PP: Default BOM base quantity by user ID

Hi Experts,
We want to default BOM base quantity by user ID when they create new BOM by CS01.
We set a new parameter ID for BOM base quantity similar as SAP standard parameter ID for BOM usage, and assigned new parameter ID to BOM base quantity data element BASMN.
User could change their own data from the default parameter ID tab to fill the default BOM Base quantity.
However, it is still required to add the parameter ID into the programs which is created BOM to achieve the final result.
Anyone has the same requirement? Please suggest.
Thanks.

Hi Qiuyan,
header quantity is defaulted reading TCS03, if it's always the same you can change it in view V_TCS03_V. Otherwise I suggest an enhancement IN LCSDIFHX FORM TCS03_LESEN.
Regards,
Edgar

Similar Messages

  • BOM Base quantity

    Dear all PP gurus,
    i m having one FERT of bae quantity 25 kgs in its BOM
    i have created the bom for this fert with for example three components
    A=10 kgs
    B=5 kgs
    C=10kgs
    upto this point its ok....but when i enter more component say D of some qnty.
    system is allowing me to make the entry in that components list
    ..As already the BOM of 25 kgs is added with A,B,C
    So is there any setting so that system restricts me to add more components as soon as
    components qty equal to base qty..?
    thanks in advance
    ravi

    Dear,
    I think you taking Base quantity in wrong way 25 kgs means to manufacture finished good you required component A = 10 B 05 and c =10 kg It does mean that you don't required fourth component You can have 50 components to manufacture the BOM. then how much quantity required of all component to manufacture the FG.
    Even thou you can have component like A=50 kg C= 100 kg and B= 45 kg also system will accept it as you required this much quantity to manufacture the FG in proportion of base quantity.
    Component quantity means = The quantity of a component needed to produce the base quantity of a product or assembly.
    Base quantity means = Quantity to which all component quantities in a BOM relate.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • BOM quantity and Base quantity

    Hi,
    I have the follwoing scenario in BOM.
    I have a plate size of 700 (OD) x 500(ID) x 60 (Thickness).
    I'll cut this plate in to following different items (Different material code) and qty
    A - 28
    B - 3
    C - 1
    D - 1
    E-  2
    How can I define in BOM in terms of Base quantity and Item Quantiy
    Kindly guide me .
    Regards
    Chandru

    Dear Rajesha,
    There is no relationship between A -28 and Size of the raw material.
    X- is plate size having the dimensions  OD x ID x Thickness - Raw material.
    From this raw material, I'm producing the following material
    A - 28 Nos
    B- 3 Nos
    C -1 No
    D -1 No
    E -2 Nos.
    All the 5 materials are called under one assembly. Raw material is same to produce five diff. items .
    Now how can I enter in BOM item and raw material details. Moreover this quantity classiffication will varies everytime.
    How I'll order the quantity  proportion after MRP to procure the raw material.
    Please clarify.
    Regards
    Chandru

  • Base Quantity in BOM

    Hi all,
    I needed to change the base quantity in BOM for one of the materials, but I found out that after changing, the component quantity in BOM did not change accordingly.
    Is there any way to update the component quantity according to the ratio?
    Thanks all

    Hi there,
    Thanks for your prompt reply.
    I'll better be specific with my question with an example:
    I have this material, AA-XXXX that was in the following BOM settings:
    Base quantity: 1000 pcs
    Components:
    BB-YYYY - 23.6kg
    CC-YYYY - 10.2kg
    DD-YYYY - 234 pcs
    We're required to change the base quantity in bom header. After I changed it to 2000 pcs, I noticed that the qty for components remain unchanged in BOM. I know during creating production order, the qty for those components will be calculated/changed accordingly. But what happened now that the components shown in BOM did not change according to the change of base quantity?
    Thanks
    Edited by: TY Ng on Jun 4, 2008 10:46 AM

  • Base quantity value of component in a BOM

    Hi Experts,
    Can you please tell me how to compute the Base Quantity of the BOM of a Process Order?
    Does the system round up or down qty's if the order qty is an odd no?
    Ex.
    I have a PO 123456 material A  with component B.
    Conversion is 1 case = 24 btl
    PO
    material A
    total qty = 211 cas
    base qty = 5064 btl
    component B
    req qty = 71 cas
    base qty = 1687 btl
    How did i get the base quantity of 1687 btl from the component B?
    Thanks a lot.

    Hi,
    From the given calculation, it seems that to produce
    1 case of MATERIAL A :  0.336 case of Component B is required
    For this maintain following data in BOM:
    1. BOM Header:  Base Quantity = 1 case
    2. In Item Detail : Basic Data Tab;
                Quantity = 0.336 case
    3. Maintain  1case = 24 btl
    In "Units Of Measuer" Tab of "Additional Data" of Material A.
    Thanks,
    Meghasham
    Edited by: Meghasham Badgujar on Nov 11, 2009 1:30 PM

  • BOM Component quantity decimal places

    Hi... All..
    how & where to maintain settings for decimal places for component quantity in a BOM..??
    eg.,  Base unit of measure is KG n base quantity is 1KG
            component quantity is o.5KG... at present system is not accepting decimal places.... 
    waiting for reply,
    with rgrds
    L Narayana

    Hi,
    enter the no of decimal places in CUNI .
    then , in CS02 - enter the qty as 0,05 and not as 0.05 (use comma instead of fullstop and it will not throw any error) pls check.
    you can change this using this path also
    in the SAP user menu System->User profile-> Own data in the Default value tab page you can find the decimal notation
    The same topic was discussed earlier in this forum.
    How to maintain BOM quantity in decimal (i.e.0.5 kg) instead of Round valu
    Regards,
    Sheik
    Edited by: sheik abdulla on Apr 14, 2008 2:25 PM

  • What-if Analysis on Bom Component Quantity

    Hi ,
    Is it possible to do What-if analysis on Bom Component Quantity ? As Users wanted to do what if analysis for Gross Die per Wafer. We tried creating one measure for GDPW and use the if condition in BOM Custom Roll up for eg. if (isNull("GDPW"),Component_Qty,"GDPW") but it is not working for What-if Analysis. Do i need to change something in On-Change formulae in BOM Custom Roll up.
    Thanks
    Lokesh

    Hi ,
    We are able to load the GDPW for Die level (only one stage )and we have a condition to validate if the measure is null it will take the component_Quantity or else it will take the 1/GDPW measure value. we are doing it for 3 purposes :
    1. To get the Accurate value of GDPW which is equal to 1/Component_Quantity (GDPW will be accurate only if we get 30 decimal places value in calculation)
    2. As part of information provided to Users as they wanted to see it.
    3. To do What-if Analysis (if Possible).
    We could have use 'todouble' for the accuracy but we were thinking of what if analysis, and user visibility also.So far calculation is coming nicely but it would be appreciated if you can give pointers for the risk involved in keeping GDPW as measure.
    Thanks
    Lokesh
    Edited by: Lokesh Rathi on Sep 21, 2011 6:38 AM

  • IH01 default screen variant for all users

    Hi,
       I want location hierarchy, equipment installed and BOM explosion checked in the transaction IH01 for all users. I can do this through a screen variant but the user will have to choose it every time he enters this transaction. Is there a way that the above fields default as checked everything a user enters the t-code? I looked for it in SPRO and could not find it. Any help would be greatly appreciated. Thanks
    Ajay

    hi
    if the variant you have created is the only one available then it will display to all the user,but the if some other variant is there with user name then it will be displayed for the user logged on .
    only thing is don't authorize the user to create the variant
    from SAP help:
    Each user can also create their own selection screen. The selection screen defined by you is only then proposed by the system, if no individual selection screen has been defined for the user under their user name.
    If you want to define an individual selection screen for each user, and the user-specific selection screen should be proposed automatically when the report is called up, the name of the report variant must begin with U_USERNAME.
    Maintenance of selection variants
    When you execute the function, you reach the initial screen with all the selection fields. There you can define the standard selection screen. This selection screen is then always proposed if no individual selection screen has been defined for the user under the name U_USERNAME.
    regards
    thyagarajan

  • How to increase Decimal Points for the BOM Component Quantity

    Hi All,
    While creating BOM:
    Can anyone help me to know how i can increase the Decimal points for the BOM components quantity.
    I can able to give only upto 3 decimal points, but the requirement is more than that.
    I have increased the Decimal point value to 5 in transaction Code CUNI. but still it is allowing me to enter only upto three decimal places.
    Thanks and Regards
    Khadeer

    Khadeer,
    You would be better off changing the base quantity of the parent part.  Instead of "1 EA  parent contains .00003MG of  component" you could say "100 EA parents contain .003MG of component".
    Alternately, you could use different units of measure for your parent or component parts, which would be more suitable for the 3 place decimal limitation.
    I agree with Anil in that if you elect to change the decimals from standard, you could end up with huge changes that will propagate through every module in the ERP.  In my view, there is no need of this kind of headache.
    Best Regards,
    DB49

  • Difference between "base quantity" and "operation quantity" in an operation

    Hello
    what is the difference between "base quantity" and "operation quantity" in a production order ?
    thank you for your answers

    Base Quantity - Quantity of the material to be produced to which the standard values of the operation refer.
    Operation Quantity - Quantity planned for this operation.
    Base quantity and operation quantity may not always be the same, if we have partial lots delivered during the sequence of operations, the operation quantity will be equal to the lot delivered during the operation.
    Base quantity is dependent on the BOM, where it signifies the total quantity of output after using the components of certain quantity.
    Hope this may help you.

  • How to change the Default login script and the USER login script in Netware3.12

    I need to cut down the disk map from Neware 3.12 in Win98 client's PC.
    please tell me
    how to change the Default login script and the USER login script in
    Netware3.12 ?
    Or is there any other ways to do this thing?
    Thanks a lot!

    On 4/6/2006 [email protected] wrote:
    > how to change the Default login script and the USER login script in
    > Netware3.12 ?
    Please repost in the discontinued.forums.
    Edison Ortiz
    Novell Product Support Forum SysOp
    (No Email Support, Thanks !)

  • How to calculate the quota base quantity in quota arrangement?

    Hi all,
    As we all know, when a new supplier is added in the quota arrangment, we take the help of quota base qunatity so that the new supplier does not get any unfair advantage over the existing suppliers. Would you please help me on how to calculate the quota base quantity or on what basis the quota base quantity is calculated?*
    Regards,
    Ranjan

    Dear,
    Quota arrangement divides the total requirements generated over a period of time among the sources of supplied by assigning a quota.
    Quota u2013 quota is equal to a number and its represents the proportionate of requirements. Total quota of all the vendors is equal to 100% of requirements.
    This quota arrangement is also specific to material and plant level.
    Quota rating = quota allocate quantity + quota base quantity / quota.
    Quota based quantity used only when a new vendor introduced.
    In the as on date situation, the minimum quota ratings will considered as preferred vendor.
    The 2 vendors has 2 same quota rating, the vendor who is having the highest quota will considered first.
    In the running quota, a new source of supply is included. (In situation of short supply) including a new source not means to reduce the quota for existing.
    Regards,
    Syed Hussain.

  • How do I set the default welcome page for PUBLIC user

    gurus,
    i'm using -
    Oracle 9i Database
    Oracle 9ias Portal Release 2
    QUESTION => how do I set the default welcome page for the PUBLIC user.
    i did the following to achieve this -
    1. logged into portal
    2. clicked on builder
    3. clicked on administer tab
    4. selected PUBLIC user in the Portal User Profile portlet
    5. went to the preferences tab
    6. in the default home page selected a custom page group
    7. logged out of portal
    8. open a new browsere session
    9. type the portal URL and i get the login page ....??
    i'm unable to understand this behavior ... shouldn't i be getting the page group that i set for the PUBLIC user in step 6 above ....
    the second QUESTION is => when the user logs out he/she should see the PUBLIC page set in step 6 above ... but, instead the user sees a page that is as follows -
    Partner Application Name Logout Status [Logout Status]
    Oracle Portal (portal) logout status
    The SSO Server (orasso) checkmark
    buzz.resva.trw.com:7778 checkmark
    infrastructure.happy.resva.trw.com checkmark
    portal1.buzz.resva.trw.com checkmark
    portal2.sylvester.resva.trw.com checkmark
    sylvester.resva.trw.com:7778 checkmark
    so, how can i set the default page for the PUBLIC user and also a page when he user logs out.
    ideas anyone ....?
    thanx a bunch.
    hero

    Hi,
    The sequence of operation you are doing to set the home page for public users is correct. You are getting the login screen as the "custom page group" selected as "home page" has not been granted to public.
    Also, while logging-out, it is normal behaviour to get the screen where it shows the list of partner applications from where user has been logged-out. When you click on "Return" button, you will get to the "home page" set above.
    Hope it clarifies the things.
    Regards,
    Ved

  • How to restrict users to not default layout while creating a user specific?

    Hi all,
               I have a problem with frequent changes in report layout setting. When users trying to create a user specific layout in the window "Default" is set, out of "User specific" & "default" checkbox defaultly, so users saving the layouts. so it's overwritting on existing layout. we are ossing the old data. how to restrict end users to create new one with out changing the existing one.How to change that default check in "Default" check box to user specific defaultly. where i have to do settings for this. Thanks in advance.
    Pradeesh

    Hi ,
    My problem is still not resolved. I tried applying the people picker property and set a specific field(an email id field) to be available to only admins. Now the field is not visible to the normal users but only admins which is good but that email field
    should be able to take normal users as wel as admin's email ID. currently due to the people picker property it only takes admin's ID and not normal user's ID - which is not as per expectation.
    What this email ID field does is - when a normal user is logged in he/she wont see this field in that view. But when an admin logs in he/she can switch to admin view and see this field . The admin can put any user's ID in this field and pull out the required
    resource's Time Report for modification.
    Please let me know how do i overcome my problem. Detailed step description will be very helpfull .
    As per Cameron's suggestion (add a rule on the "additional admin section") , i am not sure how exactly that is done. Would help a lot if i got to know how this works.
    Regards,
    Guru

  • How do I stop iTunes from defaulting back to library C:\USERS folder

    My iTunes library is stored in a NAS network drive. Everytime I lose connection to the LAN, iTunes always tries to be smart and default back to my C:\USERS\USERNAME\iTunes ... folder.
    Is there anyway to stop this behaviour. It is annoying to find out that iTunes has been copied all my new music files to my local drive until my local drive get filled up.

    I've had the same problem. The solution of not losing contact with the LAN is not an option for me. I have almost 400G of music. I keep it on my Time Capsule but my primary computer is my MacBook.
    Surely I should be able to open iTunes when I'm not within range of the Time Capsule with my iTunes music folder not defaulting back to the iTunes folder on my Mac HD? There must be a way to prevent the default?
    Sometimes I want to buy music from the iTunes store while I'm at work or import CDs I've purchased while on vacation. Will my iTunes music folder always default back to the Mac HD? Every time I have to change it back it takes me almost 45 minutes to reset it.

Maybe you are looking for

  • IPOD NOT CONNECTING TO WIFI AFTER UPDATING TO IOS 8.1.3

    I recently updated my ipod touch to ios 8.1.3. after which it stopped connecting to my wifi device saying password is incorrect. Needless to say password was correct and other devices were connecting fine. I restarted device, tried connecting it with

  • BBSM and RADIUS Authenticated Session Limits

    I have setup a BBSM System with RADIUS authentication, the authentication traffic is passed to a seperate RSA Box to authenticate user using fobs and everything works fine. My question is how do I limited the time a user can have a onnection to the B

  • Vendor Schema Group missing

    Dear Experts... In my system, while Iam doing pricing, Schema Group for Vendor is MISSING....then how can I assign the Calculation Schemas for Domestic and Import Purchases to the Domestic & Import Vendors? Why this option is missing in my system IMG

  • Got latest version of firefox - can no longer print Prop res DLL not loaded message

    Several weeks ago I clicked to update to the latest version of firefox. Now when I try to print a page from something on the internet I get a message that says Prop Res DLL not loaded. How do I fix it?

  • Export hotspot to edge and animate?

    I created the blocks in Adobe illustrator and completed the Animation without problems.  The available "Action" options in Adobe Edge : (window.open)  both force a relaod.  I am linking to a div in the same page so the link would be local, how can I