I have some question to ask, in production order, when we change the order via CO02, released it (production order create:classification) for batch will appear. after completing this the order "released carried out" will be the message. and when we save the order CHANGE BATCH view will display then, the production date and shelf life expiration date was automatically populated by SAP. my question is is there a possiblity that this CHANGE BATCH when will appear the production date and shelf life expiration date was unchangeble already SAP proposed date was fixed (gray-out) or instead change batch display batch will appear? is there any set-up to make this feasible?
we want to block the production date/shelf life expiration date in modification once SAP has already computed and proposed this date for the batch on the FG material of the production order. Please help. I know this is a standard behavior, but can this be feasible?
Any help or inputs.
Thanks
Edited by: Agent X44 on Mar 11, 2009 11:50 AM
Edited by: Agent X44 on Mar 11, 2009 12:10 PM
Edited by: Agent X44 on Mar 11, 2009 1:15 PM

You must have to check batch Class and its characteristics. Something wrong here.
Regards,
RM

Similar Messages

  • Production order released (CO02)

    Hello Guru,
    We have question in our mide if we can block for modification of other user the PRODUCTION DATE of the batch created for the order when we do the RELEASED for the order? how could we block this PRODUCTION DATE? please help us.
    Thanks a lot

    Hi Ryan,
    I am talking about,
    upon saving it the change batch view will appear were the PRODUCTION DATE and SHELF LIFE
    EXPIRATION DATE was populated automatically by SAP
    Only and not about new Batch Creation.
    Dear up to my knowledge in std. SAP system will ask you to maintain Production or Expiration Date at the time of Goods Receipt (see Shelf life expiration check in T.code OMJ5).
    Regards,
    Dhaval

  • In Production Order Old Raw Material Batch No. not being picked (FIFO)

    Hi,
    We have activated Batch Management for ROH type of Materials with Split Valuation and the Strategy applied is FIFO.
    We have generated many such batches and consumed too, but lately out of many ROH mateials, 2 ROH who have Old Batches are not being picked and the Batch which is recently created is being picked at the time of Production Order Release.
    We have not done any changes into the Master Data nor the config during this period.
    Can anyone help what can be the issue ?
    Thanks in advance,
    Harris Panchal

    Hi,
    Actually our requirement is that we want to sort out the Batch as per the Earliest one and consume the earliest first, i.e. FIFO strategy.
    For that the MM Consultant has configured the following Charac:
    1. Stock Determination: Priority
    2. Value Assignment Type
    3. Batch Number
    Which I am feeling should be changed and to be as per the following:
    1. Created On
    2. Batch Number
    In OMCV, Classification is active with following option:
    4     Classification in foreground for new batches only for the following movements: 101, 309, 310, 561
    3     Classification always in foreground (all batches)   for the following movements: 321, 501
    Requesting your valuable inputs,
    Thanks and regards,
    Harris

  • Production order settlement, on a batch job

    Dear All,
    I need to use the KO8G, for running production order settlement, on a batch job.
    I found a SAP Note Number 498387 where is said that, for the selection of statuses of orders of the order category 10 or greater, will be used a status selection profile.
    Iu2019m using the status selection profile SAPPI07 on KO8G selection variant for orders.
    When I execute KO8G report, system gives me these messages:
    Sender 0 selectu2026
    Msg number KD233 : No settlement for this sender
    Someone have Idea how I can solve this problem.
    Regards,
    Helena

    Like I was written in my first message the Standard variant SAP&01, which contains values of Order type, Status of order...Created,Closed, Tech Complete, Released doesn´t work for production orders, like is said on SAP Note Number 498387.
    So I need use the status selection profile on variant selection.
    My problem is that, I've defined a Variant selection with status selection profile SAPPI07,wich has the status Created,Closed, Tech Complete, Released, but When I execute KO8G report, system gives me these messages:
    Sender 0 selectu2026
    Msg number KD233 : No settlement for this sender
    Can you help me?

  • Unique serial number during production order release for FG materials

    Hi,
    Actually our client is asking for serial number generation for each FG material during its production order release.
    So that with this serial number he can track it in shop floor plus after dispatching to customer.
    Here the scenario is Make To Order, this serial number will also be considered by SD during dispatch.
    For serial number creation, I referred documents from SAP best practices(help.sap.com).
    After this, now I am able to create serial number for specific material automatically.
    Currently I am getting serial number with respect to material specific, i.e., serial number generating with respect to FG codes. Ex:- FG1 - 1, 2, 3, 4 and FG2 - 1, 2, 3, 4.
    But as per my client requirement, they want serial number without material specific, i.e., common serial number for all FG codes.
    Ex:- Sr No- 1-FG1, 2-FG1, 3-FG2, 4-FG1 - - - - according to production order releasing sequence.
    Plz inform if any settings are to be made.
    Thank you in advance.

    Hi Arman,
    I Had got solution for how to track which FG is linked to which SFG sr no, just go through the below link it also gives how to use COIB transaction.
    COIB transaction usage, how to track which FG is linked to which SFG sr no
    But still I had not got solution for
    how to assign common serial number for all FG codes automatically
    Ex:- Sr No- 1 -> FG1,
    2 -> FG1,
    3 -> FG2,
    4 -> FG1
    - - - - according to production order releasing sequence.
    Whether is it automatic serial number assignment is possible or not.
    Plz inform if any settings are to be made.
    Thank you in advance.

  • Serial number during production order release

    Hi,
    Currently I am getting serial number with respect to material specific, i.e., serial number generating with respect to FG codes. Ex:-  FG1 - 1, 2, 3, 4 and FG2 - 1, 2, 3, 4.
    But as per my client requirement, they want serial number without material specific, i.e., common serial number for all FG codes.
    Ex:- Sr No- 1-FG1, 2-FG1, 3-FG2, 4-FG1    - - according to production order releasing sequence.
    Plz inform if any settings are to be made.
    Thanks,
    regards,
    B C Gudageri

    Thanks Glenn Larson,
    This is the first time for me for creating serial number for FG materials.
    Actually our client is asking for serial number generation for each FG material during its production order release.
    So that with this serial number he can track it in shop floor plus after dispatching to customer.
    Here the scenario is Make To Order. So this serial number will also be considered by SD during dispatch.
    For serial number creation, I referred documents from SAP best practices(help.sap.com).
    After this, now I am able to create serial number for specific material types automatically.
    But here the condition is client wants serial number should not be specific to material codes but should be common  throughout the plant for all FG codes.
    Ex:- Sr No- 1 for FG1,
                       2 for FG2,
                       3 for FG2,
                       4 for FG3
    - according to production order releasing sequence.
    Me dont know about Presort and IMB serial numbers.
    Please tell me the appropriate approach I can make or any of links which I can refer.
    Regards,
    B C Gudageri

  • MRP - production order release

    Hi experts,
    I am new in SAP PP
    currently when run the MRP, it will generate planned orders and PR's. it will calculated planned order sub compoents requirement qty also.
    but i want to change settings for once convert planned order to production order once release after only need to create sub compoent PR's and planned order
    pls explain what change need to do?
    Regards,
    Elango

    Hi
    This is not possible,because planning and production order releasing is two different activity.When ur release production order thats mean ur giving green signal for manufacturing or start manufacturing and when ur release the production order ur work center or capacity is get booked against that production order. So at the time of production order release if u want to plan the child item then u have to procure ur child item then u have start manufacturing so complete time ur capacity is showing as loaded then ur not able plan for other production order.

  • Preview and print a printout in production order release

    Iu2019m using CO02 to release and save the production order. Currently u201Cbatch cardu201D printout is automatically printed in production order release. I want to change this to preview the printout before printout is send to the printer. Can someone tell me the configuration for this.

    Hi
    Pls refer this link
    layout adjustement in production order- suitable to printout sheet
    Print Preview of Production Order
    layout adjustement in production order- suitable to printout sheet
    Thanks
    S.Murali

  • Restricting production order qty while the converting planned order

    Dear all Hi,
                     I have a planned order for 10 qty. While converting it to production order the system is allowing me to increase the qty to more than 10 (eg 11 qty) & it is saving the production order.
    But the clients requirement is that system should not allow the user to create the production order for qty more than palnned order qty.
    Please help/suggest how to get this restriction from the system.
    Thanks in advance.

    Hi,
    If that is the case, then eliminate the Process of manual conversion of Planned Order to production order.
    You can use the Program PPBICO40.
    Schedule this Program as a background job, after the MRP Run.
    Authorization management with strict monitoring will eliminate this type of process.
    Regards,
    Siva

  • Production order release

    Dear Experts
    Good Afternoon
    I have small query regarding production order release when ever i try to release a production order system give following message
    System status WCRE is active (ACT 20030197 0010) and system status of work center is CRTD WCRE
    I can't able to find the clue how to release the sale order
    Kindy guide me
    Valuable answer will be rewarded
    Regards
    Rajeev Garg

    Hi,
    Pls. check for your Work Center Status in CR02 / CR03 -
    > Extras -
    > Administrative Data -
    > Status.
    Check whether it is locked or not. If work center is locked , unlock your work center from
    Extras Menu--->Status--> Lock / Unlock.
    Hope this may help you.
    Regards,
    Tejas

  • Can production order confirm in the future

    Can production order confirm in the future?(T-CODE:CO11N)
    (confirm date & time in the future)

    Dear,
    Yes you can do this go to OPK4 select your order type and plant go in details on first screen you will get field Dtae in future active this tick mark.
    Regards,
    R.Brahmankar

  • Production order release with batch management

    Dear All
    Our company are going to use batch managment. But someone told us the production order cannot be released if the component with batch managment is missing (requirment is lower than stock). Is that true?

    Dear,
    It depend upon the setting means if you want to automatic batch determination in production order for component then system will not allow to release if no batches are available.
    This setting come from MRP 2 view batch entry if you keep it blank then system will allow you to release the order with missing batch quantity also.
    Please try and come back if any issue.
    Regards,
    R.Brahmankar

  • Enhancement for Production Order Release and Batch Fixing.

    Hi Experts,
    I have assigned a enhancement for production order.The user exit is also given in the req as PPCO0001 through which i have to call a Z-Program for Batch fixing using Trans CO01 and release the order before saving once it is assigned to components.
    Now my probs is where to start working for the enhancement -is it possible to use any BAPI instead of Batch (BDC) or I can use any BADI instead User Exit.
    So if you guys have similar scenario worked on it or have similar example approach to solve it.Please do help.I will reward for all helpful answers.

    I figured out thr friends !
    Thanks,
    SriRam

  • Exit at the Production order release

    Hi every one,
        Can you please help me in finding the user exit for either CO01 or CO02 when a Production Order is released.
    I.e, when a production order is changed or created and once it is released, i want the exit at that point. i want to trigger some code once the order is released.
    Thanks
    Rich

    Hi,
    ppco0007- Exit when saving production order
    ppco0012 - Prod order display/change order header data
    ppco0005 - Storage location/backflushing when order is created
    In transaction smod, in enhancement field type a name & then press f4. In the pop up screen enter the package as co,keep the exit name field as "blank" & press enter.All the relevant exits will be displayed.
    Regards,
    Senthilkumar

  • Process to split production order based on the raw material batches

    Hi All, below is a business situation which needs some some SAP process to help overcoming this issue.
    We are working on process industry, where the core fabric (SFG) are produced from different machines and which are used as raw material in the subsequent process (Coating).  Business wants SAP to generate individual planned orders for Coating when it uses this materials
    e.g
    Current situation.
    SFG1  is the component of SFG2
    SFG2 is  the component of FG.
    When the demand for FG is 100, you get 2 planned orders  SFG1- 100 yd and  SFG2- 100 yds
    During production, the Planned order for SFG1 is split for 2 production order  each producing 50 yds each.
    Now I have SFG1 - 50 yds ( Batch A001), and SFG1- 50 yds ( Batch A002).
    Now Business wants  SAP to automatically propose 2 order for SFG2, However based on MRP it will  only show 1 planned order of 100 yds required for SFG2 since the demand of FG is 100.
    We want to split the planned orders of the higher level to look at lower level stock.
    Any ideas or thought process.
    Regards
    Sarvan

    Sarvan,
    You can have MRP propose two lots of SFG2 based upon lot sizing.  For instance, if you always will want SFG2 to have orders of 50 each, then one way to achieve this would be to set the 'maximum lot size' to 50.  MRP1 Tab of the material master.
    There are other lotsizing methodologies that may be better suited to your business requirements as well.
    Lot-Size Calculation - Consumption-Based Planning (MM-CBP) - SAP Library
    Best Regards,
    DB49

Maybe you are looking for

  • One-step checkout, possible?

    Is one-step checkout supported in BC, if integrating with a merchant account for payments? I.e. cart, customer details, shipping and payment details are all shown on the one page.

  • Canon printer IP6700D

    My printer no longer works since i did the update with os x yosemite. It says that i need the CD rom but i haven't had that in years and this is all the information i get when i go to the website for canon but doesn't help at all. what do I do now?

  • How to copy render queue settings?

    In the render queue is there anyway to copy the render and output settings from one job to another? As I have 100 renders to do of 100 green screen clips. if I create different comps for each one then I have to set many parameters for each comp when

  • One month free susbscrption

    Mail shows already activated but acount balance same cannot make call why eh

  • How to upload iPad photos to Mac Desk top

    I have a number of photos located in iPad photo album and need to transfer them to my Mac Desk Top OS X 10.7, can this be done in lieu of sending  photos via email?      Walt