSRM/HIER 015
    Product type XXX  of item differs from type XXX of product XXX.
    N.B : PO based on materials number work fine.
    Thank you,
    Karim

    Hello Ivy,
    I'm working with Karim, here are the maintained entries:
    (I've not listed all Z entries, they have all the same assignments)
    BIDP    HIER_SE   
    BIDX    HIER_SRM   
    ECPO    HIER_SRM   
    EXTR    HIER_SE   
    PCTR    HIER_SRM    Achat de services
    QUOT    HIER_SRM    Achat de services
    RFCR    HIER_SRM   
    RFPM    HIER_SRM   
    RFPP    HIER_SRM   
    RFPS    HIER_SRM   
    RFQU    HIER_SRM   
    ZAMI    HIER_SRM   
    ZAVN    HIER_SRM   
    ZBCC    HIER_SRM   
    ZCRS    HIER_SRM   
    ZCTR    HIER_SRM   
    ZCVN    HIER_SRM   
    ZMAL    HIER_SRM   
    ZMCA    HIER_SRM   
    ZMCR    HIER_SRM   
    Thanks in advance
    Stéphane

  • Stop attachments to move while contract creation from Bid.

    Hello Experts,
    My requirement is to stop the documents to move in to contract  which are already attached to Bid and bid response  -
    Steps -
    Bid invitation created and published to bidders  - Docs attached
    Bid submitted by the vendor - Docs attached
    Bid accepted by the purchaser - Docs attached
    Contract created from accepted Bid -  No documents should be attached.
    Please help in this problem.
    Is there any ways by which i can implement without changing standard code like BADI..etc.
    Thanks in advance.
    Atul Tripathi

    Hi Masa,
    Yes that worked we handled the lv_tcode for bid invitation in change BADI and it worked.
    Thanks for your help.
    Atul

  • Partial ordering from several bids

    Hello experts,
    One of our procurement scenarios include creating a bid invitation with reference to a shopping card, creating bids for the bid invitation and ordering an item partially from the bids. For example we want to procure 5 pieces of material and 2 of them is to be procured from bid 1 and 3 of them is procured from bid2.
    The problem is when we procure partially from several bids we lose the shopping card reference in the second bid. Is there anyway to procure an item from multiple bids and still keeping shopping card reference.
    Best regards

    Hello,
    We created PO from accepted bids that is right.
    By SC reference I mean the SC reference in PO.
    That happens when i accepted more than one bid for a shopping card item. The first PO has the bid and SC reference but the other PO's lost the SC reference.
    Best regards

  • REQUIREMENT TO STOP BALANCE SHEET ACCOUNTS FROM ACCEPTING PROJECT AT JOURNAL CREATION OR ANY FINANCIAL DOCUMENT CREATION.

    Dear Gurus,
    I have a requirement from my client to stop balance sheet account from accepting project at financial document creation or journal entry because this process distrupt the profit and loss account report or transaction report by project as balance sheet items are not expected to be part of this report.
    Kindly advise on the way to achieve this to enable fulfill requirement and deliver excellence service.
    Kind regards,

    Hi Nagarajan,
    Thank you for your response.
    My sample is whenever an entry is raised to be posted to a balance sheet account such account should not allow user to post but only in revenue and expense account. E.g. A Stock account should not allow project assignment but a cost of sales, expenses or sales revenue accounts should only accept project assignment.
    Only P&L items should allow project assignments.
    I hope this is clear is enough.
    Regards,

  • Creation of Purchase Requisition from a BID

    Hi,
    I am trying to create a purchase requisition from a bid instead of a purchase order. Does anyone have any idea on this?
    Thanks
    Sunny

    Hello,
    are you trying to create a local SC or a backend PR ?
    If you are in classic mode (so PR and not SC), you could try to derive the PO flow to create a PR instead.
    But this is not really clean.
    The best way is to add a new button "Create PR" in quote screen (or rename the create PO if you don't use it), linked to your own fcode processing and finally call the META_REQUISITION_CREATE in SRM (instead of META_PO_CREATE).
    The last point would be to create a link BID_INV>BID>PR to be displayed in document flow. You have to check if it is possible, because sometimes the system is designed for limited possible flows and does not take into account the flow you want to add.
    In standard, you can create directly a backend PO only if the bid was created from a SC in the sourcing cockpit. Otherwise use local or extended PO (replicated in R/3).
    If this is the case, FM BBP_PD_SC_TRANS_MULTI_BE_PO will transfer the initial SC items to next document, which is a backend PO. You would need to operate some changes here to create PR.
    Rgds
    Christophe

  • Grants issue while PO creation in SRM for accepted bid in PPS process

    Hi All,
    We have PPS process, while creating of PO for the accepted BID, PO is saved with following error,
    Line 1: Grant 5612100020 does not exist
    when i go through the threads in SDN, it is mentioned we need to activate Grants in R3 system.
    1, Is it necessary to activate the Grants in R3?,
    2,  is there any other alternate solution for this?
    3, or If we activate Grants in R3, what will be the impact?
    Best Regards,
    Raju

    Hi Muthu/Virendra and other xperts,
    Any suggestions?

  • In DOC CHECK BADI: Check if PO has a SC when coming from a BID

    Hi Experts,
    Please consider this situation and recommend best possible approach.
    From Sourcing, I raise a BID and then create a PO from the BID.
    While PO creation, I need to check if this PO had SC and if so include the SC requestor in the approval if the price has increased while Bidding when compared the created SC.
    Here I am facing a challenge - When executing the DOC CHECK BADI, the FM: BBP_PROCDOC_GETDETAIL does not result any HEADER_REL itab values that shows any history details of the PO document. Whereas by the time the logic moves to the Workflow BADI, this same FM returns values (SC and other details).
    My Query: While creating from a BID, How can I check if this PO is generating out of a SC in the DOC CHECK BADI.
    Thanks in advance.
    Vj

    Hello Asha,
    You can check this BADI "BBP_ITEM_CHECK_BADI" and this badi is called when
    u2022     a new item has been created,
    u2022     an item has been changed or the document is to be checked
    Regards
    Sameer

  • Automatic PO creation from SC

    Hi Experts,
    I am using SRM 7.0 with extended classic scenario and I have issue in the automatic po creation. For some Shopping Carts the PO is not automatically created. The SC is having Source of Supply Assigned and all the approves have completely approved the SC.  The latest status is  I1111          Item in Transfer Process.
    I checked in RZ20, ST22 and could not find any error or dumps.
    For the SC item under BBP_PDBEI the BE_OBJECT_TYPE is BUS2201 and BE_OBJECT_ID 1, once I trigger the PO creation manually the PO object id is reflected here.
    For such SC I am running the report BBP_ALERT_SB_NOTTRANSFERED manually which puts the SC in I1112 Error in Transmission Status and later I can trigger the SC creation from the alert monitor.
    For POs created in this manner the PO is created in Held Status without any line items, is this normal?
    I have two questions which I want to understand, how is the automatic po creation from SC setup, is there any customizing involved for the po creation from SC to happen automatically?
    What else should I check to find the reason why the the SC was stuck in I1111 status and PO was not created?

    You need to configure the Purchasing group and this will take care of automatic transfer of Doc to sourcing cockpit. Make sure you also maintain the customization for sourcing always carried out for Prod categories.
    Regards
    Saurabh

  • Automatic PO creation from PR with no master data

    Dear gurus,
    Is it possible to run ME59- Auto PO creation from approved PR with no master data/source assigned/PIR? Assuming user create adhoc PR.
    Is it possible to run this process successfully if i didn't meet on the criteria below? let say no.1 is not checked?
    1.Material Master purchasing view, check automatic PO check box.
    2. Vendor Master purchasing view, check automatic PO check box.
    3. Maintain Source list for Vendor and Material (transaction ME01) and also see validity period.
    4. Maintain Purchase Info Record (transaction ME11), check info record category (must be standard or pipeline or subcontracting)
    5. Create a Purchase Requisition ( transaction ME51N), during creation select check box of Source Determination.
    6. Use transaction ME59 and execute for purchase requisition for vendor, you will be able to create automatic PO.
    Thanks in advance.

    Hi,
    yes all point should be checked
    check following link
    [http://www.sap-img.com/materials/steps-to-create-auto-po.htm]
    Regards
    Kailas Ugale

  • Purchase Order Creation from ME5A Report

    Hi experts,
    My client wants Purchase Order Creation from ME5A Report.
    He wants show Open Purchase Requisition through ME5A report then he will select Purchase Requisition Number or line item for po creation from there only.
    Please advice how I can map this process in sap.
    Thanks in advance,
    Chandhu

    Why don't you use ME57 to display open PRs and then assign sources and convert them to PO?
    Or use ME57 to assign sources and ME59 to automatically convert them to PO.
    You can create your very own format for report display using  custom "Scope Of List" for ME57.
    Look in SPRO under Purchasing>Reporting>Maintain Purchase requisition lists.

  • IDOC/BAPI for Production order creation from Legacy system

    Hi all
    We are using an interface to create Production orders from legacy to SAP. Would you recommend an IDOC or a BAPI to create Production orders. If IDOC or BAPI then could you please mention which one?
    thanks a bunch

    Hi John,
    For your purposes, please use BAPI for production order creation from legacy system. There is no standard inbound IDoc available to use. SAP has an IDoc for outbound interface only (message type LOIPRO).
    If there is an inbound IDoc available, I would recommend to use an IDoc.
    IDoc technology has excellent error handling and will allow you to reprocess an error (if any).
    BAPI is also good approach to use and fast in term of  processing.
    For BAPI approach, you can use BAPI BAPI_PRODORD_CREATE.
    Hope this will help.
    Regards,
    Ferry Lianto

  • Blocking RdA creation from Sales Order Schedule Line

    Hi Gurus,
    please do you know if there is a way to block the RdA creation from Sales Order schedule line, for TAS item category? I tried with Header Delivery block without quantity confirmation but even if quantity on schedule lines are not confirmed, RdA is created anyway.
    Thank you very much
    Kind Regards
    Andrea

    thank you

Maybe you are looking for

  • X230 and Windows 8 problems

    Hi. I have a Lenovo x230 2306CTO. I did a clean install of Windows 8 Pro, plus all the updates suggested by Windows Update. Then I installed all the drivers for Windows 8 available at http://support.lenovo.com/en_US/research/hints-or-​tips/detail.pag

  • Vendor Balances in Local Currency

    Hi Folks, The transactioncode is S_ALR_87012082 and the output is Vendorwise Total Balance for a given period. - The requirement is the Vendorwise BusinessAreawise Balance Report Any possible clues Thanks Ganesh

  • Calculation of WIP in repetitive scenario - urgent

    Hi, We are using Product Cost Collector (Product cost by period) to capture the cost. I have the following queries. We are using standard REM profile, Target cost, 1. If I calculate WIP at the month end in a scenario where no GR has been made (No fin

  • I m nedd for seeting when i m post down payment than also calculate tds

    hello hwen i m pso the downapayment f-48 i want to also seeting for tds amount.if this possible seetings..how possible. i m also configure the tds seetings but how to confugure the when i m post the down payment vendor and also select the tds amount

  • Serious freezing after Mountain Lion Install