Problem in Generating work schedule manually
hi all,
I m facing problem while generation work schedule manually where i m not getting calender according to PWS.
i m working for chemical industry where every level have different WSR and off
eg: for manager SUN off
General shifts MON off
afternoon shifts WED off
night shifts FRI off
while creating PWS i have assign dws accordingly but while generating work schedule manually its not showing proper off................
i dont know where i m doing mistake
seeking experts help
Parth ,
One afternoon and one night shift is it changing every alternate day or every week
Mon tue wed thu fri sat sun
Ex: Night After Night After Night After Night
OR
Mon tue wed thu fri sat sun Mon tue wed thu fri sat sun
Nig Nig Nig Nig Nig Nig Nig Nig Nig Nig Nig Nig Nig Nig
Check ur sequnce and assign is it week or for day.
Thanks
Swati
Similar Messages
-
Error while generating Work Schedules
Hello,
I am trying to generate Work Schedules manually. I have configured all the previous steps like creating daily WS, Period WS, assigning PSA grouping, assigning Public Holidays etc. When I generate Work Schedules manually, I get the following error message -
Error while accessing public holiday calendar on 20110101
Diagnosis
The function module HOLIDAY_CHECK_AND_GET_INFO has generated an error.
Please guide.
Thanks.Hi,
First check the validity period of your Holiday calendar. If it is until 2010, then the Validity needs to be extended beyond 2010, Write to SAP and ask them to extend the validity period for your Holiday calendar. Once the validity is extende then generate the workschedules. As of now generate the workschedules until 112010.
Regards
Sri -
Reg: work schedule manually
Dear Experts
i have an issue .i have create PWS for 5 working days and SAT&SUN is Day off.when
i generate work schedule manually then the calendar shows Tuesday and Wednesday
Day off.i checked all the configuration.but i couldn't find out the reason.
so please assist me in this issue.
Thanks&Regards
Manoj KumarIn table V_T508A, Ref. date for PWS should be Monday, also V_T551A, 06 & 07 should be off.
Regds, -
Generate work schedules in production server
Hai Friends
I am trying to generate work schedules in production server, its saying only display client, then basis team opened the production server and while trying to save, its asking customizing request.basis guy saying that he wont create request for that in produciton.
Is this the right way to do?
When I trying to generate Work schedule in Dev, then also its asking customizing request, is it transportable one? Or we need to generate the work schedule in production it self? Please clarify
Thank youHi,
Generate the workschedules first in Dev server...you will get a customizing request. Save it.
Get the request transported to your testing / Quality server by Basis team.
Then once okay...get it transported to Prd server by the Basis team.
Doing changes directly into PROD client by opening it is not advisable...this will cause problems in future whn issues are encountered and u need to test configs for future developemts.
Keep the servers in your landscape in sync with respect to config.
Regards,
Shreyasi. -
How to check the generated work schedules
Hi Friends,
We have more than 30 Work schedule rules, in which some of them have been generated some of not. So now I want to check which work schedules have not been generated. Kindly advice the how can I check the non generated Work schedules or generated work schedule.
Thanks
klgenerally
We use the following tcodes
PT01 to generate
PT02 to change the DWSR
PT03 to display the DWSR
more over if u have not generated the Daily work schdule you will get an Error while save DWSR in IT0007 so please check the above tcodes -
Hi,
Hope someone can help me with this:
I would like to generate a working schedule for employees for x-days ahead based on a starting date that the user can enter.
I have got 3 relevant tables:
1. Table X with (1) resourcenumber, (2) starting date working schedule and (3) the daynumber representing the starting date (this is ISO so 1 for Monday, 2 for Tuesday etc.)
2. Table Y has the schedule itself and can hold a 7-days schedule or a 14-days schedule. In case of 7 days schedule
there a 14 (!) records with (1) resourcenumber, (2) daynumber, (3) starting hour a.m. (4) ending hour a.m (5) starting hour p.m and (6) ending hour p.m. In case of a 14-days schedule there are 28 records (a.m. and p.m. records)
3. Table Z with resource data.
An example to clarify (for fake employee
100):
Table X:
Resource: 100
Starting date: 2012-03-01 (from this date the schedule will be effective)
Daynumber: 4 (2012-03-01 was a Thursday)
Table Y (Resource has a 14 days schedule because per 2 weeks Monday is an off-day):
Record 1 shows: Resource: 100, Daynumber: 1 (= Monday, working day), AM-Starting hour: 09:00, AM-Ending hour: 13:00, PM-starting hour: 13:30, PM-ending hour: 17:30
Record 2: same but daynumber is 2
Record 3: same but daynumber is 3 etc.
Record 8 shows: Resource: 100, Daynumber: 8 (= Monday, off-day), AM-Starting hour: 00:00, AM-Ending hour: 00:00,
PM-starting hour: 00:00, PM-ending hour: 00:00
Record 9: same as record 2 but daynumber is 9.
etc.
Record 14: same as record 7 but day is 14 (= last day)
The weekend days show as 00:00 for the hours (same as day 8 in example)
I generated the working schedule with a CROSS APPLY function based on the starting date and the x-number of days ahead.
I then evaluate the actual daynumber corresponding with that date with the daynumber in table Y.
That works fine with a 7-days schedule but I can't get it fixed with a 14-days schedule. Day 8 in that schedule represents an actual day 1 but how do I know what actual date day 8 is ... I think I have to start with the starting date in
table X ...
I think ideally I would like to have the generated days as follows (as an example in case of a 14-days schedule starting 2014-05-01 for 30 days ahead):
2014-05-01 = day 4 (= actual daynumber)
2014-05-02 = day
5
2014-05-03 = day 6
2014-05-10 = day 13
2014-05-11 = day
14
2014-05-12 = day 1
2014-05-13 = day 2
2014-05-14 = day
3
2014-05-24 = day 13
2014-05-25 = day 14
2014-05-26 = day
1
2014-05-27 = day 2
2014-05-31 = day 6
With this done I can compare the actual daynumber with the daynumber in Table Y.
The rownumber that the CROSS APPLY function generates has to be reset to 1 after day 14.
I tried PARTITION BY in THE ROW_NUMBER function but to no avail ... The only field I can partition by is the maximum value of the daynumber (14 is the example)
but that is not allowed in the rownumber function.
I think I have to redo the whole exercise from scratch, but I wonder what the best way is to get this
solved.
I am stuck!
Thanks!The hour is late, and I don't have much time to look into this.
But it would definitely help if you posted:
1) CREATE TABLE statements for your tables.
2) INSERT statements with sample data, enough to demontstrate all aspects of the problem.
3) The desired result given the sample.
4) Which version of SQL Server you are using.
The table definitions and the sample data helps to clarify the description. It also makes it easy to copy and paste into a query window to develop a tested solution.
Erland Sommarskog, SQL Server MVP, [email protected] -
What are reasons to generate work schedules-not using SAP payroll or TM?
We have SAP ECC 6 HR and only pass a work schedule rule to our proprietory payroll system and have our own time and attendance system. The extent of our TM in SAP is just to have work schedules to attach to positions IT1011 and IT0007 on the employees. We are a very large 24/7 organization and have nearly 20,000 work schedules in use. It the past we have generated them out for 3 years and regenerate them as the come close to expiring.
My question is - what are some basic reasons for generating a work schedule? In our implementation I can't seem to find out why we need to continue doing it. We are able to attach an ungenerated work schedule to a position and a person.
Thanks in advance for any insight.Generally the reasons why you would have a works schedule is for leave deduction, and possibly accruals, and also for automatic generation of overtime and shift penalties, public holidays. It could also further link into separate systems for payment purposes, or for attendance checks (i.e. EHS, rostering, training & event mgt, Sales & Distribution).
However, if your rostering/award interpretation is being handled in a separate system, and this information is being passed to a separate payroll system, then it would seem redundant to have work schedules in SAP. -
Generating work schedule in PT01
Dear Colleagues,
Few issues related with PT01 transaction:
1. I have PWS referencing DWS that is SDAY, SDAY has 3 variants, but on PWS customizing screen variants are not visible, so it is not clear is it just SDAY or SDAY I or SDAY S.
2. On PWS config I have days 06 and 07 as FREE, but when run PT01 it falls into Thursday and Friday instead of expected Saturday and Sunday.
3. Within PWS config I choose SDAY I, but PT01 generates it with SDAY without variant.
4. Who should be doing PT01 within the business? Is it one time administrator task for the beginning of the year?
Thank you,Here are the steps to configure a WS Rule and generate them....:
http://www.soniconsulting.com/2010/hello-world/
DWS variants will be applied based on the IMG Step: IMG > Time Management > Work Schedule > Daily Work Schedule > Define Rules for Variants
In your Reference Date while configuring a WS Rule, make sure the date falls on a Monday (1/1/1900)
If your Holiday Calendar does not change year to year, you can generate the WS Rules for next 10-20-50 years or so...
- Harshal -
? system considers 1 day before and 1 day after in generating work schedule
Dear team:
Why the system considers a day before and a day after while generating the personal work schedule. Is their any specific reason behind this, please let me know.
Also experts say that a month work schedule to be generated in advance before the go-live date.
Regards
Mallikarjun PHi Advait,
Check IT 2003 ( substitutions ) infotype in the date range around the public holiday.
It may so happen that there is a substitution.
cheers,
Ajay -
Transaction Code of Work Schedule
Hello,
Please let me the Transaction Code how to update the Work Schedule Scenrio or let me know the steps how to update the Work Schedule.Follow the below steps to generate Work schedule:
1 Define Holiday Class SAP Customizing Implementation Guide (IMG) ® Time Management ® Work Schedules u2192 Define Public Holiday Classe (Change Public Holidays) Tcode-OY05 Table view-SFC_DISP
2 Personnel Sub area Grouping SAP Customizing Implementation Guide (IMG) ® Time Management ® Personnel Subarea Groupings ® Group Personnel Subarea for Work Schedules & Daily Work Schedules. Tcode-SPRO Table view-V_001P_N
3 Define Break Schedule SAP Customizing Implementation Guide (IMG) ® Time Management ® Work Schedules ® Daily Work Schedules ® Define Break Schedules Tcode-SPRO Table view-V_T550P
4 Define Daily Work schedule SAP Customizing Implementation Guide (IMG) ® Time Management® Work Schedules ® Define Daily Work Schedules Tcode-SPRO Table view-T508Z
5 Define Period Work Schedule SAP Customizing Implementation Guide (IMG) ® Time Management® Work Schedules ® Periodic Work Schedules ® Define Periodic Work Schedules Tcode-SPRO Table view-V_T551A
6 Define Day types SAP Customizing Implementation Guide (IMG) ® Time Management® Work Schedules ® Day Types ® Define Day Types Tcode-SPRO Table view-V_T553T
7 Define Employee Sub group groupings SAP Customizing Implementation Guide (IMG) ® Time Management ® Work Schedule Rules & Work Schedules ® Define Employee Subgroup Grouping. Tcode-SPRO Table view-V_T508T
8 Define Grouping for the Public Holiday Calendar SAP Customizing Implementation Guide (IMG) ® Time Management ® Work Schedule Rules & Work Schedules ® Define Employee Subgroup Grouping à Define Groupings for the Public Holiday Calendar Tcode-SPRO Table view-V_001P_M
9 Set Work Schedule Rules & Work Schedules SAP Customizing Implementation Guide (IMG) ® Time Management ® Work Schedules ® Work Schedule Rules & Work Schedules ® Set Work Schedule Rules & Work Schedules. Tcode-SPRO Table view-V_T508A
10 Generate work Schedules Manually. SAP Customizing Implementation Guide (IMG) ® Time Management ® Work Schedule Rules & Work Schedules ® Generate Work Schedules Manually. Tcode-SPRO Table view-PSHFT
11 Set Default Value for the Work Schedule IMG à Time Management à Work Schedulesà Planned Working Time à Set Default Value for the Work Schedul.(Feature:SCHKZ) Tcode-PE03 PE03 -
hi every one
How can I get information about total work schedule including holiday calendar, day types, variants and planned working time
please any one should help me
I want full details.
regards
CharanThe following is the config. document of TM.
I think its helpful to u.
Work Schedules Personnel Time Management IMG Define Public Holiday Classes
Work Personnel Time Management IMG Group Personnel Subareas for the Work Personnel Subarea Groupings Schedules Schedule
Personnel Work Schedules Personnel Time Management IMG Group Personnel Subareas for theDaily Work ScheduleSubarea Groupings
Daily Work Schedules Work Schedules Personnel Time Management IMG Define Daily Work Schedules
Work Personnel Time Management IMG Define Period Work Schedules. Period Work Schedules Schedules
IMG Define Day Day Types Work Schedules Personnel Time Management Types.
Day Types Work Schedules Personnel Time Management IMG Define Day Types.
Day Work Schedules Personnel Time Management IMG Define Special Days.Types
Work Personnel Time Management IMG Define Employee Subgroup Work Schedule Rules and Work Schedules Schedules Groupings
Work Work Schedules Personnel Time Management IMG Define Groupings for the Public HolidaySchedule Rules and Work Schedules Calendar.
Work Work Schedules Personnel Time Management IMG Set Work Schedule Rules and WorkSchedule Rules and Work Schedules Schedules.
Work Work Schedules Personnel Time Management IMG Generate Work Schedules ManuallySchedule Rules and Work Schedules
IMG Set Planned Working Time Work Schedules Personnel Time Management Default Value for the Work Schedule.
Personnel Time Management IMG Set Default Value for Time Management Planned Working Time Work Schedules Status.
Time Data Recording and Personnel Time Management IMG Define Personnel Subareas for Substitution Substitutions Administration Types.
Time Data Recording and Personnel Time Management IMG Set Defaults for Substitution Types. Substitutions Administration
IMG Absences Time Data Recording and Administration Personnel Time Management Group Personnel Subareas for Attendances and Absence Catalog Absences.
Time Data Recording and Personnel Time Management IMG Define Absence Types. Absence Catalog Absences Administration
IMG Absences Time Data Recording and Administration Personnel Time Management Define Counting Classes for the Period Work Absence Counting Absence Catalog Schedule.
Time Data Recording and Personnel Time Management IMG Rules for Absence Counting Absence Catalog Absences Administration Group Employee Subgroups for Time Quotas.Absence Counting (New)
IMG Absences Time Data Recording and Administration Personnel Time Management Group Rules for Absence Counting (New) Absence Counting Absence Catalog Personnel Subareas for Time Quotas
Time Personnel Time Management IMG Absence Absence Catalog Absences Data Recording and Administration Define Rules for Rounding Counted Rules for Absence Counting (New) Counting Absences
Time Data Recording and Personnel Time Management IMG Rules for Absence Counting Absence Catalog Absences Administration Define Counting RulesAbsence Counting (New)
Personnel TimeIMG Absence Catalog Absences Time Data Recording and Administration Management Define Counting Rules Rules for Absence Counting (New) Absence Counting Deduction rules for Absence quotas
Time Personnel Time Management IMG Absence Absence Catalog Absences Data Recording and Administration Assign Counting Rules to Absence Types.Counting
Personnel TimeIMG Attendances/Actual Working Time Data Recording and Administration Management Define Attendance Types.Times
Time Personnel Time Management IMG Attendances/Actual Working Times Data Recording and Administration Assign Counting Rules for Attendance counting (New) Attendance counting Rules to Attendance Types.
Time Data Personnel Time Management IMG Managing Time Accounts Using Attendance/AbsenceRecording and Administration Define Absence Quota Types. Time Quota Types Quotas
PersonnelIMG Managing Time Time Data Recording and Administration Time Management Calculating Absence Entitlements Accounts Using Attendance/Absence Quotas Permit Quota Generation Without TimeAutomatic Accrual of Absence Quotas Evaluation.
Time Time Evaluation Personnel Time Management IMG Set Personnel Subarea Groupings for Time Recording.Evaluation Settings
PersIMG Time Data Recording and Administration onnel Time Management Calculating AbsenceManaging Time Accounts Using Attendance/Absence Quotas Set Base Entitlements Rules for Generating Absence Quotas Entitlements Base Entitlement for Absence Quota Generation.
Personnel TimeIMG Managing Time Accounts Time Data Recording and Administration Management Rules for Calculating Absence Entitlements Using Attendance/Absence Quotas Determine Validity and Deduction Periods.Generating Absence Quotas
IMG Managing Time Data Recording and Administration Personnel Time Management Calculating Absence EntitlementsTime Accounts Using Attendance/Absence Quotas Define Set Base Entitlements Rules for Generating Absence Quotas Generation Rules for Quota Selection.
Define Public Holiday Work Schedules Personnel Time Management IMG Classes
Personnel Work Schedules Personnel Time Management IMG Group Personnel Subareas for the Work ScheduleSubarea Groupings
IMG Group Personnel Subarea Groupings Work Schedules Personnel Time Management Personnel Subareas for theDaily Work Schedule
Daily Work Schedules Work Schedules Personnel Time Management IMG Define Daily Work Schedules
Work Personnel Time Management IMG Define Period Work Schedules. Period Work Schedules Schedules
IMG Define Day Day Types Work Schedules Personnel Time Management Types.
Day Types Work Schedules Personnel Time Management IMG Define Day Types.
Day Work Schedules Personnel Time Management IMG Define Special Days.Types
Work Personnel Time Management IMG Define Employee Subgroup Work Schedule Rules and Work Schedules Schedules Groupings
Work Work Schedules Personnel Time Management IMG Define Groupings for the Public HolidaySchedule Rules and Work Schedules Calendar.
Work Work Schedules Personnel Time Management IMG Set Work Schedule Rules and WorkSchedule Rules and Work Schedules Schedules.
Work Work Schedules Personnel Time Management IMG Generate Work Schedules ManuallySchedule Rules and Work Schedules
IMG Set Planned Working Time Work Schedules Personnel Time Management Default Value for the Work Schedule.
Personnel Time Management IMG Set Default Value for Time Management Planned Working Time Work Schedules Status.
Time Data Recording and Personnel Time Management IMG Define Personnel Subareas for Substitution Substitutions Administration Types.
Time Data Recording and Personnel Time Management IMG Set Defaults for Substitution Types. Substitutions Administration
IMG Absences Time Data Recording and Administration Personnel Time Management Group Personnel Subareas for Attendances and Absence Catalog Absences.
Time Data Recording and Personnel Time Management IMG Define Absence Types. Absence Catalog Absences Administration
IMG Absences Time Data Recording and Administration Personnel Time Management Define Counting Classes for the Period Work Absence Counting Absence Catalog Schedule.
Time Data Recording and Personnel Time Management IMG Rules for Absence Counting Absence Catalog Absences Administration Group Employee Subgroups for Time Quotas.Absence Counting (New)
IMG Absences Time Data Recording and Administration Personnel Time Management Group Rules for Absence Counting (New) Absence Counting Absence Catalog Personnel Subareas for Time Quotas
Time Personnel Time Management IMG Absence Absence Catalog Absences Data Recording and Administration Define Rules for Rounding Counted Rules for Absence Counting (New) Counting Absences
Time Data Recording and Personnel Time Management IMG Rules for Absence Counting Absence Catalog Absences Administration Define Counting RulesAbsence Counting (New)
Personnel TimeIMG Absence Catalog Absences Time Data Recording and Administration Management Define Counting Rules Rules for Absence Counting (New) Absence Counting Deduction rules for Absence quotas
Time Personnel Time Management IMG Absence Absence Catalog Absences Data Recording and Administration Assign Counting Rules to Absence Types.Counting
Personnel TimeIMG Attendances/Actual Working Time Data Recording and Administration Management Define Attendance Types.Times
Time Personnel Time Management IMG Attendances/Actual Working Times Data Recording and Administration Assign Counting Rules for Attendance counting (New) Attendance counting Rules to Attendance Types.
Time Data Personnel Time Management IMG Managing Time Accounts Using Attendance/AbsenceRecording and Administration Define Absence Quota Types. Time Quota Types Quotas
PersonnelIMG Managing Time Time Data Recording and Administration Time Management Calculating Absence Entitlements Accounts Using Attendance/Absence Quotas Permit Quota Generation Without TimeAutomatic Accrual of Absence Quotas Evaluation.
Time Time Evaluation Personnel Time Management IMG Set Personnel Subarea Groupings for Time Recording.Evaluation Settings
Time Data Recording and Administration Personnel Time Management IMG Managing Calculating AbsenceTime Accounts Using Attendance/Absence Quotas Set Base Entitlements Rules for Generating Absence Quotas Entitlements Base Entitlement for Absence Quota Generation.
Personnel TimeIMG Managing Time Accounts Time Data Recording and Administration Management Rules for Calculating Absence Entitlements Using Attendance/Absence Quotas Determine Validity and Deduction Periods.Generating Absence Quotas
IMG Managing Time Data Recording and Administration Personnel Time Management Calculating Absence EntitlementsTime Accounts Using Attendance/Absence Quotas Define Set Base Entitlements Rules for Generating Absence Quotas Generation Rules for Quota Selection. -
Dear All,
Can some one guide me in the process of regenerating work schedules? I have made some changes in the customization for defining rules for variants and I want the system to regenerate work schedules based on this change. Since nothing the generate work schedules selection screen is changed, It is not allowing me to generate work schedules saying that the work schedules are already present.
How do I re generate the work schedules?
Thanks in advance,
Saroj Manrall.Saroj,
Here is the steps to follow generating/regenerating work schedule rules.
Set work schedule rules and work schedules: Path: SPRO-> Personnel Time Mgmt-> Set work schedule rules and work schedules
Generate work schedules manually: Path: SPRO-> Personnel Time Mgmt-> Generate work schedules manually (PT01)
Generate work schedules in batch: Path: SPRO-> Personnel Time Mgmt-> Generate work schedules in batch (OG00) Otherwise use this program: RPTSHF00
You will have to check in PA0007 for at least one employee from each employee sub grouping to know whether work schedules are generated properly or not.
Moreover if you want to check more details check these tables (T550A, T508A, T552A)results.
Thanks,
Kiran.
Reward points are appreciated. -
How to configure work schedules and work schedule rules?
Can some one pleas help!
After the path suggested above, the last but one step will be
--- Set work schedule rules and work schedules
Last step will be
--->generate work schedules manually ---> Create work schedule -->click create all --->you will start seeing a calender for every month you specified.
Eg: you specify that you need work schedule from march 2008 to Dec 2008, first march work schedule is generated.
Save it. Hit enter to generate April calender and so on. Keep saving till the end. -
HI,
How to configure workschedule........and wat r the pre-requistes to maintain and how to configure ?
if any body found document plz send it to me
Thanks ,
VinayHi,
The following is the config. of work Schedule
IMG --> Personnel Time Management --> Work Schedules --> Define Public Holiday Classes
IMG --> Personnel Time Management --> Work Schedules --> Personnel Subarea Groupings --> Group Personnel Subareas for the Work Schedule
IMG --> Personnel Time Management --> Work Schedules --> Personnel Subarea Groupings --> Group Personnel Subareas for theDaily Work Schedule
IMG --> Personnel Time Management --> Work Schedules --> Daily Work Schedules --> Define Daily Work Schedules
IMG --> Personnel Time Management --> Work Schedules --> Period Work Schedules --> Define Period Work Schedules.
IMG --> Personnel Time Management --> Work Schedules --> Day Types --> Define Day Types.
IMG --> Personnel Time Management --> Work Schedules --> Day Types --> Define Day Types.
IMG --> Personnel Time Management --> Work Schedules --> Day Types --> Define Special Days.
IMG --> Personnel Time Management --> Work Schedules --> Work Schedule Rules and Work Schedules --> Define Employee Subgroup Groupings
IMG --> Personnel Time Management --> Work Schedules --> Work Schedule Rules and Work Schedules --> Define Groupings for the Public Holiday Calendar.
IMG --> Personnel Time Management --> Work Schedules --> Work Schedule Rules and Work Schedules --> Set Work Schedule Rules and Work Schedules.
IMG --> Personnel Time Management --> Work Schedules --> Work Schedule Rules and Work Schedules --> Generate Work Schedules Manually
IMG --> Personnel Time Management --> Work Schedules --> Planned Working Time --> Set Default Value for the Work Schedule.
Hoping this will help you.
Warm Regards,
Kapil Kaushal -
Hello
I need one help
I have changed the WSR for a specific personnel area changing the time of the working hours, so now after changing the settings do I need to generate WSR Manually if yes do i need to create or change the existing one
When I tried to create giving claendar, ESG,WSR, it says its already exists.
what should I do Now to activate It
Kindly help
Thanks
NaveenHi Naveen,
Please generate the WSR in batch mode and generate it from the month of change till the month you wish to generate.
SPRO > Time Management > Work Schedules > Work Schedule Rules and Work Schedule > Generate Work Schedules in Batch
Enter the employee subgroup grouping, holiday calendar id, personnel subarea grouping, work schedule rule, calendar month from (042014 for Apr'14) to calendar month (122025 for Dec'25), BTCI as E and click on execute.
Please enter the months for which you want to generate the WSR. The above were sample values for illustration.
I hope this solves your query.
You can also go through the below blog on Public Holiday Calendar and Work Schedule Rules.
Thanks and regards,
Vivek Barnwal
Maybe you are looking for
-
My MacBook screen is stuck in "presentation" mode (I don't know the correct term) after using my Apple Mini DisplayPort to VGA Adapter - meaning the screen fonts and windows are larger than usual. How can I fix this? I've changed the display settings
-
We are trying to receive an XML file from a partner (with SSL) through our PI system. About half of the files we receive during the day succeed normally. The other half fail with the following messages: In CC monitor: Message processing failed. Cau
-
Java.io.IOException: Server returned HTTP response code: 405 for URL
I'm trying write to a file using a combination of CGI and Java. I am following this website: http://www.webdeveloper.com/java/java_jj_read_write.html However, when I try to write out to the file, I keep getting the error in the title: HTTP response c
-
Laptop blocks another computer from connecting router.
HiI'll appreciate your help with my problem very much: in my house there is one computer that's connected to the home router with cable, and other devices that are connected via WiFi, including my laptop (ThinkPad E540). Whenever I connect to the r
-
Bulletin Board recommendation needed
Greetings, I have a client (medical association) that has made an unusual request. They want to install a communication creature that is essentially a hybrid between a listserv and a bulletin board. We are currently running them on a CF8 server. They