Production order release based on operation

Hi friends
How to release production order based on operations ?
pl help me

Hi
The real time scenario is to select release operation wise is:
If you are expecting any change in the subsequent operations after starting of production  say first opration, you will opt for this .
I do not find any advantage if you release all operations at a time in mass processing. It is as goods as releasing at header level.
Normally in such cases one can opt for  trigger points in which system will release successive oprations automatically when preceding operation is confirmed.
If you want manually release the operations you can select the operation which you want release & press release button in operation overview screen.
Hope it is clear now.
Regards
YMREDDY

Similar Messages

  • Preview and print a printout in production order release

    Iu2019m using CO02 to release and save the production order. Currently u201Cbatch cardu201D printout is automatically printed in production order release. I want to change this to preview the printout before printout is send to the printer. Can someone tell me the configuration for this.

    Hi
    Pls refer this link
    layout adjustement in production order- suitable to printout sheet
    Print Preview of Production Order
    layout adjustement in production order- suitable to printout sheet
    Thanks
    S.Murali

  • Unique serial number during production order release for FG materials

    Hi,
    Actually our client is asking for serial number generation for each FG material during its production order release.
    So that with this serial number he can track it in shop floor plus after dispatching to customer.
    Here the scenario is Make To Order, this serial number will also be considered by SD during dispatch.
    For serial number creation, I referred documents from SAP best practices(help.sap.com).
    After this, now I am able to create serial number for specific material automatically.
    Currently I am getting serial number with respect to material specific, i.e., serial number generating with respect to FG codes. Ex:- FG1 - 1, 2, 3, 4 and FG2 - 1, 2, 3, 4.
    But as per my client requirement, they want serial number without material specific, i.e., common serial number for all FG codes.
    Ex:- Sr No- 1-FG1, 2-FG1, 3-FG2, 4-FG1 - - - - according to production order releasing sequence.
    Plz inform if any settings are to be made.
    Thank you in advance.

    Hi Arman,
    I Had got solution for how to track which FG is linked to which SFG sr no, just go through the below link it also gives how to use COIB transaction.
    COIB transaction usage, how to track which FG is linked to which SFG sr no
    But still I had not got solution for
    how to assign common serial number for all FG codes automatically
    Ex:- Sr No- 1 -> FG1,
    2 -> FG1,
    3 -> FG2,
    4 -> FG1
    - - - - according to production order releasing sequence.
    Whether is it automatic serial number assignment is possible or not.
    Plz inform if any settings are to be made.
    Thank you in advance.

  • Serial number during production order release

    Hi,
    Currently I am getting serial number with respect to material specific, i.e., serial number generating with respect to FG codes. Ex:-  FG1 - 1, 2, 3, 4 and FG2 - 1, 2, 3, 4.
    But as per my client requirement, they want serial number without material specific, i.e., common serial number for all FG codes.
    Ex:- Sr No- 1-FG1, 2-FG1, 3-FG2, 4-FG1    - - according to production order releasing sequence.
    Plz inform if any settings are to be made.
    Thanks,
    regards,
    B C Gudageri

    Thanks Glenn Larson,
    This is the first time for me for creating serial number for FG materials.
    Actually our client is asking for serial number generation for each FG material during its production order release.
    So that with this serial number he can track it in shop floor plus after dispatching to customer.
    Here the scenario is Make To Order. So this serial number will also be considered by SD during dispatch.
    For serial number creation, I referred documents from SAP best practices(help.sap.com).
    After this, now I am able to create serial number for specific material types automatically.
    But here the condition is client wants serial number should not be specific to material codes but should be common  throughout the plant for all FG codes.
    Ex:- Sr No- 1 for FG1,
                       2 for FG2,
                       3 for FG2,
                       4 for FG3
    - according to production order releasing sequence.
    Me dont know about Presort and IMB serial numbers.
    Please tell me the appropriate approach I can make or any of links which I can refer.
    Regards,
    B C Gudageri

  • Production order release

    Dear Experts
    Good Afternoon
    I have small query regarding production order release when ever i try to release a production order system give following message
    System status WCRE is active (ACT 20030197 0010) and system status of work center is CRTD WCRE
    I can't able to find the clue how to release the sale order
    Kindy guide me
    Valuable answer will be rewarded
    Regards
    Rajeev Garg

    Hi,
    Pls. check for your Work Center Status in CR02 / CR03 -
    > Extras -
    > Administrative Data -
    > Status.
    Check whether it is locked or not. If work center is locked , unlock your work center from
    Extras Menu--->Status--> Lock / Unlock.
    Hope this may help you.
    Regards,
    Tejas

  • MRP - production order release

    Hi experts,
    I am new in SAP PP
    currently when run the MRP, it will generate planned orders and PR's. it will calculated planned order sub compoents requirement qty also.
    but i want to change settings for once convert planned order to production order once release after only need to create sub compoent PR's and planned order
    pls explain what change need to do?
    Regards,
    Elango

    Hi
    This is not possible,because planning and production order releasing is two different activity.When ur release production order thats mean ur giving green signal for manufacturing or start manufacturing and when ur release the production order ur work center or capacity is get booked against that production order. So at the time of production order release if u want to plan the child item then u have to procure ur child item then u have start manufacturing so complete time ur capacity is showing as loaded then ur not able plan for other production order.

  • Deactivating production order changes after 1st operation is confirmed

    Hi,
    I want to deactivate production order changes after 1st operation is confirmed through CO11n.Ie. production order qty should not be allowed to change after 1st operation is confirmed.
    Expecting ur immense help on this.
    Regards,
    JS Karthi

    Dear ,
    PPCO0007
    EXIT_SAPLCOZV_001 Exit when saving production order
    Provide the restrictions in coding, so that when saving the order check for the order status PCNF or CNF and quantity change.
    Check thread
    first operation confimed - after system allowed changed order qty
    Regards,
    Ishwar

  • Restrict Automatic serial number calculation for Production order release

    Hi,
    I need the solution for following requirement.
    Release production order(CO02) . Then go to Menu header-> Serial Numbers.
    Here I am getting serial numbers automatically as the material used in production order is set for automatic serial number calculation.
    But I want to restrict automatic serial number assignment based on production order type.
    If order type is 'XYZ', I dont want to calculate serial numbers automatically.
    Can anyone tell me how to do it?
    Regards,
    Manan Desai.

    When you press Release Order button the BADI 'WORKORDER_UPDATE->AT_RELEASE' will be called.
    At this point the internal tables for Serial numbers are filled by the program automatically.
    So call function module 'SERIAL_INTTAB_REFRESH' which will refresh the internal tables for serial numbers generated before teh serial number window pops up.
    Also at the BADI 'WORKORDER_UPDATE->AT_SAVE' call the same function module because before this BADI call when you press 'SAVE' the program again checks if automatic serial number is set for that material and if yes then check if no serial numbers are generated then it generates the serial numbers again and fills the internal tables. So clear the internal tables again based on the conditions.
    In these BADI's we have access of header information which can be used to check condition.
    I hope this will give you better idea.
    Thanks for your efforts.
    Manan Desai.

  • User exit for Production Order release

    Hi Experts,
    Any User eixt for Prouction Order Mass processing.
    Before releasing the production order i have to do some checks. Can you please provide right user exit. More reward points with best solutions.
    Thanks
    Cris

    Hi,
              check the following userexits and BADI's for Production Order
    Enhancement/ Business Add-in Description
    Enhancement
    PPCO0010 Enhancement in make-to-order production - Unit of measure
    PPCO0012 Production Order: Display/Change Order Header Data
    PPCO0013 Change priorities of selection crit. for batch determinati
    PPCO0015 Additional check for document links from BOMs
    PPCO0016 Additional check for document links from master data
    PPCO0017 Additional check for online processing of document links
    PPCO0018 Check for changes to production order header
    PPCO0019 Checks for changes to order operations
    PPCO0021 Release Control for Automatic Batch Determination
    PPCO0022 Determination of Production Memo
    PPCO0023 Checks Changes to Order Components
    STATTEXT Modification exit for formatting status text lines
    PPCO0009 Enhancement in goods movements for prod. process order
    CCOWB001 Customer exit for modifying menu entries
    COIB0001 Customer Exit for As-Built Assignment Tool
    COZF0001 Change purchase req. for externally processed operation
    COZF0002 Change purchase req. for externally procured component
    PPCO0001 Application development: PP orders
    PPCO0002 Check exit for setting delete mark / deletion indicator
    PPCO0003 Check exit for order changes from sales order
    PPCO0004 Sort and processing exit: Mass processing orders
    PPCO0005 Storage location/backflushing when order is created
    PPCO0006 Enhancement to specify defaults for fields in order header
    PPCO0007 Exit when saving production order
    PPCO0008 Enhancement in the adding and changing of components
    Business Add-in
    AFABD_CHANGE Change Relationship
    CAUFVD_CHANGE BAdI: Overall Network Scheduling with Selection
    PPPI_SEL_ORD_EXT_REL
    SIDAT_UPDATE Change date of price simulation
    Regards

  • Production order release Material Availability check

    Gurus,
    I have a production problem where the order can be released when the component for the order is in a restricted status.  This is not allowed by the batch search strategy.
    <u>Here's Problem Description:</u>
    When running on version 4.6C, I have a work order created. I release the work order successfully.  However there is a component that has an invalid material/batch according to the batch search strategy  The material availability check shows all components available. 
    However, I remove the batch and the batch can not be entered because it is not correct according to the batch search strategy.  I try and release and the material is added to the missing parts list.
    I change the component so that it can be used.  
    Put the batch number back in the order. 
    Save the order.  
    Change the component material/batch so that it is no longer valid.  
    The order will release and it shouldn't because the material/batch is not valid.
    <u>I've looked at the following transactions and master data:</u>
    OPL8 - Order Type - Dependent Parameters Overview for my plant and order type and the check batch box is checked.
    MM03 - Material Master MRP 2 view for the component to get the availability check
    OVZ2 - Availability check control
    OPJK - Order Control to get the checking rule for order release
    OPJJ - Availability check control details with availability check and the checking rule for order release - I did not see anything here that would influence the checking based on if the batch was entered or not.
    I did double check the batch search strategy for production order - COB3. Everything looks OK there.
    Does anyone have any other places to check? I must be missing something. I tried OSS - there weren't any notes that I could find.
    Thank you!
    Michelle

    Hi,
    Check in order control opjk for order type pp01
    Batch assignment /release material
    Release despite missing batches
    no release if batches are missing
    Regards,
    nandha

  • Production order release with batch management

    Dear All
    Our company are going to use batch managment. But someone told us the production order cannot be released if the component with batch managment is missing (requirment is lower than stock). Is that true?

    Dear,
    It depend upon the setting means if you want to automatic batch determination in production order for component then system will not allow to release if no batches are available.
    This setting come from MRP 2 view batch entry if you keep it blank then system will allow you to release the order with missing batch quantity also.
    Please try and come back if any issue.
    Regards,
    R.Brahmankar

  • Error during Production Order release

    Hi Experts,
    When I am releasing one production order follwoing messege appearing.
    Error during availability check for order xxxxx (see log)
    co02>goto> logs--> release
    Date 22000504 lies after the end of the valid factory calendar (please correct).
    I have checked routing, pv, bom etc. availability check indicator 02 is alreadly maintained in mm03. Earlier we have confirmed several order of this material in the past, now suddenly this error is appearing.
    Kindly help me to solve this problem.
    Regards
    GR

    Hi,
    Chk for following :
    01. Timings in Routings/Factory calender
    02. Chk for all components in order . It may be possible that one of component is having some MRP elelment dated beyond factory calender
    03. Also chk all receipt /issue elements with dates .
    Regards,
    Milind.

  • Stanging indicator change in control cycle after production order released

    HI
    We have MM PP interface active
    i setup staging indicator 4 for one material via control cycle
    Production order is created and released
    now we would like to change staging indicator to 1 [pick parts]
    how we reread control cycles data in production order
    Thanks

    Try: CO02 > Functions > Read PP master data

  • Activity is calculated on Production Order Quantity based .

    Hi Experts,
    My requirement is Planned Activity cost should be calculated based on Production order Quantity. and not on timing mentioned in Routing.
    For Example-   My PO Quantity is 10 - and activity assigned rate is 1 then = 10 RS is my planned activity Price
                                IF PO quantity is 1  then planned Activity Price is 1 RS
    pour some light on this
    Regards,
    Girish

    Hi
    Create an Activity Type and assign in work center / Routing... Keep the Activty Qty same as Base Qty in Routing....
    if you create Prod Order for 10, system would automatically propose Qty as 10.... Assign a fully variable formula in the work center to this activity
    Then maintain a price for this n KP26
    br, Ajay M

  • Collective production order link based on parent production order in MTS with strategy 10

    Dear Team,
    Now we are using MTS Production order system with strategy 10,As per my Business requirement we need to take all the child components production
    orders based on the Parent component production order .In this case for planned order conversion we are using CO40 transaction code(i.e. Collective conversion) as well as all planned orders  generated through MRP. As per my business process we are using Route cards which are Z smart forms with all Production orders from parent to child component with quantity is taken as a PDF printout,As per our customer requirement we will store those Route cards up to next 15 years. When user has to check Production order linking at any point of time, this functionality is not available for MTS. I tried MD4C but it is not a best solution for my business requirement.So please provide any another standard solution available for this requirement.
    Thanks in advance,
    Regards,
    Krishna.

    There is another suggestion that you can determine the costing indicator in the requirement class. you can get the requirement type from procurement page in the sales order header, then go the customizing menu to find out which requirement class has been assigned to the requirement type. Then you can get the "costing" and "mark" indicator.
    The customizing menu is the node of controlling - cost object controlling -> CO PC for sales order.
    Correct me if i am wrong, thanks.
    Best Regards!
    Flex Yang

Maybe you are looking for

  • SharePoint 2013 Date Field Limitation

    We are working on a project that we need to add the birthdates of some artists born before 1900. The system says that the date should e between 1900- 8900 or so and not allowing us to add these dates. We cannot use any other text field coz we need th

  • Script Error when trying to install Flash Player

    I am running Windows XP and used to have Flash Player installed.  Don't know what happened, but I have to install again.  The error I am getting coming during download: "Internet Explorer Script Error" and the error message says " 'ActionLaunchAdobe'

  • Aquisiton Value Negetive In 01

    Dear Experts,    I am getting an error messege i.e.Aquisiton Value Negetive In 01  while I am  posting in F-90 . Please help Me Regards, DKB Edited by: David Bera on Nov 9, 2009 11:37 AM

  • Divide layer into 4 quarters and trouble with marquee tool.

    Help, please!!! Because I will be doing this often in the near future, I need to create an action to precisely divide a LAYER into 4 quarters, in order to easily create seamless patterns. I'm having trouble figuring out how to automate the placing of

  • Latch Performance Question

    Hello all, is there any way to see how long a particular session maintained a hold on a latch? My specific desire is to see how long a session held onto the cache buffers chains latch while traversing through the chain. I understand that this time wo