Production order qty change tracking

Dear gurus,
In a production order qunatity change should be tracked.Say for eg prodn order qty is 100.User is changing  to 200.As a client requirement they want he change historya of PIR change history.The same tracking reuired for Component change qty.plz through some light.Without OCM any other solution plz guide me
        Please through some light
                         -Guna

Hi,
There is a way by which the quantity field in the production order can be fixed and made non modifiable
You need to create a status profile in bs02
Double click the status profile.
Enter the user status as crtd
Tick the initial status as enabled
Place the cursor on the status profile
Select the object type as PP ORDER HEADER
Now choose the user status
Double click the user status
Goto create mode
select change and set forbid radio button
save.
Assign this status profile to order type in opjh tcode.
Now once you have created the production order the system automatically forbids any change.
And
OCM is option to track it or authorization feild to restrict it.
Regards,
R.Brahmankar
Edited by: R Brahmankar on Jul 22, 2008 10:38 AM

Similar Messages

  • PRODUCTION ORDER--Qty changed after one operation----URGENT

    Dear Experts
            Hope u all R doing well
    In the production order,after one operation completed(whether it is first ,second  or last ) the system is allowing to change the qty.
    but we want the system to disallow  the qty change.
    could anybody can help, is there any configuration settings inside?
    waiting for your valuable response
    Thanks in advance

    Hi,
    Sorry for the delay.
    Pl. follow the steps below.
    1. Create a status profile Eg: s1 usng t.code bs02.
    2. Enter status no. as 1, status as CRTD, a description, tick Initial status & lower status no. as 1 & higher status no. as 2.
    3.In the second line enter status no. as 2, status as REL, a description,  & lower status no. as 1 & higher status no. as 3.
    4.Choose Object type tab.
    5. Choose PP/PM: Order header.(tick)
    6.Then come back to main screen & double click REL.
    7.Click the create icon in the top.
    8.Choose Release & then choose radio button under <b>SET.</b>
    9.Then come back to main screen & again double click REL & then choose create & select change & check the radio button under <b>FORBID</b> & then save.
    10. In t.code OPJH(order type), choose your order type & then assign the status profile( Eg:S1)
    11.Now convert the planned order into production order.Release the order & save.
    Further changes cannot be made in the production order.
    Pl. give feedback after testing.
    Regards,
    S.D.Senthilkumar

  • Production order quantity changes

    Hi Guru's,
                  Please help me to trace the production order changes.
    for example: order 1 = 100 and later I changed to 200
    how can i trace it.please explain the steps to follow.
    Thanks
    Satya

    Dear Sathyanarayana,
    Production order Changes can be traced only using OCM - Order Change Management.
    So you have to activate Order Change Management,Check these links
    [OCM Link1|Re: Changes to item in prod order]
    [Link for using an OSS Notes instead of OCM|Re: Production order qty change tracking]
    Regards
    Mangalraj.S

  • I need Checking in Production Order Qty

    Hi all,
    In our industry we are creating Production Order From Sales Order (MTO Scenario) by using T.Code CO08 or CO01 T.Code with out running MRP.Now if anybody intend to change the PO qty by using CO02 T.Code system allows and as a result the Sales Order Qty and Production Order qty mismatch.Now please give me solution so that anybody cannot change the production order qty and it must be same as sales order qty.
    I am waiting for your valuable suggestion.
    Thanks & Regards
    Nirmal Sharma

    Hi,
    1. I dont think this is possible in any standard configuration.
    2. You can utilise the exit   EXIT_SAPLCOBT_001 and write our logic inside that
    3. This exit is validated when ever we save the order,
    4. The abap code should be written such that each time it should check for the sales order / itme no and check the quanity to be matching if it fails it should give error
    note: in this case if you are trying to creat multiple production order for one single salesorder/item number then it will not be possible or another logic is to be incorporated.
    reg
    satheesh

  • Production Order Qty- Inspection Lot Qty

    Hi Guru's,
    When an  production order is relreased an inspection lot is creaetd with the production Qty. But later when we change Qty for  the released Prodction Order the inspection lot  Qty is not changes it remains the same as previous Order Qty.
    Say for Ex: intial Prod  order qty (MTS Scenario) is 200 (production order released). Inspection lot Qty is 200.
    Later  User changes the Qty to  100. Our problem is the inspection lot qty  does not change ramins the same as 200. Can inspection lot qty be changed automically on change of production order qty .
    What settings need to change? pls advise
    Regards,
    Sankaran
    Edited by: Sankaran M on Oct 10, 2008 9:41 AM

    Hi Sankaran,
    It is possible if the user not doing any result against existing lot.
    Follow the Below step.
    Your Existing order Qty = 200 Nos Inspection lot no 300000200.
    Now you want change the Qty as 200 to 100.
    Before change the qty, first you have to delete the Inspection lot Go to CO02 -> Got to menu Functions -> Inspection lot -> Delete.
    Now change the Qty 100.
    And Again go to Functions -> Inspection Lot -> Create. and save the order.
    Now system will delete the Old indpection lot and create the new inspection lot.
    Qty : 100 Inspection Lot 300000201.
    Revert further clarification.
    Regards,
    S.Babusingh

  • Confirmation of the production order qty equal to sales order qty

    Hi Experts,
    I need to control the confirmation of the production order should be equal to sales order qty.
    I'm having the scenario as follows
    If sale order qty for X material = 3
    while running the MRP, system will plan the order qty as 8 because of we maintained rounding profile in the Material master and enhancement we used for this.
    Rounding Profile Qty=5
    Total Production Order Qty=8.
    But, finally they will do the GRN for sales order qty only, remaining will be used for testing purpose.
    So, the confirmation also has to happen for only sales order qty. There, we need to control the qty based on the sales order.
    Is there any exit or Enhancement is available for this.
    Please help me.
    Naren

    Hi,
    Exit for confirmation check is CONFPP04.
    However, opening orders for quantities higher than demand and leaving pieces undelivered and unconfirmed in production orders does not make sense. I could not get the requirement of incresing production quantity by adding rounding value? Moreover, if rounding is to be used for test purposes, why not do you receive them into stock? Why don't you receive 8 pieces into stock, deliver 3 pieces to sales order and transfer 5 pieces to related department?
    If it is because of MRP and you really do not want to produce extra 5 piece immediately, you may use material reservation or any other form of demand for 5 pieces, use EX for lot size calculation and have MRP create two planned orders for sales order and testing requirement, then you can convert planned order for sales order requirement into production order and continue processing.
    Regards.

  • Production Order qty in Report Painter

    Can we get Production Order qty in Report Painter?
    I have tried and used couple of Libaries but the values are not getting updated in report.
    Can anybody please tell me which Library and Table combination to to get the result.
    Kami

    Hi
    Prod order qty (Target / Plan / Actual) is available in KKO0 reports
    To activate them:
    a. OKN0: Assign a cost comp str here and choose Product Group = Material Group.. Transport this setting
    b. Run KKRV every month after period end settlements are over...
    c. Finally execute KKO0 reports
    b and c you need to do every month... a is one time setting
    br, Ajay M

  • Excess Qty confirmation than Production order qty

    Hi
    SAP Experts
    Is it possible to confirm excess qty of yield in co11n against Production order qty.
    pl. guide me the steps required.
    with Best Regards
    Yogesh

    Yes,
    If you do not waht to conform excess qty than the production order qty, then the following are the options
    - as our friend told in Work scheduling view the under/over delivery tolerance should be zero and unlimited delivery tick should not be active
    - In production order the under/over delivery tolerance should be zero and unlimited delivery tick should not be active.
    - In OPK4 fior the combintaion of plant and order type the following confirmation parameters are to be maintained
    Under delivery - X error if qty below under delivery tolarance
    Over delivery - X error if qty above over delivery tolarance.
    With this settings you can avoid what you wanted.

  • In inprocess inspection lets say the production order qty is 20. i would want only 1 no. to be inspected while inprocess inspection is configured. kindly guide. Regards,Mathew

    In inprocess inspection lets say the production order qty is 20. i would want only 1 no. out of the 20 to be inspected while inprocess inspection is configured. kindly guide.
    Thanks in Advance
    Regards,
    Mat

    Hi Mathew,
    Create sampling procedure with fixed sample and give sample size = 1. Assign this sampling procedure for the characteristics of the in-process materials in Routing/Master Recipe etc. For sample size calculation at-least one characteristic should be required characteristic for the Material.
    Thanks&Regards,
    kumar

  • Production Order BOM change

    Dear Expers,
    How can i restrict the Production order BOM Change. Please tell me with the steps.
    Other than screen variant.
    Regards
    Raghu

    Hi,
    To do this you can use below mentioned processed.
    1. create a user status and give approval to the order at creation and the user will not be able to change any thing in the process order.
    2. You can use user exits to restrict changes changes at "materials" screen.
    Hope this will help.
    regards,
    kaushik

  • WM-production order-need change the open quantity in Transfer order

    Hi,
       I created the production order (order quantity 1000).  i did material staging and generated TR. .
       But i need to change the open quantity in transfer order . i need to create the partial Transfer order
        against TR..
       KINDLY SUGGEST ME
       WITH REGARDS
       Dinesh

    Hi Dinesh,
    TO for partial qty is possible.
    When you are doing material staging with 319 mov.type, you create a transfer order for partial quantity as follows:
    You first create a manual transfer order using transaction LT04.
    You specify the TR number in the intial screen and navigate to the detail screen, system shows the Open TR quantity and the proposed TO quantity. By default, both these quantities are equal to the TR quantity.
    However, when you create by clicing the "Create TO button" (the icon with a plus sign in the tool bar of LT04 screen), system takes you to another screen where it asks for the "Requested Qty" on the top of the screen.  Here you can modify the qty as per your requirement; then you can check and confirm the storage type and storage bin for source and destination stocks & save.
    It is important that you give the correct source storage type & storage bin that is having stock or otherwise system might give error message.
    System will create a TO line item with the entered qty and propose the balance TR qty as the 2nd TO line item. You can skip this 2nd TO item or delete it from the TO.
    Once again, if you click the Save button, system will save the TO with the partial quantity.
    The balance quantity will be available in the TR as open quantity and this can be seen in the header data of transaction LB03.
    Regards
    Prabhu

  • User exit for sale order qty change

    Hi all,
    In our industry we are creating Sale Order for MTO Scenario by using T.Code VA01 . Most of the time after taking the MRP run and raising PO for BOM components, Users are changing the qty in the sale order . eg. and due to that it is becoming difficult to make necessary change in production programe. .Now please give me solution/ userexit  so that anybody cannot change the sale  order qty and it must be check the authorised userid to do necessary change in sale order.
    I am waiting for your valuable suggestion.
    Thanks & Regards

    Hi LIMAYE,
      You can use user exit include 'MV45AFZZ'.
    Make necessary changes in FORM USEREXIT_MOVE_FIELD_TO_VBAP.
    XVBAP will contain the old values before making the changes. You can comapare the quantity wtih VBAP field.

  • How to get Initial Production Order Qty?

    Hi Gurus,
    I need to stage initial production order quantity in BW. How can i do that? Is there any change record management or table in R/3 from which I can get the Initial Productin order qty?
    Regards,
    Gaurav

    Hi !
    I was having a look at "2LIS_04_P_MATNR", 
    The underlyning tables for this are AFPO and AFKO.
    We have a field "PSMNG" - Item Quantity Order. I think corresponds to your requirment ....
    Also, have a look at the folowing link ..
    http://help.sap.com/saphelp_nw70/helpdata/EN/88/7fc73c0c52085be10000000a114084/frameset.htm
    Hope it helps !
    Please update me if it works for you !
    Award points if it is helpful.
    Regards
    Anshul

  • Can SAP take scrap into account with determining open production order qty?

    SAP appears to completely ignore scrap on production orders.  This isn't working for us.  What we would like is something like this:
    If the production order is for 20, we've confirmed scrap of 2, and confirmed 10 good, then the open quantity should be 8.  The next time MRP runs, it should re-schedule the 2 for a later date.
    I didn't see any way to accomplish this through settings on the order, or through configuration.  Can anyone recommend a user exit I can use to accomplish this, or did I miss a setting somewhere?
    Thanks,
    Randy

    Hi Randy,
    The scrap you are confirming is basically unplanned scrap...That is basically for consuming the components for the scrapped quantity ...but not to affect the total production.
    In your case you can maintain assembly scrap in material master...so that system will plan extra material while the MRP..
    For ex , if u want toa chieve a final qty of 100 & ur scrapping pattern is 20% ..syatem will plan for 12 % so that u can achieve 100 at the end of production.
    Regards
    Mahesh

  • Production Order Mass Change

    Hello All,
    Do you know a transaction which allow mass change of productions orders?
    I found COHV, but I'm not sure how to use it, and if is useful for what I need.
    What I need is to change let's say for 100 orders field Scheduling margin (Tcode Co02).
    Rewards points guaranteed.
    Thank you
    Bogdan

    I don't want to change the material master...
    I would like to this on a daily basis on opened production orders.
    I would like to fake the order reservation for the default storage location 10 and at a certain date; I want to change in the production orders the storage location 30 (1 day prior to backflush)...
    I know it sounds weird; but let me explain the entire process...
    we have a stoarage location caged (Locked) ex: 10 where we really know the inventory levels; we would like to order according to the inventory level on this storage location.
    --> At a point in time we will issue to another storage location (Production area)ex: 30 the material physically.  In SAP we would issue to a cost center the material.
    --> Storage location 30 allows negative stock (in fact there will nevever be any stock)
    --> at the end of the month we will know the standard consumptions (total of the negative quantitiues in storage location 30)
    -->  We will also know the real consumptions according to the content of cost center (related to stor. 10)
    In order to do that we need to change the storage location 10 --> 30 before backflush.
    If we do not change it the backflush will not be done at the right place.
    If we always use stor. 30, our dependent requirements / inventory level / Pur req will be mixted and we don't want that.
    The production area is hard to control and the inventory there is rarely good because the processes are specials.
    --> ex: huge paper rolls:  Before starting a lot, we need an entire roll (to avoid stops) in fact in the inventory we have 4 rolls with remaining quantity of 0.25 (4x0.25 = 1) for example.  So for the buyer we're ok, but for the operations its not enough..
    I hope my problem is clearer...
    Any suggestions would be very appreciated...
    Regards!

Maybe you are looking for

  • Printing causes ALL apps to give "Not Responding " error

    After installing the recent round of Apple software updates ( iweb, pages, numbers, iphoto, etc) anytime I try to print from any application it causes the app to go into not responding mode..... the print diolog box never appears. If I force quit the

  • Does an AP reboot if you change the WLANs in an AP Group?

    When you create an AP Group and then assign an access point to that AP Group, you have to reboot the AP. What if you edit an AP Group?  Do the APs automatically reboot, or do you need to do it manually or even better, not at all? I can't see to find

  • How to add your own videos or photos?

    I want to know how to add Photos and Videos from my PC to my iPod...

  • Logic Control Jog Wheel Erratic in 7.1.1, OK in 6.4.3

    Rotating the Jog Wheel clockwise causes the SPL to leap to bar 13, 66, 201 and rotating counter-clockwise allows no rewind function except return to zero. I have re-initialized everything including key commands, even re-installing Logic Pro 7.1 and u

  • Not getting value from DropDownByKey

    Hi    I have a drop down by key and assigned a simple type to it and have 4 options in that simple type. and i bound that DropDownByKey element to a model attribute but i am not getting any value in that attribure i have not written any code to get s