Production Order : Split of variance in COPA

Hi,
I am testing the variance flow to COPA in production order settlement scenario..
Below is the cost trend of the production order.
Below is the resulting copa document whic is generated from settlement
Below are the cost element and value field assignments.(in PA transfer structure configuration)
I want to know, how the variance split happened in the COPA document. Because in cost trend , the entire variance is during GI stage.
SO this pertains to the GL account 50000 , as seen in the cost trend. How did the system split the amount in COPA document
Regards
SR

Dear Rajan,
Please find the following Link:
Transferring Production Variances:
Transferring Production Variances - Profitability Analysis (COPA) - SAP Library
Regards,
Pavan Kumar Arvapally

Similar Messages

  • Production order with $0 variance

    Hi gurus,
    I've generated the report KKS1 and I have some negative values under the variance column. This shows that the production cost is less than the finish goods so is ok. But when I take a look in the production order costing analysis, the price difference is $0. Do you know why is that so?

    Hi,
    There are several types of variance. It must be total variance that you observe in KSS1. It is calculated by comparing material standart price and actual cost of order. In production order cost analysis, what you see is the production variance.  It is calculated by comparing planned cost and actual cost of order. Consequently, the difference you observe stems from the difference between standart price of the material and planned cost of the order.
    Check the link below.
    [http://help.sap.com/saphelp_46c/helpdata/en/90/ba6235446711d189420000e829fbbd/content.htm]

  • Production order split for configurable products

    Hello
    Is it possible to convert an APO planned order for configurable product to a production order in ECC and then to split this order in ECC?
    What will be the visibility in APO regarding pegging, GATP...
    thanks in advance for your help
    regards
    patrice

    Hi,
    What strategy are you using
    Startegy 25 is used for MTO configurable material.
    Regards,
    Vishal

  • Production Order Split

    I am exploring the functionality in LOG_PP_PROD_ORD_SPLIT in our sandbox region.  We are currently at EHP 4, thus rendering OSS note 170819 not relevant.  I have activated  LOG_PP_PROD_ORD_SPLIT  via SFW5.  I am trying to split a production order for a MTO end item that is NOT batch managed.  Also, since we have ECC 6.0 EHP 4 the requirement of a product cost collector is no longer there.
    I select the operation in the parent order that I want the split to occur and always get a message "Missing by-product/missing batch for cost transfer material".  I tried creating a by-product that is batch managed. When I add that material in the by-product field in the material for cost transfer, I get the message "No batch numbers could be determined".  So now I enter a batch number and get the message "Material uses internal batch number assignment (Entry will be deleted)".  I have also tried to add an existing batch with no inventory that I manually created and get the Batch number already exists message. 
    I have not activated the business function LOG_PP_WIP_BATCH, as I do not wish to use WIP batches. 
    Questions: 
    How do I get around the fact that our MTO end items are NOT batch mangaged?  Do I use a generic by-product as the material for cost transfer?  If so, how do I get past the need to add a batch number or get the system to accept the internally assigned number as outlined above?  It is not an option to batch manage the end item.
    What is the purpose/reason for needing this material for cost transfer to be batch managed?
    Thanks for any help you may be able to provide.

    Shrek66 wrote:
    I am exploring the functionality in LOG_PP_PROD_ORD_SPLIT in our sandbox region.  We are currently at EHP 4, thus rendering OSS note 170819 not relevant.  I have activated  LOG_PP_PROD_ORD_SPLIT  via SFW5.  I am trying to split a production order for a MTO end item that is NOT batch managed.  Also, since we have ECC 6.0 EHP 4 the requirement of a product cost collector is no longer there.
    >
    > I select the operation in the parent order that I want the split to occur and always get a message "Missing by-product/missing batch for cost transfer material".  I tried creating a by-product that is batch managed. When I add that material in the by-product field in the material for cost transfer, I get the message "No batch numbers could be determined".  So now I enter a batch number and get the message "Material uses internal batch number assignment (Entry will be deleted)".  I have also tried to add an existing batch with no inventory that I manually created and get the Batch number already exists message. 
    >
    > I have not activated the business function LOG_PP_WIP_BATCH, as I do not wish to use WIP batches. 
    >
    > Questions: 
    > How do I get around the fact that our MTO end items are NOT batch mangaged?  Do I use a generic by-product as the material for cost transfer?  If so, how do I get past the need to add a batch number or get the system to accept the internally assigned number as outlined above?  It is not an option to batch manage the end item.
    >
    > What is the purpose/reason for needing this material for cost transfer to be batch managed?
    >
    > Thanks for any help you may be able to provide.
    Hi,
    Assume you have to do 5 operations to get the product
    creating the production order .
    confirm the first two  operations using Co11N
    now open the production order in the change mode using Co02
    In production order operation overview, select the operation 0030 and go to functions menu and click on split order.
    System will display a  screen with all parameters for order split.
    enter split quantity and order type(you can select different order type for child order)
    Click execute Split Order
    operation quantity for the current order will be reduced based on the split quantity
    Balance quantity would be assigned to the new production order created because of order split .
    Regards,
    Raj

  • Production order splitting

    Dear All ,
    We have discrete Mfg scenario.
    Say i have created a production order for qty 100 with Prodn version 01 in Workcenter W01.
    I have partially confirmed 50 Qty for the same in confimation .
    Now remaining 50 qty have to be confirmed by using Prod Version 02 in workcenter w02.
    How to carry the same ?Pl guide
    regards

    Dear,
    It can be possible though the  business function
    LOG_PP_PROD_ORD_SPLIT.
    to split an order using the entire open order quantity or the open operation quantity.
    Example: A production order has a planned quantity of ten pieces. All operations of the order are already partially confirmed with a quantity of one piece. Therefore, the order quantity and the operation quantity that are still open both amount to nine pieces.
    If you specify nine pieces as the split quantity during the order split you can use the another production live for it also.
    Please refer this link for details,
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/95/21a524ec9c40c8840f7cef07d3ef32/frameset.htm
    Regards,
    R.Brahmankar

  • Production variance in COPA

    Hi All,
    We are settling production variances to COPA and We have 3 values fields in COPA,Material Variance,production labor variance and Other variance.
    Variance categories are mapped to material, labor variance and others value fields.but i dont see any labor variances in Variance value field.i have reviewed and this is becuase of Variance categories.which are not one to one mapping to value fields.
    we have 9 Variance categories mapped to 3 value fields.
    client requirement is labor variances to settled to Variance value field,material variance to Material value field and Overhead and other variances to settlement others value field.is this possible?if yes.how can i do this?
    Any help is appreciated.
    Thanks,
    Anusha

    Hi,
    As explained earlier by other forum colleagues,variances captured at production can be assigned to COPA under value field.This assignment is happening through PA transfer structure for variance settlement.
    Normally this can be defined broadly into 2 categories : 1.Cost element and 2.Variance categories.
    After looking at your requirement,your main interest is in cost element based production variance push to COPA for reporting.i.e.Labor variance.
    Production order shows this variance under secondary cost element labor and difference between target/actual.COPA transfer structure doesn't push 2 seprate values (target/actual) ,whereas only delta gets posted.
    I feel your requirement is not possible through PA transfer structure.
    I would suggest,you push cost center specific labor expenses under new value field,capture cost component wise break up of standard cost udner different value field.
    Comparision of cost center expense and labor part of standard cost will provide you expected value.
    I know this complex thing to do,so discuss with client do they really want from COPA?
    Same reporting they can get from cost cente i.e.expense posted(labor ) and absorbed on product under secondary cost element.
    regards,ashok

  • Production order and Variance

    Hi,
    I need some clarifictions on production order settlement and variance.
    Our PP consultant created one PO.Before release of PO they took standard cost estimate it is showing 9000. In this stnadard cost estimate we are calculating the scrap credit also and scrap credit 1000 and we are mainting for cost center also for scrap credit.
    while doing of production of settlement we saw that actual amount is 11000.
    As per my knowledge When the production order settlement scrap debit also should settle to scrap cost center. Then our scrap cost center will be 0. But everything is settle except scrap and it is not giving any error also. My doubt is whether scrap is settled or does it was clubbed to any other receiver.
    One more question. Why we have to settle the order and why we have to run the variance for order. Does it provides any advantage to the management.
    Please guide me deeply.
    It is very urgent for me.
    Thanks in advance

    Hi Sateesh
    please check the distribution rule for settlement, you may have put 100 (Full) settlemnt for 1st  Receiver type say Material
    Enev if yo maintained two receiver type in order then also if the first one is Full settlement then system will not able take the second receiver type
    I think it is going to your 1st receiver type
    Thanks
    Ansuman

  • Input Quantity Variance and Input Price Variance for Production Order

    Dear All
    I am running variance program KKS2 for calculating variance of production order. for Activity variances are coming under input price variance and input quantity varinace but for material the variances is now shown separately for quantity and price rather it is shown as variances total amount. Can someone help me in know why material quanitty variance and price variance not shown separately
    Regards

    How does input variance and output varia.nce will be calculated on the settlement of production order after TECO.
    VARIANCE CALCULATION DEPENDS ON CONFIGURATION IN THE FOLLOWING AREAS,
    1) VARIANCE VARIANT -  DETERMINES WHAT VAREIANCE CATEGORIES ARE CALCULATED, E.G MATERIAL PRICE , USAGE, LABOUR RATE , USAGE VARIANCE ETC..
    2) TARGET COST VERSIONS
    3) VALUATION VARIANT FOR WIP  AND SCRAP
    Can we check in KOB3 or COOIS.
    KOB3 -  YES
    COOIS -  CHECK IN COST REPORT

  • Expected yield variance in production order

    Hello,
    The issue is when we confirm the order operation wise, an error Message no. RU139 is coming, however the production order "expected yield variance" field is 4 and the order quantity is 1.
    GR is not taken place, hence delivered qty field is 0.
    The solution i have proposed is to check the "Unlimited Overdelivery " check box in production order screen to allow the excess confirmation.
    please suggest, How the field "Expected yield variance" is filled up in production order? because of this field, the error RU139 is encountered though we have not entered yield in confirmation (ZERO yield is given).
    The confirmed quantity is 5 (here thre is uncertaininty that how the system allowed to enter 5 when the check for over delivery is set as an error)
    please suggest or close the thread
    Regards,
    Santhosh
    Edited by: SANTHOSHCH on Jul 31, 2010 7:10 AM
    Edited by: SANTHOSHCH on Aug 6, 2010 5:38 AM

    dear santhosh,
    Check in opk4 confrmation parameter, In the genereal valid setting tab, over delivery, Change the over delivery not checked to Error when over delivery tolerance is exceeded. If U make this setting, system won't allow the overdelivery while confirmation
    Regards,
    Sundaresan

  • Production order Settlement to COPA

    Hi,
    How production order settlement will flow to COPA? Kindly help me by providing the Process flow for this.
    I have ticked on settle to settlemtn COPA in settlement profile, and also assigned Pa transfer structure to profile, then system give below error
    Enter a PA transfer structure
    Message no. KD044
    Diagnosis
    A PA transfer structure is required for settlement to profitability
    analysis.
    If any body has any idea then pleas inform me.
    Harry

    Hi,
    Please ensure that following:
    1. Create the Settlement Profile. Make sure the settings are correct like valid receivers Segment should be made mandatory.
    2. Make sure that the allocation sturcure is created correctly with all the cost elements and value fields
    3.  Please assign this allocation structure to Settlement Profile
    4. in KOT2 assign the settlement profile to Order type
    Once this is done, you are through with the settings and you will be able to do the settlement
    Best Regards
    Surya

  • Production order not settle correctly

    Hello Guru,
    PO70 in the closing steps showing the balance of production jobs that settled in the current month.  Normally the account holds hundreds of records for thousands of dollars.  February close had approximately 10 records for $.05. 
    1. How Can I  check to make sure the settlement is working properly into account 5049000 which is Production Variance Clearing Account?
    2. We had 5000 production orders settled in September, 2013 and only  1500 settle in February, 2014. What could have caused this? How can I reslove and go about this issue?
    Thank you.

    Hi Adelkunle
    While running variance cycle or settling the production orders, are you getting any error messages. Check the logs.
    Also from business point of view and also based on status of the active production orders, it is quite possible to have low number of production orders settling to variances, in the current period. I do not see any technical issues in this, unless I have no complete understanding of your issue, in which case, I wish if you can please elaborate more on the issue, on technical side.
    Regards
    Mustafa

  • Assemble-to-order with spliting the Production Order

    Hello,
    I'm new to SAP and we just implemented the SAP System.
    My Experince is from one year as Process Owner for PP in our Project.
    I have a specific Question regarding the assemble to order process.
    So far we did not implemet Capacity Planning in the System, but I would like to use it.
    The Idea is the following:
    1. There is a sales order coming for 1pc of Product. The scheduling is carried out, ATP-Check and so on. The production order is created and at least the capa is placed on the end of the chain (using quetimes). One Product needs 60min to assemble.
    2. more orders are comeing in, all consuming 60min of capa on that day. If the capa is used, move to later date until capa is back again. this also should be now Problem to set as far as I understand what I have learned already  
    3. What i do not like... If I get orders with too many qty.... I would like to hav a maximum qty. where the order gets splited and moved forward to the next day... so... Customer orders 10, 5 are placed on Tuesday, 5 on wednesday and so on.
    Each of those "Splits" should have one production order header.
    Any idea how I can reach that?
    Thanks, hope I will find a solution
    BR Marian

    Marian,
    Standard ERP Sales order ATP cannot be made to confirm Sales orders based on capacity availability.  All capacity related conflicts and resolutions are done during dispatching, which is a separate step.
    If you need SO ATP to consider available capacity while confirming the Sales order, you could use functionality that exists in APO.  Otherwise, in ERP, you are facing custom development.
    Assemble to order in general is restrictive as to what types of scheduling can be permitted.  There is no automatic production order splitting in standard SAP ATO.  Some manual manipulation is permitted.  Of course, with custom development, you are only limted by your imagination.
    Best Regards,
    DB49

  • SAP B1 9.1 PL 05 Production Order Summary Screen

    Hi All,
    Has anyone noticed a change in the SAP B1 Production Order ? The Variance Per Product and Variance % no longer appear.
    Have these fields been moved to a different location?
    This may affect upgrades for clients who use production orders from older versions 8.8, 9.0.
    Is there any explanation given in any of the documents?
    Kind Regards,
    Robinson.

    Hi Nagrajan,
    I already did and I was  quite surprised. That is not the reality in version 9.1 PL05.
    This description is true for SAP B1 8.82 and 9.0. The fields in 9.1 are different.
    See screenshot and compare.
    Kind Regards,
    Robinson

  • GR quantity less than Production Order quantity

    Hello all
    I am working at a client where they produce Make-To-Order items specific to a Sales Order by triggering an Assembly Order (Production Order).
    Now I am facing a tricky situation & hence want some advice from you guys.
    In a generac scenario when an order comes for a MTO material ABC, a Production Order is triggerred for that item.
    I can navigate to this Production Order from the Sales Order > Schedule Line tab (Just FYI)
    Now once the Production Order is confirmed for each Operation on the floor using CO11N, the material is receipted in the Inventory & the requirement gets fulfilled.
    Now sometimes the Production Order is Goods Receipted for a Lesser quantity as compared to the Production Order Quantity.
    e.g. Sales Order Quantity = Production Order Quantity = 3 EA & the Delivered Quantity (GR qty) = 1 EA
    In such a case, in MD04 the system still shows an open requirement for 2 EA on the same Production Order Number
    Is there a way to trigger another Production Order for the remaining quantity automatically ?
    If anyone can share their thoughts proposing possible solutions to handle such a scenario, it would be a great help.
    I am an SD consultant & hence cant think ways to handle the scenario & propose it to the Business.
    Any help will be appreciated
    Thanks
    Vin

    Hello
    Thanks for all your replies.
    As of now the 1st scenario is no more an issue. The business process is modified to fix the problem.
    Now my main problem is the 2nd scenario which I will explain better here.
    In our scenario MTO items when placed in a Sales Order triggers a Production Order.
    This Production Order needs to be confirmed for each operation & at the final step the MTO item is pushed into the inventory.
    The Production BOM & the operation overview for the MTO item is as shown below:
    E.g.
    Operation Overview:
    Operation            Work center                  Control key
      0010                    Prod                               PP01
      0020                    Pack                               PP01
      0070                    Confirm                          PP03
    Routing:
    Item                Material             QTY        Unit            Operation
    0010               ABC                  100         G                0010
    0020               XYZ                  10           G                0020
    Now as shown above, the business users who produce the MTO item will confirm operation 10 & consume raw material ABC at the Work Center = Prod.
    Then at the Work Center = Pack, the packaging material is used & operation 20 is confirmed.
    Finally after the packing is done, at the Work center = Confirm, the operation 70 is confirmed when the MTO item is receipted in the Inventory.
    Before it is receipted at the Confirm work center, a user monitors the quality of this produced item. If it is good only then it is receipted in the inventory.
    Now depending on when the Sales Order is fulfilled, this MTO item will be shipped.
    Issue:
    Now when the MTO item produced passes thru the high level quality check, it gets receipted in the inventory at operation 70.
    However in a case where the some or all the qty of the MTO item ordered doesn't pass the quality check, they will be scrapped physically.
    Thus my understanding is that e.g. 3 qty of the MTO was ordered & 1 got rejected, then the user confirming the step 70 will enter YIELD = 2 ea & Scrap = 1 ea and do the final confirmation.
    This means that the original demand of 3 ea is still incomplete. 1 Ea still need to be made as a Sales Order Stock.
    Now the function needed is that the system should automatically generate a Production order for the remaining 1 Ea as a Sales Order stock.
    I dont know if this can be achieved by receipting the 1 EA as REWORK on the CO11n screen at operation 70.
    Also I am not sure if Production Order Split case would work in this case.
    I would need some input from all the PP gurus. Any solution which be close to what functionality is needed will be greatly appreciated.
    Thanks
    Vin
    Edited by: vinit parkar on Mar 3, 2010 5:04 PM

  • Production Order Variance Split based on Cost Component Split

    Hi All,
    We want the material/labor/overhead variances on the production Order to go to different value fields in the P&L.
    We will be issuing Actual Material/Overheads to the Production order and there will variances for both Material and Overheads due to differene in Standard and Actual Qty issued.
    But Standard SAP Variance Split Functionality will club the Material/Labor/Overhead Variances as Input Qty Variances so we cannot split it into different lines in the P&L.
    Any ideas on how this can be done.
    Thanks and regards,
    Ankur

    Hi Ankur
    Its not possble in FI, but certainly possible in COPA
    Create as many assignment lines in PA Trf Str as your Cost Comp Structure...
    Assign the relevant GL/Cost ele in the SOURCE and choose the radio button "Costs/Revenues", instead of "Variances"
    You can then assign each assignment to a separate Val Field in COPA
    br, Ajay M