Production Order maintain/change
Hi,
I need to change operations of a production order via RFC. Therefore I found the function "CLOI_CHANGES_UPL_31" but I have no idea how to use this function. Can anybody give me an example how to change (or even better how to add) operations of a production order.
An example:
I've a PO (Nr. 60028803) including three operations 0010, 0020 and 0030. Now I need an operation 0040. How can I add this one via RFC?
Thanks for any help,
Joerg
Hi,
I would like to update Batch Number into Production Order and by using this CLOI_CHANGES_UPL_31 FM it return no error but when i checked on the BAPI_PRODORD_GET_DETAIL and found that the Batch Number did not change.
Can anyone be my mentor to guide me how to update batch number into a production order?
Thanks and Regards,
WannYang
Similar Messages
-
Production order quantity changes
Hi Guru's,
Please help me to trace the production order changes.
for example: order 1 = 100 and later I changed to 200
how can i trace it.please explain the steps to follow.
Thanks
SatyaDear Sathyanarayana,
Production order Changes can be traced only using OCM - Order Change Management.
So you have to activate Order Change Management,Check these links
[OCM Link1|Re: Changes to item in prod order]
[Link for using an OSS Notes instead of OCM|Re: Production order qty change tracking]
Regards
Mangalraj.S -
Production order qty change tracking
Dear gurus,
In a production order qunatity change should be tracked.Say for eg prodn order qty is 100.User is changing to 200.As a client requirement they want he change historya of PIR change history.The same tracking reuired for Component change qty.plz through some light.Without OCM any other solution plz guide me
Please through some light
-GunaHi,
There is a way by which the quantity field in the production order can be fixed and made non modifiable
You need to create a status profile in bs02
Double click the status profile.
Enter the user status as crtd
Tick the initial status as enabled
Place the cursor on the status profile
Select the object type as PP ORDER HEADER
Now choose the user status
Double click the user status
Goto create mode
select change and set forbid radio button
save.
Assign this status profile to order type in opjh tcode.
Now once you have created the production order the system automatically forbids any change.
And
OCM is option to track it or authorization feild to restrict it.
Regards,
R.Brahmankar
Edited by: R Brahmankar on Jul 22, 2008 10:38 AM -
Dear Expers,
How can i restrict the Production order BOM Change. Please tell me with the steps.
Other than screen variant.
Regards
RaghuHi,
To do this you can use below mentioned processed.
1. create a user status and give approval to the order at creation and the user will not be able to change any thing in the process order.
2. You can use user exits to restrict changes changes at "materials" screen.
Hope this will help.
regards,
kaushik -
Update of Sales Order Delivery Dates from Production Order Date Changes
I work at a discrete made-to-order manufacturer.
When our factories maintain their production orders, they will often have to change their order dates. Is there a way so that these changes can automatically update our sales orders so we can re-send sales order confirmations?hi,
this comes under development part.
please check the feasibility with your abaper because you will have to change standard code.
regars,
balajia -
WM-production order-need change the open quantity in Transfer order
Hi,
I created the production order (order quantity 1000). i did material staging and generated TR. .
But i need to change the open quantity in transfer order . i need to create the partial Transfer order
against TR..
KINDLY SUGGEST ME
WITH REGARDS
DineshHi Dinesh,
TO for partial qty is possible.
When you are doing material staging with 319 mov.type, you create a transfer order for partial quantity as follows:
You first create a manual transfer order using transaction LT04.
You specify the TR number in the intial screen and navigate to the detail screen, system shows the Open TR quantity and the proposed TO quantity. By default, both these quantities are equal to the TR quantity.
However, when you create by clicing the "Create TO button" (the icon with a plus sign in the tool bar of LT04 screen), system takes you to another screen where it asks for the "Requested Qty" on the top of the screen. Here you can modify the qty as per your requirement; then you can check and confirm the storage type and storage bin for source and destination stocks & save.
It is important that you give the correct source storage type & storage bin that is having stock or otherwise system might give error message.
System will create a TO line item with the entered qty and propose the balance TR qty as the 2nd TO line item. You can skip this 2nd TO item or delete it from the TO.
Once again, if you click the Save button, system will save the TO with the partial quantity.
The balance quantity will be available in the TR as open quantity and this can be seen in the header data of transaction LB03.
Regards
Prabhu -
Hello All,
Do you know a transaction which allow mass change of productions orders?
I found COHV, but I'm not sure how to use it, and if is useful for what I need.
What I need is to change let's say for 100 orders field Scheduling margin (Tcode Co02).
Rewards points guaranteed.
Thank you
BogdanI don't want to change the material master...
I would like to this on a daily basis on opened production orders.
I would like to fake the order reservation for the default storage location 10 and at a certain date; I want to change in the production orders the storage location 30 (1 day prior to backflush)...
I know it sounds weird; but let me explain the entire process...
we have a stoarage location caged (Locked) ex: 10 where we really know the inventory levels; we would like to order according to the inventory level on this storage location.
--> At a point in time we will issue to another storage location (Production area)ex: 30 the material physically. In SAP we would issue to a cost center the material.
--> Storage location 30 allows negative stock (in fact there will nevever be any stock)
--> at the end of the month we will know the standard consumptions (total of the negative quantitiues in storage location 30)
--> We will also know the real consumptions according to the content of cost center (related to stor. 10)
In order to do that we need to change the storage location 10 --> 30 before backflush.
If we do not change it the backflush will not be done at the right place.
If we always use stor. 30, our dependent requirements / inventory level / Pur req will be mixted and we don't want that.
The production area is hard to control and the inventory there is rarely good because the processes are specials.
--> ex: huge paper rolls: Before starting a lot, we need an entire roll (to avoid stops) in fact in the inventory we have 4 rolls with remaining quantity of 0.25 (4x0.25 = 1) for example. So for the buyer we're ok, but for the operations its not enough..
I hope my problem is clearer...
Any suggestions would be very appreciated...
Regards! -
Issue with printing production order after changes through CO02
Hi,
Currently I have one issue with printing production order changes through CO02. If I go for print, all the operations are captured in printout. But after the print, if I add any new operations to this production order, and then go for print, its not capturing the newly added operations. Also, there is information popup coming "Copies will be printed for order. Original list already printed". This message effectively means, even after changes, when I go for print functionality, its just going for printing copies of original printed list.
Can anyone help me out to get the newly added operations reflected in the print through CO02 ?
Regards,
ShivaHi Shiva,
Refer SAP note 28887.
Source: http://www.sapfans.com/forums/viewtopic.php?f=9&t=308577
Please search /google before posting queries.
Regards,
SuryaD. -
PRODUCTION ORDER--Qty changed after one operation----URGENT
Dear Experts
Hope u all R doing well
In the production order,after one operation completed(whether it is first ,second or last ) the system is allowing to change the qty.
but we want the system to disallow the qty change.
could anybody can help, is there any configuration settings inside?
waiting for your valuable response
Thanks in advanceHi,
Sorry for the delay.
Pl. follow the steps below.
1. Create a status profile Eg: s1 usng t.code bs02.
2. Enter status no. as 1, status as CRTD, a description, tick Initial status & lower status no. as 1 & higher status no. as 2.
3.In the second line enter status no. as 2, status as REL, a description, & lower status no. as 1 & higher status no. as 3.
4.Choose Object type tab.
5. Choose PP/PM: Order header.(tick)
6.Then come back to main screen & double click REL.
7.Click the create icon in the top.
8.Choose Release & then choose radio button under <b>SET.</b>
9.Then come back to main screen & again double click REL & then choose create & select change & check the radio button under <b>FORBID</b> & then save.
10. In t.code OPJH(order type), choose your order type & then assign the status profile( Eg:S1)
11.Now convert the planned order into production order.Release the order & save.
Further changes cannot be made in the production order.
Pl. give feedback after testing.
Regards,
S.D.Senthilkumar -
Production order material change report
Hi,
Is there any standard report to find out the list of materials added, changed or deleted in production orders by a specific persion?
If not, which tables can I query to get the data?
Thanks,
Sincerely,
NickyHi,
There is no such standard report available.
You can have ABAP development with tables CDHDR and CDPOS.
Worning: using these tables the system performance issue may come.
Cheers,
Satish Purandare -
Production Order Status Change
How can i change the Status of the Production order by using any BAPI or FM?
Hi,
Try this,
BAPI_PRODORD_CHANGE
You use this method to change certain header data in an order that already exists in the database.
CALL FUNCTION 'BAPI_PRODORD_CHANGE'
EXPORTING
NUMBER =
ORDERDATA =
ORDERDATAX =
IMPORTING
RETURN =
ORDER_TYPE =
ORDER_STATUS =
MASTER_DATA_READ =
Use threads
Re: how to use BAPI Program for change workcenter in co02?
Batch determination in production order for a component -
using CO03 to display a production order. there is a line item that shows a change status on it on the Chnge.Proc column. (1) - manually changed.
how can you display changes?Hi,
The changes in production order can be traced in the status level only.
If you require what changes have been done then order change management has to be activated in customising. Generally It is not advisable as it will affect the system performance.
Other wise you compare the BOM in CS03 and the item in order to check the changes.
Regards
Ranga -
Add new authorization object for production order creation/change/display
As mentioned. I definded new authorization object using "Production scheduler" (Field Name : FEVOR) by SU20. then use SU21/SU24 to add authorization object for some transaction code such as COOIS. use PFCG maintain new role and assign a fixed production scheduler value and assgin transaction code COOIS to this role. create new user ID and assign to that role.
logon system with new ID, run COOIS. but system don't check new authorization object(production scheduler). who can tell me why it is and how i can add new new authorization object for standard transaction code?
Thanks.
Kevin.WUHi,
there is an icon of generation. just click there in PFCG and also in su21.
then add this object in new role.
Assign this role to user id
while assigning the role also there is a generation.
Please take a help of BASIS consultant also as this is entire a BASIS process.
Regards
Amit parkhi -
Add a new field to Co02 ( production order change )
Hello, I need to add a new field to the transaction Co02. I've found the following customer exit, but don't know which is the proper one. Maybe none of them can meet my requirement. Does anybody has any idea or experience?
Exit name Short text
PPAPO002 Publication of APO Data in Transfer from APO to R/3
PPAPO003 Production Order R/3->APO: Check if Operation is APO-Relev.
PPAPO004 Planned Order Conversion from APO: New BOM Explosion?
PPAPO005 Enh. of Relationships in Proc. Order during Transfer to APO
PPAPO006 Influencing Initial Supply of Manufacturing Orders
PPAPO007 Overriding Checkbox Fields for Production Order APO -> R/3
PPAPO008 Override Order Type for Planned Order Conversion
PPAPO009 Customer Exit for Addition of Components and Items
PPAPO010 Filtering Components out of Quantity Propagation
PPAPO011 Performance-Related Adjustment of Remaining Duration
PPCO0001 Application development: PP orders
PPCO0002 Check exit for setting delete mark / deletion indicator
PPCO0003 Check exit for order changes from sales order
PPCO0004 Sort and processing exit: Mass processing orders
PPCO0005 Storage location/backflushing when order is created
PPCO0006 Enhancement to specify defaults for fields in order header
PPCO0007 Exit when saving production order
PPCO0008 Enhancement in the adding and changing of components
PPCO0009 Enhancement in goods movements for prod. process order
PPCO0010 Enhancement in make-to-order production - Unit of measure
PPCO0012 Production Order: Display/Change Order Header Data
PPCO0013 Change priorities of selection crit. for batch determination
PPCO0014 Select process orders for external relationships
PPCO0015 Additional check for document links from BOMs
PPCO0016 Additional check for document links from master data
PPCO0017 Additional check for online processing of document links
PPCO0018 Check for changes to production order header
PPCO0019 Checks for changes to order operations
PPCO0020 Process order: Display/change order header data
PPCO0021 Release Control for Automatic Batch Determination
PPCO0022 Determination of Production Memo
PPCO0023 Checks changes to order components
PPCP0001 P.Cost Planning: Additional Cost Elements for Person
PPEACT01 Customer Fields at Mode D
PPECMP01 Customer Fields: CMP Nodes
PPECMP02 Customer Fields: CMP Variants
PPEGEN01 General Engineering Node: Customer Fields
PPERES01 Customer Fields at RES Node
BTW, if this is impossible, can I rename a field (field name on the screen) of Co02 that I don't need, and add my own values to it?
Thanks.
NunoHi Nuno,
how did you solve this problem?
tks -
Function Module /BAPI for changing the components in Production order
Hi,
We are in ECC5.0. We have requirement wherein we want to change /delete the existing component of the production order and add new component through RFC call from an external system. We tried to use CO_XT_COMPONENT_ADD FM for adding new components and when we tested this FM in SM37 with data there were no error messages . When we checked the Production order ,no changes were made to the production order component. Tried to use Commit statement and there is no change in the system behavior.Can some one help me to understand the system behavior . If possible kindly suggest me some alternate FM/BAPI .
With regards,
Joseph Anand BDear,
Please check this link,
ADD COMPONENTS TO PRODUCTION ORDER
Regards,
R.Brahmankar
Maybe you are looking for
-
KSB1 - Incorrect line item selected on drill down
Dear Guru's To set the scene we have been using KSB1 for a long time. Now something odd is occuring - but what appears to be quite randomly. When we run a standard KSB1 report and drill down to line item detail we are getting the wrong (and complete
-
Effects plug-ins, and user preset weirdness
Here's a headache for you. I've noticed that when using VST/DX effects in Audition that it adds its very own load/save preset bar to whatever effects application is in use, and that when saving presets with this quick access bar that it doesn't appea
-
6210 Navigator: Issues with GPS
Hi there, We just got a 6210 navigator phone, and it works great, apart from the GPS function. We have only been able to get the GPS function to work once, where the little red dot actually was where we were. Since then everytime we have tried to use
-
Adobe InDesign CS6 Trial stopped working
I have downloaded InDesign Trial and all went well. The day after it stopped working so I reinstalled it and started working again. It did that a few times in the last week but now it wont let me reinstall it again. It comes up with the errors: ERROR
-
Generating B doc as follow up document.
Hie Guys, We create an Activity in CRM. But all of a sudden system is showing out bound B doc as a a follow up document. Our concern is we dont replicate these document to anywhere. Can any one imagine how this could have happpened? if i click on fol