Satus problem with Third party sales process

Hi Friends,
I have an issue with thrid party sales order processing
Step#1
My client runs the sales order for
Material Qty
p-100 10
p-101 10
p-102 10
step-2
Purchase requisition created and from vendor delivery happened
Step-3
My user created billing with reference of sales order for below material
Material quantity
p-100 20
p-101 10
p-102 20
step-4
user found mistake and he cancelled the invoice and created new billing document
for
material quantity
p-100 10
p-102 10
again he found mistake and cancelled this billing document and create one more billing document with reference of sales order
material quantity
p-100 10
p-101 10
p-102 10
now the issue is for p-100 and p-101 it showing being process and p-101 it showing status as completed
please suggest m

Dear Amar,
please see the billing document which you have cancelled and see the status of the item as well as you are saying,
that two items are cancelled, so i believe it is the sap functionality that it is showing the uncancelled item as complete.
also if the user has cancelled the whole document
kindly check all the documents again and then tell me
revert if helpful
Mohit Singh

Similar Messages

  • Cannot do MIGO in Third Party Sales Process with shipping notification

    In the Third party sales process with Shipping notification,the item category for the material is TAS (Billing relevance=R),item category group is BANS.
    Intially sales order is created,then using me21n with reference to purchase requisation purchase order is created,then in MIGO stage i used the PO No there but i get the message no item found in PO.
    what adjustment have to be done in order to do MIGO

    Refer following SDN thread, by that you will be able to get overview on best practices about Third Party Sales & necessary configuration you need to follow for statistical GR:
    - Third party direct shipment (II)
    Further maintain Billing Relevance for Item Category as G - Order-related billing of the delivery quantity.
    Regards
    JP

  • Third party sales processing issue

    Hi,
    I have a batche managed materail which i am processing for the first time with Third party sales.
    I have created deklivery for the material . but when i am creating the Billing docuemnt , system is asking for Goods issue.
    As there is no stock in system, how this should be processed?

    Hi
    Delivery is not a part of third party process. Please go through the third party process again and configure.
    Check this [Link|http://help.sap.com/saphelp_46c/helpdata/en/e6/4a78e39e0311d189b70000e829fbbd/content.htm].
    Regards

  • Accounting Entries hit in Third party Sales Process

    Hi,
    Can anybody tell which accounting entries are hit when we create the following entries in third party sales process
    1.When Sales Order is created.
    2.When PR is Created
    3.When ME21N is done
    4.MIGO
    5.MIRO
    please provide your valuable suggestion..
    Thanks...

    Hi,
    1. When Sales Order is created.
    No FI Entry
    2. When PR is Created
    No FI Entry
    3. When ME21N is done
    No FI Entry
    4. MIGO
    (GBB-VAY) COGS - 3rd Party A/c - Dr
    (WRX) GR/IR Clearing A/c - Cr
    5. MIRO
    Vendor Account - Cr
    GR/IR Clearing A/c - Dr
    6. VF01
    Customer Account - Dr
    Sales Revenue A/c - Cr

  • Query about third party sale process

    Hi,
    SD experts,would u please tell me the acctual spro configuration of "third party sale process".

    Hi Anirban,
    First, there is a note 550388 which is the FAQ note for customizing of third-party process.
    Actually the main configuration is just the item category and schedule line category.
    You could refer to TAS and TAB in standard system to create third party order and individual purchase order.
    You could also refer to the online documentation at
    http://help.sap.com/saphelp_47x200/helpdata/en/70/a7853478616434e10000009b38f83b/frameset.htm
    Sales->Special Business Process in Sales->Third Party Process
    Best regards,
    Smile

  • Third Party Sales Process

    Dear All,
    When creating a Third Party Sales Order, the PR gets generated but the system asks for a WBS element in the incompletion log (the field is not maintained in Incompletion Log).
    The Account Assignment Catagory in Schedule Line is for Third Party (with only GL as mandatory option.)
    The Requirement Class/Type combination has also been maintained with Account Assignment as blank (Notification not required), The valuation field is also blank so that Sales Order/Project Valuation should also not come into the process.
    The Stratogy Group of the Material is not maintained and as per standard the system should follow the following logic
    1. First, an attempt is made to find a requirements type using the strategy group in the material master.
    2. If the strategy group has not been maintained, the system will determine it using the MRP group.
    MRP Group is also not there
    3. If the MRP group has not been defined, the system uses the material type instead of the MRP group when accessing the corresponding control tables.
    Material Type is also not controlling this
    4. If no requirements type is found here, the system assumes a special rule and attempts to find a requirements type with the aid of the item category and the MRP type.
    Item catagory is maintained but not the MRP Type (although the MRP Type is maintained in Material Master)
    5. If this is not possible, a last attempt is made to find a requirements type with the item category only.
    6. If the last attempt fails, the system declares the transaction as not relevant for the availability check or transfer of requirements.
    I have also maintained the option of Determination Of Requirement Types Using Transaction as 1.
    Could anyone help me out with the issue?
    Regards,
    N

    Hi,
    3rd Party is nothing but trading business. you Receive a order from your customer (sales Order) n Issue/raise Purchase Order on Vendor. and ask ur vendor to delivery the goods directly to your customer.
    steps in R/3
    1. Create Sales Order (VA01)
    2. System will create PR in backgroud (ME53N)
    3. Convert PR into PO. (ME21N)
    4. Create GR (Optional) (MIGO-101)
    5. Create IV(Vendor Invoice) (MIRO)
    6. and finally Generate SD Billing (VF01)
    This is SD-MM Integrated business process.
    hope this will clear you.
    Rds Sopan Patil

  • Problem in third party sales

    HI ALL
    CAN ANY ONE GIVE ON THE BRIEF INTRODUCTION ON THIRD PARTY ORDER / INDIVIDUAL PURCHASE ORDER.
    PLS GIVE  ME REPLY ASAP.......
    REGARDS
    RAO

    THIRD PARTY SCENARIO
    in third-party order processing, your company does not deliver the items requested by a customer. Instead, you pass the order along to a third-party vendor who then ships the goods directly to the customer and bills you. A sales order may consist partly or wholly of third-party items. Occasionally, you may need to let a vendor deliver items you would normally deliver yourself.
    Process Flow
    the processing of third-party orders is controlled via material types. Material types define whether a material is produced only internally can be ordered only from third-party vendors, or whether both are possible. For example, a material that is defined as a trading good can only be ordered from a third-party vendor. However, if you manufacture your own finished products, you may also want, from time to time, to be able to order the same type of product from other vendors.
    Processing Third-Party Orders in Sales
    Third-party items can be created automatically by the system, depending on how your system is set. However, you can also change a standard item to a third-party item during sales processing manually.
    Automatic third-party order processing:-
    if a material is always delivered from one or more third-party vendors, you can specify in the material master that the material is a third-party item. During subsequent sales order processing, the system automatically determines the appropriate item category for a third-party item: TAS. To specify a material as a third-party item, enter BANS in the Item category group field in the Sales 2 screen of the material master record.
    Manual third-party order processing
    In the case of a material that you normally deliver yourself but occasionally need to order from a third-party vendor, you can overwrite the item category during sales order processing. For a material that you normally deliver yourself, you specify the item category group NORM in the material master.
    If, as an exception, you use a third-party material, change the entry TAN to TAS in the ItCa field when processing the sales document. The item is then processed as third-party item.
    If address data for the ship-to party is changed in the sales order in third-party business transactions, the changed data will automatically be passed on to purchase requisition and also to the purchase order ,if one already exists. In the purchase order, you can display the address data for the ship-to party in the attributes for the item.
    You can only change the address data for the ship-to party in the sales order for third-party business transactions, and not in the purchase order.
    Processing Third-Party Orders in Purchasing
    when you save a sales order that contains one or more third-party items, the system automatically creates a purchase requisition in Purchasing. Each third-party item in a sales order automatically generates a corresponding purchase requisition item. During creation of the requisition, the system automatically determines a vendor for each requisition item. If a sales order item has more than one schedule line, the system creates a purchase requisition item for each schedule line.
    Purchase orders are created from purchase requisitions in the usual way. For more information about creating purchase orders, see the Purchasing documentation. During creation of the purchase order, the system automatically copies the delivery address of your customer from the corresponding sales order. In a sales order, you can enter purchase order texts for each third-party item. When you create the corresponding purchase order, the texts are automatically copied into the purchase order. The number of the purchase order appears in the document flow information of the sales order.
    All changes made in the purchase order are automatically made in the sales order as well. For example, if the vendor confirms quantities and delivery dates different from those you request and enters them in the purchase order, the revised data is automatically copied into the sales order
    you process third-party items by creating a normal sales order. In overview for the order, you can then overwrite the default item category (TAN in the standard system) with the special item category for third-party items: TAS
    Billing Third-Party Orders
    If relevance for billing indicator for the item category has been set to B (relevant for order-related billing on the basis of the order quantity) in Customizing, the system includes the order in the billing due list immediately. If, however, the indicator has been set to F (relevant to order-related billing on the basis of the invoice quantity), the system does not include the order in the billing due list until an invoice from the vendor has been received and processed by the purchasing department. In the standard system, item category TAS (third-party order processing) has been given billing-relevance indicator F.
    In the first case, the third-party order is considered to be completely billed only when the invoiced quantity equals the order quantity of the sales order item. In the second case, each time a vendor invoice is received, a customer invoice is created for the quantity in the vendor invoice and the order is considered to be fully invoiced until the next vendor invoice is received.
    If you have activated billing-relevance indicator F for item categories in Customizing, billing can refer to the goods receipt quantity instead of the incoming invoice quantity.
    You can control whether the invoice receipt quantity or the quantity of goods received is relevant for billing in Customizing for copying control for billing at item level.
    FOR YOUR PROCESS Individual Purchase Orders WELL GIVE THE RIGHT SOLUTION
    Individual purchase orders are used when your customer orders goods from you that are not in stock and must be ordered from one or more external vendors.
    Process Flow
    During sales order entry, the system automatically creates a purchase requisition item. The purchasing department creates a purchase order based on the requisition and the vendor ships the goods directly to you (unlike third party order processing, where the vendor ships directly to your customer). You then ship the goods to your customer. While the goods are part of your inventory, you manage them as part of the sales order stock. Sales order stock consists of stock that is assigned to specific sales orders and cannot be used for other purposes.
    Process Flow for 3rd Party Sales
    Customize the third party sales in summary:
    Prerequisites for 3rd party sales,
    Purchasing org,
    purchasing group,
    assign the Purchase org to company code
    assign Purchase org to plant,
    should not maintain the stock in material, it should be trading goods,
    1. Create Vendor XK01
    2. Create Material – Material Type as "Trading Goods". Item category group as "BANS".
    3. Assign Item Category TAS to Order type that you are going to use.
    4. A sale order is created and when saved a PR is generated at the background
    5. With reference to SO a PO is created (ME21N). The company raises PO to the vendor.
    6. Vendor delivers the goods and raises bill to company. MM receives the invoice MIRO
    7. Goods receipt MIGO
    8. Goods issue
    9. The item cat TAS or Schedule line cat CS is not relevant for delivery which is evident from the config and, therefore, there is no delivery process attached in the whole process of Third party sales.
    10. Billing *--
    SD - 3rd party sales order Create Sales Order
    VA01
    Order Type
    Sales org, distr chnl, div
    Enter
    Sold to
    PO #
    Material
    Quantity
    Enter
    Save
    SD - 3rd party sales order View the PR that is created with a third party sales order
    VA01
    Order Number
    Goto Item Overview
    Item ->Schedule Item
    SD - 3rd party sales order View the PR that is created
    ME52N
    Key in the PR number
    Save
    SD - 3rd party sales order Assign the PR to the vendor and create PO
    ME57
    Key in the PR number
    Toggle the "Assigned Purchase Requisition"
    Execute
    Check the box next to the material
    Assign Automatically button
    Click on "Assignments" button
    Click on "Process assignment"
    The "Process Assignment Create PO" box , enter
    Drag the PR and drop in the shopping basket
    Save
    SD - 3rd party sales order Receive Goods
    MIGO_GR
    PO Number
    DN Number
    Batch tab , click on classification
    Serial Numbers tab
    Date of Production
    Flag Item OK
    Check, just in case
    Post
    Save
    SD - 3rd party sales order Create Invoice
    MIRO
    Invoice Date
    Look for the PO , state the vendor and the Material
    Check the box
    Click on "Copy"
    Purchase Order Number (bottom half of the screen)
    Amount
    State the baseline date
    Simulate & Post
    Invoice Number
    *Invoice blocked due to date variance
    SD - 3rd party sales order Create a delivery order
    VL01N
    In the order screen , go to the menu Sales Document , select "Deliver"
    Go to "picking" tab
    State the qty and save
    SD - 3rd party sales order Create a billing document
    VF01
    Ensure that the delivery document is correct in the
    Enter
    Go to edit -> Log
    Save

  • Problem in third party sales scenario

    Hi all,
    When i'm creating sales order for third party i'm not getting purchase requistion number and when i'm enter third party in sales order system displaying message like " Puchase requistion can only be created for items assigned to plant. Please solve my issue.
    Thanks and regards
    Keshav

    Hi
    In standard SAP, item category TAS is used for this. The schedule line category is CS. Here you can see a field 'order type' with value 'NB'. This triggers the automatic creation of the PR.
    Plus in the material master also you need to do certain settings.
    1) If you are always following a third party process for a material then you have to create the material using item category group BANS. The procurement type should be marked as external procurement (F) in MRP 2 view of the material master record.
    2) If you are not always allowing third party order processing then you can create a material master record with item category group as NORM and the procurement type should be marked as (X) meaning both types of procurement (in house manufacturing and external procurement).
    In the item category the billing relevance should be 'F'.
    With Regards
    baalakrushnan.da

  • Third party sales processing

    hello sap gurus
    i have a doubt regards third party sales
    while creating standard sales order i have different 3line items on that one is not available for that i did third party for 1 line item
    item category is TAS in one sales order. if i dolike this system will give purchase req no. i want to create one invoice for standard and third party order is it posible or not if it is posible please explain detailed.
    thanks for advance

    Hello,
    Whether your reuirement is possible in SAP is a second question.
    First question is that whether this is practically possible? Because out of three line items, two will be delivered by your Company & one (third party item) will be delivered by Vendor.
    Now the actual Delivery date & time to Customer of 2 items sent by you & Third party item item sent by Vendor may happen on different dates, thus creating Invoice for all these Items togather may not be a good idea.
    Also Vendor too may not have the entire stock & send the goods to customer partially or on different dates.
    Also in future you may like to have a seperate report of third party Invoices for profitability & other analysis. This will also be difficult if you have single Invoice for all Items.
    Now coming to your requirement, it may be possible if you Item Category - Billing Relevance for TAN is A & for TAS is F or G.
    Now in VF01, enter Delivery Numbers for two items sent by you & also enter the Sales Order Number & go to selection list & select the Third party Item. With this you will be able to create single Invoice for all the Items.
    Hope this helps.
    Thanks,
    Jignesh Mehta

  • Problem in Third Party Sales (W & W/0 Shipping Notification)

    Hi Gurus,
    When I am doing Third Party Scenario I am facing Problem in Understanding why there is no Outbound
    Delivery takes place, Only because if I am taking Goods-In from MIGO against Sales Order, It means
    my Stock is increased & after Goods Issue only I can deduct that stock,
    If I wants to do Outbound Delivery is it Recommended or Not ?
    Please Explain me,
    I checked all Relevant massages but still confuse,
    Regards,
    Sai

    Hi Sai,
    I think there is some slight confusion here wrt 3rd party sales, in this process we are not actually delivering the goods to customers, that part is done on behalf of us by our vendor. Vendor directly sends the gooods order to customer does the outbound delivery and all from his system and sends us a corrosponding invoice (MIRO) for same.
    On that MIRO vendor invoice we create a final customer invoice (VF01) and send it to customer for collecting the payment.
    Although you are somehat right that once we do MIGO (goods are placed in storage> so stock should also increase first and should be reduced accordingly after doing PGI) but here since we are not making any physical delivery, there is no movement type, PGI from our side thus a aadition or reduction in stocks. MIGO stands here as 1 component of whole process.
    VA01> ME51- auto creates PR for SO> ME21N create PO/Convert PR to PO> MIGO>MIRO>VF01.
    config is in place of normal CP schedule lines for TAS its CS, Movement type NIL, item relevant for delivery box- unchecked.

  • SerialVersionUID problem with third party class

    Hello,
    One of our projects is using java 6 (that won't change). We need to use some third party APIs which is developped using java 5, and I guess some wild rmi implementation.
    If I try to use this api from a java 5 project, no problem.
    If I try to use it from java 6, I got this exception.
    Is there something I could try (workaround, something I can tell the api provider to fix, ...)?
    "C:\Program Files\Java\jdk1.6.0_01\bin\javaw.exe" -client -classpath D:\dev\TestAde\Project1\classes;D:\dev\TestAde\Project1\lib\ADEAde.jar;D:\dev\TestAde\Project1\lib\ADEConfig.jar;D:\dev\TestAde\Project1\lib\ADEJDom.jar;D:\dev\TestAde\Project1\lib\ADEMisc.jar;D:\dev\TestAde\Project1\lib\ADEStubs.jar project1.Test
    Exception in thread "main" java.lang.RuntimeException: Unable to connect to the server : java.rmi.UnmarshalException: error unmarshalling return; nested exception is:
    java.io.InvalidClassException: sun.rmi.server.UnicastRef; local class incompatible: stream classdesc serialVersionUID = -9213327104222131866, local class serialVersionUID = 8258372400816541186
    at com.adesoft.config.ServerLocation.getRemoteConfig(Unknown Source)
    at com.adesoft.config.ConfigManager.getRemote(Unknown Source)
    at com.adesoft.config.ConfigManager.getProperty(Unknown Source)
    at com.adesoft.login.WebSessions.<init>(Unknown Source)
    at com.adesoft.login.WebSessions.getInstance(Unknown Source)
    at com.adesoft.beans.SessionBean.setLogin(Unknown Source)
    at project1.Test.main(Test.java:14)
    Process exited with exit code 1.

    The serialVersionUID of sun.rmi.server.UnicastRef in 1.5 is -9213327104222131866L. Strangely it isn't defined in the source code, just left to be calculated at runtime.
    I recommend you first search all your JAR files on both client and server, apart from the Java rt.jar of course, for classes in java.rmi.* and sun.rmi.*. If you find any class in these packages, or indeed in sun.* or java.*, complain loudly to the supplier, and try deleting them.
    If you don't find any such thing, I would then report this as a bug to Sun and I would also post it to the RMI-USERS mailing list where you will probably get a very rapid response.

  • Problems with third party package and file access

    I am using a third party package that allows me to decode
    multipart forms that I use to upload files to our server.
    I have been able to write my own code (JSP) that both reads and
    writes to our filesystem. However, when I try to upload a file
    using the third party package the method I am using fails with
    the following IO exception: The error message is "access is
    denied." But the files get written and are usable (even binary
    files). I have checked the directories and all the dirs I am
    writing to have read, write and execute permission.
    I have access to the code so when I duplicate the actual
    methods used for writing (FileOutputStream.write(foo)) in my
    JSP, it writes fine without exceptions. In fact, I use
    FileOutputStream.write() in other code and it works fine. My
    question is: why would FileOutputStream work in packages we have
    developed and not in a third-party package. I have added the
    codebase and filePermissions to <weblogic_home>\weblogic.policy
    without any changes.
    I am running WLS 5.1 and NT 4.0 with SP5.
    Does this problem sound familiar to anyone?
    thanks for any and all help,
    saulj

    HI Mike,
    If you have third party Document Management System, then you can post two different message, i.e. service order in transaction details of the third party tool with link to document which would be posted to third party Document management server.
    If you don't have third party document management system and what to use sap infrastructure, then you don't need to maintain attachment, maintain the link between the third party tool and SAP document repository, with some login utilities.
    Best Regards,
    Pratik Patel.
    Reward with points if it is of any help to you!

  • Problem with third party installer asking for restart

    Hello,
    I have a problem with software installers (not from AppStore) asking for restart (soundflower, M-Audio soundcard driver…). Gatekeeper is disabled, all is working perfectly but at the end I have a "l'installation a échoué" (installation failed) with a yellow triangle. I try to make a safe boot, make a new admin account, repair permissions… But no way!
    It appends only with software installer asking for restart. Any idea?
    Thank you

    Yosemite and third party SSDs not friends.  Do an Internet search for details.
    I recommend that you consider reverting back to Mavericks or earlier if you wish to use your SSD.
    Ciao.

  • Does Mountain Lion checks for original hardware??  (problem with third-party ram)

    Hi all,
    I am wondering if Mountain Lion does a hardware check for original hardware. I did a RAM upgrade 6 months ago (from 2x2Gb to 2x4Gb Dolphin 1333Mhz DDR3 on a an early 2011 MacBook Pro)  and everything went smooth, I really noticed the upgraded performance.
    My problem started after a firmware update (I was running Mountain Leopard). The system became really unstable, with a lot of programs crashing randomly and some crash black screens. I then decided to update to Mountain Lion with a fresh install to solve all the problems and clean up my computer.
    I did it from a bootable USB drive using Lion Disk Maker and following these instructions with the harddrive completely formatted: How To Make A Bootable Disk Or USB Drive Of OS X Mountain Lion. The installation got stuck half way through and exited without any error message. After checking the log I got an error code (FAILED TO VERIFY ESSENTIALS PACKAGE). After diggin for a couple of days I found out in an old apple support discussion (Failed To Verify Essentials Package On Installation)  that the problem could be the non-original RAM. I then replaced the RAM with the original one and finally was able to install the new OS without problems.
    After the OS install and setting up my usual programs, I decided to go back to the upgraded RAM for extra performance and the crashes came back as before. So the newer RAM clearly caused the system to become unstable. So right now I am using the original RAM, I want to get extra RAM but not sure if it was a sporadic problem or it will happen with all the third party memories. Going to the official tecnical service will cost me more than 130€ while buying a third party RAM is around 40€. Is it really Apple  pushing us to get original parts or I am just unlucky? Did someone else experienced something similar?

    Well, the upgraded RAM worked properly for 5 months straight. I don´t think it is a problem of dirt on the contacts or improper seating. Having the RAM not working properly the same day I want to update the OS, without touching it would be too much of a coincidence I think.
    I am going to try the third party RAM again to be sure, trying to clean the contacts just in case, I will post the outcome later.

  • Problems with third party software unable to maint...

    Hi,
    I have a problem with a software application that needs to be connected to a server on the web all the time. I get disconnects logged in its log file. It's worst in the evening up until about 11pm and then it improves markedly but during the weekdays its connectivity degrades again until the evening.
    I have tried many things including taking my PC and connecting up to O2 broadband where these disconnects didn't happen at all. I think that BT is throttling my connection and causing packet loss that this software can't deal with.
    I was looking at my BT account on bt.com and I discovered there is a usage meter. Up until now, I thought I had a flatrate deal however the usage meter tells me I've only got 10Gb for December and I've used half of it and it's only the 10th today.
    I read in the Help section that if I exceed my limit I will get charged and BT will start restricting my connection. This is what I think is happening.
    However the Help section also said I would be informed by email but I haven't received any emails regarding my usage. I have a suspicion that they may be being sent to a BT email address which I was allocated, but I set this account up 6 years ago and I now have no record of what the BT email would be.
    How can I find out what my email address is and whether there are a pile of emails waiting for me to read? Am I likely to be right about the software connectivity problem and BT throttling my connection?
    Thanks for any help!
    Regards
    Adam Hardy

    Hi Guys,
    thanks for your quick responses.
    I don't have a record of an email from BT for 2004 when I set up my telephone & broadband. I do have an email saying that my BT.com login name is "[email protected]" (obviously not really) but nothing else.
    In my files I have a letter saying the same thing with an account number, but no btinternet.com address.
    I logged into MyBT and under the Broadband "Manage your services" there's a username which I am not familiar with and my telephone number.
    I tried setting up an email account in Thunderbird to download any emails from mail.btinternet.com using that username but it asks me for a password which I leave blank and then it says "Error logging in. Please visit mail.yahoo.com". I also tried it with [email protected]
    I just visited mail.yahoo.com which redirected me to https://register.btinternet.com/cgi-bin/respasswd1 but that form asks me for postcode, DOB and mother's maiden name and then tells me the info is wrong (which it's not - I even tried my old postcodes).
    What is strange is that the username given "jsmith123" is not the username I use to log in here - see to the right  - I think that must have been adopted by BT at some point later.
    Any other advice?
    Thanks!

Maybe you are looking for

  • Windows-No Disk Error Mess

    I get the following error message upon start-up or reboot for Audigy SE:?Windows-No Disk?c0000003 Parameters 75b6bf9c 4 75b6bf9c 75b6bf9c.... I have the option to Continue-Cancel-Retry??The sound card seems to work otherwise, but this error is annoyi

  • Photoshop CC installation hung at "Waiting..." in Creative Cloud window.

    2013-06-17 Downloaded and installed new version of Adobe Application Manager which magically turned into the new Creative Cloud window. Found the Photoshop CC entry and clicked "Install" after which the download took lots of minutes and then switched

  • Transferring music from a shuffle to a touch

    Hi, I have a shuffle. My wife gave me a touch for Christmas. Is there any way to transfer the music on my shuffle to my touch? Thanks, Evan

  • Deploy a BC4J JSP Application on IAS

    OK, I changed my classpath jserv.properties file as you suggest, but I get the following error when I run my applet from IE: wrapper.bin=K:\Ora816\Apache\jdk\bin\java.exe wrapper.env=PATH=K:\Ora816\bin # Oracle XSQL Servlet wrapper.classpath=K:\Ora81

  • Upgrade Dump analysis

    Hi Gurus Here is a list of our system dumps in September and October. I would like if any of you would analyze these for any trends or differences. The reason is that we upgraded from BW 3.1 to 3.5 by the end of September. We need to know if this has