Problem in third party sales scenario

Hi all,
When i'm creating sales order for third party i'm not getting purchase requistion number and when i'm enter third party in sales order system displaying message like " Puchase requistion can only be created for items assigned to plant. Please solve my issue.
Thanks and regards
Keshav

Hi
In standard SAP, item category TAS is used for this. The schedule line category is CS. Here you can see a field 'order type' with value 'NB'. This triggers the automatic creation of the PR.
Plus in the material master also you need to do certain settings.
1) If you are always following a third party process for a material then you have to create the material using item category group BANS. The procurement type should be marked as external procurement (F) in MRP 2 view of the material master record.
2) If you are not always allowing third party order processing then you can create a material master record with item category group as NORM and the procurement type should be marked as (X) meaning both types of procurement (in house manufacturing and external procurement).
In the item category the billing relevance should be 'F'.
With Regards
baalakrushnan.da

Similar Messages

  • Third party sale scenario: COGS not allowed as automatically posted.

    Dear Gurus,
    I have come across this error during execution of third party sale scenario.
    When the user enters a PO with reference to PR which is in reference to SO, one error pops up which says COGS cannot be automatically posted only.
    When I deselect the "Post automatically" tick, the PO can be saved.
    Process we are following during third party sale process:-
    1. Sales order.
    2. PR with reference to Sales order.
    3. Purchase order with reference to PR.
    4. Statistical GR with reference to PO.: COGS Dr. To GR/IR Clearing account Cr.
    5. Sales Invoice: Customer Dr. To Sales Cr.
    6. MIRO: GR/IR Clearing account Dr. To Vendor Cr.
    I have my own doubts on the statistical GR part. Can you pls. validate the same.
    Also in case of third party sale, what will be the CO object as COGS is not created a cost element. (SAP standard)
    Regards,
    Harnish Shah

    Hi
    Please check the steps for 3rd business process.
    Sales Order:VA01
    List of Sales Order:VA05
    Purchase Order with reference to Purchase Requisition: ME21N
    Inbound Delivery:VL31N Material Receipt:MIGO
    Result Recording Work list:QE51N
    QM Usage Decision:QA32
    Activities due for Shipping `Sales Orders, fast display` VL10A (VL01N)
    Post of Goods Issue (PGI):VL02N
    Post of Goods Deliver:VLPOD
    Post the Billing doc VF01 or Maintain the Billing due list-VF04
    Release Billing Document for Accounting VFX3
    Delivery Document list ZVL05
    Edit Work list for Invoice List VF24
    Output of Billing Document VF31
    Customer Payment F-28
    As per my knowledge once psot the PGI,System will upddate COGS  values.
    Regards
    asuvamsi

  • Third party sales scenario for Service.

    Dear Friends,
                    Is it possible to create third party sales scenario for Service. If it is possible Please up date me the configuration process.
    Regards,
    Bhanu

    Hi Banu,
    Please go through this link it will help you about third party process in SAP R/3
    You need to create the service material with BANS itemctegory group.
    http://help.sap.com/saphelp_47x200/helpdata/en/dd/560287545a11d1a7020000e829fd11/frameset.htm
    I hope it will help you,
    Regards,
    Murali.

  • A doubt on third party sales scenario

    hi gurus
    please anybody solve my doubt
    in the third party sales scenario, the vendor delivers the goods to the customer and sends the delivery acknowledgement to the company.
    by what configurations the delivery acknowledgement will automatically go to the company from vendor
    regards
    mahesh

    When you do MIGO (Goods Receipt), it will trigger PGI automatically. 
    Vendor has to inform Us when they delivered to our Customer.  This could be done via Proof of Delivery (POD).
    Let me know if you need more details.
    Please reward points if you find this information is useful /resolves your issue.
    Thanks,
    Ramesh

  • Acct  assignemnt for the PR Third Party sales scenario

    Hello,
    In third party sales, when we create a SO it automatically creates a Purchase requisition. It is a Account assigned Pr with acct assgt cat as "X".
    For this acct assgt cat "X" I have VAX as the acct modifier.
    In OBYC i have set the G/L for this GBB - VAX
    The PR that is getting generated from Sales order is not taking this G/L instead it is picking the G/L assigned from BSX trasaction key.
    My question is in a Third party scenario it shud pick the COGS G/L that we have assigned in VAX or the stock G/L assigned in BSX ??
    If it shud be the VAX G/L what could have gone wrong?
    Please advice,
    Thanks a ton in advance.

    Hi
    Chk in Configuration
    Spro > materials mmgnt > Purchasing > acc Assignment > acc assignment category > Go to X > see details > Chk the acccount modifications >
    If nothing is there put VAX
    Hope it solve u r problem
    Reward if useful

  • Problem in third party sales

    HI ALL
    CAN ANY ONE GIVE ON THE BRIEF INTRODUCTION ON THIRD PARTY ORDER / INDIVIDUAL PURCHASE ORDER.
    PLS GIVE  ME REPLY ASAP.......
    REGARDS
    RAO

    THIRD PARTY SCENARIO
    in third-party order processing, your company does not deliver the items requested by a customer. Instead, you pass the order along to a third-party vendor who then ships the goods directly to the customer and bills you. A sales order may consist partly or wholly of third-party items. Occasionally, you may need to let a vendor deliver items you would normally deliver yourself.
    Process Flow
    the processing of third-party orders is controlled via material types. Material types define whether a material is produced only internally can be ordered only from third-party vendors, or whether both are possible. For example, a material that is defined as a trading good can only be ordered from a third-party vendor. However, if you manufacture your own finished products, you may also want, from time to time, to be able to order the same type of product from other vendors.
    Processing Third-Party Orders in Sales
    Third-party items can be created automatically by the system, depending on how your system is set. However, you can also change a standard item to a third-party item during sales processing manually.
    Automatic third-party order processing:-
    if a material is always delivered from one or more third-party vendors, you can specify in the material master that the material is a third-party item. During subsequent sales order processing, the system automatically determines the appropriate item category for a third-party item: TAS. To specify a material as a third-party item, enter BANS in the Item category group field in the Sales 2 screen of the material master record.
    Manual third-party order processing
    In the case of a material that you normally deliver yourself but occasionally need to order from a third-party vendor, you can overwrite the item category during sales order processing. For a material that you normally deliver yourself, you specify the item category group NORM in the material master.
    If, as an exception, you use a third-party material, change the entry TAN to TAS in the ItCa field when processing the sales document. The item is then processed as third-party item.
    If address data for the ship-to party is changed in the sales order in third-party business transactions, the changed data will automatically be passed on to purchase requisition and also to the purchase order ,if one already exists. In the purchase order, you can display the address data for the ship-to party in the attributes for the item.
    You can only change the address data for the ship-to party in the sales order for third-party business transactions, and not in the purchase order.
    Processing Third-Party Orders in Purchasing
    when you save a sales order that contains one or more third-party items, the system automatically creates a purchase requisition in Purchasing. Each third-party item in a sales order automatically generates a corresponding purchase requisition item. During creation of the requisition, the system automatically determines a vendor for each requisition item. If a sales order item has more than one schedule line, the system creates a purchase requisition item for each schedule line.
    Purchase orders are created from purchase requisitions in the usual way. For more information about creating purchase orders, see the Purchasing documentation. During creation of the purchase order, the system automatically copies the delivery address of your customer from the corresponding sales order. In a sales order, you can enter purchase order texts for each third-party item. When you create the corresponding purchase order, the texts are automatically copied into the purchase order. The number of the purchase order appears in the document flow information of the sales order.
    All changes made in the purchase order are automatically made in the sales order as well. For example, if the vendor confirms quantities and delivery dates different from those you request and enters them in the purchase order, the revised data is automatically copied into the sales order
    you process third-party items by creating a normal sales order. In overview for the order, you can then overwrite the default item category (TAN in the standard system) with the special item category for third-party items: TAS
    Billing Third-Party Orders
    If relevance for billing indicator for the item category has been set to B (relevant for order-related billing on the basis of the order quantity) in Customizing, the system includes the order in the billing due list immediately. If, however, the indicator has been set to F (relevant to order-related billing on the basis of the invoice quantity), the system does not include the order in the billing due list until an invoice from the vendor has been received and processed by the purchasing department. In the standard system, item category TAS (third-party order processing) has been given billing-relevance indicator F.
    In the first case, the third-party order is considered to be completely billed only when the invoiced quantity equals the order quantity of the sales order item. In the second case, each time a vendor invoice is received, a customer invoice is created for the quantity in the vendor invoice and the order is considered to be fully invoiced until the next vendor invoice is received.
    If you have activated billing-relevance indicator F for item categories in Customizing, billing can refer to the goods receipt quantity instead of the incoming invoice quantity.
    You can control whether the invoice receipt quantity or the quantity of goods received is relevant for billing in Customizing for copying control for billing at item level.
    FOR YOUR PROCESS Individual Purchase Orders WELL GIVE THE RIGHT SOLUTION
    Individual purchase orders are used when your customer orders goods from you that are not in stock and must be ordered from one or more external vendors.
    Process Flow
    During sales order entry, the system automatically creates a purchase requisition item. The purchasing department creates a purchase order based on the requisition and the vendor ships the goods directly to you (unlike third party order processing, where the vendor ships directly to your customer). You then ship the goods to your customer. While the goods are part of your inventory, you manage them as part of the sales order stock. Sales order stock consists of stock that is assigned to specific sales orders and cannot be used for other purposes.
    Process Flow for 3rd Party Sales
    Customize the third party sales in summary:
    Prerequisites for 3rd party sales,
    Purchasing org,
    purchasing group,
    assign the Purchase org to company code
    assign Purchase org to plant,
    should not maintain the stock in material, it should be trading goods,
    1. Create Vendor XK01
    2. Create Material – Material Type as "Trading Goods". Item category group as "BANS".
    3. Assign Item Category TAS to Order type that you are going to use.
    4. A sale order is created and when saved a PR is generated at the background
    5. With reference to SO a PO is created (ME21N). The company raises PO to the vendor.
    6. Vendor delivers the goods and raises bill to company. MM receives the invoice MIRO
    7. Goods receipt MIGO
    8. Goods issue
    9. The item cat TAS or Schedule line cat CS is not relevant for delivery which is evident from the config and, therefore, there is no delivery process attached in the whole process of Third party sales.
    10. Billing *--
    SD - 3rd party sales order Create Sales Order
    VA01
    Order Type
    Sales org, distr chnl, div
    Enter
    Sold to
    PO #
    Material
    Quantity
    Enter
    Save
    SD - 3rd party sales order View the PR that is created with a third party sales order
    VA01
    Order Number
    Goto Item Overview
    Item ->Schedule Item
    SD - 3rd party sales order View the PR that is created
    ME52N
    Key in the PR number
    Save
    SD - 3rd party sales order Assign the PR to the vendor and create PO
    ME57
    Key in the PR number
    Toggle the "Assigned Purchase Requisition"
    Execute
    Check the box next to the material
    Assign Automatically button
    Click on "Assignments" button
    Click on "Process assignment"
    The "Process Assignment Create PO" box , enter
    Drag the PR and drop in the shopping basket
    Save
    SD - 3rd party sales order Receive Goods
    MIGO_GR
    PO Number
    DN Number
    Batch tab , click on classification
    Serial Numbers tab
    Date of Production
    Flag Item OK
    Check, just in case
    Post
    Save
    SD - 3rd party sales order Create Invoice
    MIRO
    Invoice Date
    Look for the PO , state the vendor and the Material
    Check the box
    Click on "Copy"
    Purchase Order Number (bottom half of the screen)
    Amount
    State the baseline date
    Simulate & Post
    Invoice Number
    *Invoice blocked due to date variance
    SD - 3rd party sales order Create a delivery order
    VL01N
    In the order screen , go to the menu Sales Document , select "Deliver"
    Go to "picking" tab
    State the qty and save
    SD - 3rd party sales order Create a billing document
    VF01
    Ensure that the delivery document is correct in the
    Enter
    Go to edit -> Log
    Save

  • Problem in Third Party Sales (W & W/0 Shipping Notification)

    Hi Gurus,
    When I am doing Third Party Scenario I am facing Problem in Understanding why there is no Outbound
    Delivery takes place, Only because if I am taking Goods-In from MIGO against Sales Order, It means
    my Stock is increased & after Goods Issue only I can deduct that stock,
    If I wants to do Outbound Delivery is it Recommended or Not ?
    Please Explain me,
    I checked all Relevant massages but still confuse,
    Regards,
    Sai

    Hi Sai,
    I think there is some slight confusion here wrt 3rd party sales, in this process we are not actually delivering the goods to customers, that part is done on behalf of us by our vendor. Vendor directly sends the gooods order to customer does the outbound delivery and all from his system and sends us a corrosponding invoice (MIRO) for same.
    On that MIRO vendor invoice we create a final customer invoice (VF01) and send it to customer for collecting the payment.
    Although you are somehat right that once we do MIGO (goods are placed in storage> so stock should also increase first and should be reduced accordingly after doing PGI) but here since we are not making any physical delivery, there is no movement type, PGI from our side thus a aadition or reduction in stocks. MIGO stands here as 1 component of whole process.
    VA01> ME51- auto creates PR for SO> ME21N create PO/Convert PR to PO> MIGO>MIRO>VF01.
    config is in place of normal CP schedule lines for TAS its CS, Movement type NIL, item relevant for delivery box- unchecked.

  • Third party sales scenario

    Hi All,
    We have received an order for 1000 qty. we can produce and deliver only 500, so we have a third party which will produce and deliver it directly to the customer.
    I want to know how this process goes on in SAP. specifically if we deliver 500 qty with a delivery note, then how we will accomodate other 500 qty in delivery and how to bill it.
    Kindly help me understanding the process.
    Thanks and regards,
    Danny.

    Dear Danny
    If u want total 1000 qty to be delivered together n billed at once.
    In my opinion, u can very well do it by maintaining the Item Category TAB for Third Party Item.
    So this will be an Individual Purchase Order scenario of Third Party.
    Vendor will deliver goods to you n you can deliver those goods with your own goods, to customer.
    Or otherwise, if you want your vendor to deliver goods directly to customer n you will deliver yours, in that case, two deliveries will take place but still u can create single Billing Invoice for both the deliveries.
    In this case, u have to use Item Category TAS for third party item.
    U will bill the customer on the basis of Shipping Notification raised by the Vendor.
    If u want more details, check the link -
    http://help.sap.com/bp_bl603/BL_IN/html/index.htm
    Hope this helps u.

  • Satus problem with Third party sales process

    Hi Friends,
    I have an issue with thrid party sales order processing
    Step#1
    My client runs the sales order for
    Material Qty
    p-100 10
    p-101 10
    p-102 10
    step-2
    Purchase requisition created and from vendor delivery happened
    Step-3
    My user created billing with reference of sales order for below material
    Material quantity
    p-100 20
    p-101 10
    p-102 20
    step-4
    user found mistake and he cancelled the invoice and created new billing document
    for
    material quantity
    p-100 10
    p-102 10
    again he found mistake and cancelled this billing document and create one more billing document with reference of sales order
    material quantity
    p-100 10
    p-101 10
    p-102 10
    now the issue is for p-100 and p-101 it showing being process and p-101 it showing status as completed
    please suggest m

    Dear Amar,
    please see the billing document which you have cancelled and see the status of the item as well as you are saying,
    that two items are cancelled, so i believe it is the sap functionality that it is showing the uncancelled item as complete.
    also if the user has cancelled the whole document
    kindly check all the documents again and then tell me
    revert if helpful
    Mohit Singh

  • Payment Terms in Third Party Sales Invoice.

    Hi Experts,
    We are facing the problem in third party sales process.
    Suppose X is our customer and Y is our vendor, here Y is supplying the material directly to X and Y sending us the bill of entry and other documents to us, and then we create the sales invoices to X, we are following all process like first we create SO to X then with the PR we create PO to Y then we do migo and miro of vendor invoices then creating the sales invoice to X.
    The main problem is that we want that the payment due date to our customer invoice starts from the vendor bill of lading date which we enter at the time of migo and miro (document date), but in our system, in sales invoice to X, system is calculating payment terms which we have entered in the customer master of X.
    How to get above functionality activated in sap.
    Regards
    Rajeev Gupta
    Message was edited by: Rajeev Gupta
    Please somebody reply.

    Can somebody reply this query.
    Thanks

  • Tax & Excise in Third Party Sales

    Hi Friends,
    As per Std.SAP in third party Sales Scenario a PR will be automatically created when we save the SO & out of that we create a PO.
    Now kindly provide clarifications for the below query's
    1. When we create a PO with respect to this PR (Is taxes & excise applicable) ?
    2. How we have to maintain this Third Party Material in J1ID inorder to determine the excise rates for Calculation?
    3. As per this Scenario our Vendor will deliver the goods to our customer & we will do a Statistical GR which will post to the consumption & GR/IR clearing accounts. Now what will the impact in Excise side as our material in the PO is subjected to excise?
    4. Do we take the Cenvat credit as in case of Raw materials??
    Since I am not clear in the excise & taxes part of this Scenario. Please help me..
    Regards,

    Excise Duty: Excise Duty is applicable only in an manufacturing scenario in India. I will illustrate with sone examples, as under:
    Example 1:
    Sales from Plant 'A', material 'B' (manufactured product) to Customer 'XYZ'.
    Customer XYZ orders material 'B', which is supplied from plant 'A', say quantity 1. Sale Base Value is Rs. 100/-, Basic Excise Duty 10%, Education Cess 2%, Higher Education Cess 1%, Vat 12.5%
    (Excise Duty will be applicable and reflect as a separate component in above scenario)
    Example 2:
    Stock Transfer from Plant 'A', material 'B' (manufactured product) to Plant 'D'.
    Plant 'D' has a requirement for material 'B', which is supplied from plant 'A', say quantity 1. Assessable Value is Rs. 80/-, Basic Excise Duty 10%, Education Cess 2%, Higher Education Cess 1%
    (Excise Duty will be applicable and reflect as a separate component, but Vat will not be applicable in above scenario)
    Example 3:
    Sales from Plant 'A', material 'B' (Trading product) to Customer 'XYZ'.
    Customer XYZ orders material 'B', which is supplied from plant 'A', say quantity 1. Sale Base Value is Rs. 120/-, Vat 12.5%
    (Excise Duty will not be applicable in above scenario)
    Regards,
    Rajesh Banka

  • Manual G/L postings for COGS in third party sales

    Hello,
    I have a scenario where we have the COGS G/L which is blocked for Manual postings. Now in case of a Third party sales scenario when the PO is created from the Sales order it is a account assigned PO so the G/L determined from GBB- VAX is the COGS G/L. But now as this G/L is locked for manual posting I am not able to process the PO.
    Is there anyway I can bypass this lock for this particular scenario.
    Kindly advise,
    Points will be awarded,
    Thanks

    Hi,
    Create a new G/L account for COGS -THIRD PARTY SALES
    but don’t select the check box "automatic postings only" & save the G/L account.
    Now assign the same G/L account in VAX- GBB  in OBYC.
    Hope it will work for you and then reward.
    Regards,
    Biju K

  • Third party sales- why MIGO in our system?

    Why we do MIGO in third party sales scenario, as we dont have stock movement in our plant?
    In the case- third party vendor delivers the goods directly to customer?
    Please clear me?
    Edited by: arshad ahamad on Feb 4, 2008 9:28 AM

    Dear Arshad,
    Certification does not guarantee you job - for that matter no one can give you a guarantee. it is up to you to get a job - prove your knowledge, creditbility, work experience and communication all these things count in an interview.
    Certification is an acknowledgement that you know something plus in SAP.
    Thank n regards,
    Ganesh JK

  • MIGO- why we do it in third party sales?

    Why we do MIGO in third party sales scenario?
    what is the effect of it on- our inventory?
    (In the case- third party vendor delivers the goods directly to customer)
    Please clear me?

    Incase of Third Party, the scenario can be mapped with 2 possibilities (Check details as under):
    http://help.sap.com/bp_blv1500/BL_India/index.htm
    Path: Technical Info --> Building Blocks --> Country: India
    J54: Third Party with Shipping Notification (MIGO required)
    J55: Third Party without Shipping Notification (MIGO not required)
    It depends on configuration whether MIGO is required or not.
    Regards,
    Rajesh Banka
    Reward points if helpful

  • Availability check in third party sales

    Hi SD Gurus,
    I have configured third party sales scenario.
    I have an issue. When I create sales order for the customer the system goes into availability check before creating the Purchase Requisition.  Should the system go into availability check for third party sales scenario as at schedule line category level i.e CS availability check is disabled .
    Please provide your suggestions.  Thx in advance.
    Jayant

    I have one more query.. On doing the MIGO after the Purchase Order is created should the stock increase for the receiving plant in MMBE.. I have checked and it is not getting increased.. Please let me know if the stock should get increased or not..
    Please answer the above 2 queries :
    1)  Related to the availability check in third party sales.
    2)  Second related to MIGO in third party sales.
    Thanks
    Jayant

Maybe you are looking for