Project Systems - Quantity withdrawn with reference to network

Here material is assigned to network. The requirement is 10 nos. But when the quantity is withdrawn from warehouse (mvt 281), it is 15 nos. Now we have withdrawn 5 nos more than requirement.
Can I cofigure my system so that quntity should not be withdrawn more than the requirement ?

Hi,
I have checked this in system. SAP allows to issue more quantity against reservation. To restrict this you will have to go for some development. Look for any userexit available.
Reward points if helpful.
Regards
Message was edited by:
        Shrikant Rakate

Similar Messages

  • Contract with Reference Purchase requisition

    Hi experts,
    i created one pr from project system , pr quntity  1000 ea , i created quantity contract with reference to pr, quntity contract quantity is equal to pr quantity,now i am creating another contract with reference to same pr but i am not getting
    any warning and error message like already contract exits for this pr, is any option  to get error message when i am creating second contract.
    regards
    G.vijay kumar

    Hi
    Kindly check following any one of the message would works.
    Materials Management > Purchasing > Environment Data > Define Attributes of System Messages
    06     042     Target value of contract & exceeded by & &
    06     060     Document type/item category &/& (PReq) <-> &/& (contract)
    06     106     No requisition items selectable for contract type &1 item category &2
    You need to set error or warning message:
    Regards
    Shrinivas

  • Production order-Project system

    Hi
    How can planned order can be converted into production order in project system
    Regards
    Suresh

    Hi
    With manual selection the system lists all the valid task lists that exist for the material at the time of copying and that should be selected according to the selection ID. You can select the required routing from this list.
    Working Without a Routing
    When you work without a routing the system automatically generates an operation. It proceeds as follows:
       If default values have been maintained for the automatic generation of an operation the system uses these values to generate an operation automatically in the order.
       If no default values are specified in Customizing the system generates an operation with the control key 0001 and the operation number 0010.
    <b>If a routing must be selected but no routing can be selected then the system reacts with a termination message and you must carry out order creation again.</b>
    Further information please refer the link
    http://help.sap.com/saphelp_47x200/helpdata/en/b1/c04182439a11d189410000e829fbbd/frameset.htm
    Regards
    Ramakrishna

  • SAP R/3 4.7 Enterprise Project System(PS)

    Hi,
            I have to do achieve following four tasks for four integration scenarios :
          1. Create a Project in Project System.
          2. Create a Network in Project System.
          3. Create an Activity in Project System.
          4. Update an Activity on Project System.
    I want to know the following :
         1. Which BAPIs to use?
         2. How to import these BAPIs in my integration repository.?
    Thanks in advance.

    Go to transaction BAPI in R/3
    <i>1. Create a Project in Project System.</i>
    Project System -> Project Definition -> CreateFromData ->  FM: BAPI_PROJECTDEF_CREATE
    <i>2. Create a Network in Project System.</i>
    Project System -> Network -> Maintain -> FM: BAPI_NETWORK_MAINTAIN
    <i>3. Create an Activity in Project System.</i>
    Project System -> Network -> Maintain -> FM: BAPI_NETWORK_MAINTAIN, this has activity create
    <i>4. Update an Activity on Project System.</i>
    Project System -> Network -> Maintain -> FM: BAPI_NETWORK_MAINTAIN, this has activity update
    <i>I want to know the following :</i>
    <i>1. Which BAPIs to use?</i>
    mentioned above.
    <i>2. How to import these BAPIs in my integration repository.?</i>
    Double click on your SWCV, click the radio button <b>import RFC and IDoc interfaces from SAP Systems permitted</b>, then enter your R/3 System ID and client number. Save and activate. Then you will see new item under the SWCV
    Imported Objects
      RFC
      IDoc
    Right click on Imported Objects and in the pop up mention R/3 system host, system number, userid and password.
    regards
    SKM
    Message was edited by: SKM

  • Delivery from Project with reference to sales order

    Dear All,
    I am facing problem in delivery. In my case scenario is-
    1. There are 10 materials with 20 quantities.
    2. I create a sales order only for two material with 5 quantities and enter wbs element number.
    Now when i use CNS0, enter sales order number and wbs elelment number system shows all 10 materials that I dont want means I want the materials that are included in sales order. Please help me how to control this.

    Please read SAP Help for a better under standing...
    I mentioned below a line from SAP help for your info.
    ...... it selects material components, the system takes components into account that have been assigned to either a network or ...... ...
    Please follow the below path to access the help..
    SAP Help Portal >>> Logistics >>>> Project System >>> Material >>>> Delivery from Projects......

  • Delivery note with reference to sales order - 0 quantity items

    Hi all,
    our system allows items with quantity 0 to be created in delivery notes with reference to sales orders.
    This happens when some items in a sales order are out of stock while others are availiable. The unavailable items are included in the delivery note, but have quantity 0.
    The requirement is to eliminate this behavior and to create delivery notes with availiable items only.
    I would be grateful for any advice how to realise this.
    Best regards, Andreas

    Make the necessary configuration i.e. Check quantity 0 field value should be maintained as B in the respective delivery item category using transaction 0VLP.
    Regards,
    GSL.

  • How to control Order/Target Quantity with reference to Contract Quantity

    Hello GURUs,
    In my current organization, there is one scenario in which i have to control target quantity in sales contract e.g., i have created sales contract of 100 MT (contract no : 123), and with reference to that contract i have created another contract for say 100 MT (contract no : 456), after that i have changed quantity (of contract no 456) to 150 from original quantity 100. In this case system allows to do so, which is not correct, and i want same to be control based original contract quantity.
    Is there any solution in standard system to control the same? If there is any then pleas let me know.
    Thanks,
    Pratik

    Hello,
    Let me clarify your requirement:
    You have created Contract no. 456 (100 MT) with reference to another Contract No. 123 (100 MT).
    Now you want that system should not allow to change quantity in Contract no. 456 & keep it as it is (100 MT) in Original Contract No. 123.
    Now, if the above requirment is from Sales Order created with reference to Contract then it can be easily don thru Item Category Controls.
    But as the second COntract (456) is entirely a new Contract with it own contral parameters (validity dates, etc) system will allow you to change Quantity & other feilds).
    You requirment is not standard & will have be achieved thru applying a User Exit. Speak to your ABAPer & he would do the needful .
    Hope this helps,
    Thanks,
    Jignesh Mehta

  • Default quantity = 2 pcs. in POs with reference to contract

    Hey gurus,
    we have a material "A". Its base unit of measure is (and has to be) piece. Now, we have a contract for this material.
    Normally we order this material in pairs (2 pieces) with reference to the contract, but sometimes only 1 piece has to be ordered.
    Now I would like the system to give me a default quantity of 2 pieces in the PO. But I also want to be able to manually change this to 1 piece.
    Is this possible?
    Thanks in advance
    Alicia

    enter a rounding rule in your material master  or info record, that always round to 2.
    SAP will then round the qantity to 2 when you create the PO, but if you overwrite again with 1, then SAP keeps this new quantity.

  • Estimation in Projects with reference to materials and expenses

    Dear Experts,
    Currently am undergoing a project implementation for a manufacturing industry also a construction firm. The client has a specific requirement from project system. They get a various constructions projects inquiry (they also deal with this scenario) based on that they want to calculate the material's cost, processing time for that project as well as the project general expenses. Based on this they want to trigger the estimation for the client. Also they want to calculate analytical estimation of the project.
    Could anyone explain me how to encounter this scenario in PS. As this is a challenging task i would require your expertise.
    Can we do estimation from PS with reference to materials, resource as well as expenses.
    Is this something to do with cProjects?
    Kindly do the needful
    Thanks and Regards
    Praveen B M

    use Sales Pricing and quotation creation functionality....you can read it here http://help.sap.com/saphelp_erp60_sp/helpdata/en/aa/96853478616434e10000009b38f83b/frameset.htm

  • Project system: Purchase requisition coming from Networks

    Dear Experts,
    I have a tricky problem. I want to exclude a specific number range for purchase requisition coming from the Project system.
    The current number range I have for the purchase requisition is let say: 10000000 - 19999999.
    I want to use another number range (50000000-59999999) for the purchase requisitions as an impact of material components of an network activity.
    What I've tried but it is not working properly:
    1. TC: OMH7 - I created a new number range as I mentioned above
    2. TC: OMEB - I've copied the document type NB to a new document type ZNB (NB = ZNB)
    3. TC: OPTT - as last step I've assigned the document type ZNB to the order category 20 (network)
    Please advice ASAP
    Thanks a lot in advance

    It should work as it works fine for me.
    1. You create the Internal number range (50000000-59999999) first and number it with an ID.
    2. Create the ZNB document type and assign the number range number (i.e., two-character ID)
    3. Assign this ZNB in OPTT
    If I've repeated what ever you've done/said, check the settings once again. It should work.
    Regards
    Sreenivas

  • Sales Order is not creating with reference to Quantity Contract.

    Dear SAP Experts,
    I am creating a Sales Order with reference to quantity contract but system showing an error *"""Material SUG10051 does not exist in RG1 Table for Excise Group 42 - Message no. ZCOMM002"""* i am not getting y system showing this error because all the necessary configuration for series group is maintained already.
    Please advise me what should i do.
    Looking forward for your quick response on the same.
    Regards
    Parul Deshwal

    Hi
    As per STD SAP, all billing items will be updated in RG1 register.
    The control is in J1ID where you have to select "Material and Chapter ID combination" and choose the tab "Material type".
    There against the billing material code, maintain "F"
    Also check setting
    IMG --> Logistics General --> Taxes on Goods movements --> India Check Basic Settings, Master Data, A/c deteremination, Business transactions and Tools.

  • Sales order creation with reference to check quantity according reference

    Hi,
    I create return sales order with reference. But the problem is that system can not check the quantity of creation sales order according reference quantity now. I want the system check the quantity according reference sales order quantity and do not allow to put sales order quantity more than reference sales order quantity.
    Thanks.

    hi,
    please check the below thread
    Return Quntity is more the sales Quantity?
    this may help you
    regards
    senya

  • Depot  Excise Invoice with reference to Delivery from project

    please understood my requirement
    Normal Depo Sales is like VA01-VL01N-J1IJ----VF01 here whatever excise values captured in J1IJ those values come to the commercial Invoice.
    As per My requirement we are creating Project and while creating sales order we have to assign WBS element.
    now Project -Delivery--Excise Invoice J1IJ
    Sales order -
    Inovice VFO1
    my question is how excise and commercial Invoice values come together.
    regards
    etr

    Hello Amol,
    you can create with reference of the deliveyr document. in J1iin trnsaction you have the option in the header tabs of create from delivery
    enter the delivery and create the excise invocie
    Hope this helps
    Thanks
    akasha

  • Sales order create/change line item with reference to contract - Open quantity not getting deducted for copied line item from the contract

    Hi friends,
    Please provide some valuable inputs for the following scenario:
    When a sales order line item is created(VA01) or changed(VA02) with reference to a Contract the open quantity is deducted in the contract which is a standard functionality. If the referenced line item is copied (custom enhancement to copy line item), then for the copied line item the open quantity is not getting deducted instead ATP quantity i.e. Available-to-promise is deducted.
    Any inputs on how we can fix this functionality i.e. deduct the open quantity from the contract for the copied line item?
    P.S. : Custom enhancement to copy line item is working fine, but open quantity is not getting deducted if the copied line item was referenced to a contract.
    Thanks,
    Sandeep
    Message was edited by: sandeep

    Sandeep,
    Yes, that was my original interpretation.  I was having a hard time believing that someone would ask such a question. 
    I guess, then, that you already know that you will have to add this logic to your enhancement. You should create your specifications and hand them off to a developer; ideally the one who created this enhanced solution in the first place.
    I do not provide advice in these forums about details of enhanced solutions.  Perhaps one of the other members will be more willing to do your work for you.
    Best Regards,
    DB49

  • I have created a quotation in CRM system. I want that to be downloaded into ECC, so that, I can create a sales order there with reference to that quotation. So, what are the parameters that I need to set in CRM system so that my quotation gets replicated?

    Dear Experts,
    I have created a quotation in CRM system. I want that to be downloaded into ECC, so that, I can create a sales order there with reference to that quotation. What are the parameters that I need to set in CRM system so that my quotation gets replicated without any error?
    Please help me in this regard. An early and in detail step by step guidance is highly appreciated.
    Thanks,
    SMTP

    It may be best to recreate the folder and the smart playlists from scratch.
    tt2

Maybe you are looking for

  • How to identify date & time of insertion of rows in a table

    Hi, Is it possible to identify the date & time of insertion of rows in a table? for example: Table name: emp I have rows like this emp_code name dept pr01 ram edp ac05 gowri civil pr02 sam pro i want to know the date and time of the insertion this( a

  • If I buy Lightroom for PC, can I still use it if I switch to a Mac in the future?

    If I buy Lightroom for PC, can I still use it if I switch to a Mac in the future? I want to use Lightroom now, but don't want to pay for it again if I start using a Mac.

  • Restriction on subtotal in ALV

    Dear ALL I have requirement like for one particular column in ALV report subtotal should not be enable only sorting can be done . If user clicks on subtotal button for that particular field then system generated message should come subtotal on this f

  • Certain Audio Not Working

    I got this macbook in late December and starting a few days ago certain audio won't work. The noise when you empty the trash can, or the noise when you can't click doesn't go off, when using photobooth it'll count down but the shutter won't go off. I

  • Webserver on NT or Linux

    Hello folks.. Right now I am running Forms and reports(Developer server) on Web using the Oracle Web server on a NT environment which is giving me reoccuring problems.. 1)Can i achieve the same using a more stable Apache Web server?. 2)Or i stay with