Problem when creating planned order with MRP run
Hello,
I create a material with a fix reorder point, MRP type VB. When I run MRP with MD03 on this material I have several problems :
- planned order is created with an opening date in the past, so I have error 'Opening date in the past' in MD04. How can I generate a planned order with opening date not in the past
- when changing manually opening date, after running again MD03, I have error 'No BOM selected'. Material is configurable, has a text BOM, a routing and a configuration profile. What is the problem? When modifying planned order, I have message :
Material requires configuration
Message no. 61259
Diagnosis
Orders and requirements for a configurable material must have characteristic values.
Usually, you should create a variation for configurable materials managed in inventory management which has the default variant configuration.
System Response
MRP: Requirements without characteristic values for a material cannot be planned in MRP.
Procedure
Check requirements or orders.
Create a configuration evaluation for the material in the material master record if necessary.
Thanks in advance.
Hi
I am facing the problem. Could you please tell me if you have resolved the above problem? If yes, Could you please provide me as how you resolved? Thanks in advance.
Thanks
Nagesh.
Similar Messages
-
Error when creating planned orders with BAPI_POSRVAPS_SAVEMULTI3
Hello,
I am working on a program which duplicates planned orders from one planning version to another. To do this, I am using the BAPI BAPI_POSRVAPS_SAVEMULTI3.
When I run the program, I get this error messae from the BAPI: A different planning version is being used.
The flow of my program is the following:
- Reading target planning version
- Deleting orders with the same selection criteria than the orders to be duplicated
- Reading source planning version
- Creating read orders to target planning version (where it goes wrong)
I worked before on another program which does the same but with manufacturing orders, and I did not encounter such a problem.
Can someone help ?
Thanks in advance.Hello Babu,
I am facing the same error in BAPI_PIRSRVAPS_DELMULTI. Could you revert with the solution if you have got one.
Thanks,
Ankit -
Production orders in place of planned orders in MRP run
Hi,
Please help me with this senario,
we receive saleorders through CRM interface then these are chnged to redistribute to different plants by changing the plants in saleorders.
we want to run and create production orders directly for these saleorders without creating planned orders.
I tried using strategy 82 but it makes the production order online, but we want it to be created after mrp run.
Is there a way to create production orders instead to planned orders in MRP run.Hi You used Right strategy only.Use Strategy '82', Transfer requirement from CRM and execute MRP run in Background.It will generate Production order.But i didn't understand what you mean by 'Online' 3
Pl. Correct me If I am wrong.
Edited by: Velmurugan S on Mar 4, 2008 10:02 AM -
Creating planned orders with BAPI_MOSRVAPS_SAVEMULTI3
Dear all,
I have to create planned orders in our APO-system ... This works fine with function BAPI_MOSRVAPS_SAVEMULTI3, until I try to create a planned order with a configurable material ... I added values to the following tables: cfg_headers, cfg_instances and cfg_values but still I am not able to create a planned order ... Maybe I don't fill the correct fields in the mentioned tables ? Can anyone tell me which fields they fill to create planned orders with configurable materials ? I used the fields that are required according to the SAP-help, but it seems that my values are possibly wrong ... Maybe an example can help me too ?
Thanks in advance !!!
Greetz,
Kurt.Hello Babu,
I am facing the same error in BAPI_PIRSRVAPS_DELMULTI. Could you revert with the solution if you have got one.
Thanks,
Ankit -
Problem in creating Maintenance Order with multiple operations
Hello all,
I am facing problem while creating Maintenance Order with multiple operations and sub-operations. I am using BAPI : BAPI_ALM_ORDER_MAINTAIN.
For single operation it is working fine,but i am unable to create MO with multiple operations and sub-operations.
Please, provide me the inputs required,
I have used methods :
ORDER CREATE,
OPERATION CREATE
and SAVE.
Regards,
SiddharthaHi,
The FM you are using is a perfect one. This FM is bit tricky to use. You need to perfectly pass the Reference number field. which links various input table parameters of this FM.
Thanks & Regards,
Navneeth K. -
Creating purchase requisitions instead of planned orders after MRP run in MDBT
When running regenerative planning in MDBT for plant with following details ,The system has to provides planned orders for the materials .
Processing key:NEUPL
Create Purchase requisition :3
Schedule lines:3
Create MRP list:1
Planning Mode:1
Scheduling :1
But sometimes it provides purchase requisitions for certain materials.The problem happens for different materials at different times.
I checked the material master and found that procurement type is external procurement.Business need to create planned order for the materials and then want to convert it to purchase requisition.
MRP group is assigned to the materials but no creation indicator maintained for the MRP group.
Please tell me why this run creates purchase requisitions suddenly and in the next run it disappears?Hello
Maybe someonelse is running MRP in another transaction, such as MD02, with a different parameter. Check on transaction MD05 when was the last MRP execution and the user that ran it.
Also check if there is any active implementation of BAdI MD_MRP_PARAMETERS.
If you don't have a cretion indicator, maybe it would be useful to set it for your MRP group, with the parameter 3, in order to make sure that planned orders will be created.
BR
Caetano -
Generate Plan Order from MRP Run (MD51) by WBS Element
Dear All,
1. I have created sales order with assigment WBS element (VA01)
2. Then I created Routing & BOM for Material (CA01 & CS01)
3. Generate MRP Run (MD51)
The problem the generated mrp run doesnt consume planned order .. i have set the planning strategy 21 or 40, but still doesnt works.. is there any other parameter that i should configure..???
Help Me...
MamaRaraHello,
Hopefully, the following link can assist you.
- Re: After firming planned order, new planned order is generating in MRP run
- Basic Scheduling in MRP run
- Re: MRP run
- During MRP run unwanted plant and storage location include and exclude
- MRP run does not consider the common stock
Thanks & Regards
JP -
Issue when creating sales order with Sold-to/Ship-to Party's state
Hi All,
we have issue while creating Sales Order with picking up of State tax
for Ship-to-party & Sold-to-party.
<b>When we create a sales order, for the sold to party 140052732 and
ship to party 140052733 it is picking state tax. Which should not
suppose to pick? Because the partner is marked as tax exemption</b>.
Can any body tell me how can we solve this issue!
Why this is happening!
How to make not to pick tax when it is marked for tax exemtion.
As i am not Functional guy i am not aware what is happening here!
Can anybody solve this issue!
Thanks in advance.
Thanks,
Deep.Hi Deep
What do you mean by "It is picking up state tax"? Does it mean that in the pricing procedure it is picking up a condition type which is meant for state tax?
If so go and check the condition record meant for it. Follow the following steps
1) Go to Sales order
2) Select the line item for which the state tax is being picked.
3) In the condition tab select analysis.
4) In Analysis you shall find the condition type meant for state tax.
5) See which condition record has been found.
6) Go to VK12, enter the state tax condition type and check the condition record for that state tax.
7) If wrong correct it.
8) If anything else come back to the post and inform the details
Thanks
Regards
Sunil -
Issue when creating sales order with Sold-to/Ship-to Party's state tax
Hi All,
we have issue while creating Sales Order with picking up of State tax
for Ship-to-party & Sold-to-party.
<b>When we create a sales order, for the sold to party 140052732 and
ship to party 140052733 it is picking state tax. Which should not
suppose to pick? Because the partner is marked as tax exemption</b>.
Can any body tell me how can we solve this issue!
Why this is happening!
How to make not to pick tax when it is marked for tax exemtion.
As i am not Functional guy i am not aware what is happening here!
Can anybody solve this issue!
Thanks in advance.
Thanks,
Deep.Hi Deep
What do you mean by "It is picking up state tax"? Does it mean that in the pricing procedure it is picking up a condition type which is meant for state tax?
If so go and check the condition record meant for it. Follow the following steps
1) Go to Sales order
2) Select the line item for which the state tax is being picked.
3) In the condition tab select analysis.
4) In Analysis you shall find the condition type meant for state tax.
5) See which condition record has been found.
6) Go to VK12, enter the state tax condition type and check the condition record for that state tax.
7) If wrong correct it.
8) If anything else come back to the post and inform the details
Thanks
Regards
Sunil -
Where/ how do I set SNP to create Planned orders with multiple line items?
Hi
Currently our SNP is generating planned orders on a daily basis, it creates a single order with a single line item per location.
Where/ how do set SNP to create planned orders on a daily basis to generate a single order with multiple line items per location, so therefore one planned order with multiple line items for a single location.
Thanx
KeeganHi Keegan,
In SNP (APO) it is not possible to create order with multiple line items.
But you can do some settings so that while planning system can do aggregation and disaggregation.
But your requirment should be set on Aggregation/Dis-aggregation logic.
Please follow the follwing links:
http://help.sap.com/saphelp_scm2007/helpdata/en/2c/c557e9e330cc46b8e440fb3999ca51/content.htm
Aggregation:
http://help.sap.com/saphelp_scm2007/helpdata/en/42/f731d078e73ee4e10000000a1553f6/content.htm
Disaggregation:
http://help.sap.com/saphelp_scm2007/helpdata/en/a6/ebefaf32e22e468355da304cc59387/content.htm
Please be sure that the setting of this logic will be at planning area level.
You can't change aggregation/disaggregation logic further.
Regards,
Santosh -
Wrong Planned Order dates - MRP Run
Dear Experts,
Please guide to resolve the following problem:
I have uploaded the PIRs for 3 months. When I take the MRP run, the system is scheduling the planned orders for first 2 months only. For the 3rd month's PIR the planned order are created for the PIR dates only.
For example, if the PIR (for 3rd month) is maintained on 25th of the month. The planned orders for FG & SFGs are being created for 25th only. While for 2 months the Planned orders are properly scheduled.
What could be the reason for such behavior.
The planning horizon is 90 days.
Regards,
Rohit.Dear Rohit,
If you are running MRP with NETPL, then the Lead time scheduling will be carried out only for the planning harizon.
Try executing MRP you can select NETCH key.
or
If you want to run MRP with NETPL key, then please give In-house production time in workscheduling view as per the routing values. For example 1 day is the processing time and give the quantity for for 24 hr production. Then the sceduling will be carried out as per this values.
And change the planning harizon for detailed scheduling in OPU5 transaction.
Thanks and regards
Murugesan -
Sales order with MRP run but no need of sales order stock while PGI
Dear Gurus,
We have scenario in company that we want to run MRP for sales order & generate requirements. But while doing post goods issue for same sales order, sales order stock need not be present.
Please tell which planning strategy, strategy group or else should be used here.
Thanks in Advance !!
Thanks,
VishwasHi,
Please configure in the following manner..
create a strategy group say Z9..in this maintain main strategy as 20 and alternate strategy as 10... Now assign this strategy group to material in material master in MRP3 View..
Now create sales order say A and run MRP with MD50..after completion of production you will get Sales order stock.. now convert this sales order stock unrestricted use stock..
Now before you are doing PGI for sales order A... go to sales order change VA02 and change the requirement type to KSL from KE and then system will all you to do PGI with unrestricted use stock...
Thanks
Kumar -
Multiple planned orders in MRP run
Hi All
I have a requirement where I need to create multiple planned order for the same material during MRP run. I understand that once I run MRP a planned order creates. If I run again for the same material, the quantity will be changed for the same planned order. Do we have any configuration so that system creates multiple planned orders for same material for each MRP run.Hi Adithya
Planned orders may be changed by MRP until they are firmed. Therefore, what you need to do is to firm the planned orders after the MRP execution.
You can use for example, transaction MD19 to mass firm planned orders after each MRP run.
Otherwise, you can user BAdI MD_PLDORD_CHANGE to automatically firm the planned orders created by MRP.
BR
Caetano -
ORA-00600 problem when create XMLType table with registerd schema
Hi,
I am using Oracle9i Enterprise Edition Release 9.2.0.4.0 on RedHat Linux 7.2
I found a problem when I create table with registered schema with follow content:
<xs:element name="body">
<xs:complexType>
<xs:sequence>
</xs:sequence>
<xs:attribute name="id" type="xs:ID"/>
<xs:attribute name="class" type="xs:NMTOKENS"/>
<xs:attribute name="style" type="xs:string"/>
</xs:complexType>
</xs:element>
<xs:element name="body.content">
<xs:complexType>
<xs:choice minOccurs="0" maxOccurs="unbounded">
<xs:element ref="p"/>
<xs:element ref="hl2"/>
<xs:element ref="nitf-table"/>
<xs:element ref="ol"/>
</xs:choice>
<xs:attribute name="id" type="xs:ID"/>
</xs:complexType>
</xs:element>
Does Oracle not support element reference to other element with dot?
For instance, body -> body.content
Thanks for your attention.Sorry, amendment on the schema
<xs:element name="body">
<xs:complexType>
<xs:sequence>
<xs:element ref="body.head" minOccurs="0"/>
<xs:element ref="body.content" minOccurs="0" maxOccurs="unbounded"/>
<xs:element ref="body.end" minOccurs="0"/>
</xs:sequence>
<xs:attribute name="id" type="xs:ID"/>
<xs:attribute name="class" type="xs:NMTOKENS"/>
<xs:attribute name="style" type="xs:string"/>
</xs:complexType>
</xs:element> -
Problem when creating a Form with Launch Task Form Wizard
Hi all,
I'm using jdeveloper 11.1.1.6 over Windows 7 64bits for my BPM project.
I'm a new with BPM and i have a problem when trying to create a task's Form with the "Launch Task Form Wizard". I'm trying to create my Form based on a custom template, i already have imported the template as a library, now after i have selected the template i follow the wizard and i reach the wizard's rowX-columnX where i should choose the field i want in my form, but the problem is that i don't see any fields in that part of the wizard, the window is empty :(
I have created a business object based on a XSD, then i created a process data object based on the previous created business object and finally i used this data object as a parameter to the human task.
What could be my problem ?? :( :(
Regards
CarlosI have also faced this issue few times. There could be a namespace issue / schema issue. Please check if you are able to see task:task in the schema section anywhere in the .task file you created. If that is not shown, the fields will not appear while creating human task form.
Thanks
Ashwini
Maybe you are looking for
-
I need to load an InfoCube from an InfoSet - Is this possible in 2004s?
Greetings, <b>This question looks long, but it's really not. I'm just trying to give a lot of detail about the screens that I am seeing. Anyway, here goes:</b> I am in 2004s. I want to load an InfoCube from an InfoSet. I know that an InfoSet is j
-
Using a Second Display while MBP display is in Fullscreen use
I recently began using a second display consistently (something I only did sparingly in the past), and I was hoping to find out how to utilize my second display while running a fullscreen application on the MBP display (when in fullscreen, the second
-
Is it possible to make a link in a mobile site close the browser window on the iPhone?
I'm developing a mobile site specifically for iPhone users and on my home page I have a disclaimer saying something like do not browse this site while driving. I give them the option to continue by clicking a link or to close the browser by clikcinga
-
Airport or airport extreme?
Hey all, I am finally joining the 21st century and want to install a wireless card on my G4 Powerbook. How do I know which type of AirPort it's compatible with? I checked the lists of compatible Macs in the support section but none of the types of co
-
Maintain sales text View through BAPI_MATERIAL_SAVEDATA
Hi, in BAPI_MATERIAL_SAVEDATA, can we maintain the Sales Text view in mm02 through this BAPI. Regards, Masoom Ali